Professional Documents
Culture Documents
Operation Manual For TP-800B Microcomputer Rapid Sulfur Analyzer
Operation Manual For TP-800B Microcomputer Rapid Sulfur Analyzer
analyzer
1
1. Overview
Smart a cervix sulfur, mainly used for determination of total sulfur in coal, steel, and
various mineral content. Therefore, the equipment is available for coal, electric
total sulfur in coal" coulomb titration principle design. This method is based on
iodine coulomb titration agent, all the testing process USES the microcomputer
automatic control, and by the microcomputer to a variety of correction and the test
data, the Chinese show the percentage content of sulfur in coal, sample weight, date,
time, number, and print the results. Each time for about 5 minutes. Than the method
currently used hona ralf suess card weight analysis method and high temperature
burning neutralization method is rapid, accurate and intuitive. This machine use
color touch screen input data, intuitive and easy to operate, intelligent human
nature, etc, and is now in general use laboratory sulfur ideal measuring instrument.
tubes.
The stability of the instrument: boot after 20 minutes, the machine circuit at steady
state
2
3.Conditions of use
Ambient temperature: 5 ~ 40 ℃
Installation environment: indoor should not have the intense heat, cold or corrosive
air, should as far as possible away from strong electromagnetic field equipment, do
Carrier gas: dry acidic oxides of purify air, flow rate of 1000 ml/min.
Coal sample: particle size is less than 0.2 mm, each weighing about 50 + 5 mg.
Reagent, potassium iodide, potassium bromide, ice acetic acid are analytically pure;
Tungsten trioxide (or tungsten trioxide), sodium hydroxide as the chemical pure;
potassium bromide, after waiting for it in 250 ml of distilled water, then add 10 ml
ice acetic acid. Electrolyte can be repeated use, with the length of time according to
the number of repeated use and the sample is high and low in sulfur and calm, but
make a iodine iodine ion in the electrolyte on the electrode potential of the
Coal sample preparation: on the porcelain boat said take 50 + 2 mg of coal sample,
according to 0.1 mg, the thin covering a layer of tungsten trioxide or tungsten
trioxide, attention should be directly in the porcelain boat on weighing, cannot use
weighing, ensure the accuracy of weighing is the premise to guarantee the accuracy
of the results.
3
5.The installation of the instrument
The instrument is put on the workbench. Will open the instrument side cover, silicon
tubes in the furnace, and both ends are placed in (in furnace and the oven), the
steps of refractory baffle carefully pick good silicon tubes, lead by load line on the
receiving terminal. Insert the reducer silicon tubes, and put on the steps of the
furnace, should and must be seen from the mouth reducer is in place, then tighten
Put the thermocouples inserted into the furnace surface thermocouple hole, fixed
The electrolytic cell of the air to purify the air in the socket.
Air pipe connection. According to the air purification device schematic will purify
device inlet with latex tube and electrolytic cell cover the outlet connection; The air
outlet on the purification plant latex tube connected to the furnace; Use the left side
reducer of furnace body, silicone tube and electrolytic cell inlet connection.
Deliver and install to quartz boat. To deliver great twist into the magnetic stripe.
Make rods on the oven door and directly in order to ensure a smooth landed on a
straight line. Then adjust the bar directly from high temperature furnace.
Connect the power cord: it is better to open, power cords, 220 v power supply,
grounding line.
6.Test steps
Open the host power supply, put the instrument to heat up.
For furnace temperature to 900 ℃, can open air pump, will put liquid electrolyte by
pipe to the electrolytic cell, and then put fluid pipe clamp good, check the
electrolysis pool of rubber plug must fort tight, close two-way valve again, to check
up on the gas tightness of electrolytic cell. Float down to near the bottom, such as
Open the stirrer, stirring speed adjustment, in the case of ensure not lose step makes
4
stirring speed as far as possible big, in principle, the higher the speed, the more
the rotating magnetic field are not synchronized with the blender stirring rod
Open the two-way valve, adjust knob of the flow meter, gets the flow rate of 1000
ml/min.
Keep ventilation state waiting for furnace temperature reach the set temperature, to
dry gas path, prevent moisture absorption sour gas in the gas path.
The first thing to do first sample 1 ~ 2 waste, the purpose is to balance the
content display screen appears. As soon as possible in order to not affect balance
dedicated to do sample. Without weighing waste samples, but it must be like formal
Waste sample test is completed, can begin formal experiment. Such as two
experimental time interval greater than 5 minutes, advice and burning waste sample
at a time.
Test completely, can shut down the host power supply directly.
Open the electrolysis pool of rubber plug, loose open fluid tube, release the
5
7. Operation method
Turn on the power switch and the instrument enters the main interface first.
Click the item that needs to be modified to input parameters, and then press
6
The rest of the work is done automatically by the instrument. When the test is
finished, the test data will be printed automatically and the test results will be
7
"Analyze" directly enters the next test input interface.
8.Equipment maintenance
The instrument should be protected from dust and corrosive gases and used in
a dry environment. If it is not used for a long time, it should be covered with a
plastic cover and taken out and connected to the power supply regularly to
damage.
A small amount of loose absorbent cotton should be added to the air path,
which is generally added in the pipeline on the right side of the two-way valve,
in order to prevent the flying ash from entering the glass molten plate of the
electrolytic cell with the air flow and causing blockage. When black precipitates
appear on sintered glass melting plate and its pipeline, it should be cleaned in
time. The preparation method of washing solution is: use 5 grams of potassium
dichromatate and 10 ml of water, heat and melt to cool down and slowly add
100 ml of concentrated sulfuric acid. The washing solution can wash the black
If sintering glass plate is cleaned, the flow rate of the flow meter instructions still
amounted to less than 1000 ml/min, or 1000 ml/min can be obtained, but the
fuse board without bubbles or very little bubble, need to check each part of the
the latex tube, silicone tube, gas purge line of rubber plug and the place such as
electrolytic cell.
Do not touch the platinum pole of the electrolytic tank by hand, otherwise it will
the terminal control will fail, which often leads to overtitration. Use day long or
8
because of other reason the surface is stained, can use alcohol or acetone to
scrub, also can use toothpaste to grind its surface, rinse with clean water finally.
The discoloration silica gel installed in the purification device shall be replaced in
time after complete discoloration to prevent water vapor from entering the
When adding the electrolyte and washing the cell, do not sprinkle the solution
on the plug and socket of the agitator, otherwise the terminal control will fail. At
this time, use ethanol or acetone to scrub the electrode. The plug of the cell shall
Standard calibration is carried out every 3-5 days to check whether the
t214-2007 as follows:
Reproducibility critical
Total sulfur mass fraction Repeatability limit
difference
St /% St,ad /%
St,d /%
11