[Company Name]
[Address company]
Phnom Penh - Cambodia
[Phone Contact]
[Email Address]
PROJECT :BUILDING
CLIENT :
LOCATION :Phnom Penh Cambodia
PACKAGE : PRELIMNARY,BORE PILE ,STR,ARC,MEP
REVISION : REV-00
Friday, February 24, 2023
[Email Address]
CLIENT :
PROJECT :BUILDING
LOCATION :Phnom Penh Cambodia
PACKAGE : PRELIMNARY,BORE PILE ,STR,ARC,MEP
REVISION : REV-00 Friday, February 24, 2023
SUMMARRY
AMOUNT (US$)
ITEM DESCRIPTION TOTAL AMOUNT (US$) REMARKS
MATERIAL LABOR
TOTAL FLOOR AREA 1,323.48 m²
1 Bill 01.PRELIMINARY WORK $ - $ - $ - -
2 BILL-02.BORE PILE WORK $ - $ - $ - -
3 BILL-03.STRUCTURE WORK $ - $ - $ - -
4 BILL-04.ARCHITECTURE WORK $ - $ - $ - -
5 BILL-05.MEP WORK $ - $ - $ - -
TOTAL $ - $ - $ - -
GOOD WILL DISCOUNT $ -
GRAND TOTAL $ - -
WITH VAT 10% $ - -
GRAND TOTAL WITH VAT : $ - -
Checked By
Prepared By Confirmed and Approved By
Name: .......................
Name: ................................. Name: ______________
Position: ......................................
Position: .................................. Position: ______________
Date: ............. ....., 2022
CLIENT :
PROJECT :BUILDING
LOCATION :Phnom Penh Cambodia
PACKAGE : PRELIMNARY,BORE PILE ,STR,ARC,MEP
REVISION : REV-00 Friday, February 24, 2023
Bill 01.PRELIMINARY WORK
TEMPORARY FACILITIES
Site office for Contractor included meeting room,
chairs, tables, internet connectionm, air-con and lot 1.00 $ - $ - $ - $ - $ -
stationary.
Temporary sheds for the storage of materialsm
lot 1.00 $ - $ - $ - $ - $ -
tools and equipments
Temporary Sanitary Accommodation included
lot 1.00 $ - $ - $ - $ - $ -
sealed setic tanks and its connection
Temporary fencing (H=2.5m) m 30.50 $ - $ - $ - $ - $ -
Temporary accommodation & transportation Month 9.00 $ - $ - $ - $ - $ -
Project Signboard & hoarding lot 1.00 $ - $ - $ - $ - $ - Exclude
CONTRACTOR EQUIPMENT & TOOL
Cranage Month 9.00 $ - $ - $ - $ - $ -
Scaffolding, and staging outter building boundary
m² 1,556.50 $ - $ - $ - $ - $ -
L=55m with Height (From GF to RF= 28.3m)
PAPER WORK & MANAGEMENT FEE
Site management & Field Engineers Month 9.00 $ - $ - $ - $ - $ -
Shop drawing, submission and hand over lot 1.00 $ - $ - $ - $ - $ - Included
As-built drawing, submission and hand over lot 1.00 $ - $ - $ - $ - $ - Included
Testing sample of rebars, and concrete to meet
lot 1.00 $ - $ - $ - $ - $ -
material specification
SAFETY, HEALTH AND ENVIRONMENTAL
CONTROL
Site security guard house & security guard for
Month 9.00 $ - $ - $ - $ - $ -
project
Personal Protective Equipment PPE for contractor
lot 1.00 $ - $ - $ - $ - $ -
staff
Railing barriers of each floor and voids for fall
lot 1.00 $ - $ - $ - $ - $ -
protection
Proper bulk bins for storage of construction waste
and debris. Daily site cleaning & debris disposal lot 1.00 $ - $ - $ - $ - $ - Included
away from site
INSURANCE
Workman's Compensation Insurance LS 1.00 $ - $ - $ - $ - $ -
Guarantee for down payment, a retention security,
LS 1.00 $ - $ - $ - $ - $ -
and performance security
Contractors All Risks (CAR) LS 1.00 $ - $ - $ - $ - $ -
ELECTRICITY AND WATER CONSUMPTION
Electricity Consumption for the work Month 9.00 $ - $ - $ - $ - $ -
Water Consumption for the work Month 9.00 $ - $ - $ - $ - $ -
SUB TOTAL - 1 $ - $ - $ -
GRAND TOTAL $ - $ - $ -
160 Cabinet Rack 27U (For CCTV, Data) set 1.00 $ - $ - $ - $ - $ - Toten