BILL OF QUANTITIES

[Company Name]
[Address company]
Phnom Penh - Cambodia
[Phone Contact]
[Email Address]

PROJECT :BUILDING
CLIENT :
LOCATION :Phnom Penh Cambodia
PACKAGE : PRELIMNARY,BORE PILE ,STR,ARC,MEP
REVISION : REV-00
Friday, February 24, 2023

Cover/1/21Pages Print on 24-02-23


[Company Name]
[Address company]
Phnom Penh - Cambodia
[Phone Contact]

[Email Address]
CLIENT :
PROJECT :BUILDING
LOCATION :Phnom Penh Cambodia
PACKAGE : PRELIMNARY,BORE PILE ,STR,ARC,MEP
REVISION : REV-00 Friday, February 24, 2023
SUMMARRY

AMOUNT (US$)
ITEM DESCRIPTION TOTAL AMOUNT (US$) REMARKS
MATERIAL LABOR
TOTAL FLOOR AREA 1,323.48 m²
1 Bill 01.PRELIMINARY WORK $ - $ - $ - -
2 BILL-02.BORE PILE WORK $ - $ - $ - -
3 BILL-03.STRUCTURE WORK $ - $ - $ - -
4 BILL-04.ARCHITECTURE WORK $ - $ - $ - -
5 BILL-05.MEP WORK $ - $ - $ - -
TOTAL $ - $ - $ - -
GOOD WILL DISCOUNT $ -
GRAND TOTAL $ - -
WITH VAT 10% $ - -
GRAND TOTAL WITH VAT : $ - -

No Dollars and No Cents

Checked By
Prepared By Confirmed and Approved By

Name: .......................
Name: ................................. Name: ______________
Position: ......................................
Position: .................................. Position: ______________
Date: ............. ....., 2022

Summary/2/21Pages Print on 24-02-23


[Company Name]
[Address company]
Phnom Penh - Cambodia
[Phone Contact]
[Email Address]

CLIENT :
PROJECT :BUILDING
LOCATION :Phnom Penh Cambodia
PACKAGE : PRELIMNARY,BORE PILE ,STR,ARC,MEP
REVISION : REV-00 Friday, February 24, 2023
Bill 01.PRELIMINARY WORK

U.PRICE (US$) AMOUNT (US$) TOTAL


ITEM DESCRIPTION UNIT QTY. REMARKS
MATERIAL LABOR MATERIAL LABOR AMOUNT (US$)
[A] [B] [C] [D] = [A] X [B] [E] = [A] X [C] [F] = [D] + [E]
S-1 PRELIMINARY WORKS
GENERAL REQUIREMENT
Mobilization
Mobilization ,Surveyer , Site preparation lot 1.00 $ - $ - $ - $ - $ -

TEMPORARY FACILITIES
Site office for Contractor included meeting room,
chairs, tables, internet connectionm, air-con and lot 1.00 $ - $ - $ - $ - $ -
stationary.
Temporary sheds for the storage of materialsm
lot 1.00 $ - $ - $ - $ - $ -
tools and equipments
Temporary Sanitary Accommodation included
lot 1.00 $ - $ - $ - $ - $ -
sealed setic tanks and its connection
Temporary fencing (H=2.5m) m 30.50 $ - $ - $ - $ - $ -
Temporary accommodation & transportation Month 9.00 $ - $ - $ - $ - $ -
Project Signboard & hoarding lot 1.00 $ - $ - $ - $ - $ - Exclude
CONTRACTOR EQUIPMENT & TOOL
Cranage Month 9.00 $ - $ - $ - $ - $ -
Scaffolding, and staging outter building boundary
m² 1,556.50 $ - $ - $ - $ - $ -
L=55m with Height (From GF to RF= 28.3m)
PAPER WORK & MANAGEMENT FEE
Site management & Field Engineers Month 9.00 $ - $ - $ - $ - $ -
Shop drawing, submission and hand over lot 1.00 $ - $ - $ - $ - $ - Included
As-built drawing, submission and hand over lot 1.00 $ - $ - $ - $ - $ - Included
Testing sample of rebars, and concrete to meet
lot 1.00 $ - $ - $ - $ - $ -
material specification
SAFETY, HEALTH AND ENVIRONMENTAL
CONTROL
Site security guard house & security guard for
Month 9.00 $ - $ - $ - $ - $ -
project
Personal Protective Equipment PPE for contractor
lot 1.00 $ - $ - $ - $ - $ -
staff
Railing barriers of each floor and voids for fall
lot 1.00 $ - $ - $ - $ - $ -
protection
Proper bulk bins for storage of construction waste
and debris. Daily site cleaning & debris disposal lot 1.00 $ - $ - $ - $ - $ - Included
away from site
INSURANCE
Workman's Compensation Insurance LS 1.00 $ - $ - $ - $ - $ -
Guarantee for down payment, a retention security,
LS 1.00 $ - $ - $ - $ - $ -
and performance security
Contractors All Risks (CAR) LS 1.00 $ - $ - $ - $ - $ -
ELECTRICITY AND WATER CONSUMPTION
Electricity Consumption for the work Month 9.00 $ - $ - $ - $ - $ -
Water Consumption for the work Month 9.00 $ - $ - $ - $ - $ -
SUB TOTAL - 1 $ - $ - $ -

GRAND TOTAL $ - $ - $ -

BIL-1Pre./3/21Pages Print on 24-02-23


[Company Name]
[Address company]
Phnom Penh - Cambodia
[Phone Contact]
[Email Address]
CLIENT :
PROJECT :BUILDING
LOCATION :Phnom Penh Cambodia
PACKAGE : PRELIMNARY,BORE PILE ,STR,ARC,MEP
REVISION : REV-00 Friday, February 24, 2023
BILL-02.BORE PILE WORK

U.PRICE (US$) AMOUNT (US$) TOTAL


ITEM DESCRIPTION UNIT QTY. REMARKS
MATERIAL LABOR MATERIAL LABOR AMOUNT (US$)
[A] [B] [C] [D] = [A] X [B] [E] = [A] X [C] [F] = [D] + [E]
BP-1 BORE PILE WORK
Bore pile Ø600mm
-Soils drilling depth 20m
-Rebar 10DB20, Spiral DB10@200mm
BP-2 m 80.00 $ - $ - $ - $ - $ -
(Concrete f'c :30MPa (Sample cylinder)
(Rebar DB=SD390MPa,RB=S235MPa
Brand : Pomina Or V)
Bore pile Ø800mm
-Soils drilling depth 20m
-Rebar 12DB20, Spiral DB10@200mm
BP-3 m 160.00 $ - $ - $ - $ - $ -
(Concrete f'c :30MPa (Sample cylinder)
(Rebar DB=SD390MPa,RB=S235MPa
Brand : Pomina Or V)
BP-4 Sub Total For BORE PILE WORK $ - $ - $ -

BP-5 GRAND TOTAL $ - $ - $ -

BIL-2BORE PILE/4/21Pages Print on 24-02-23


[Company Name]
[Address company]
Phnom Penh - Cambodia
[Phone Contact]
[Email Address]
CLIENT :
PROJECT :BUILDING
LOCATION :Phnom Penh Cambodia
PACKAGE : PRELIMNARY,BORE PILE ,STR,ARC,MEP
REVISION : REV-00 Friday, February 24, 2023
BILL-03.STRUCTURE WORK

U.PRICE (US$) AMOUNT (US$) TOTAL


ITEM DESCRIPTION UNIT QTY. REMARKS
MATERIAL LABOR MATERIAL LABOR AMOUNT (US$)
[A] [B] [C] [D] = [A] X [B] [E] = [A] X [C] [F] = [D] + [E]
I SUB-STRUCTURE WORK
S-1 BORE PILE TEST
S-2 Pile Ø800mm PDA test pcs 1.00 $ - $ - $ - $ - $ -
S-2 Bore pile Ø600mm PIT test pcs 4.00 $ - $ - $ - $ - $ -
S-3 Bore pile Ø800mm PIT test pcs 8.00 $ - $ - $ - $ - $ -
S-4 Sub Total For BORE PILE TEST $ - $ - $ -
S-5 BORE PILE HEAD BREAKING
S-6 Bore pile Ø600mm pcs 4.00 $ - $ - $ - $ - $ -
S-7 Bore pile Ø800mm pcs 8.00 $ - $ - $ - $ - $ -
Sub Total For BORE PILE HEAD
S-8 $ - $ - $ -
BREAKING
S-9 EARTH WORK
S-10 Soils excavation disposal m³ 194.26 $ - $ - $ - $ - $ -
S-11 Wheel Washing Ls 1.00 $ - $ - $ - $ - $ -
S-12 Soils backfill m³ 155.35 $ - $ - $ - $ - $ -
S-13 Sub Total For EARTH WORK $ - $ - $ -
S-14 FOUNDATION WORK
S-15 PILE CAP
S-16 Concrete C30 water proof (Cylinder) m³ 38.91 $ - $ - $ - $ - $ -
S-17 Reinforcement rebar kg 4,565.85 $ - $ - $ - $ - $ -
S-18 Wire kg 82.19 $ - $ - $ - $ - $ -
S-19 Formwork. m² 75.17 $ - $ - $ - $ - $ -
S-20 Lean Concrete C12/15 100mm.thk m³ 1.96 $ - $ - $ - $ - $ -
S-21 Anti-Termite soil treatment m² 148.78 $ - $ - $ - $ - $ -
S-22 Imported crush stone (4x6) 150mm thk. m³ 5.88 $ - $ - $ - $ - $ -
S-23 SUM PIT LIFT CORE WALL
S-24 Concrete C30 water proof (Cylinder) m³ 3.07 $ - $ - $ - $ - $ -
S-25 Reinforcement rebar kg 944.96 $ - $ - $ - $ - $ -
S-26 Wire kg 17.01 $ - $ - $ - $ - $ -
S-27 Formwork. m² 40.80 $ - $ - $ - $ - $ -
S-28 Waterstop bar W:200 m 22.07 $ - $ - $ - $ - $ -
S-29 STUMP COLUMN
S-30 Concrete C30(Cylinder) m³ - $ - $ - $ - $ - $ -
S-31 Reinforcement rebar kg 959.26 $ - $ - $ - $ - $ -
S-32 Wire kg 17.27 $ - $ - $ - $ - $ -
S-33 Formwork. m² - $ - $ - $ - $ - $ -
S-34 SEPTIC TANK
S-35 Concrete C30(Cylinder) m³ $ - $ - $ - $ - $ -
S-36 Reinforcement rebar kg $ - $ - $ - $ - $ -
S-37 Wire kg $ - $ - $ - $ - $ -
S-38 Formwork. m² $ - $ - $ - $ - $ -
S-39 Waterstop bar W:200 m $ - $ - $ - $ - $ -
S-40 WATER TANK
S-41 Concrete C30 water proof (Cylinder) m³ $ - $ - $ - $ - $ -
S-42 Reinforcement rebar kg $ - $ - $ - $ - $ -
S-43 Wire kg $ - $ - $ - $ - $ -
S-44 Formwork. m² $ - $ - $ - $ - $ -
S-45 Waterstop bar W:200 m $ - $ - $ - $ - $ -
S-46 Sub Total For FOUNDATION WORK $ - $ - $ -
S-47 Sub Total For SUB-STRUCTURE WORK $ - $ - $ -
S-48 SUPPER-STRUCTURE WORK
S-49 GROUND FLOOR
S-50 RC SLAB
S-51 Concrete C30(Cylinder) m³ 19.89 $ - $ - $ - $ - $ -
S-52 Reinforcement rebar kg 2,459.26 $ - $ - $ - $ - $ -
S-53 Wire kg 44.27 $ - $ - $ - $ - $ -
S-54 Formwork. m² 158.51 $ - $ - $ - $ - $ -
S-55 RC BEAM $ - $ -
S-56 Concrete C30(Cylinder) m³ 10.82 $ - $ - $ - $ - $ -
S-57 Reinforcement rebar kg 2,951.63 $ - $ - $ - $ - $ -
S-58 Wire kg 53.13 $ - $ - $ - $ - $ -
S-59 Formwork. m² 84.62 $ - $ - $ - $ - $ -
S-60 COLUMN ON GROUND FLOOR $ - $ -
S-61 Concrete C30(Cylinder) m³ 5.43 $ - $ - $ - $ - $ -
S-62 Reinforcement rebar kg 1,711.11 $ - $ - $ - $ - $ -
S-63 Wire kg 30.80 $ - $ - $ - $ - $ -

BILL-3STR/5/22Pages Print on 24-02-23


BILL-03.STRUCTURE WORK

U.PRICE (US$) AMOUNT (US$) TOTAL


ITEM DESCRIPTION UNIT QTY. REMARKS
MATERIAL LABOR MATERIAL LABOR AMOUNT (US$)
[A] [B] [C] [D] = [A] X [B] [E] = [A] X [C] [F] = [D] + [E]
S-64 Formwork. m² 49.00 $ - $ - $ - $ - $ -
S-65 CORE WALL ON GROUND FLOOR $ - $ -
S-66 Concrete C30(Cylinder) m³ 7.32 $ - $ - $ - $ - $ -
S-67 Reinforcement rebar kg 902.30 $ - $ - $ - $ - $ -
S-68 Wire kg 16.24 $ - $ - $ - $ - $ -
S-69 Formwork. m² 83.99 $ - $ - $ - $ - $ -
S-70 STAIR CASE ON GROUND FLOOR $ - $ -
S-71 Concrete C30(Cylinder) m³ 1.50 $ - $ - $ - $ - $ -
S-72 Reinforcement rebar kg 382.81 $ - $ - $ - $ - $ -
S-73 Wire kg 6.89 $ - $ - $ - $ - $ -
S-74 Formwork. m² 18.27 $ - $ - $ - $ - $ -
S-75 Sub Total For GROUND FLOOR $ - $ - $ -
S-76 MEZZ. FLOOR
S-77 RC SLAB
S-78 Concrete C30(Cylinder) m³ 8.75 $ - $ - $ - $ - $ -
S-79 Reinforcement rebar kg 1,098.15 $ - $ - $ - $ - $ -
S-80 Wire kg 19.77 $ - $ - $ - $ - $ -
S-81 Formwork. m² 67.31 $ - $ - $ - $ - $ -
S-82 RC BEAM $ - $ -
S-83 Concrete C30(Cylinder) m³ 7.80 $ - $ - $ - $ - $ -
S-84 Reinforcement rebar kg 2,569.78 $ - $ - $ - $ - $ -
S-85 Wire kg 46.26 $ - $ - $ - $ - $ -
S-86 Formwork. m² 87.16 $ - $ - $ - $ - $ -
S-87 COLUMN ON MEZZ. FLOOR $ - $ -
S-88 Concrete C30(Cylinder) m³ 4.90 $ - $ - $ - $ - $ -
S-89 Reinforcement rebar kg 1,438.89 $ - $ - $ - $ - $ -
S-90 Wire kg 25.90 $ - $ - $ - $ - $ -
S-91 Formwork. m² 44.80 $ - $ - $ - $ - $ -
S-92 CORE WALL ON MEZZ. FLOOR $ - $ -
S-93 Concrete C30(Cylinder) m³ 6.61 $ - $ - $ - $ - $ -
S-94 Reinforcement rebar kg 812.30 $ - $ - $ - $ - $ -
S-95 Wire kg 14.62 $ - $ - $ - $ - $ -
S-96 Formwork. m² 76.79 $ - $ - $ - $ - $ -
S-97 STAIR CASE ON MEZZ. FLOOR $ - $ -
S-98 Concrete C30(Cylinder) m³ 1.50 $ - $ - $ - $ - $ -
S-99 Reinforcement rebar kg 382.81 $ - $ - $ - $ - $ -
S-100 Wire kg 6.89 $ - $ - $ - $ - $ -
S-101 Formwork. m² 18.27 $ - $ - $ - $ - $ -
S-102 Sub Total For MEZZ. FLOOR $ - $ - $ -
S-103 1ST FLOOR
S-104 RC SLAB
S-105 Concrete C30(Cylinder) m³ 20.67 $ - $ - $ - $ - $ -
S-106 Reinforcement rebar kg 2,233.33 $ - $ - $ - $ - $ -
S-107 Wire kg 40.20 $ - $ - $ - $ - $ -
S-108 Formwork. m² 158.98 $ - $ - $ - $ - $ -
S-109 RC BEAM $ - $ -
S-110 Concrete C30(Cylinder) m³ 8.05 $ - $ - $ - $ - $ -
S-111 Reinforcement rebar kg 3,134.96 $ - $ - $ - $ - $ -
S-112 Wire kg 56.43 $ - $ - $ - $ - $ -
S-113 Formwork. m² 92.12 $ - $ - $ - $ - $ -
S-114 COLUMN ON 1ST FLOOR $ - $ -
S-115 Concrete C30(Cylinder) m³ 5.43 $ - $ - $ - $ - $ -
S-116 Reinforcement rebar kg 1,711.11 $ - $ - $ - $ - $ -
S-117 Wire kg 30.80 $ - $ - $ - $ - $ -
S-118 Formwork. m² 49.00 $ - $ - $ - $ - $ -
S-119 CORE WALL ON 1ST FLOOR $ - $ -
S-120 Concrete C30(Cylinder) m³ 12.74 $ - $ - $ - $ - $ -
S-121 Reinforcement rebar kg 2,613.41 $ - $ - $ - $ - $ -
S-122 Wire kg 47.04 $ - $ - $ - $ - $ -
S-123 Formwork. m² 132.99 $ - $ - $ - $ - $ -
S-124 STAIR CASE ON 1ST FLOOR $ - $ -
S-125 Concrete C30(Cylinder) m³ 1.50 $ - $ - $ - $ - $ -
S-126 Reinforcement rebar kg 382.81 $ - $ - $ - $ - $ -
S-127 Wire kg 6.89 $ - $ - $ - $ - $ -
S-128 Formwork. m² 18.27 $ - $ - $ - $ - $ -
S-129 Sub Total For 1ST FLOOR $ - $ - $ -
S-130 2nd FLOOR
S-131 RC SLAB
S-132 Concrete C30(Cylinder) m³ 20.67 $ - $ - $ - $ - $ -
S-133 Reinforcement rebar kg 2,233.33 $ - $ - $ - $ - $ -
S-134 Wire kg 40.20 $ - $ - $ - $ - $ -
S-135 Formwork. m² 158.98 $ - $ - $ - $ - $ -
S-136 RC BEAM $ - $ -
S-137 Concrete C30(Cylinder) m³ 7.87 $ - $ - $ - $ - $ -
S-138 Reinforcement rebar kg 3,061.48 $ - $ - $ - $ - $ -
S-139 Wire kg 55.11 $ - $ - $ - $ - $ -
S-140 Formwork. m² 89.44 $ - $ - $ - $ - $ -
S-141 COLUMN ON 2nd FLOOR $ - $ -
S-142 Concrete C30(Cylinder) m³ 3.26 $ - $ - $ - $ - $ -

BILL-3STR/6/22Pages Print on 24-02-23


BILL-03.STRUCTURE WORK

U.PRICE (US$) AMOUNT (US$) TOTAL


ITEM DESCRIPTION UNIT QTY. REMARKS
MATERIAL LABOR MATERIAL LABOR AMOUNT (US$)
[A] [B] [C] [D] = [A] X [B] [E] = [A] X [C] [F] = [D] + [E]
S-143 Reinforcement rebar kg 920.37 $ - $ - $ - $ - $ -
S-144 Wire kg 16.57 $ - $ - $ - $ - $ -
S-145 Formwork. m² 39.20 $ - $ - $ - $ - $ -
S-146 CORE WALL ON 2nd FLOOR $ - $ -
S-147 Concrete C30(Cylinder) m³ 10.57 $ - $ - $ - $ - $ -
S-148 Reinforcement rebar kg 1,822.67 $ - $ - $ - $ - $ -
S-149 Wire kg 32.81 $ - $ - $ - $ - $ -
S-150 Formwork. m² 123.19 $ - $ - $ - $ - $ -
S-151 STAIR CASE ON 2nd FLOOR $ - $ -
S-152 Concrete C30(Cylinder) m³ 1.50 $ - $ - $ - $ - $ -
S-153 Reinforcement rebar kg 382.81 $ - $ - $ - $ - $ -
S-154 Wire kg 6.89 $ - $ - $ - $ - $ -
S-155 Formwork. m² 18.27 $ - $ - $ - $ - $ -
S-156 Sub Total For 2nd FLOOR $ - $ - $ -
S-157 3RD FLOOR
S-158 RC SLAB
S-159 Concrete C30(Cylinder) m³ 20.67 $ - $ - $ - $ - $ -
S-160 Reinforcement rebar kg 2,233.33 $ - $ - $ - $ - $ -
S-161 Wire kg 40.20 $ - $ - $ - $ - $ -
S-162 Formwork. m² 158.98 $ - $ - $ - $ - $ -
S-163 RC BEAM $ - $ -
S-164 Concrete C30(Cylinder) m³ 7.87 $ - $ - $ - $ - $ -
S-165 Reinforcement rebar kg 3,061.48 $ - $ - $ - $ - $ -
S-166 Wire kg 55.11 $ - $ - $ - $ - $ -
S-167 Formwork. m² 89.44 $ - $ - $ - $ - $ -
S-168 COLUMN ON 3RD FLOOR $ - $ -
S-169 Concrete C30(Cylinder) m³ 3.26 $ - $ - $ - $ - $ -
S-170 Reinforcement rebar kg 920.37 $ - $ - $ - $ - $ -
S-171 Wire kg 16.57 $ - $ - $ - $ - $ -
S-172 Formwork. m² 39.20 $ - $ - $ - $ - $ -
S-173 CORE WALL ON 3RD FLOOR $ - $ -
S-174 Concrete C30(Cylinder) m³ 10.57 $ - $ - $ - $ - $ -
S-175 Reinforcement rebar kg 1,822.67 $ - $ - $ - $ - $ -
S-176 Wire kg 32.81 $ - $ - $ - $ - $ -
S-177 Formwork. m² 123.19 $ - $ - $ - $ - $ -
S-178 STAIR CASE ON 3RD FLOOR $ - $ -
S-179 Concrete C30(Cylinder) m³ 1.50 $ - $ - $ - $ - $ -
S-180 Reinforcement rebar kg 382.81 $ - $ - $ - $ - $ -
S-181 Wire kg 6.89 $ - $ - $ - $ - $ -
S-182 Formwork. m² 18.27 $ - $ - $ - $ - $ -
S-183 Sub Total For 3RD FLOOR $ - $ - $ -
S-184 4TH FLOOR
S-185 RC SLAB
S-186 Concrete C30(Cylinder) m³ 20.67 $ - $ - $ - $ - $ -
S-187 Reinforcement rebar kg 2,233.33 $ - $ - $ - $ - $ -
S-188 Wire kg 40.20 $ - $ - $ - $ - $ -
S-189 Formwork. m² 158.98 $ - $ - $ - $ - $ -
S-190 RC BEAM $ - $ -
S-191 Concrete C30(Cylinder) m³ 7.87 $ - $ - $ - $ - $ -
S-192 Reinforcement rebar kg 3,061.48 $ - $ - $ - $ - $ -
S-193 Wire kg 55.11 $ - $ - $ - $ - $ -
S-194 Formwork. m² 89.44 $ - $ - $ - $ - $ -
S-195 COLUMN ON 4TH FLOOR $ - $ -
S-196 Concrete C30(Cylinder) m³ 3.26 $ - $ - $ - $ - $ -
S-197 Reinforcement rebar kg 920.37 $ - $ - $ - $ - $ -
S-198 Wire kg 16.57 $ - $ - $ - $ - $ -
S-199 Formwork. m² 39.20 $ - $ - $ - $ - $ -
S-200 CORE WALL ON 4TH FLOOR $ - $ -
S-201 Concrete C30(Cylinder) m³ 10.57 $ - $ - $ - $ - $ -
S-202 Reinforcement rebar kg 1,822.67 $ - $ - $ - $ - $ -
S-203 Wire kg 32.81 $ - $ - $ - $ - $ -
S-204 Formwork. m² 123.19 $ - $ - $ - $ - $ -
S-205 STAIR CASE ON 4TH FLOOR $ - $ -
S-206 Concrete C30(Cylinder) m³ 1.50 $ - $ - $ - $ - $ -
S-207 Reinforcement rebar kg 382.81 $ - $ - $ - $ - $ -
S-208 Wire kg 6.89 $ - $ - $ - $ - $ -
S-209 Formwork. m² 18.27 $ - $ - $ - $ - $ -
S-210 Sub Total For 4TH FLOOR $ - $ - $ -
S-211 5TH FLOOR
S-212 RC SLAB
S-213 Concrete C30(Cylinder) m³ 20.67 $ - $ - $ - $ - $ -
S-214 Reinforcement rebar kg 2,233.33 $ - $ - $ - $ - $ -
S-215 Wire kg 40.20 $ - $ - $ - $ - $ -
S-216 Formwork. m² 158.98 $ - $ - $ - $ - $ -
S-217 RC BEAM $ - $ -
S-218 Concrete C30(Cylinder) m³ 7.87 $ - $ - $ - $ - $ -
S-219 Reinforcement rebar kg 3,061.48 $ - $ - $ - $ - $ -
S-220 Wire kg 55.11 $ - $ - $ - $ - $ -
S-221 Formwork. m² 89.44 $ - $ - $ - $ - $ -

BILL-3STR/7/22Pages Print on 24-02-23


BILL-03.STRUCTURE WORK

U.PRICE (US$) AMOUNT (US$) TOTAL


ITEM DESCRIPTION UNIT QTY. REMARKS
MATERIAL LABOR MATERIAL LABOR AMOUNT (US$)
[A] [B] [C] [D] = [A] X [B] [E] = [A] X [C] [F] = [D] + [E]
S-222 COLUMN ON 5TH FLOOR $ - $ -
S-223 Concrete C30(Cylinder) m³ 3.26 $ - $ - $ - $ - $ -
S-224 Reinforcement rebar kg 659.04 $ - $ - $ - $ - $ -
S-225 Wire kg 11.86 $ - $ - $ - $ - $ -
S-226 Formwork. m² 39.20 $ - $ - $ - $ - $ -
S-227 CORE WALL ON 5TH FLOOR $ - $ -
S-228 Concrete C30(Cylinder) m³ 10.57 $ - $ - $ - $ - $ -
S-229 Reinforcement rebar kg 1,822.67 $ - $ - $ - $ - $ -
S-230 Wire kg 32.81 $ - $ - $ - $ - $ -
S-231 Formwork. m² 123.19 $ - $ - $ - $ - $ -
S-232 STAIR CASE ON 5TH FLOOR $ - $ -
S-233 Concrete C30(Cylinder) m³ 1.50 $ - $ - $ - $ - $ -
S-234 Reinforcement rebar kg 382.81 $ - $ - $ - $ - $ -
S-235 Wire kg 6.89 $ - $ - $ - $ - $ -
S-236 Formwork. m² 18.27 $ - $ - $ - $ - $ -
S-237 Sub Total For 5TH FLOOR $ - $ - $ -
S-238 TERRACE FLOOR
S-239 RC SLAB
S-240 Concrete C30(Cylinder) m³ 20.67 $ - $ - $ - $ - $ -
S-241 Reinforcement rebar kg 2,233.33 $ - $ - $ - $ - $ -
S-242 Wire kg 40.20 $ - $ - $ - $ - $ -
S-243 Formwork. m² 158.98 $ - $ - $ - $ - $ -
S-244 RC BEAM $ - $ -
S-245 Concrete C30(Cylinder) m³ 7.92 $ - $ - $ - $ - $ -
S-246 Reinforcement rebar kg 3,061.48 $ - $ - $ - $ - $ -
S-247 Wire kg 55.11 $ - $ - $ - $ - $ -
S-248 Formwork. m² 90.12 $ - $ - $ - $ - $ -
S-249 COLUMN ON TERRACE FLOOR $ - $ -
S-250 Concrete C30(Cylinder) m³ 3.26 $ - $ - $ - $ - $ -
S-251 Reinforcement rebar kg 659.04 $ - $ - $ - $ - $ -
S-252 Wire kg 11.86 $ - $ - $ - $ - $ -
S-253 Formwork. m² 39.20 $ - $ - $ - $ - $ -
S-254 CORE WALL ON TERRACE FLOOR $ - $ -
S-255 Concrete C30(Cylinder) m³ 10.57 $ - $ - $ - $ - $ -
S-256 Reinforcement rebar kg 1,822.67 $ - $ - $ - $ - $ -
S-257 Wire kg 32.81 $ - $ - $ - $ - $ -
S-258 Formwork. m² 123.19 $ - $ - $ - $ - $ -
S-259 Sub Total For TERRACE FLOOR $ - $ - $ -
S-260 ROOF FLOOR
S-261 RC SLAB $ - $ -
S-262 Concrete C30(Cylinder) m³ 20.67 $ - $ - $ - $ - $ -
S-263 Reinforcement rebar kg 2,233.33 $ - $ - $ - $ - $ -
S-264 Wire kg 40.20 $ - $ - $ - $ - $ -
S-265 Formwork. m² 158.98 $ - $ - $ - $ - $ -
S-266 RC BEAM $ - $ -
S-267 Concrete C30(Cylinder) m³ 12.38 $ - $ - $ - $ - $ -
S-268 Reinforcement rebar kg 4,833.33 $ - $ - $ - $ - $ -
S-269 Wire kg 87.00 $ - $ - $ - $ - $ -
S-270 Formwork. m² 150.86 $ - $ - $ - $ - $ -
S-271 CORE WALL ON ROOF FLOOR $ - $ -
S-272 Concrete C30(Cylinder) m³ 4.96 $ - $ - $ - $ - $ -
S-273 Reinforcement rebar kg 610.44 $ - $ - $ - $ - $ -
S-274 Wire kg 10.99 $ - $ - $ - $ - $ -
S-275 Formwork. m² 60.00 $ - $ - $ - $ - $ -
S-276 Sub Total For ROOF FLOOR $ - $ - $ -
S-277 ROOF LIFT
S-278 RC SLAB
S-279 Concrete C30(Cylinder) m³ 1.26 $ - $ - $ - $ - $ -
S-280 Reinforcement rebar kg 129.63 $ - $ - $ - $ - $ -
S-281 Wire kg 2.33 $ - $ - $ - $ - $ -
S-282 Formwork. m² 8.40 $ - $ - $ - $ - $ -
S-283 RC BEAM $ - $ -
S-284 Concrete C30(Cylinder) m³ 0.12 $ - $ - $ - $ - $ -
S-285 Reinforcement rebar kg 56.89 $ - $ - $ - $ - $ -
S-286 Wire kg 1.02 $ - $ - $ - $ - $ -
S-287 Formwork. m² 1.92 $ - $ - $ - $ - $ -
S-288 Sub Total For ROOF LIFT $ - $ - $ -
STEEL ROOF CANOPY FRAME FRONT
S-289
(MF )24.5m²
S-290 Hollow black steel (100x100x2)mm m 46.12 $ - $ - $ - $ - $ -
S-291 Anchor bolts M20 pcs 52.00 $ - $ - $ - $ - $ -
S-292 Steel Plate (200x200x8)mm pcs 13.00 $ - $ - $ - $ - $ -
S-293 Anticorrosion m² 18.45 $ - $ - $ - $ - $ -
S-294 Painting (Fire rate 1h) m² 18.45 $ - $ - $ - $ - $ -
S-295 Accessories ls 1.00 $ - $ - $ - $ - $ -
Sub Total For STEEL ROOF CANOPY
S-296 FRAME FRONT $ - $ - $ -
(MF )24.5m²

BILL-3STR/8/22Pages Print on 24-02-23


BILL-03.STRUCTURE WORK

U.PRICE (US$) AMOUNT (US$) TOTAL


ITEM DESCRIPTION UNIT QTY. REMARKS
MATERIAL LABOR MATERIAL LABOR AMOUNT (US$)
[A] [B] [C] [D] = [A] X [B] [E] = [A] X [C] [F] = [D] + [E]
297 GRAND TOTAL $ - $ - $ - TRUE

BILL-3STR/9/22Pages Print on 24-02-23


[Company Name]
[Address company]
Phnom Penh - Cambodia
[Phone Contact]
[Email Address]
CLIENT :
PROJECT :BUILDING
LOCATION :Phnom Penh Cambodia
PACKAGE : PRELIMNARY,BORE PILE ,STR,ARC,MEP
REVISION : REV-00 Friday, February 24, 2023
BILL-04.ARCHITECTURE WORK

U.PRICE (US$) AMOUNT (US$) TOTAL


ITEM DESCRIPTION UNIT QTY. REMARKS
MATERIAL LABOR MATERIAL LABOR AMOUNT (US$)
[A] [B] [C] [D] = [A] X [B] [E] = [A] X [C] [F] = [D] + [E]
A-1 GROUND FLOOR
A-2 MASONARY WORK
A-3 Brick wall 100mm thk. m² 58.53 $ - $ - $ - $ - $ -
A-4 Brick wall 200mm thk. m² 117.97 $ - $ - $ - $ - $ -
A-5 Stiffener 80x180mm m 7.00 $ - $ - $ - $ - $ -
A-6 Stiffener 180x180mm m 12.40 $ - $ - $ - $ - $ -
A-7 Lintel 180x180mm m 16.85 $ - $ - $ - $ - $ -
A-8 Lintel 80x180mm m 18.60 $ - $ - $ - $ - $ -
A-9 Internal plastering 15mm thk. m² 277.74 $ - $ - $ - $ - $ -
A-10 External plastering 20mm thk. m² 153.83 $ - $ - $ - $ - $ -
A-11 Corner bead m 224.78 $ - $ - $ - $ - $ -
A-12 Sub-Total For MASONARY WORK $ - $ - $ -
A-13 CEILING WORK
A-14 Normal flate ceiling m² 50.94 $ - $ - $ - $ - $ -
A-15 Normal model ceiling m² - $ - $ - $ - $ - $ -
A-16 Moisture flate ceiling m² 4.85 $ - $ - $ - $ - $ -
A-17 Acess panel (600x600)mm pcs 1.00 $ - $ - $ - $ - $ -
A-18 Redo m - $ - $ - $ - $ - $ -
A-19 Sub-Total For CEILING WORK $ - $ - $ -
A-20 WATER PROOOF
A-21 Silka top seal 107 m² 6.69 $ - $ - $ - $ - $ -
A-22 Sub-Total For WATER PROOOF $ - $ - $ -
A-23 FLOOR FINISH
A-24 Pavement floor for main entrance m² 80.54 $ - $ - $ - $ - $ -
A-25 Polish concrete surface m² 25.10 $ - $ - $ - $ - $ -
A-26 Floor tile 600x600 m² 106.47 $ - $ - $ - $ - $ -
A-27 Skirting tile m 87.37 $ - $ - $ - $ - $ -
A-28 Floor tile(300x300)mm W.C m² 4.85 $ - $ - $ - $ - $ -
A-29 Wall tile (300x600)mm W.C m² 21.24 $ - $ - $ - $ - $ -
A-30 Marble 18mm thk. on stair m² 10.75 $ - $ - $ - $ - $ -
A-31 Sub-Total For FLOOR FINISH $ - $ - $ -
A-32 DOOR, WINDOW & HANDRAIL
Door W1(3.9mx 4.95m)
Frame aluminum
A-33 pcs 1.00 $ - $ - $ - $ - $ -
Fixed laminat safety glass 10mm thk.
Temper glass (1.8mx2.45m) 10mm thk.
Window W2((4.0mx 4.95m)
A-34 Frame aluminum pcs 1.00 $ - $ - $ - $ - $ -
Fixed laminat safety glass 10mm thk.
Window W3((0.6mx 4.95m)
A-35 Frame aluminum pcs 1.00 $ - $ - $ - $ - $ -
Fixed laminat safety glass 10mm thk.
Door D1(1.4mx 3.36m)
A-36 Frame aluminum pcs 1.00 $ - $ - $ - $ - $ -
Temper glass 10mm thk.
A-37 Wooden door (0.8mx2.2mm) pcs 1.00 $ - $ - $ - $ - $ -
A-38 Wooden door (0.8mx2.2mm) W.C pcs 4.00 $ - $ - $ - $ - $ -
A-39 Steel stair handrail height 800mm m 6.00 $ - $ - $ - $ - $ -
Sub-Total For DOOR, WINDOW &
A-40 $ - $ - $ -
HANDRAIL
A-41 WALL FINISH
A-42 Internal wall painting (Warranty 5year) m² 277.74 $ - $ - $ - $ - $ -
A-43 External wall painting (Warranty 10year) m² 153.83 $ - $ - $ - $ - $ -
A-44 Sub-Total For WALL FINISH $ - $ - $ -
A-45 Sub Total For GROUND FLOOR $ - $ - $ -
A-46 MF FLOOR
A-47 MASONARY WORK
A-48 Brick wall 100mm thk. m² 84.45 $ - $ - $ - $ - $ -
A-49 Brick wall 200mm thk. m² 95.82 $ - $ - $ - $ - $ -
A-50 Stiffener 80x180mm m 8.30 $ - $ - $ - $ - $ -
A-51 Stiffener 180x180mm m 14.70 $ - $ - $ - $ - $ -
A-52 Lintel 180x180mm m 15.35 $ - $ - $ - $ - $ -
A-53 Lintel 80x180mm m 8.40 $ - $ - $ - $ - $ -
A-54 Internal plastering 15mm thk. m² 328.03 $ - $ - $ - $ - $ -
A-55 External plastering 20mm thk. m² 147.36 $ - $ - $ - $ - $ -
A-56 Corner bead m 218.86 $ - $ - $ - $ - $ -
A-57 Sub-Total For MASONARY WORK $ - $ - $ -
A-58 CEILING WORK

BILL-4ARC/10/21Pages Print on 24-02-23


BILL-04.ARCHITECTURE WORK

U.PRICE (US$) AMOUNT (US$) TOTAL


ITEM DESCRIPTION UNIT QTY. REMARKS
MATERIAL LABOR MATERIAL LABOR AMOUNT (US$)
[A] [B] [C] [D] = [A] X [B] [E] = [A] X [C] [F] = [D] + [E]
A-59 Normal flate ceiling m² 94.58 $ - $ - $ - $ - $ -
A-60 Moisture flate ceiling m² 2.58 $ - $ - $ - $ - $ -
A-61 Acess panel (600x600)mm pcs 1.00 $ - $ - $ - $ - $ -
A-62 Redo m 13.24 $ - $ - $ - $ - $ -
A-63 Sub-Total For CEILING WORK $ - $ - $ -
A-64 WATER PROOOF
A-65 Silka top seal 107 m² 3.90 $ - $ - $ - $ - $ -
A-66 Sub-Total For WATER PROOOF $ - $ - $ -
A-67 FLOOR FINISH
A-68 Floor tile 600x600 m² 47.82 $ - $ - $ - $ - $ -
A-69 Skirting tile m 55.35 $ - $ - $ - $ - $ -
A-70 Floor tile(300x300)mm W.C m² 2.58 $ - $ - $ - $ - $ -
A-71 Wall tile (300x600)mm W.C m² 14.69 $ - $ - $ - $ - $ -
A-72 Marble 18mm thk. on stair m² 10.75 $ - $ - $ - $ - $ -
A-73 Sub-Total For FLOOR FINISH $ - $ - $ -
A-74 DOOR, WINDOW & HANDRAIL
Window W4((1.0mx 2.75m)
A-75 Frame aluminum pcs 1.00 $ - $ - $ - $ - $ -
Laminat safety glass 10mm thk.
Window B1 ((2.2mx 2.75m)
A-76 Frame aluminum pcs 1.00 $ - $ - $ - $ - $ -
Louver gril
A-77 Wooden door (0.8mx2.2mm) Double swing pcs 1.00 $ - $ - $ - $ - $ -
A-78 Wooden door (0.8mx2.2mm) pcs 4.00 $ - $ - $ - $ - $ -
A-79 Wooden door (0.8mx2.2mm) W.C pcs 1.00 $ - $ - $ - $ - $ -
A-80 Steel stair handrail height 800mm m 6.00 $ - $ - $ - $ - $ -
Sub-Total For DOOR, WINDOW &
A-81 $ - $ - $ -
HANDRAIL
A-82 WALL FINISH
A-83 Internal wall painting (Warranty 5year) m² 328.03 $ - $ - $ - $ - $ -
A-84 External wall painting (Warranty 10year) m² 147.36 $ - $ - $ - $ - $ -
A-85 Sub-Total For WALL FINISH $ - $ - $ -
A-86 Sub Total For MF FLOOR $ - $ - $ -
A-87 1F FLOOR
A-88 MASONARY WORK
A-89 Brick wall 100mm thk. m² 184.48 $ - $ - $ - $ - $ -
A-90 Brick wall 200mm thk. m² 51.03 $ - $ - $ - $ - $ -
A-91 Stiffener 80x180mm m 15.90 $ - $ - $ - $ - $ -
A-92 Stiffener 180x180mm m 4.40 $ - $ - $ - $ - $ -
A-93 Lintel 180x180mm m 80.88 $ - $ - $ - $ - $ -
A-94 Lintel 80x180mm m 3.10 $ - $ - $ - $ - $ -
A-95 Internal plastering 15mm thk. m² 413.84 $ - $ - $ - $ - $ -
A-96 External plastering 20mm thk. m² 108.57 $ - $ - $ - $ - $ -
A-97 Corner bead m 298.17 $ - $ - $ - $ - $ -
A-98 Sub-Total For MASONARY WORK $ - $ - $ -
A-99 CEILING WORK
A-100 Normal flate ceiling m² 115.34 $ - $ - $ - $ - $ -
A-101 Normal model ceiling m² - $ - $ - $ - $ - $ -
A-102 Moisture flate ceiling m² 4.00 $ - $ - $ - $ - $ -
A-103 Acess panel (600x600)mm pcs 1.00 $ - $ - $ - $ - $ -
A-104 Redo m 24.34 $ - $ - $ - $ - $ -
A-105 Sub-Total For CEILING WORK $ - $ - $ -
A-106 WATER PROOOF
Water proof menbrance
A-107 m² $ - $ - $ - $ - $ -
Sika bitus seal SG130(3mm thk.)
A-108 Silka top seal 107 m² 5.75 $ - $ - $ - $ - $ -
A-109 Sub-Total For WATER PROOOF $ - $ - $ -
A-110 FLOOR FINISH
A-111 Floor tile 600x600 m² 117.66 $ - $ - $ - $ - $ -
A-112 Skirting tile m 138.85 $ - $ - $ - $ - $ -
A-113 Floor tile(300x300)mm W.C m² 4.00 $ - $ - $ - $ - $ -
A-114 Wall tile (300x600)mm W.C m² 20.12 $ - $ - $ - $ - $ -
A-115 Marble 18mm thk. on stair m² 10.31 $ - $ - $ - $ - $ -
A-116 Sub-Total For FLOOR FINISH $ - $ - $ -
A-117 DOOR, WINDOW & HANDRAIL
Window W5((1.0mx 3.05m)
A-118 Frame aluminum pcs 1.00 $ - $ - $ - $ - $ -
Laminat safety glass 10mm thk.
Window B2 ((2.2mx 3.05m)
A-119 Frame aluminum pcs 1.00 $ - $ - $ - $ - $ -
Louver gril
A-120 Wooden door (0.8mx2.2mm) pcs 9.00 $ - $ - $ - $ - $ -
A-121 Wooden door (0.8mx2.2mm) W.C pcs 1.00 $ - $ - $ - $ - $ -
A-122 Steel stair handrail height 800mm m 6.00 $ - $ - $ - $ - $ -
Sub-Total For DOOR, WINDOW &
A-123 $ - $ - $ -
HANDRAIL
A-124 WALL FINISH
A-125 Internal wall painting (Warranty 5year) m² 413.84 $ - $ - $ - $ - $ -
A-126 External wall painting (Warranty 10year) m² 108.57 $ - $ - $ - $ - $ -

BILL-4ARC/11/21Pages Print on 24-02-23


BILL-04.ARCHITECTURE WORK

U.PRICE (US$) AMOUNT (US$) TOTAL


ITEM DESCRIPTION UNIT QTY. REMARKS
MATERIAL LABOR MATERIAL LABOR AMOUNT (US$)
[A] [B] [C] [D] = [A] X [B] [E] = [A] X [C] [F] = [D] + [E]
A-127 Sub-Total For WALL FINISH $ - $ - $ -
A-128 Sub Total For 1F FLOOR $ - $ - $ -
A-129 2F FLOOR
A-130 MASONARY WORK
A-131 Brick wall 100mm thk. m² 184.12 $ - $ - $ - $ - $ -
A-132 Brick wall 200mm thk. m² 51.28 $ - $ - $ - $ - $ -
A-133 Stiffener 80x180mm m 21.70 $ - $ - $ - $ - $ -
A-134 Stiffener 180x180mm m 4.40 $ - $ - $ - $ - $ -
A-135 Lintel 180x180mm m 90.99 $ - $ - $ - $ - $ -
A-136 Lintel 80x180mm m 3.10 $ - $ - $ - $ - $ -
A-137 Internal plastering 15mm thk. m² 356.40 $ - $ - $ - $ - $ -
A-138 External plastering 20mm thk. m² 106.41 $ - $ - $ - $ - $ -
A-139 Corner bead m 379.65 $ - $ - $ - $ - $ -
A-140 Sub-Total For MASONARY WORK $ - $ - $ -
A-141 CEILING WORK
A-142 Normal flate ceiling m² 114.74 $ - $ - $ - $ - $ -
A-143 Normal model ceiling m² - $ - $ - $ - $ - $ -
A-144 Moisture flate ceiling m² 4.00 $ - $ - $ - $ - $ -
A-145 Acess panel (600x600)mm pcs 1.00 $ - $ - $ - $ - $ -
A-146 Redo m 23.69 $ - $ - $ - $ - $ -
A-147 Sub-Total For CEILING WORK $ - $ - $ -
A-148 WATER PROOOF
Water proof menbrance
A-149 m² $ - $ - $ - $ - $ -
Sika bitus seal SG130(3mm thk.)
A-150 Silka top seal 107 m² 5.75 $ - $ - $ - $ - $ -
A-151 Sub-Total For WATER PROOOF $ - $ - $ -
A-152 FLOOR FINISH
A-153 Floor tile 600x600 m² 117.06 $ - $ - $ - $ - $ -
A-154 Skirting tile m 148.50 $ - $ - $ - $ - $ -
A-155 Floor tile(300x300)mm W.C m² 4.00 $ - $ - $ - $ - $ -
A-156 Wall tile (300x600)mm W.C m² 21.88 $ - $ - $ - $ - $ -
A-157 Marble 18mm thk. on stair m² 10.31 $ - $ - $ - $ - $ -
A-158 Sub-Total For FLOOR FINISH $ - $ - $ -
A-159 DOOR, WINDOW & HANDRAIL
Window W5((1.0mx 3.05m)
A-160 Frame aluminum pcs 1.00 $ - $ - $ - $ - $ -
Laminat safety glass 10mm thk.
Window B2 ((2.2mx 3.05m)
A-161 Frame aluminum pcs 1.00 $ - $ - $ - $ - $ -
Louver gril
Door D1(1.4mx 3.36m)
A-162 Frame aluminum pcs 4.00 $ - $ - $ - $ - $ -
Temper glass 10mm thk.
A-163 Wooden door (0.8mx2.2mm) pcs 6.00 $ - $ - $ - $ - $ -
A-164 Wooden door (0.8mx2.2mm) W.C pcs 1.00 $ - $ - $ - $ - $ -
A-165 Steel stair handrail height 800mm m 6.00 $ - $ - $ - $ - $ -
Sub-Total For DOOR, WINDOW &
A-166 $ - $ - $ -
HANDRAIL
A-167 WALL FINISH
A-168 Internal wall painting (Warranty 5year) m² 356.40 $ - $ - $ - $ - $ -
A-169 External wall painting (Warranty 10year) m² 106.41 $ - $ - $ - $ - $ -
A-170 Sub-Total For WALL FINISH $ - $ - $ -
A-171 Sub Total For 2F FLOOR $ - $ - $ -
A-172 3F FLOOR
A-173 MASONARY WORK
A-174 Brick wall 100mm thk. m² 169.01 $ - $ - $ - $ - $ -
A-175 Brick wall 200mm thk. m² 44.02 $ - $ - $ - $ - $ -
A-176 Stiffener 80x180mm m 12.58 $ - $ - $ - $ - $ -
A-177 Stiffener 180x180mm m 8.00 $ - $ - $ - $ - $ -
A-178 Lintel 180x180mm m 70.77 $ - $ - $ - $ - $ -
A-179 Lintel 80x180mm m 3.10 $ - $ - $ - $ - $ -
A-180 Internal plastering 15mm thk. m² 366.30 $ - $ - $ - $ - $ -
A-181 External plastering 20mm thk. m² 99.13 $ - $ - $ - $ - $ -
A-182 Corner bead m 311.06 $ - $ - $ - $ - $ -
A-183 Sub-Total For MASONARY WORK $ - $ - $ -
A-184 CEILING WORK
A-185 Normal flate ceiling m² 116.40 $ - $ - $ - $ - $ -
A-186 Normal model ceiling m² - $ - $ - $ - $ - $ -
A-187 Moisture flate ceiling m² 4.06 $ - $ - $ - $ - $ -
A-188 Acess panel (600x600)mm pcs 1.00 $ - $ - $ - $ - $ -
A-189 Redo m 23.96 $ - $ - $ - $ - $ -
A-190 Sub-Total For CEILING WORK $ - $ - $ -
A-191 WATER PROOOF
Water proof menbrance
A-192 m² $ - $ - $ - $ - $ -
Sika bitus seal SG130(3mm thk.)
A-193 Silka top seal 107 m² 5.76 $ - $ - $ - $ - $ -
A-194 Sub-Total For WATER PROOOF $ - $ - $ -
A-195 FLOOR FINISH
A-196 Floor tile 600x600 m² 118.00 $ - $ - $ - $ - $ -
A-197 Skirting tile m 123.00 $ - $ - $ - $ - $ -

BILL-4ARC/12/21Pages Print on 24-02-23


BILL-04.ARCHITECTURE WORK

U.PRICE (US$) AMOUNT (US$) TOTAL


ITEM DESCRIPTION UNIT QTY. REMARKS
MATERIAL LABOR MATERIAL LABOR AMOUNT (US$)
[A] [B] [C] [D] = [A] X [B] [E] = [A] X [C] [F] = [D] + [E]
A-198 Floor tile(300x300)mm W.C m² 4.00 $ - $ - $ - $ - $ -
A-199 Wall tile (300x600)mm W.C m² 22.00 $ - $ - $ - $ - $ -
A-200 Marble 18mm thk. on stair m² 10.31 $ - $ - $ - $ - $ -
A-201 Sub-Total For FLOOR FINISH $ - $ - $ -
A-202 DOOR, WINDOW & HANDRAIL
Window W5((1.0mx 3.05m)
A-203 Frame aluminum pcs 1.00 $ - $ - $ - $ - $ -
Laminat safety glass 10mm thk.
Window B2 ((2.2mx 3.05m)
A-204 Frame aluminum pcs 1.00 $ - $ - $ - $ - $ -
Louver gril
Window W6((1.2mx 3.05m)
A-205 Frame aluminum pcs 2.00 $ - $ - $ - $ - $ -
Laminat safety glass 10mm thk.
A-206 Wooden door (0.8mx2.2mm) pcs 8.00 $ - $ - $ - $ - $ -
A-207 Wooden door (0.8mx2.2mm) W.C pcs 1.00 $ - $ - $ - $ - $ -
A-208 Steel stair handrail height 800mm m 6.00 $ - $ - $ - $ - $ -
Sub-Total For DOOR, WINDOW &
A-209 $ - $ - $ -
HANDRAIL
A-210 WALL FINISH
A-211 Internal wall painting (Warranty 5year) m² 366.30 $ - $ - $ - $ - $ -
A-212 External wall painting (Warranty 10year) m² 99.13 $ - $ - $ - $ - $ -
A-213 Sub-Total For WALL FINISH $ - $ - $ -
A-214 Sub Total For 3F FLOOR $ - $ - $ -
A-215 4F FLOOR
A-216 MASONARY WORK
A-217 Brick wall 100mm thk. m² 228.60 $ - $ - $ - $ - $ -
A-218 Brick wall 200mm thk. m² 43.71 $ - $ - $ - $ - $ -
A-219 Stiffener 80x180mm m 17.98 $ - $ - $ - $ - $ -
A-220 Stiffener 180x180mm m 8.00 $ - $ - $ - $ - $ -
A-221 Lintel 180x180mm m 101.10 $ - $ - $ - $ - $ -
A-222 Lintel 80x180mm m 3.10 $ - $ - $ - $ - $ -
A-223 Internal plastering 15mm thk. m² 489.21 $ - $ - $ - $ - $ -
A-224 External plastering 20mm thk. m² 99.13 $ - $ - $ - $ - $ -
A-225 Corner bead m 171.87 $ - $ - $ - $ - $ -
A-226 Sub-Total For MASONARY WORK $ - $ - $ -
A-227 CEILING WORK
A-228 Normal flate ceiling m² 96.55 $ - $ - $ - $ - $ -
A-229 Normal model ceiling m² - $ - $ - $ - $ - $ -
A-230 Moisture flate ceiling m² 21.22 $ - $ - $ - $ - $ -
A-231 Acess panel (600x600)mm pcs 5.00 $ - $ - $ - $ - $ -
A-232 Redo m 26.60 $ - $ - $ - $ - $ -
A-233 Sub-Total For CEILING WORK $ - $ - $ -
A-234 WATER PROOOF
Water proof menbrance
A-235 m² $ - $ - $ - $ - $ -
Sika bitus seal SG130(3mm thk.)
A-236 Silka top seal 107 m² 30.96 $ - $ - $ - $ - $ -
A-237 Sub-Total For WATER PROOOF $ - $ - $ -
A-238 FLOOR FINISH
A-239 Floor tile 600x600 m² 98.86 $ - $ - $ - $ - $ -
A-240 Skirting tile m 127.20 $ - $ - $ - $ - $ -
A-241 Floor tile(300x300)mm W.C m² 21.22 $ - $ - $ - $ - $ -
A-242 Wall tile (300x600)mm W.C m² 121.70 $ - $ - $ - $ - $ -
A-243 Marble 18mm thk. on stair m² 10.31 $ - $ - $ - $ - $ -
A-244 Sub-Total For FLOOR FINISH $ - $ - $ -
A-245 DOOR, WINDOW & HANDRAIL
Window W5((1.0mx 3.05m)
A-246 Frame aluminum pcs 1.00 $ - $ - $ - $ - $ -
Laminat safety glass 10mm thk.
Window B2 ((2.2mx 3.05m)
A-247 Frame aluminum pcs 1.00 $ - $ - $ - $ - $ -
Louver gril
Window W6((1.2mx 3.05m)
A-248 Frame aluminum pcs 2.00 $ - $ - $ - $ - $ -
Laminat safety glass 10mm thk.
Door D1(1.4mx 3.36m)
A-249 Frame aluminum pcs 4.00 $ - $ - $ - $ - $ -
Temper glass 10mm thk.
A-250 Wooden door (0.8mx2.2mm) pcs 6.00 $ - $ - $ - $ - $ -
A-251 Wooden door (0.8mx2.2mm) W.C pcs 5.00 $ - $ - $ - $ - $ -
A-252 Steel stair handrail height 800mm m 6.00 $ - $ - $ - $ - $ -
Sub-Total For DOOR, WINDOW &
A-253 $ - $ - $ -
HANDRAIL
A-254 WALL FINISH
A-255 Internal wall painting (Warranty 5year) m² 489.21 $ - $ - $ - $ - $ -
A-256 External wall painting (Warranty 10year) m² 99.13 $ - $ - $ - $ - $ -
A-257 Sub-Total For WALL FINISH $ - $ - $ -
A-258 Sub Total For 4F FLOOR $ - $ - $ -
A-259 5F FLOOR
A-260 MASONARY WORK

BILL-4ARC/13/21Pages Print on 24-02-23


BILL-04.ARCHITECTURE WORK

U.PRICE (US$) AMOUNT (US$) TOTAL


ITEM DESCRIPTION UNIT QTY. REMARKS
MATERIAL LABOR MATERIAL LABOR AMOUNT (US$)
[A] [B] [C] [D] = [A] X [B] [E] = [A] X [C] [F] = [D] + [E]
A-261 Brick wall 100mm thk. m² 184.72 $ - $ - $ - $ - $ -
A-262 Brick wall 200mm thk. m² 51.03 $ - $ - $ - $ - $ -
A-263 Stiffener 80x180mm m 11.68 $ - $ - $ - $ - $ -
A-264 Stiffener 180x180mm m 4.40 $ - $ - $ - $ - $ -
A-265 Lintel 180x180mm m 87.62 $ - $ - $ - $ - $ -
A-266 Lintel 80x180mm m 3.10 $ - $ - $ - $ - $ -
A-267 Internal plastering 15mm thk. m² 394.33 $ - $ - $ - $ - $ -
A-268 External plastering 20mm thk. m² 106.41 $ - $ - $ - $ - $ -
A-269 Corner bead m 266.56 $ - $ - $ - $ - $ -
A-270 Sub-Total For MASONARY WORK $ - $ - $ -
A-271 CEILING WORK
A-272 Normal flate ceiling m² 115.00 $ - $ - $ - $ - $ -
A-273 Normal model ceiling m² - $ - $ - $ - $ - $ -
A-274 Moisture flate ceiling m² 4.00 $ - $ - $ - $ - $ -
A-275 Acess panel (600x600)mm pcs 1.00 $ - $ - $ - $ - $ -
A-276 Redo m 23.70 $ - $ - $ - $ - $ -
A-277 Sub-Total For CEILING WORK $ - $ - $ -
A-278 WATER PROOOF
Water proof menbrance
A-279 m² $ - $ - $ - $ - $ -
Sika bitus seal SG130(3mm thk.)
A-280 Silka top seal 107 m² 5.75 $ - $ - $ - $ - $ -
A-281 Sub-Total For WATER PROOOF $ - $ - $ -
A-282 FLOOR FINISH
A-283 Pavement floor for main entrance m² $ - $ - $ - $ - $ -
A-284 Polish concrete surface m² $ - $ - $ - $ - $ -
A-285 Floor tile 600x600 m² 117.00 $ - $ - $ - $ - $ -
A-286 Skirting tile m 146.00 $ - $ - $ - $ - $ -
A-287 Floor tile(300x300)mm W.C m² 4.00 $ - $ - $ - $ - $ -
A-288 Wall tile (300x600)mm W.C m² 21.88 $ - $ - $ - $ - $ -
A-289 Marble 18mm thk. on stair m² 10.31 $ - $ - $ - $ - $ -
A-290 Sub-Total For FLOOR FINISH $ - $ - $ -
A-291 DOOR, WINDOW & HANDRAIL
Window W5((1.0mx 3.05m)
A-292 Frame aluminum pcs 1.00 $ - $ - $ - $ - $ -
Laminat safety glass 10mm thk.
Window B2 ((2.2mx 3.05m)
A-293 Frame aluminum pcs 1.00 $ - $ - $ - $ - $ -
Louver gril
Door D1(1.4mx 3.36m)
A-294 Frame aluminum pcs 1.00 $ - $ - $ - $ - $ -
Temper glass 10mm thk.
A-295 Wooden door (0.8mx2.2mm) pcs 8.00 $ - $ - $ - $ - $ -
A-296 Wooden door (0.8mx2.2mm) W.C pcs 1.00 $ - $ - $ - $ - $ -
A-297 Steel stair handrail height 800mm m 6.00 $ - $ - $ - $ - $ -
Sub-Total For DOOR, WINDOW &
A-298 $ - $ - $ -
HANDRAIL
A-299 WALL FINISH
A-300 Internal wall painting (Warranty 5year) m² 394.33 $ - $ - $ - $ - $ -
A-301 External wall painting (Warranty 10year) m² 106.41 $ - $ - $ - $ - $ -
A-302 Sub-Total For WALL FINISH $ - $ - $ -
A-303 Sub Total For 5F FLOOR $ - $ - $ -
A-304 TERRACE FLOOR
A-305 MASONARY WORK
A-306 Brick wall 100mm thk. m² 124.04 $ - $ - $ - $ - $ -
A-307 Brick wall 200mm thk. m² 44.53 $ - $ - $ - $ - $ -
A-308 Stiffener 80x180mm m 9.58 $ - $ - $ - $ - $ -
A-309 Stiffener 180x180mm m 8.20 $ - $ - $ - $ - $ -
A-310 Lintel 180x180mm m 53.92 $ - $ - $ - $ - $ -
A-311 Lintel 80x180mm m 3.10 $ - $ - $ - $ - $ -
A-312 Internal plastering 15mm thk. m² 267.15 $ - $ - $ - $ - $ -
A-313 External plastering 20mm thk. m² 99.90 $ - $ - $ - $ - $ -
A-314 Corner bead m 317.96 $ - $ - $ - $ - $ -
A-315 Sub-Total For MASONARY WORK $ - $ - $ -
A-316 CEILING WORK
A-317 Normal flate ceiling m² 32.70 $ - $ - $ - $ - $ -
A-318 Normal model ceiling m² - $ - $ - $ - $ - $ -
A-319 Moisture flate ceiling m² 2.10 $ - $ - $ - $ - $ -
A-320 Acess panel (600x600)mm pcs 1.00 $ - $ - $ - $ - $ -
A-321 Redo m 1.00 $ - $ - $ - $ - $ -
A-322 Sub-Total For CEILING WORK $ - $ - $ -
A-323 WATER PROOOF
Water proof menbrance
A-324 m² 99.00 $ - $ - $ - $ - $ -
Sika bitus seal SG130(3mm thk.)
A-325 Silka top seal 107 m² 4.47 $ - $ - $ - $ - $ -
A-326 Sub-Total For WATER PROOOF $ - $ - $ -
A-327 FLOOR FINISH
A-328 Pavement floor for main entrance m² $ - $ - $ - $ - $ -
A-329 Polish concrete surface m² $ - $ - $ - $ - $ -
A-330 Floor tile 600x600 m² 118.00 $ - $ - $ - $ - $ -
A-331 Skirting tile m 134.50 $ - $ - $ - $ - $ -

BILL-4ARC/14/21Pages Print on 24-02-23


BILL-04.ARCHITECTURE WORK

U.PRICE (US$) AMOUNT (US$) TOTAL


ITEM DESCRIPTION UNIT QTY. REMARKS
MATERIAL LABOR MATERIAL LABOR AMOUNT (US$)
[A] [B] [C] [D] = [A] X [B] [E] = [A] X [C] [F] = [D] + [E]
A-332 Floor tile(300x300)mm W.C m² 2.71 $ - $ - $ - $ - $ -
A-333 Wall tile (300x600)mm W.C m² 22.00 $ - $ - $ - $ - $ -
A-334 Marble 18mm thk. on stair m² - $ - $ - $ - $ - $ -
A-335 Sub-Total For FLOOR FINISH $ - $ - $ -
A-336 DOOR, WINDOW & HANDRAIL
Window W5((1.0mx 3.05m)
A-337 Frame aluminum pcs 1.00 $ - $ - $ - $ - $ -
Laminat safety glass 10mm thk.
Window B2 ((2.2mx 3.05m)
A-338 Frame aluminum pcs 1.00 $ - $ - $ - $ - $ -
Louver gril
Door D1(1.4mx 3.36m)
A-339 Frame aluminum pcs 1.00 $ - $ - $ - $ - $ -
Temper glass 10mm thk.
A-340 Wooden door (0.8mx2.2mm) pcs 6.00 $ - $ - $ - $ - $ -
A-341 Wooden door (0.8mx2.2mm) W.C pcs 1.00 $ - $ - $ - $ - $ -
A-342 Steel stair handrail height 800mm m 6.00 $ - $ - $ - $ - $ -
Sub-Total For DOOR, WINDOW &
A-343 $ - $ - $ -
HANDRAIL
A-344 WALL FINISH
A-345 Internal wall painting (Warranty 5year) m² 267.15 $ - $ - $ - $ - $ -
A-346 External wall painting (Warranty 10year) m² 99.90 $ - $ - $ - $ - $ -
A-347 Sub-Total For WALL FINISH $ - $ - $ -
A-348 Sub Total For TERRACE FLOOR $ - $ - $ -
A-344 ROOF FLOOR
A-349 WATER PROOOF
Water proof menbrance
A-350 m² 166.50 $ - $ - $ - $ - $ -
Sika bitus seal SG130(3mm thk.)
A-351 Sub-Total For WATER PROOOF $ - $ - $ -
A-352 Sub Total For ROOF FLOOR $ - $ - $ -
A-343 Facadé WORk
A-353 Curtain wall
Curtain wall Front building (1F-5F)
A-353 Frame Aluminum m² 145.33 $ - $ - $ - $ - $ -
Laminate Safety glass 8mm thk.
Curtain wall Left building (1F-5F)
A-353 Frame Aluminum m² 271.90 $ - $ - $ - $ - $ -
Laminate Safety glass 8mm thk.
A-354 Skin A m² 63.70 $ - $ - $ - $ - $ -
A-355 Sub-Total For Curtain wall $ - $ - $ -
A-356 Sub Total For Facadé WORk $ - $ - $ -
A-349 ROOF MF
A-357 Alucabon MF m² 24.23 $ - $ - $ - $ - $ -
A-357 ROOF Zine MF(Behind building) m² 5.25 $ - $ - $ - $ - $ -
A-358 Sub Total For ROOF MF $ - $ - $ -
A-359 GRAND TOTAL $ - $ - $ -

BILL-4ARC/15/21Pages Print on 24-02-23


[Company Name]
[Address company]
Phnom Penh - Cambodia
[Phone Contact]
[Email Address]
CLIENT :
PROJECT :BUILDING
LOCATION :Phnom Penh Cambodia
PACKAGE : PRELIMNARY,BORE PILE ,STR,ARC,MEP
REVISION : REV-00 Friday, February 24, 2023
BILL-05.MEP WORK

U.PRICE (US$) AMOUNT (US$) TOTAL


ITEM DESCRIPTION UNIT QTY. REMARKS
MATERIAL LABOR MATERIAL LABOR AMOUNT (US$)
[A] [B] [C] [D] = [A] X [B] [E] = [A] X [C] [F] = [D] + [E]
1 MEP WORKS
2 MVAC SYSTEM
3 Air Conditioning System
Material By
4 AC Wall Mounted Inverter 1.0 HP set 7.00 $ - $ - $ - $ - $ -
owner
Material By
5 AC Wall Mounted Inverter 1.5 HP set 5.00 $ - $ - $ - $ - $ -
owner
Material By
6 AC Wall Mounted Inverter 2.0 HP set 10.00 $ - $ - $ - $ - $ -
owner
Material By
7 AC Wall Mounted Inverter 2.5 HP set 3.00 $ - $ - $ - $ - $ -
owner
Material By
8 AC 4 Way Cassette Inverter 2.0 HP set 1.00 $ - $ - $ - $ - $ -
owner
Material By
9 AC 4 Way Cassette Inverter 6.0 HP set 1.00 $ - $ - $ - $ - $ -
owner
10 CDU Sopport set 27.00 $ - $ - $ - $ - $ - Local
Refrigerant Copper Pipe OD 6.35mm,
11 m 504.00 $ - $ - $ - $ - $ - Hailiang
thk. 0.72mm
Refrigerant Copper Pipe OD 9.52mm,
12 m 234.00 $ - $ - $ - $ - $ - Hailiang
thk. 0.72mm
Refrigerant Copper Pipe OD 12.70mm,
13 m 293.00 $ - $ - $ - $ - $ - Hailiang
thk. 0.72mm
Refrigerant Copper Pipe OD 19.05mm,
14 m 23.00 $ - $ - $ - $ - $ - Hailiang
thk. 0.72mm
Insulation Refrigerant Copper Pipe OD
15 m 504.00 $ - $ - $ - $ - $ - CF-Flex
6.35mm, thk. 19mm
Insulation Refrigerant Copper Pipe OD
16 m 234.00 $ - $ - $ - $ - $ - CF-Flex
9.52mm, thk. 19mm
Insulation Refrigerant Copper Pipe OD
17 m 293.00 $ - $ - $ - $ - $ - CF-Flex
12.70mm, thk. 19mm
Insulation Refrigerant Copper Pipe OD
18 m 23.00 $ - $ - $ - $ - $ - CF-Flex
19.05mm, thk. 19mm

19 Drain Water Pipe PVC DN20, Class 8.5 m 205.00 $ - $ - $ - $ - $ - KAP

20 Drain Water Pipe PVC DN25, Class 8.5 m 74.00 $ - $ - $ - $ - $ - KAP

21 Drain Water Pipe PVC DN32, Class 8.5 m 6.00 $ - $ - $ - $ - $ - KAP

22 Drain Water Pipe PVC DN40, Class 8.5 m 53.00 $ - $ - $ - $ - $ - KAP

Insulation Drain Water Pipe PVC DN20,


23 m 205.00 $ - $ - $ - $ - $ - CF-Flex
thk. 9mm
Insulation Drain Water Pipe PVC DN25,
24 m 74.00 $ - $ - $ - $ - $ - CF-Flex
thk. 9mm
Insulation Drain Water Pipe PVC DN32,
25 m 6.00 $ - $ - $ - $ - $ - CF-Flex
thk. 9mm
Insulation Drain Water Pipe PVC DN40,
26 m 53.00 $ - $ - $ - $ - $ - CF-Flex
thk. 9mm
27 1C x 2.5mm² Cu/PVC / Cable m 2,635.00 $ - $ - $ - $ - $ - Keystone
28 PVC Conduit dai. 25mm m 527.00 $ - $ - $ - $ - $ -
29 PVC Flexible Conduit dai. 25mm m 132.00 $ - $ - $ - $ - $ -
30 Additional Gas kg 19.00 $ - $ - $ - $ - $ - USA
31 Nitrogen N2 lot 1.00 $ - $ - $ - $ - $ - Local
32 Access Panel 450x450mm pcs 2.00 $ - $ - $ - $ - $ - Local
33 Fitting & Accessories lot 1.00 $ - $ - $ - $ - $ - Local
34 Ventilation System $ - $ -

Kitchen Hood 500 m3


35 set 1.00 $ - $ - $ - $ - $ - By Owner
/h_700mmx400mm (Home Use Type)

36 Inline Exhaust Fan 600 m3/h @ 50Pa set 1.00 $ - $ - $ - $ - $ - Grad

BILL-5MEP/16/21Pages Print on 24-02-23


BILL-05.MEP WORK

U.PRICE (US$) AMOUNT (US$) TOTAL


ITEM DESCRIPTION UNIT QTY. REMARKS
MATERIAL LABOR MATERIAL LABOR AMOUNT (US$)
[A] [B] [C] [D] = [A] X [B] [E] = [A] X [C] [F] = [D] + [E]

37 Ceiling Exhaust Fan 90 m3 /h @ 50Pa set 5.00 $ - $ - $ - $ - $ - Lonon

38 Wall Exhaust Fan 650 m3 /h set 1.00 $ - $ - $ - $ - $ - Lonon


39 Wall Exhaust Fan 90 m3 /h set 8.00 $ - $ - $ - $ - $ - Lonon
40 Gavanised Steel Duct, thk 0.6mm m² 22.00 $ - $ - $ - $ - $ - Local
41 Exhaust Air Louver 150mmx150mm pcs 1.00 $ - $ - $ - $ - $ - Grad
42 Exhaust Air Louver 200mmx200mm pcs 3.00 $ - $ - $ - $ - $ - Grad
43 Exhaust Air Louver 350mmx250mm pcs 1.00 $ - $ - $ - $ - $ - Grad
44 Exhaust Air Grill 250mmx250mm pcs 1.00 $ - $ - $ - $ - $ - Grad
45 Flexible Duct Dia. 250mm m 2.00 $ - $ - $ - $ - $ - CF-Flex
46 Flexible Duct Dia. 150mm m 2.00 $ - $ - $ - $ - $ - CF-Flex
47 Flexible Duct Dia. 100mm m 11.00 $ - $ - $ - $ - $ - CF-Flex
48 Fitting & Accessories lot 1.00 $ - $ - $ - $ - $ - Local
49 Sub Total For MVAC SYSTEM $ - $ - $ - $ - $ -
50 Electrical System $ - $ -
51 Main Equipment - -
Power Transfromer Oil Type 160kVA,
52 set 1.00 $ - $ - $ - $ - $ - By Owner
400v/230v/50Hz
Power Generator Closed Type
53 set 1.00 $ - $ - $ - $ - $ - By Owner
160kVA, 400v/230v/50Hz
54 Distribution Board - -
55 MDB-GF (MCCB-3P-250A 15kA) lot 1.00 $ - $ - $ - $ - $ - Local
56 DB-MF (MCCB-3P-32A 10kA) lot 1.00 $ - $ - $ - $ - $ - Local
57 DB-E1 (MCCB-3P-32A 10kA) lot 1.00 $ - $ - $ - $ - $ - Local
58 DB-E2 (MCCB-3P-80A 10kA) lot 1.00 $ - $ - $ - $ - $ - Local
59 DB-E3 (MCCB-3P-32A 10kA) lot 1.00 $ - $ - $ - $ - $ - Local
60 DB-E4 (MCCB-3P-40A 10kA) lot 1.00 $ - $ - $ - $ - $ - Local
61 DB-E5 (MCCB-3P-32A 10kA) lot 1.00 $ - $ - $ - $ - $ - Local
62 DB-TF (MCCB-3P-25A 10kA) lot 1.00 $ - $ - $ - $ - $ - Local
63 Accessories lot 1.00 $ - $ - $ - $ - $ - Local
64 Power Cable - -
4Cx95mm2 Cu/XLPE/PVC Cable
65 m 55.00 $ - $ - $ - $ - $ - Keystone
(Transformer to MDB)
4Cx95mm2 Cu/XLPE/PVC Cable
66 m 39.00 $ - $ - $ - $ - $ - Keystone
(Generator to MDB)
1Cx25mm2 Cu/XLPE/PVC Cable (MDB
67 m 97.00 $ - $ - $ - $ - $ - Keystone
to DB-E2)
1Cx16mm2 Cu/PVC Cable (MDB to DB-
68 m 24.00 $ - $ - $ - $ - $ - Keystone
E2)
1Cx10mm2 Cu/XLPE/PVC Cable (MDB
69 m 132.00 $ - $ - $ - $ - $ - Keystone
to DB-E4)
1Cx10mm2 Cu/PVC Cable (MDB to DB-
70 m 33.00 $ - $ - $ - $ - $ - Keystone
E4)
1Cx6mm2 Cu/XLPE/PVC Cable (MDB
71 m 572.00 $ - $ - $ - $ - $ - Keystone
to DB-MF,E1,E3,E5,TF)
1Cx6mm2 Cu/PVC Y/G Cable (MDB
72 m 143.00 $ - $ - $ - $ - $ - Keystone
to DB-MF,E1,E3,E5,TF)

73 1Cx4mm2 Cu/PVC Cable (AC Cable) m 88.00 $ - $ - $ - $ - $ - Keystone

1Cx2.5mm2 Cu/PVC Cable (AC


74 m 1,742.00 $ - $ - $ - $ - $ - Keystone
Cable)
4Cx4mm2 Cu/XLPE/PVC Cable
75 m 22.00 $ - $ - $ - $ - $ - Keystone
(Transfer Pump)
1Cx4mm2 Cu/PVC Y/G Cable
76 m 22.00 $ - $ - $ - $ - $ - Keystone
(Transfer Pump)
4Cx4mm2 Cu/XLPE/PVC Cable (Fire
77 m 22.00 $ - $ - $ - $ - $ - Keystone
Pump)
1Cx4mm2 Cu/PVC Y/G Cable (Fire
78 m 22.00 $ - $ - $ - $ - $ - Keystone
Pump)
4Cx4mm2 Cu/XLPE/PVC Cable
79 m 22.00 $ - $ - $ - $ - $ - Keystone
(Jockey Pump)
1Cx4mm2 Cu/PVC Y/G Cable
80 m 22.00 $ - $ - $ - $ - $ - Keystone
(Jockey Pump)
4Cx4mm2 Cu/XLPE/PVC Cable
81 m 33.00 $ - $ - $ - $ - $ - Keystone
(Booster Pump)
1Cx4mm2 Cu/PVC Y/G Cable
82 m 33.00 $ - $ - $ - $ - $ - Keystone
(Booster Pump)
4Cx16mm2 Cu/XLPE/PVC Cable (MDB
83 m 54.00 $ - $ - $ - $ - $ - Keystone
to Lift)
1Cx16mm2 Cu/PVC Y/G Cable (MDB
84 m 54.00 $ - $ - $ - $ - $ - Keystone
to Lift)
85 uPVC Conduit OD25mm m 581.00 $ - $ - $ - $ - $ -

BILL-5MEP/17/21Pages Print on 24-02-23


BILL-05.MEP WORK

U.PRICE (US$) AMOUNT (US$) TOTAL


ITEM DESCRIPTION UNIT QTY. REMARKS
MATERIAL LABOR MATERIAL LABOR AMOUNT (US$)
[A] [B] [C] [D] = [A] X [B] [E] = [A] X [C] [F] = [D] + [E]
86 uPVC Conduit OD32mm m 62.00 $ - $ - $ - $ - $ -
87 Accessories lot 1.00 $ - $ - $ - $ - $ - Local
88 Main Network System - -
89 Manhole 600x600mm pcs 2.00 $ - $ - $ - $ - $ -
90 HDPE OD90 PN6 m 28.00 $ - $ - $ - $ - $ - RLC
91 HDPE OD50 PN6 m 28.00 $ - $ - $ - $ - $ - RLC
92 Cable Tray 150x100mm m 73.00 $ - $ - $ - $ - $ - Local
93 Cable Tray 100x100mm m 94.00 $ - $ - $ - $ - $ - Local
94 Cable Tray Elbow 90 150x100mm pcs 7.00 $ - $ - $ - $ - $ - Local
95 Cable Tray Elbow 90 100x100mm pcs 26.00 $ - $ - $ - $ - $ - Local
96 Cable Tray Tee 150x100mm pcs 1.00 $ - $ - $ - $ - $ - Local
97 Cable Tray Tee 100x100mm pcs 7.00 $ - $ - $ - $ - $ - Local
98 Cable Tray Reducer 150 -100mm pcs 1.00 $ - $ - $ - $ - $ - Local
99 Cable Tray Support lot 1.00 $ - $ - $ - $ - $ - Local
100 Accessories lot 1.00 $ - $ - $ - $ - $ - Local
101 Lighting System - -
Racer /
102 Surface Mounted Down Light 12W pcs 24.00 $ - $ - $ - $ - $ -
Laviki
Racer /
103 Recess Down Light 12W pcs 273.00 $ - $ - $ - $ - $ -
Laviki
Racer /
104 Recess Down Light 9W pcs 23.00 $ - $ - $ - $ - $ -
Laviki
Racer /
105 Fluorescent Ligh 0.6m 1x18W pcs 15.00 $ - $ - $ - $ - $ -
Laviki
Racer /
106 Chandelier Light 50W pcs 1.00 $ - $ - $ - $ - $ -
Laviki
Racer /
107 Pendant Light 25W pcs 1.00 $ - $ - $ - $ - $ -
Laviki
108 Exit Light pcs 10.00 $ - $ - $ - $ - $ - ASW
109 Emergency Wall Light pcs 17.00 $ - $ - $ - $ - $ - ASW
110 1 Gang 1 way Switch pcs 46.00 $ - $ - $ - $ - $ - Lonon
111 2 Gang 1 way Switch pcs 31.00 $ - $ - $ - $ - $ - Lonon
112 3 Gang 1 way Switch pcs 3.00 $ - $ - $ - $ - $ - Lonon
113 1 Gang 2way Switch pcs 14.00 $ - $ - $ - $ - $ - Lonon
114 1Cx1.5mm²-Cu/PVC Cable m 8,991.00 $ - $ - $ - $ - $ - Keystone
115 Flexible uPVC OD20mm m 801.00 $ - $ - $ - $ - $ -
116 uPVC OD20mm m 3,597.00 $ - $ - $ - $ - $ -
117 Accessories lot 1.00 $ - $ - $ - $ - $ - Local
118 Power Socket System - -
119 Single Socket Outlet Universal pcs 71.00 $ - $ - $ - $ - $ - Lonon
120 Double Socket Outlet Universal pcs 56.00 $ - $ - $ - $ - $ - Lonon
Single Socket Outlet Universal with
121 pcs 17.00 $ - $ - $ - $ - $ - Lonon
Water Proof

122 1Cx2.5mm²-Cu/PVC Cable (Socket) m 6,336.00 $ - $ - $ - $ - $ - Keystone

1Cx4mm²-Cu/PVC Cable (Power Point


123 m 251.00 $ - $ - $ - $ - $ - Keystone
Operation Rooms)
1Cx16mm²-Cu/PVC Cable (Power
124 m 154.00 $ - $ - $ - $ - $ - Keystone
Point Sterilization Room)
1Cx4mm²-Cu/PVC Cable (Water
125 m 380.00 $ - $ - $ - $ - $ - Keystone
Heater)
126 uPVC OD25mm m 1,977.00 $ - $ - $ - $ - $ -
127 Accessories lot 1.00 $ - $ - $ - $ - $ - Local
128 Earthing System - -
Copper Bonded Earth Rod ∅14mm,
129 pcs 6.00 $ - $ - $ - $ - $ - India
L=2.4m
130 Exothermic Welding, 115g pcs 3.00 $ - $ - $ - $ - $ - India
131 Earth Pit 300mm x 300mm pcs 1.00 $ - $ - $ - $ - $ - India
132 Coupling pcs 3.00 $ - $ - $ - $ - $ - India
133 Bare Copper Cable 70mm2 m 15.00 $ - $ - $ - $ - $ - Keystone
134 1Cx50mm2 Cu/PVC Y/G Cable m 8.00 $ - $ - $ - $ - $ - Keystone
135 uPVC Conduit OD32mm m 8.00 $ - $ - $ - $ - $ -
136 Accessories lot 1.00 $ - $ - $ - $ - $ - Local
137 Lightning Protection System - -
ESE Air Terminal With RP=19, H=3m
138 set 1.00 $ - $ - $ - $ - $ - LPI
@Protection Level I
139 Lightning Strike Counter pcs 1.00 $ - $ - $ - $ - $ - LPI
140 Test Box pcs 1.00 $ - $ - $ - $ - $ - LPI
Copper Bonded Earth Rod ∅14mm,
141 pcs 6.00 $ - $ - $ - $ - $ - India
L=2.4m
142 Exothermic Welding, 115g pcs 3.00 $ - $ - $ - $ - $ - India

BILL-5MEP/18/21Pages Print on 24-02-23


BILL-05.MEP WORK

U.PRICE (US$) AMOUNT (US$) TOTAL


ITEM DESCRIPTION UNIT QTY. REMARKS
MATERIAL LABOR MATERIAL LABOR AMOUNT (US$)
[A] [B] [C] [D] = [A] X [B] [E] = [A] X [C] [F] = [D] + [E]
143 Earth Pit 300mm x 300mm pcs 1.00 $ - $ - $ - $ - $ - India
144 Coupling pcs 3.00 $ - $ - $ - $ - $ - India
145 Copper Tape 25x3mm m 47.00 $ - $ - $ - $ - $ - India
146 Bare Copper Cable 70mm2 m 17.00 $ - $ - $ - $ - $ - Keystone
147 uPVC Conduit OD32mm m 6.00 $ - $ - $ - $ - $ -
148 Accessories lot 1.00 $ - $ - $ - $ - $ - Local
149 Sub Total For Electrical System $ - $ - $ - $ - $ -
150 ELV SYSTEM - -
151 CCTV System - -
152 IP Dome Camera 4MP set 26.00 $ - $ - $ - $ - $ - Hikvission
153 IP Bullet Camera 4MP set 4.00 $ - $ - $ - $ - $ - Hikvission
154 NVR 32-Channel set 1.00 $ - $ - $ - $ - $ - Hikvission
155 PoE Swicth 24Port set 2.00 $ - $ - $ - $ - $ - Hikvission
156 Patch Panel 24Port pcs 2.00 $ - $ - $ - $ - $ - AMP
157 Cable Management pcs 2.00 $ - $ - $ - $ - $ - AMP
158 Hard Disk 8TB pcs 6.00 $ - $ - $ - $ - $ - WD
159 TV 43 Inch set 1.00 $ - $ - $ - $ - $ - LG

160 Cabinet Rack 27U (For CCTV, Data) set 1.00 $ - $ - $ - $ - $ - Toten

161 UPS Backup 10KVA set 1.00 $ - $ - $ - $ - $ - Zpower


162 Cat6 Patch Cord 1m pcs 48.00 $ - $ - $ - $ - $ - AMP
163 HDMI Cable 15m pcs 1.00 $ - $ - $ - $ - $ - Dtech
164 Cat 6 Cable 24AWG m 1,374.00 $ - $ - $ - $ - $ - AD-Link
165 uPVC Conduit OD20mm m 1,099.00 $ - $ - $ - $ - $ -
166 uPVC Flexible OD20mm m 79.00 $ - $ - $ - $ - $ -
167 Accessories lot 1.00 $ - $ - $ - $ - $ - Local
168 Data Network System $ - $ -

169 Router (By internet service provider) set 1.00 $ - $ - $ - $ - $ - By Owner

170 PoE Switch 16Port set 1.00 $ - $ - $ - $ - $ - Cisco


171 Network Switch 24Port set 1.00 $ - $ - $ - $ - $ - Cisco
172 Patch Panel 16Port set 1.00 $ - $ - $ - $ - $ - AMP
173 Patch Panel 24Port set 1.00 $ - $ - $ - $ - $ - AMP
174 Cable Management set 2.00 $ - $ - $ - $ - $ - AMP
175 Cat6 Patch Cord 1m pcs 40.00 $ - $ - $ - $ - $ - AMP
176 Wi-Fi Access Point pcs 8.00 $ - $ - $ - $ - $ - Comfast
177 Data Socket Outlet pcs 15.00 $ - $ - $ - $ - $ - Lonon
178 Cat 6 Cable 24AWG m 879.00 $ - $ - $ - $ - $ - AD-Link
179 uPVC Conduit OD20mm m 703.00 $ - $ - $ - $ - $ -
180 Accessories lot 1.00 $ - $ - $ - $ - $ - Local
181 CATV System $ - $ -

182 Incomming TV cable (By TV provider) lot 1.00 $ - $ - $ - $ - $ - By Owner

183 Main Booster Ampifier pcs 1.00 $ - $ - $ - $ - $ - NFNA


184 Tap-Off 4Way pcs 1.00 $ - $ - $ - $ - $ - NFNA
185 Splitter 8Way pcs 1.00 $ - $ - $ - $ - $ - NFNA
186 TV Socket Outlet pcs 5.00 $ - $ - $ - $ - $ - Lonon
187 RG11 Cable m 39.00 $ - $ - $ - $ - $ - City Link
188 RG6 Cable m 118.00 $ - $ - $ - $ - $ - City Link
189 PVC Conduit Dai. 20mm m 141.00 $ - $ - $ - $ - $ -
190 Fittingt & Accessories lot 1.00 $ - $ - $ - $ - $ - Local
191 Sub Total For ELV SYSTEM $ - $ - $ - $ - $ -
192 Plumbing System $ - $ -
193 Cold Water System $ - $ -
194 Underground Water Tank 24m3 set 1.00 $ - $ - $ - $ - $ -
195 Roof Water Tank 3m3 (3000L) set 1.00 $ - $ - $ - $ - $ -
196 Water Level Sensor set 3.00 $ - $ - $ - $ - $ - EN
Watermeter c/w Gate Valve-DN40, By City
197 set 1.00 $ - $ - $ - $ - $ -
2pcs Water
Booster Pump set: 1duty 1standby:
198 set 1.00 $ - $ - $ - $ - $ - Leo Pump
Q=2.5l/s, H=2.5 bar
Transfer Pump set: 1duty 1standby:
199 set 1.00 $ - $ - $ - $ - $ - Leo Pump
Q=2.5l/s, H= 4.5 bar
200 HDPE DN 40 ( Incoming Line ) m 33.00 $ - $ - $ - $ - $ - LRC
201 PPR Pipe OD 50, PN 12.5 m 99.00 $ - $ - $ - $ - $ -
202 PPR Pipe OD32, PN 12.5 m 22.00 $ - $ - $ - $ - $ -
203 PPR Pipe OD25, PN 12.5 m 50.00 $ - $ - $ - $ - $ -
204 PPR Pipe OD20, PN 12.5 m 461.00 $ - $ - $ - $ - $ -
205 Tee OD50-32mm pcs 2.00 $ - $ - $ - $ - $ -
206 Tee OD50-25mm pcs 8.00 $ - $ - $ - $ - $ -
207 Tee OD50-20mm pcs 8.00 $ - $ - $ - $ - $ -
208 Elbow OD50mm pcs 8.00 $ - $ - $ - $ - $ -

BILL-5MEP/19/21Pages Print on 24-02-23


BILL-05.MEP WORK

U.PRICE (US$) AMOUNT (US$) TOTAL


ITEM DESCRIPTION UNIT QTY. REMARKS
MATERIAL LABOR MATERIAL LABOR AMOUNT (US$)
[A] [B] [C] [D] = [A] X [B] [E] = [A] X [C] [F] = [D] + [E]
209 Gate Valve OD50 pcs 10.00 $ - $ - $ - $ - $ -
210 Gate Valve OD32 pcs 1.00 $ - $ - $ - $ - $ -
211 Gate Valve OD25 pcs 4.00 $ - $ - $ - $ - $ -
212 Gate Valve OD20 pcs 28.00 $ - $ - $ - $ - $ -
213 Check Valve OD50 pcs 4.00 $ - $ - $ - $ - $ -
214 Flexible Joint OD50 pcs 8.00 $ - $ - $ - $ - $ -
215 Y-Strainer OD50 pcs 4.00 $ - $ - $ - $ - $ - Y.D.K
Pressure Gauge c/w Ball vale-OD20,
216 set 6.00 $ - $ - $ - $ - $ - Local
2pcs
217 Float Valve OD50 pcs 1.00 $ - $ - $ - $ - $ - Y.D.K
218 Float Valve OD40 pcs 1.00 $ - $ - $ - $ - $ - Y.D.K
219 Hose Bib-DN15 pcs 11.00 $ - $ - $ - $ - $ - Local
220 Fitting & Accessories lot 1.00 $ - $ - $ - $ - $ - Local
221 Hot Water System $ - $ -
222 Water Heater Tank 30L set 4.00 $ - $ - $ - $ - $ - Joven
223 PPR Pipe OD20, PN 20 m 52.00 $ - $ - $ - $ - $ -
224 Gate Valve 20 pcs 4.00 $ - $ - $ - $ - $ -
225 Fitting & Accessories lot 1.00 $ - $ - $ - $ - $ - Local
226 Sawage Water $ - $ -
Under Ground Concrete Septic Tank
227 set 1.00 $ - $ - $ - $ - $ -
17.m3 ( 2m x 5m x 1.7m )
228 DN 150 mm-PVC/Class8.5 m 66.00 $ - $ - $ - $ - $ - KAP
229 DN 100 mm-PVC/Class8.5 m 171.00 $ - $ - $ - $ - $ - KAP
230 DN 80 mm-PVC/Class8.5 m 17.00 $ - $ - $ - $ - $ - KAP
231 DN 65 mm-PVC/Class8.5 m 109.00 $ - $ - $ - $ - $ - KAP
232 DN 55 mm-PVC/Class8.5 m 233.00 $ - $ - $ - $ - $ - KAP
233 DN 40 mm-PVC/Class8.5 m 94.00 $ - $ - $ - $ - $ - KAP
234 Y 45º dia 150-100mm pcs 7.00 $ - $ - $ - $ - $ - KAP
235 Y 45º dia 150-100mm pcs 8.00 $ - $ - $ - $ - $ - KAP
236 Y 45º dia 100-100mm pcs 15.00 $ - $ - $ - $ - $ - KAP
237 Y 45º dia 100-80mm pcs 3.00 $ - $ - $ - $ - $ - KAP
238 Y 45º dia 100-55mm pcs 15.00 $ - $ - $ - $ - $ - KAP
239 Y 45º dia 100-65mm pcs 4.00 $ - $ - $ - $ - $ - KAP
240 Y 45º dia 80-65mm pcs 4.00 $ - $ - $ - $ - $ - KAP
241 Y 45º dia 65-65mm pcs 1.00 $ - $ - $ - $ - $ - KAP
242 Y 45º dia 65-55mm pcs 20.00 $ - $ - $ - $ - $ - KAP
243 Y 45º dia 65-40mm pcs 12.00 $ - $ - $ - $ - $ - KAP
244 Y 45º dia 55-55mm pcs 20.00 $ - $ - $ - $ - $ - KAP
245 Y 45º dia 55-40mm pcs 4.00 $ - $ - $ - $ - $ - KAP
246 45º Elbow dia 100mm pcs 76.00 $ - $ - $ - $ - $ - KAP
247 45º Elbow dia 80mm pcs 9.00 $ - $ - $ - $ - $ - KAP
248 45º Elbow dia 65mm pcs 36.00 $ - $ - $ - $ - $ - KAP
249 45º Elbow dia 55mm pcs 31.00 $ - $ - $ - $ - $ - KAP
250 45º Elbow dia 40mm pcs 80.00 $ - $ - $ - $ - $ - KAP
251 90º Elbow dia 55mm pcs 42.00 $ - $ - $ - $ - $ - KAP
252 Tee dia 100-55mm pcs 9.00 $ - $ - $ - $ - $ - KAP
253 Tee dia 65-55mm pcs 11.00 $ - $ - $ - $ - $ - KAP
254 Tee dia 55-55mm pcs 15.00 $ - $ - $ - $ - $ - KAP
255 Clean Out DN100mm pcs 7.00 $ - $ - $ - $ - $ - KAP
256 Clean Out DN65mm pcs 11.00 $ - $ - $ - $ - $ - KAP
257 Reducer DN100-55mm pcs 1.00 $ - $ - $ - $ - $ - KAP
258 Reducer DN80-65mm pcs 4.00 $ - $ - $ - $ - $ - KAP
259 Reducer DN65-55mm pcs 2.00 $ - $ - $ - $ - $ - KAP
260 Reducer DN65-40mm pcs 3.00 $ - $ - $ - $ - $ - KAP
261 Floor Clean Out DN100mm pcs 1.00 $ - $ - $ - $ - $ - KAP
262 Floor Clean Out DN65mm pcs 1.00 $ - $ - $ - $ - $ - KAP
263 Floor Drain DN55mm pcs 12.00 $ - $ - $ - $ - $ - KAP
264 P-Trap DN55 pcs 12.00 $ - $ - $ - $ - $ - KAP
265 Air Vent Cap-DN55 pcs 1.00 $ - $ - $ - $ - $ - KAP
266 Support & Accessories lot 1.00 $ - $ - $ - $ - $ - Local
267 Sanitary ware equipments (By Other) $ - $ -
Water closet (Flush Tank) + Spray + Material By
268 pcs 10.00 $ - $ - $ - $ - $ -
Flexible Hose owner
Material By
269 Urinal + Faucet pcs 10.00 $ - $ - $ - $ - $ -
owner
Lavatory + Mixer + Flexible Hose + P- Material By
270 pcs 27.00 $ - $ - $ - $ - $ -
Trap owner
Double Kitchen Sink + Mixer + Flexible Material By
271 pcs 1.00 $ - $ - $ - $ - $ -
Hose + P-Trap owner
Material By
272 Shower + Mixer pcs 4.00 $ - $ - $ - $ - $ -
owner

BILL-5MEP/20/21Pages Print on 24-02-23


BILL-05.MEP WORK

U.PRICE (US$) AMOUNT (US$) TOTAL


ITEM DESCRIPTION UNIT QTY. REMARKS
MATERIAL LABOR MATERIAL LABOR AMOUNT (US$)
[A] [B] [C] [D] = [A] X [B] [E] = [A] X [C] [F] = [D] + [E]
Material By
273 Mirror pcs 10.00 $ - $ - $ - $ - $ -
owner
Material By
274 Paper Holder pcs 11.00 $ - $ - $ - $ - $ -
owner
Material By
275 Shampoo Holder pcs 4.00 $ - $ - $ - $ - $ -
owner
Material By
276 Accessories lot 1.00 $ - $ - $ - $ - $ -
owner
277 Rain Water System lot $ - $ -
278 PVC-DN100, Class 8.5 m 66.00 $ - $ - $ - $ - $ - KAP
279 PVC-DN80, Class 8.5 m 31.00 $ - $ - $ - $ - $ - KAP
280 PVC-DN55, Class 8.6 m 28.00 $ - $ - $ - $ - $ - KAP
281 Elbow 45º DN-100 pcs 6.00 $ - $ - $ - $ - $ - KAP
282 Elbow 45º DN-80 pcs 1.00 $ - $ - $ - $ - $ - KAP
283 Elbow 45º DN-55 pcs 15.00 $ - $ - $ - $ - $ - KAP
284 Y DN100-100 pcs 1.00 $ - $ - $ - $ - $ - KAP
285 Y DN100-80 pcs 2.00 $ - $ - $ - $ - $ - KAP
286 Y DN80-55 pcs 5.00 $ - $ - $ - $ - $ - KAP
287 Reducer DN 100-80 pcs 1.00 $ - $ - $ - $ - $ - KAP
288 Clean Out DN 80 pcs 1.00 $ - $ - $ - $ - $ - Local
289 Roof Drain DN 80 pcs 2.00 $ - $ - $ - $ - $ - Local
290 Roof Drain DN 55 pcs 5.00 $ - $ - $ - $ - $ - Local
291 Support & Accessories pcs 1.00 $ - $ - $ - $ - $ - Local
292 Fire Fighting System lot $ - $ -

Fire pump Set:


- 1 Electrical Pump: Q = 1.2 L/s @ H = 6
bar
- 1 Jokey Pump: Q=0.1 L/s @H= 7 bar
- 2 Pressure Gauge 10 Bar
293 - 1 Flecxible Joint - DN65 & 1 Flecxible set 1.00 $ - $ - $ - $ - $ - Leo Pump
Joint - DN32
- 1 Check Valve - DN65 & 1 Check
Valve - DN32
- 1 Gate Valve - DN65 & 1 Gate Valve -
DN32

Fire Hose Reel Cabinet DN25 @Length


30m c/w:
- Fire Extinguishers ABC 5kg,1pcs
294 set 7.00 $ - $ - $ - $ - $ - ASW
- Fire Extinguishers CO2 3kg,1pcs
- Gate Valve DN25,1pcs
- Finish Jet & Spray Nozzle DN25,1pcs

295 Electrode Water Level set 1.00 $ - $ - $ - $ - $ - EN


296 Black Steel DN65 m 40.00 $ - $ - $ - $ - $ - BS
297 Black Steel DN32 m 39.00 $ - $ - $ - $ - $ - BS
298 Elbow90° DN65 pcs 5.00 $ - $ - $ - $ - $ - BS
299 Tee DN65-32 pcs 1.00 $ - $ - $ - $ - $ - BS
300 Reducer DN65-20 pcs 1.00 $ - $ - $ - $ - $ - BS
301 Automatic Air Vent DN20 @ 10 Bar pcs 1.00 $ - $ - $ - $ - $ - Gala
302 Gate Valve DN65 pcs 2.00 $ - $ - $ - $ - $ - Gala
303 Gate Valve DN32 pcs 1.00 $ - $ - $ - $ - $ - Gala
304 Gate Valve DN20 pcs 1.00 $ - $ - $ - $ - $ - Gala
305 Foot Valve DN65 pcs 1.00 $ - $ - $ - $ - $ - Gala
306 Y-Strainer DN65 pcs 1.00 $ - $ - $ - $ - $ - Gala
307 Y-Strainer DN32 pcs 1.00 $ - $ - $ - $ - $ - Gala
308 Pressure Gauge 6 Bar pcs 2.00 $ - $ - $ - $ - $ - Gala
309 Flecxible Joint DN65 pcs 1.00 $ - $ - $ - $ - $ - Local
310 Flecxible Joint DN32 pcs 1.00 $ - $ - $ - $ - $ - Local
311 Fitting & Accessories lot 1.00 $ - $ - $ - $ - $ - Local
312 Sub Total For Plumbing System $ - $ - $ - $ - $ -
313 GRAND TOTAL $ - $ - $ -