Professional Documents
Culture Documents
As-Built Boq - Avida One Union Place - Towers 1-3
As-Built Boq - Avida One Union Place - Towers 1-3
As-Built Boq - Avida One Union Place - Towers 1-3
Haysen-M C. Venal
Shinka Constrquction Services
Date: 24-November-2022
BILL OF QUANTITIES (BOQ)
Site Name
i
HORIZONTAL
B Horizontal FOC, Clear Track and Termination Boxes
1 Fiber Distribution Panel piece(s) 0.00 0.00 0.00 0.00
2 Clear Track 12-Fiber Micro-Module meter(s) 0.00 - 7.00 7.00 - 0.00 0.00
3 Micro Point-of-Entry Wall Cover piece(s) 0.00 - 120.00 100.00 - 0.00 0.00
4 Clear Track Fiber Point-of-Entry Sliding Wall Cover piece(s) 0.00 - 120.00 120.00 - 0.00 0.00
5 Clear Track Hallway Fiber Pathway meter(s) 0.00 - 15.00 15.00 - 0.00 0.00
6 Clear Track Hallway Small Point-of-Entry Box INSTALLATION ONLY piece(s) 0.00 - 150.00 150.00 - 0.00 0.00
7 Junction box ea. 0.00 0.00 120.00 120.00 - 0.00 0.00
8 Pullbox ea. 0.00 0.00 500.00 500.00 - 0.00 0.00
9 Flexible Metal Conduit, 1-run 1/2" dia. meter(s) 0.00 0.00 70.00 70.00 - 0.00 0.00
10 Mobilization per tower 0.00 0.00 6,500.00 6,500.00 - 0.00 0.00
Sub Total - - -
Total price with VAT 0.00 0.00 0.00
Haysen-M C. Venal
Shinka Construction Services
Date: 24-November-2022
Site Name
1. Cambridge Cluster 1
2. Cambridge Cluster 2
3. Cambridge Cluster 3
4. Cambridge Cluster 4
5. Cambridge Cluster 5
6. Cambridge Cluster 6
7. Cambridge Cluster 7
8. Cambridge Cluster 37
9. Cambridge Cluster 1-37
10. Cambridge Cluster 26
11. Cambridge Cluster 27
12. Cambridge Cluster 28
13. Cambridge Cluster 29
14. Cambridge Cluster 30
15. Cambridge Cluster 31
16. Cambridge Cluster 32
17. Accolade Place
18. Accolade Place OSP See Figure 1
19. Altura Tower 1
20. Altura Tower 2
21. Cambridge Radius Assistance
22. Cambridge OSP
23. Accolade CT
Figure 1
ACCOLADE PLACE
CCOLADE PLACE
Unit Cost VAT EX
he RISE MAKATI
Unit Cost VAT EX
Sep. 14, Sep. 28-30, Oct. 3-4, Oct. 6-7, Oct. 17-18, Oct. 21-23, Nov. 24-25, Nov. 28