IM Daily Report 08082023

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

GUJARAT STATE FERTILIZERS AND CHEMICALS LIMITED‐SU

STATUS REPORT‐INSTRUMENT
DATE: 08/08/2023

PLANT STATUS
ANY STOPPAGE NONE
BREAKDOWN NONE
REPORT OF SAFETY NONE
JOB AFTER GEN SHIFT NONE
ARC‐AMC RELATED JOBS NONE
MAJOR JOB PLANNED FOR NEXT DAY NONE
DAP
D.T. MAKASANA
D. K. JADEJA
Y. K. MISTRY
TRAIN‐A TRAIN‐B TRAIN‐C
2. PA system location changed
1. Bin Diverter Proxy adjusted. for 3X diverter at 4th floor as
shutdown job.

UTILITY & SERVICES


V. S. PRAJAPATI
A. O. FALDU
R. A. BARAIYA
MOTI KHAVDI SST
1. FIRE pump Jockey pump Pressure switch
calibrated.
2. FTs of Gagva road, decimal point corrected,
and range corrected.
BAGGING
B. P. JADEJA
BAG‐OLD BAG‐A BAG‐B TRANSFER TOWER
1. W/M‐7, fitting
replaced of
discharge gate
1. W/M‐1, U switch
cyl. 1. 2 PG removed and
stand relocated.
1. 2. W/M‐3 air tube installed at
2. W/M‐2, 8 stared for
replaced. Deducting system.
bagging.
3. W/M‐4 air tube
replaced.

COMMUNICATION
J J PANDYA
TELEPHONE OTHER COMMUNICATION

1. Telephone 507 joint created in cable at SST.


3.
2. Telephone 281 rojet box replaced.