UDC

national standards of People's Republic of China GB


p GB 50661-2011

Steel structure welding specifications

Code for welding of steel structures

Published on 2011-12-05 2012-08-01 Implementation

Ministry of Housing and Urban-Rural Development of the People's Republic of China General
Joint release
Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China
national standards of People's Republic of China

Steel structure welding specifications

Code for welding.of steel structures

GB 50661-2011

Editor-in-Chief Department: Ministry of Housing and Urban-Rural Development of the People's Republic of China

Approval authority: Ministry of Housing and Urban-Rural Development of the People's Republic of China

Implementation date:2 0 1 2 Year8 moon 1 day

China Construction Industry Press

2011 Beijing
national standards of People's Republic of China

Steel structure welding specifications

,
(ode for welding of steel structures
GB 50661-2011

Published by China Construction Industry Press,Released (Beijing Xijiaobai hI dry)

Popular among Xinhua Bookstores and Architectural Bookstores in various places

Platemaking by Beijing Hongguang Platemaking Company

Renyi.
Chemistry 1 · Industry: I\Printing Press I Printing

-¥. ·

Imoto;exchange()A1168mml enter -l2printed sheet:6% word count:165 thousand words

First edition January 2o12 First printing in January 2012

Pricing:31. 00 yuan

Unified ISBN:1Sl12 • 21707


All rights reserved. Reproduction will not be tolerated.

If there is any problem with the printing and packaging quality, you can send the original copy for a return or exchange.

(postal codelOBa7)
This supplement URL: h1 lp: I7www. cabp.(Y)In..cn
html:
1Right|.4Quote from ancient times : '-'www.china-huilding.com.en
Ministry of Housing and Urban-Rural Development of the People's Republic of China

announcement

No. 1212

About issuing national standards

Announcement of "Steel Structure Welding Code"

The "Steel Structure Welding Code" is now approved as a national standard. The number is GB 50661

2011, Effective from August 1, 2012.Among them, No. 4.o.1,5. 7. l,


6. 1. l, 8. 1. Article 8 is mandatory and must be strictly implemented..

This specification is published by the China Construction Industry Press organized by the Standards and Quota Research Institute of our Ministry.

issued.

Ministry of Housing and Urban-Rural Development of the People's Republic of China

December 5, 2011

3
forward Word

This specification is based on the original Ministry of Construction's "About Issuance of(2007Establishment of annual

engineering construction standards and specifications,Notice of Revised Plan (Second Batch)" (Building Standards[2007] 126No.)

requirements, compiled by MCC Construction Research Institute Co., Ltd. in conjunction with relevant units.

This specification proposes the structural design of welded connections for steel structures.,make,Material,Craftsmanship,QC,

Personnel and other technical requirements. At the same time, in order to implement the national technical and economic policies and

reflect the concept of sustainable development in the field of steel structure construction, this specification not only controls the welding

quality of steel structures, but also strengthens energy conservation.,Material saving and environmental protection requirements.

During the preparation process of this specification, the practical experience and research results of steel structure

welding in my country in recent years were summarized. The preparation team carried out a number of special studies and fully

adopted new welding technologies and processes that have been applied in actual engineering.,new materials, and drew on

relevant international standards and foreign advanced standards, extensively solicited opinions from all parties, repeatedly

discussed and revised the specific content, and finalized it after review.

The main contents of this specification include: general principles, terms and symbols, basic provisions, materials, welded

connection structural design, welding process qualification, welding process, welding inspection, welding reinforcement and

reinforcement, etc..

The provisions marked in bold in this specification are mandatory provisions and must be strictly followed

implement.

The Ministry of Housing and Urban-Rural Development is responsible for the management and interpretation of the mandatory

provisions of this Code, and the MCC Construction Research Institute Co., Ltd. is responsible for the interpretation of the specific technical

content. All units are requested to sum up experience and accumulate information during the implementation of this code, and feedback

relevant opinions and suggestions at any time to the National Standards Management Group of the "Steel Structure Welding Code" of MCC

Construction Research Institute Co., Ltd. (Address: Xitu, Haidian District, Beijing city road33number; mail

Political coding:100088;E-mail:jyz3408@263.net), for future repair


Ordering reference.

The editor-in-chief of this specification:MCC Construction Research Institute Co., Ltd.

4
China Metallurgical Corporation Limited

Units participating in the preparation of this specification:


National Steel Structure Engineering Technology Research Center

China Jingye Engineering Technology Co., Ltd.

China Aviation Industry Planning and Design Institute

Baosteel Steel Structure Co., Ltd.

Baoshan Iron and Steel Co., Ltd.

MCC Saidi Engineering Technology Co., Ltd.

Quality inspection and testing of hydraulic metal structures by the Ministry of Water Resources

center

Jiangsu Huning Steel Machinery Co., Ltd.

Zhejiang Southeast Grid Co., Ltd.

Beijing Yuanda International Engineering Management Consulting Co., Ltd.

Shanghai COSCO Kawasaki Heavy Industries Steel Structure Co., Ltd.

Shaanxi Academy of Architectural Sciences

China Railway Shanqiao Group Co., Ltd.

Zhejiang Jinggong Steel Structure Co., Ltd.

Beijing Sanjie International Steel Structure Co., Ltd.

Shanghai Baoye Construction Co., Ltd.

China Construction Steel Structure Co., Ltd.

China Construction First Bureau Steel Structure Engineering Co., Ltd.

Beijing Municipal Engineering Design and Research Institute

China Electric Power Research Institute

Beijing Shuangyuan Engineering Consulting and Supervision Co., Ltd.

Tianjin Ershiye Steel Structure Manufacturing Co., Ltd.

Dalian Heavy Industry Hoisting Group Co., Ltd.

Wuhan Iron and Steel Group Wuhan Metallurgical Heavy Industry Co., Ltd.

Wuhan Iron and Steel Group Metal Structure Co., Ltd.

The main drafters of this specification: Liu Jingfeng Zhou Wenying Duan Bin Su Ping

Hou Zhaoxin, Ma Dezhi, Ge Jiaqi, Qu Zhaoxia

Fei Xinhua, Ma Ying, Jiang Wenlin, Li Cuiguang

5
Fan Xixian, Dong Xiaohui, Liu Xuming, Zhang Xuanguan

Xu Xiangjun, Dai Weizhi, Yin Minda, Wang Bin

Lu Lixiang Dai Lixian He Weili Xu Delu


Liu Mingxue Zhang Aimin Wang Hui Hu Yinhua

Wu Youming Ren Wenjun He Mingxuan Cao Xiaochun

Wang Jiangao Liang Liu Chun

The main reviewers of this specification: Yang Jianping, Li Benduan, Bao Guangjian, He Xianjuan

Dan Zeyi Wu Sujun Zhang Xindong Shi Tianmin

Yin Shian Zhang Yuling Wu Chengcai

6
L.

Head Second-rate

l General principles.....................................................................1

2 Terminology and symbols........................................................ ..…………2

2. 1 Terminology ........................................................ .....................2


2.2 Symbols........................................ .....................3
3 Basic rules...............................................................5

4 Material.....................................................................8

5Welded connection structure design……………...……………………… 11


5.1 General provisions
......................................................... 11
5. 2 Weld groove form and size……………………………… 13
5.3 Calculation of weld thickness…...….............................…·..••• ••• 15
5.4Assembly welding component welding nodes……………………………..…
·… 26
5.5Nodes to prevent lamellar tearing of panels,Material selection and process measures·…………..31

5.6 Component production and construction site installation


and welding structure design………………………… 33
5.7Welded structural design to withstand dynamic loads and
resist earthquakes……··:…………………… 41
6Welding procedure qualification......…·····································�......45
6.1 General provisions
• • • • • • • • • • . • • • · .. . • · • • • • · • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • 45
………………………48
6.2 Alternative rules for welding procedure qualification………

6.3Provisions for re-evaluation of processes ………………………………… 51


6.4 Preparation of test pieces and inspection specimens• •• •• •• · •• •• •• • ••••• •••••·: •• • • •• ••••••••• 54

6.5 Testing and inspection of test pieces and specimens


……………………………… 63
6.6 Exemption from welding procedure qualification................................................68

7Welding process· •••••••••••••••••••••••••••••••••••••••••••••••••••••••·•••••••• 72


7. 1 Base material preparation ••••••••••• •• • •• • •• • • • •• • • ••••• • •••• ••••••••• ••••••••••••• 72

7.2 Welding consumables requirements........................…·•••• • •• •••••••••••••••••••••• 73

7.3Assembly requirements for welded joints………...………………...………


77

7
7.4 Tack welding••••••••••••••••••••••••••••••••••••••••••••••• ••••••••••••78 Welding
7.5 environment.................................................................. ....... 78
7.6 Preheating and inter-pass temperature control…………………
……………………… 79
7.7Post-weld hydrogen elimination heat treatment......................................................................................80

7.8 Post-weld stress relief treatment......................................................................................80

7.9 arc ignition plate,Lead-out plate and gasket……………………………


…………… 81
7.10 Welding process technical requirements……………………………
…………… 82
7.11Control of welding deformation .................................................................83
7.12Rework welding........................................ ............84
7.13Weldment correction................................................ ...........85
7.14Weld root cleaning................................................ ...........85
7. 1 5Temporary welds........................•·•.....•·•..... ............86
7.16Bow 1 arc and arc extinction . . . . . . . . . . . . . . . . . . . . . . . . . .86

7.17 Electroslag welding and gas-electric vertical welding………


………………………………… 86
8 Welding Inspection…·…..…………………..………·…’……………88

8.1 General provisions


••••••••••••••••••••••••••••••••••••••••••••••••••••••••••
88
static load…………………………………………92
8.2 Inspection of welding quality of structures subjected to

8. 3 Weld quality inspection of structures requiring fatigue


verification…………………·… -…….. 96
9Welding reinforcement and reinforcement………………·…………………io1

Appendix A Groove forms, dimensions and marking methods of steel structure welded joints...105

appendixB Steel structure welding process assessment report format………


…………… 123
Appendix C Measurement of penetration width of electroslag welds in inner partitions of box columns (beams)...138

Explanation of wording in this specification……………………………


…………… 140
Standard catalog for bow 1…………………·…..…………………141
Attachment: Explanation of the Articles·…………·……………………………………·…•••••••143

8
Contents

1 Genergetic Provisions ••• ••••• · … .... … ..................... … .........1


2 Terms and Symbols ••••••••••••••••••••••••••••••••••• ·••••••••••• • 2
2.1 Terms ••••••••••••••••••••••••••••••••••••••••••••• ••••••••••••••• 2
twenty twoSymbols •••••••••••••••••••••••••••••••••••••••••••••••••• ••••••••••• 3

3 Basiic Requirement •••••••••••••••••••••••••••••••••••••••••••••• ••• 5


4 Materials •• •••••••••••••••••••••••••••••••••••••••••• •••••••••••••••••••8
5 Design of WeldingConections •••••••••••••••••••••••••••••••••11
5.1General Requirement ••••• · ............. ··•·••.••.•·11
……… …

5.2Size and Form of Weld Groove · · · · · · · · · …·• • • • • • • • • • • • • • • • • • • • • •13

5.3 Theoretical Throat of Weld •••••••••••••••••••••••••••••••••••••15

5. 4 Welding Nodal Point of Combined Welding Member…………26


5.5Technics for Avoid'of Lamellar Tearing……………………31
5.6Design of Shop and Field Welding Connections………………33
5.7Design of Welding Connections BearingDynamicLoad

and Anti-earthquake • · ….... …... ……… ·••·•··•·····•·41


6 Welding Pro�edure Qualifaction…… ………………………45

6. 1 General Requirement ••••••••••••••••• · .........


… … ... …45

6.2 Substitute Principles of Welding

Procedure Qualifaction •••••• … · ........... ...


… ………48

6.3Requalifacition ••••••••••••••••••••••••••••••••••••••••••••••• ••51

6.4Prepartion of Test Pieces and Samples………………………54


6.5Testing ••••••••••••••••••••••••••·............... .... ..................63

6.6Principle of Prequalifacition ••••••••••••••••••••••••••••••••••••••• 68

7 Welding Procedures ••• ••••••••••••••••••••••••••••••••••·. … ... …72

7. 1 Prepartion of Base Metal… ............. .............


… …72

You might also like