Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Quotation for Concealed with Material

SR NO DESCRIPTION QUANTITY RATE


1. Light Point 1 650
2. Light I.P. 1 600
3. Fan Point 1 750
4. Power Point 1 1300
5. Two Way Point 1 1300
6. TV Point 1 1300
7. Bell Point 1 1300
8. Light Circuit 1 1300
9. Power Circuit 1 2600
10. DP Fitting 1 1300
11. Running Earthing Job 1 1300
12. Mains Job 1 Feet 45 (RF)
13. MCB DB Box with MCB Job 1 2800
14. Labor Charges Per Fixture 1 100
15. Mains Earthing 1 1950
16. Light Mains 1 Feet 15 (RF)
17. Phone Point 1 1200

 Extra money charge for foot-lamp fitting


 If any changes rates will be charged
 Below 5 meter wire rate is consider in point after that rate should be given as in running per
foot
 Extra money charged for fan regulator

You might also like