Inspection Report

Date of Inspection: 23/03/2022

Inspected By- 1)Mr. B.A. Bhole (Dy.EE)

2) Mrs. S.S. Patil (AE)

Inspection of,

1 Name of workshop :- Shinde Electricals and Contractors

Date of commencement of workshop :- 15/08/2021

2 Address of workshop :- Servey No. 179/2K, Plot No 1 Shivganga Nagar

near Hortikar Honda

Showroom Umadi Tal - Jath Dist - Sangli 416413

3 Address of Registered office :- C.S. NO. 5006B/25 Trai Park near Sanjay Nagar
Police Station Sangli 416416
4 Whether proprietary :- Yes
5 Name of Director :- Shubham Gajanan Shinde
6 Own capital :- 31 Lakhs
7 Loan capital :- No
8 Transformer repaired (Dist T/f) :- 18 Nos
9 Minimum built-up area :- 560 square foot
10 Minimum open space area with :- 2000 square foot
Built-up area
11 No of shifts in the workshop :- 2
12 Factory License No. :- MH29D0035027
S. S. I. Registration No.
Udyog Aadhar No

13 Whether small scale Industry :- No


14 Whether Registered with other Electricity :- Yes (PWD)
Board & Other Semi govt. department
And validity thereof
15 Details Of Machinery installed are :- Attached
16 Details of Testing Equipment :- Attached

17 Whether machineries installed are :-


adequate to carry out the repair Work as
Per HO circular No .50980 Dt. 24.10.94

18 Whether testing equipments are adequate :-


to test the transformer as per the standard
Procedure and Whether a per H.O.Circular
No. 40980 Dt. 24.10.94

19 Whether qualified testing staff is available :- Yes

20 Qualified Personnel working in the workshop :-


& there qualification & experience

STAFF NAME QUALIFICATINON/


EXPERIENCE

a. Testing Engineer 01 Shubham Gajanan Shinde DEE (2 Years)


b. Factory in Charge 01 Daval Malik Shaikh ITI (23 Years)
c. Manager Finance 01 Raghvendra Shivappa Bijjaragi DEE (2 Years)
d. Assembler 01 Daval Malik Shaikh ITI (23 Years)
e. Winder 01 Nagesh B Dindure ITI (10 Years)
f. Helper 01 Chnadrashekhar S Balgav ITI (6 Months)

21 Is testing record maintained & if so :- No


Since when
22 Whether raw Material procured in being :- No
Subjected the Test
23 What are the Steps to be taken to Maintain :-
Quality of raw material
24 a) Source of supply of raw material :- Aurangabad , Kolhapur , Sangli

b) Maintenance of excise Gate Pass / Bills etc. :- No


c) Whether test certificate, warranty obtained :- Yes
While buying raw materials confirming
to relevant IS.
25 a) Capacity of repair of Transformer in :- 25 Nos
Workshop per month.
b) Maximum repair carried out per month :- 6 Nos
achieved so far
26 Total turnover for the last three years :- 5,96,000 Lakhs (7 Months)

27 Power supply position whether alternative :- No


Arrangement is available
28 Facilities available for services at site :- Oil Filter Machine , BDD Kit , Megger ,
In case for emergencies Earth Resistance

Repairer’s Signature

Executive Engineer ,O&M Dn.

Executive Engineer ,Testing Dn. Sangli

Superintending Engineer
M.S.E.D.Co. Circle Office , Sangli