Professional Documents
Culture Documents
ME Data & Telephone Point Installation Upper Floor AR - NB - 01 Floor Plan
ME Data & Telephone Point Installation Upper Floor AR - NB - 01 Floor Plan
GL. 123.000
GL. 122.000
GL. 124.000
B BOUNDARY WALL FINISH
TEXTURE PAINT
GL. 121.000
SECTION
OTHER LAND
DANPALON CANOPY STAFF / SERVICES ACCES
REFLECTED GREY COLOR - FFL - 4.465
1536
AFL +3.000 MM HIGH WALL
SP
DOWN TO FINISH TEXTURE PAINT
GRASS ROOF SP SP SP SP SP
VEHICLE LOADING
3077
FFL - 4.315
LANDSCAPE ROOF
FFL - 0.515
5075
FEMALE TOILET MALE TOILET
5575
2175
- FFL - 4.465
UPPER FLOOR LINE
648
HK HK
CIRCLE STEEL POST AS EXISTING HIDROLIC
HAND RAILING AS EXISTING LIFT SHRINE COURT
1350
450 375
FFL - 0.300
825
500
2000
11575
REV.04
12075
A USED SLIDING DOOR
AFL +1.000 MM HIGH WALL
A
SECTION FINISH TEXTURE PAINT SECTION
SANDWASH BLACK
LAWN WALL FINISH
WALL FINISH
FFL - 6.465 SANDWASH BLACK
6000
6000
7000
DINNING AREA SP
F5 FFL - 0.465 BLACK GARDEN
FFL - 3.815
ELEVATION
WEST
GL. 124.000
500
N LAND
OTHER DOWN TO
2600
BASEMENT STORAGE DOWN TO
SP
ALFRESCO PARTY AREA ALFRESCO PARTY AREA
- FFL - 4.265
CONNECTING BRIDGE
GL. 123.000
GL. 122.000
F3 FFL - 0.465
00
LAWN
1.0
W E
. 12
FFL - 4.465
GL
S
B
SECTION
Scale 1 :100
Project : No. Descriptions Sign Drawing Title :