Download as pdf or txt
Download as pdf or txt
You are on page 1of 13

INDEX OF DRAWINGS Republic of the Philippines

3
OFFICE OF THE BUILDING OFFICIAL
ROAD
0
10,00

MAIN O.W. R . R.
STRA
IN
PEDE R A N C E
ENT
T ARCHITECTURAL STRUCTURAL
FRONN
TRA NCE LAW
UL AR EN
VEHIC
A-01 COVERSHEET
2
BALC
ONY A-02 ARCHITECTURAL FLOOR PLANS 1
A-03 ARCHITECTURAL FLOOR PLANS 2
A-04 ARCHITECTURAL ELEVATIONS 1 District / City / Municipality
A-05 ARCHITECTURAL ELEVATIONS 2
A-06 ARCHITECTURAL SECTIONS
A-07 SCHEDULE OF DOORS

PROP

12,50
A-08 SCHEDULE OF WINDOWS 1

ERTY
8
LOT

0
A.02 LOCATIONAL MAP A-09 SCHEDULE OF WINDOWS 2

LINE
NOT TO SCALE A-10 ARCHITECTURAL REFLECTED CEILING PLAN 1
LOT
7 .
A-11 ARCHITECTURAL FLOOR PATTERN LAYOUT 1
PROP

q.m
a: 125 s
L ot Are T
Tolal IN
OTPR A-12 LIGHTING LAY-OUT 1
ERTY
12,50

G FO .
ILDIN 9 sq.m
BU 47.5
LAND USE & ZONING
LINE

A-13 POWER & AUXILIARY LAY-OUT 1


0

A-14 LIGHTING & POWER LAY-OUT 2


6
LOT
A-15 MAIN STAIRCASE DETAILS
A-16 STAIRS TO ROOF DECK DETAILS
A-17 GATE DETAILS
REAR N 4
E
GARD
N PORC
H
BACKFRESCO
/AL

1
10,00
0
LINE & GRADE
SITE DEVELOPMENT PLAN A.03 VICINITY MAP
A.01
SCALE: 1:100 NOT TO SCALE

ELECTRICAL

ARCHITECTURAL

CIVIL / STRUCTURAL
PLUMBING / SANITARY

ELECTRICAL

MECHANICAL

MECHANICAL

A.04 EXTERIOR PERSPECTIVE


NOT TO SCALE

COVERSHEET
A-01 SCALE: 1:1.87, 1:100, 1:1.59 SANITARY
Site Orientation Sun Path Wind Direction

IMPORTANT:
BIM BY : KIR PROJECT TITLE: OWNER: SHEET CONTENTS: SHEET NUMBER:
REPUBLIC ACT No.9266

KATHLEEN I. RUNAS OWNERSHIP OF PLANS, SPECIFICATIONS AND OTHER CONTRACT


DOCUMENTS-DRAWINGS AND SPECIFICATIONS AND OTHER
CONTRACT DOCUMENTS DULY SIGNED, STAMPED OR SEALED, AS AN
DATE : 15/03/2021
LOCATIONAL MAP, VICINITY MAP, SITE DEVELOPMENT PLAN,
INSTRUMENT OF SERVICE, ARE THE INTELLECTUAL PROPERTY AND
ARCHITECT EXTERIOR PERSPECTIVE
DESIGNED BY : KIR
A-01
DOCUMENTS OF THE ARCHITECT, WHETHER THE OBJECT FOR WHICH

P.T.R. NO.: 0696129 PRC NO.: 32779 REG.DATE: FEBRUARY 5, 2014


THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR
ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID
DOCUMENTS FOR USE IN THE REPETITION OF AND FOR OTHER
PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN A
WHOLE, WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT OR
DATE : 15/03/2021
TATLONGHARI RESIDENCE Atty. RENEL and Mrs. ANGEL ANNE TATLONGHARI
AUTHOR OF SAID DOCUMENTS.

DATE ISSUED: JARUNARY 05, 2021 T.I.N.: 314-192-442-0000 -ALL MEASUREMENTS ARE TO BE VERIFIED ON SITE BY CONTRACTOR. CHECKED BY : KIR
-ALL DISCREPANCIES ARE TO BE IMMEDIATELY REPORTED TO
ARCHITECTS AND PROJECT MANAGERS.
-CONTRACTORS ARE TO PREPARE AND SUBMIT SHOP DRAWINGS TO APPROVED BY : KIR ADDRESS: LOT 7, BLOCK 33, BRGY. SINALHAN, STA. ROSA, LAGUNA PHILIPPINES ADDRESS: LOT 7, BLOCK 33, BRGY. SINALHAN, STA. ROSA, LAGUNA PHILIPPINES
"A truly great structure, one that is meant to stand the test of time,
never disregards its environment"
PLACE ISSUED: CALAPAN CITY IAPOA NO.: 28311-306999-122320 ARCHITECTS PRIOR TO COMMENCEMENT OF WORK.
SHT. 1 OF 37
- Lake House -
LEGEND PROPOSED COLUMNS CHB WALL DRYWALL DOUBLE WALL SYSTEM FIRE WALL PLYWOOD PARTITION 6mm THK TEMPERED GLASS

FLOOR FF-01 - POLISHED CONCRETE FF-02 - POLISHED CONCRETE FF-03 - (60x60) GRANITE TILE FF-04 - BAMBOO WOOD FLOORING FF-06 - POROUS/PERVIOUS PAVERS
FINISHES (Flowcrete-Diamond) (Flowcrete-Ebony) (Color as per Technical Specs) (Color as per Technical Specs) (Color as per Technical Specs)

A A' B B' B'' C D A A' B B' B'' C D

10,000 10,000
8,000 2,000 (SETBACK) 8,400 1,600

A.02.11

A.02.11
2,700 5,100 1,000 1,000 199 (ALFRESCO CLEARANCE) 2,701 2,284 3,415

A.08

A.08
EXISTING
PROPERTY FENCE

1 PLANT BOX
1

600
2,000 (SETBACK)
1 2
LINE OF 2F ROOF

1,600
UP
ALFRESCO 2 1
VEGETABLE
2,000

2,000
GARDEN A: 7.97 m2 GARDEN

1,000
UP
A: 7.87 m2 +50 +200
+100 A: 4.00 m2
FOR FUTURE DEVELOPMENT
1' LINE OF 2F SLAB
as HELPER'S QUARTERS & SERVICE AREA
1' WS-06 WS-05

PLANT BOX STAIRS W-08


TO ROOF W-09

400

4
PLANT BOX

7
DECK

W-10
3

2 D-02
2 A: 2.37 m2
EXTENSION)
(FIREWALL

W-03 W-03 W-03 DN W-06 W-06 W-06


LINE OF
1
2

2F SLAB 2
600

1
MASTER
LAUNDRY & UP
BEDROOM
UP

3 DRYING AREA A: 9.84 m2


STAIRS A: 4.96 m2

2,900
DINING AREA

W-11
A: 6.36 m2 A: 9.98 m2

2,500
6,500
WORKSTATION
A: 2.14 m2

W
4

5
OPEN BELOW
6
TO LIVING ROOF OF
ROOM

D-06
SERVICE
#toPZvalue A: 7.04 m2

4,500
6mm THK Frosted

2' 2'

W-10
FAMILY Polycarbonate Sheet
5,000

LIVING AREA

5,061
ACTIVITY
A: 14.26 m2 AREA
D-08

Slope: 5°
+170 A: 5.11 m2

D-08
D-10
MASTER WIC

2,0002,610

1,439
A.02.12 POWDERDN COFFEE BAR UP AUXILIARY A.02.12 A.02.12 A: 2.73 m2 A.02.12
A.09 ROOM A: 1.57 m2 KITCHEN A.09 A.09FIREWALL A.09
A: 3.52 m2 KITCHEN 4.32 m2
A: +220
7,500
7,500

8,300
FIREWALL
A: 6.17 m2

7,900

3,022
MASTER T&B

W-12
+220
RE F A: 4.09 m2
12,500

12,500

12,500

12,500
DN MAIN STAIRS COMMON T&B
HALLWAY

D-07
W-04 W-05 1 A: 3.09 m2
3 3 A: 5.57 m2 A: 3.70 m2
D-05

+300

1,583
UP

DN

W-07

3' 3'
D-06
935
W-02

WS-04
D-04

HALLWAY to
3'' 3''

1,548
HOME OFFICE BALCONY
A: 6.60 m2 A: 3.14 m2

D-06
BEDROOM 2

W-13a
WS-03
W-02

FOYER A: 6.93 m2

W-13b
2,500

BEDROOM 1 WS-03

A: 4.23 m2 Pre-Painted G.I. Sheet


A: 7.31 m2

2,839
+320 Gauge 24

2,378
+320

6,000 (GARAGE DEPTH)


W-02

Slope: 21°

1,291
W-01 D-01

4 4

WS - 01 PORCH
A: 3.89 m2 CW-01 W-13a D-09 W-13b CWD-02
800

PLANT

4' LINE OF
2F SLAB
STAND
2-CAR 4' WS-02 WS-03 WS-03 WS-02

LINE OF ROOF +170 GARAGE


Steel Gutter
A: 36.00 m2
LINE OF
ROOF
FRONT LAWN LINE OF 2F ROOF
3,000

A: 8.10 m2 1 6mm THK Clear

2,600

2,600
Polycarbonate
Roofing BALCONY
UP
A: 15.86 m2
Slope: 4°
#toPZvalue
+70

GATE
(See Detail for Reference)

5 5
A.02.11

A.02.11
A.08

A.08
979 1,348 4,073 400 1,600
2,700 1,300 (PORCH) 4,000 2,000
1,600 2,327 6,069 (BALCONY)
4,000 6,000 (GARAGE)
9,996
10,000

GROUND FLOOR PLAN SECOND FLOOR PLAN


A.05 A.06
SCALE: 1:50 SCALE: 1:50

ARCHITECTURAL FLOOR PLANS 1


A-02 SCALE: 1:50
Site Orientation Sun Path Wind Direction

IMPORTANT:
BIM BY : KIR PROJECT TITLE: OWNER: SHEET CONTENTS: SHEET NUMBER:
REPUBLIC ACT No.9266

KATHLEEN I. RUNAS OWNERSHIP OF PLANS, SPECIFICATIONS AND OTHER CONTRACT


DOCUMENTS-DRAWINGS AND SPECIFICATIONS AND OTHER
CONTRACT DOCUMENTS DULY SIGNED, STAMPED OR SEALED, AS AN
DATE : 15/03/2021
GROUND FLOOR PLAN, SECOND FLOOR PLAN
INSTRUMENT OF SERVICE, ARE THE INTELLECTUAL PROPERTY AND
ARCHITECT DESIGNED BY : KIR
A-02
DOCUMENTS OF THE ARCHITECT, WHETHER THE OBJECT FOR WHICH

P.T.R. NO.: 0696129 PRC NO.: 32779 REG.DATE: FEBRUARY 5, 2014


THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR
ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID
DOCUMENTS FOR USE IN THE REPETITION OF AND FOR OTHER
PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN A
WHOLE, WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT OR
DATE : 15/03/2021
TATLONGHARI RESIDENCE Atty. RENEL and Mrs. ANGEL ANNE TATLONGHARI
AUTHOR OF SAID DOCUMENTS.

DATE ISSUED: JARUNARY 05, 2021 T.I.N.: 314-192-442-0000 -ALL MEASUREMENTS ARE TO BE VERIFIED ON SITE BY CONTRACTOR. CHECKED BY : KIR
-ALL DISCREPANCIES ARE TO BE IMMEDIATELY REPORTED TO
ARCHITECTS AND PROJECT MANAGERS.
-CONTRACTORS ARE TO PREPARE AND SUBMIT SHOP DRAWINGS TO APPROVED BY : KIR ADDRESS: LOT 7, BLOCK 33, BRGY. SINALHAN, STA. ROSA, LAGUNA PHILIPPINES ADDRESS: LOT 7, BLOCK 33, BRGY. SINALHAN, STA. ROSA, LAGUNA PHILIPPINES
"A truly great structure, one that is meant to stand the test of time,
never disregards its environment"
PLACE ISSUED: CALAPAN CITY IAPOA NO.: 28311-306999-122320 ARCHITECTS PRIOR TO COMMENCEMENT OF WORK.
SHT. 2 OF 37
- Lake House -
LEGEND PROPOSED COLUMNS CHB WALL DRYWALL DOUBLE WALL SYSTEM FIRE WALL PLYWOOD PARTITION 6mm THK TEMPERED GLASS

FLOOR FF-01 - POLISHED CONCRETE FF-02 - POLISHED CONCRETE FF-03 - (60x60) GRANITE TILE FF-04 - BAMBOO WOOD FLOORING FF-06 - POROUS/PERVIOUS PAVERS
FINISHES (Flowcrete-Diamond) (Flowcrete-Ebony) (Color as per Technical Specs) (Color as per Technical Specs) (Color as per Technical Specs)

A A' B B' B'' C D A A' B B' B'' C D

9,373 627 3,763


1,728 7,645 148 1,733 1,733 148

A.02.11

A.02.11
111 1,617 973 5,699 973

A.08

A.08
148 825 2,345 3,354 800 173

1 1
652

652
148
SS Gutter

SS Gutter
548

Slope: 21° SS Gutter

959

148
SS Gutter

811
1' Pre-Painted G.I. Sheet, Gauge 24
1'
400

5mm Insulation Foil Slope: 21°

W-52

1,733
Pre-Painted G.I. Sheet, Gauge 24

2 2 5mm Insulation Foil

Pre-Painted G.I. Sheet, Gauge 24

Pre-Painted G.I. Sheet, Gauge 24


W-49
3,331

5mm Insulation Foil

5mm Insulation Foil


2,931

Slope: 21°

Slope: 21°

Slope: 21°
LIEN OF ROOF

SS Gutter

SS Gutter
5,108
4,812
1,345

5,108
W-51

Pre-Painted G.I. Sheet, Gauge 24

Pre-Painted G.I. Sheet, Gauge 24


DOWN

5mm Insulation Foil

5mm Insulation Foil


2' 2'

SS Gutter
Slope: 21°
6,661

5,900
7,818
W-50
760

1,733
Pre-Painted G.I. Sheet, Gauge 24
5mm Insulation Foil
D-10 W-49
A.02.12 Pre-Painted G.I. Sheet, Gauge 24 A.02.12 A.02.12 A.02.12
A.09 5mm Insulation Foil A.09 A.09 A.09
Slope: 21°
FIREWALL
10,196

10,196
Slope: 21°
SS Gutter

148
3,330
2,221

3,763
3 3

3' 3'
Pre-Painted G.I. Sheet

5mm Insulation Foil

3'' 3''
350

Slope: 21°

Gauge 24

811
SS Gutter

959
Pre-Painted G.I. Sheet

5mm Insulation Foil

Slope: 21°
Gauge 24

SS Gutter

148
Pre-Painted G.I. Sheet, Gauge 24
SS Gutter

5mm Insulation Foil


2,839
2,987

SS Gutter

4 4

2,230
2,378
Slope: 21°

4' 4'

SS Gutter
148

148
1,652

1,652

5 5
A.02.11

A.02.11
A.08

A.08
148
652 800 6,400 800 425 148
800 8,000 573
9,373 627

ROOF DECK PLAN ROOF PLAN


A.07 A.08
SCALE: 1:50 SCALE: 1:50

ARCHITECTURAL FLOOR PLANS 2


A-03 SCALE: 1:50
Site Orientation Sun Path Wind Direction

IMPORTANT:
BIM BY : KIR PROJECT TITLE: OWNER: SHEET CONTENTS: SHEET NUMBER:
REPUBLIC ACT No.9266

KATHLEEN I. RUNAS OWNERSHIP OF PLANS, SPECIFICATIONS AND OTHER CONTRACT


DOCUMENTS-DRAWINGS AND SPECIFICATIONS AND OTHER
CONTRACT DOCUMENTS DULY SIGNED, STAMPED OR SEALED, AS AN
DATE : 15/03/2021
ROOF DECK PLAN, ROOF PLAN
INSTRUMENT OF SERVICE, ARE THE INTELLECTUAL PROPERTY AND
ARCHITECT DESIGNED BY : KIR
A-03
DOCUMENTS OF THE ARCHITECT, WHETHER THE OBJECT FOR WHICH

P.T.R. NO.: 0696129 PRC NO.: 32779 REG.DATE: FEBRUARY 5, 2014


THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR
ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID
DOCUMENTS FOR USE IN THE REPETITION OF AND FOR OTHER
PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN A
WHOLE, WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT OR
DATE : 15/03/2021
TATLONGHARI RESIDENCE Atty. RENEL and Mrs. ANGEL ANNE TATLONGHARI
AUTHOR OF SAID DOCUMENTS.

DATE ISSUED: JARUNARY 05, 2021 T.I.N.: 314-192-442-0000 -ALL MEASUREMENTS ARE TO BE VERIFIED ON SITE BY CONTRACTOR. CHECKED BY : KIR
-ALL DISCREPANCIES ARE TO BE IMMEDIATELY REPORTED TO
ARCHITECTS AND PROJECT MANAGERS.
-CONTRACTORS ARE TO PREPARE AND SUBMIT SHOP DRAWINGS TO APPROVED BY : KIR ADDRESS: LOT 7, BLOCK 33, BRGY. SINALHAN, STA. ROSA, LAGUNA PHILIPPINES ADDRESS: LOT 7, BLOCK 33, BRGY. SINALHAN, STA. ROSA, LAGUNA PHILIPPINES
"A truly great structure, one that is meant to stand the test of time,
never disregards its environment"
PLACE ISSUED: CALAPAN CITY IAPOA NO.: 28311-306999-122320 ARCHITECTS PRIOR TO COMMENCEMENT OF WORK.
SHT. 3 OF 37
- Lake House -
LEGEND PROPOSED COLUMNS CHB WALL DRYWALL DOUBLE WALL SYSTEM FIRE WALL PLYWOOD PARTITION 6mm THK TEMPERED GLASS

EXTERIOR
FINISHES

A A' B B' B'' C D 1 1' 2 2' 3 3' 3'' 4 4' 5

5 ROOF APEX +9.300


+9.300 5 ROOF APEX Pre-Painted G.I. Sheet, Gauge 24
5mm Insulation Foil
Slope: 21°
Slope: 21°

W-51

D-10 W-49

Pre-Painted G.I. Sheet, Gauge 24


5mm Insulation Foil
Pre-Painted G.I. Sheet, Gauge 24
5mm Insulation Foil

Slope: 21°

4 ROOF DECK Slope: 21° +6.300 Slope: 21°


+6.300 4 ROOF DECK

W-07 CW-01 W-13a W-13b CWD-02 CW-01

D-09

Pre-Painted G.I. Sheet, Gauge 24


5mm Insulation Foil

3 SECOND FLOOR Slope: 21° +3.300


+3.300 3 SECOND FLOOR
FIREWALL

2 MEZZANINE +2.300
+2.300 2 MEZZANINE

W-01
W-04 W-05
D-01

PERIMETER
FENCE

2.000
1 GROUND FLOOR +0.300
+0.300 1 GROUND FLOOR
0 NGL ±0.000
±0.000 0 NGL

EARTH FILL
-1 LOT (REAR) LEVEL EARTH FILL -0.600
-0.600 -1 LOT (REAR) LEVEL

-2 FOUNDATION -1.200
-1.200 -2 FOUNDATION

FRONT ELEVATION (North) LEFT ELEVATION (East)


A.09 A.10
SCALE: 1:50 SCALE: 1:50

ARCHITECTURAL ELEVATIONS 1
A-04 SCALE: 1:50
IMPORTANT:
BIM BY : KIR PROJECT TITLE: OWNER: SHEET CONTENTS: SHEET NUMBER:
REPUBLIC ACT No.9266

KATHLEEN I. RUNAS OWNERSHIP OF PLANS, SPECIFICATIONS AND OTHER CONTRACT


DOCUMENTS-DRAWINGS AND SPECIFICATIONS AND OTHER
CONTRACT DOCUMENTS DULY SIGNED, STAMPED OR SEALED, AS AN
DATE : 15/03/2021
FRONT ELEVATION (North), LEFT ELEVATION (East)
INSTRUMENT OF SERVICE, ARE THE INTELLECTUAL PROPERTY AND
ARCHITECT DESIGNED BY : KIR
A-04
DOCUMENTS OF THE ARCHITECT, WHETHER THE OBJECT FOR WHICH

P.T.R. NO.: 0696129 PRC NO.: 32779 REG.DATE: FEBRUARY 5, 2014


THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR
ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID
DOCUMENTS FOR USE IN THE REPETITION OF AND FOR OTHER
PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN A
WHOLE, WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT OR
DATE : 15/03/2021
TATLONGHARI RESIDENCE Atty. RENEL and Mrs. ANGEL ANNE TATLONGHARI
AUTHOR OF SAID DOCUMENTS.

DATE ISSUED: JARUNARY 05, 2021 T.I.N.: 314-192-442-0000 -ALL MEASUREMENTS ARE TO BE VERIFIED ON SITE BY CONTRACTOR. CHECKED BY : KIR
-ALL DISCREPANCIES ARE TO BE IMMEDIATELY REPORTED TO
ARCHITECTS AND PROJECT MANAGERS.
-CONTRACTORS ARE TO PREPARE AND SUBMIT SHOP DRAWINGS TO APPROVED BY : KIR ADDRESS: LOT 7, BLOCK 33, BRGY. SINALHAN, STA. ROSA, LAGUNA PHILIPPINES ADDRESS: LOT 7, BLOCK 33, BRGY. SINALHAN, STA. ROSA, LAGUNA PHILIPPINES
"A truly great structure, one that is meant to stand the test of time,
never disregards its environment"
PLACE ISSUED: CALAPAN CITY IAPOA NO.: 28311-306999-122320 ARCHITECTS PRIOR TO COMMENCEMENT OF WORK.
SHT. 4 OF 37
- Lake House -
LEGEND PROPOSED COLUMNS CHB WALL DRYWALL DOUBLE WALL SYSTEM FIRE WALL PLYWOOD PARTITION 6mm THK TEMPERED GLASS

EXTERIOR
FINISHES

D C B'' B' B A' A 5 4' 4 3'' 3' 3 2' 2 1' 1

5 ROOF APEX 5 ROOF APEX


+9.300 Pre-Painted G.I. Sheet, Gauge 24 +9.300 Pre-Painted G.I. Sheet, Gauge 24

Slope: 21° Slope: 21°

W-52

W-50 W-49

Pre-Painted G.I. Sheet, Gauge 24

Slope: 21°
Slope: 21°
4 ROOF DECK 4 ROOF DECK Slope: 21°
+6.300 +6.300

W-12
W-10 W-11 W-10

W-09 CWD-02 W-13b

W-06 W-06 W-06


W-08

3 SECOND FLOOR 3 SECOND FLOOR


+3.300 +3.300

2 MEZZANINE 2 MEZZANINE W-02


+2.300 +2.300

W-03 W-03 W-03


D-02

PERIMETER FENCE

1 GROUND FLOOR 1 GROUND FLOOR


+0.300 +0.300
0 NGL GARDEN FILL 0 NGL
±0.000 ±0.000
EARTH FILL
-1 LOT (REAR) LEVEL -1 LOT (REAR) LEVEL
-0.600 -0.600

EARTH FILL
-2 FOUNDATION -2 FOUNDATION
-1.200 -1.200

REAR ELEVATION (South) RIGHT ELEVATION (West)


A.11 A.12
SCALE: 1:50 SCALE: 1:50

ARCHITECTURAL ELEVATIONS 2
A-05 SCALE: 1:50
IMPORTANT:
BIM BY : KIR PROJECT TITLE: OWNER: SHEET CONTENTS: SHEET NUMBER:
REPUBLIC ACT No.9266

KATHLEEN I. RUNAS OWNERSHIP OF PLANS, SPECIFICATIONS AND OTHER CONTRACT


DOCUMENTS-DRAWINGS AND SPECIFICATIONS AND OTHER
CONTRACT DOCUMENTS DULY SIGNED, STAMPED OR SEALED, AS AN
DATE : 15/03/2021
REAR ELEVATION (South), RIGHT ELEVATION (West)
INSTRUMENT OF SERVICE, ARE THE INTELLECTUAL PROPERTY AND
ARCHITECT DESIGNED BY : KIR
A-05
DOCUMENTS OF THE ARCHITECT, WHETHER THE OBJECT FOR WHICH

P.T.R. NO.: 0696129 PRC NO.: 32779 REG.DATE: FEBRUARY 5, 2014


THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR
ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID
DOCUMENTS FOR USE IN THE REPETITION OF AND FOR OTHER
PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN A
WHOLE, WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT OR
DATE : 15/03/2021
TATLONGHARI RESIDENCE Atty. RENEL and Mrs. ANGEL ANNE TATLONGHARI
AUTHOR OF SAID DOCUMENTS.

DATE ISSUED: JARUNARY 05, 2021 T.I.N.: 314-192-442-0000 -ALL MEASUREMENTS ARE TO BE VERIFIED ON SITE BY CONTRACTOR. CHECKED BY : KIR
-ALL DISCREPANCIES ARE TO BE IMMEDIATELY REPORTED TO
ARCHITECTS AND PROJECT MANAGERS.
-CONTRACTORS ARE TO PREPARE AND SUBMIT SHOP DRAWINGS TO APPROVED BY : KIR ADDRESS: LOT 7, BLOCK 33, BRGY. SINALHAN, STA. ROSA, LAGUNA PHILIPPINES ADDRESS: LOT 7, BLOCK 33, BRGY. SINALHAN, STA. ROSA, LAGUNA PHILIPPINES
"A truly great structure, one that is meant to stand the test of time,
never disregards its environment"
PLACE ISSUED: CALAPAN CITY IAPOA NO.: 28311-306999-122320 ARCHITECTS PRIOR TO COMMENCEMENT OF WORK.
SHT. 5 OF 37
- Lake House -
LEGEND PROPOSED COLUMNS CHB WALL DRYWALL DOUBLE WALL SYSTEM FIRE WALL PLYWOOD PARTITION 6mm THK TEMPERED GLASS

INTERIOR
FINISHES

5 4' 4 3'' 3' 3 2' 2 1' 1 D C B'' B' B A' A

5 ROOF APEX +9,300


+9,300 5 ROOF APEX

REFER TO ROOF FRAMING


DETAILS

W-51

REFER TO ROOF FRAMING


DETAILS
ROOF DECK COMMON AREA
REFER TO ROOF FRAMING
DETAILS

4 ROOF DECK +6,300


+6,300 4 ROOF DECK
SUSPENDED CEILING (Refer to details)
SUSPENDED CEILING (Refer to SUSPENDED CEILING (Refer to details) SUSPENDED CEILING (Refer to details)
details)

CW-01 W-13a W-07

D-09 D-06

BEDROOM 2 MASTER T&B MASTER WIC HALLWAY

3 SECOND FLOOR +3,300


+3,300 3 SECOND FLOOR
SUSPENDED CEILING (Refer to details)
SUSPENDED CEILING (Refer to details) SUSPENDED CEILING (Refer to details)

2 MEZZANINE +2,300
+2,300 2 MEZZANINE

D-01
D-04 D-05 W-05 W-04

KITCHEN LIVING AREA


FOYER LIVING AREA POWDER
AUXILIARY KITCHEN ROOM
1 GROUND FLOOR GARDEN +300
PORCH
+300 1 GROUND FLOOR EARTH FILL
0 NGL ±0
±0 EARTH FILL 0 NGL

-1 LOT (REAR) LEVEL -600


-600 -1 LOT (REAR) LEVEL

-2 FOUNDATION -1,200
-1,200 -2 FOUNDATION

SECTION VIEW A SECTION VIEW B


A.13 A.14
SCALE: 1:50 SCALE: 1:50

ARCHITECTURAL SECTIONS
A-06 SCALE: 1:50
IMPORTANT:
BIM BY : KIR PROJECT TITLE: OWNER: SHEET CONTENTS: SHEET NUMBER:
REPUBLIC ACT No.9266

KATHLEEN I. RUNAS OWNERSHIP OF PLANS, SPECIFICATIONS AND OTHER CONTRACT


DOCUMENTS-DRAWINGS AND SPECIFICATIONS AND OTHER
CONTRACT DOCUMENTS DULY SIGNED, STAMPED OR SEALED, AS AN
DATE : 15/03/2021
SECTION VIEW A, SECTION VIEW B
INSTRUMENT OF SERVICE, ARE THE INTELLECTUAL PROPERTY AND
ARCHITECT DESIGNED BY : KIR
A-06
DOCUMENTS OF THE ARCHITECT, WHETHER THE OBJECT FOR WHICH

P.T.R. NO.: 0696129 PRC NO.: 32779 REG.DATE: FEBRUARY 5, 2014


THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR
ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID
DOCUMENTS FOR USE IN THE REPETITION OF AND FOR OTHER
PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN A
WHOLE, WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT OR
DATE : 15/03/2021
TATLONGHARI RESIDENCE Atty. RENEL and Mrs. ANGEL ANNE TATLONGHARI
AUTHOR OF SAID DOCUMENTS.

DATE ISSUED: JARUNARY 05, 2021 T.I.N.: 314-192-442-0000 -ALL MEASUREMENTS ARE TO BE VERIFIED ON SITE BY CONTRACTOR. CHECKED BY : KIR
-ALL DISCREPANCIES ARE TO BE IMMEDIATELY REPORTED TO
ARCHITECTS AND PROJECT MANAGERS.
-CONTRACTORS ARE TO PREPARE AND SUBMIT SHOP DRAWINGS TO APPROVED BY : KIR ADDRESS: LOT 7, BLOCK 33, BRGY. SINALHAN, STA. ROSA, LAGUNA PHILIPPINES ADDRESS: LOT 7, BLOCK 33, BRGY. SINALHAN, STA. ROSA, LAGUNA PHILIPPINES
"A truly great structure, one that is meant to stand the test of time,
never disregards its environment"
PLACE ISSUED: CALAPAN CITY IAPOA NO.: 28311-306999-122320 ARCHITECTS PRIOR TO COMMENCEMENT OF WORK.
SHT. 6 OF 37
- Lake House -
DOOR SCHEDULE
ID D-01 D-02 D-04 D-05 D-06 D-06 D-06 D-07

PLAN VIEW 2,920

700
800 800 800
1,091

356 736 2,920 800 800 800 700

TOP OF TOP OF TOP OF TOP OF TOP OF TOP OF TOP OF TOP OF


JAMB JAMB JAMB JAMB JAMB JAMB JAMB JAMB
300

HEIGHT OF HEIGHT OF HEIGHT OF HEIGHT OF HEIGHT OF HEIGHT OF HEIGHT OF HEIGHT OF


DOOR LEAF DOOR LEAF DOOR LEAF DOOR LEAF DOOR LEAF DOOR LEAF DOOR LEAF DOOR LEAF
1,100

ELEVATION
2,400

2,400

2,400

2,400

2,400

2,400
2,100

HEIGHT OF HEIGHT OF HEIGHT OF HEIGHT OF HEIGHT OF HEIGHT OF HEIGHT OF HEIGHT OF


DOOR KNOB DOOR KNOB DOOR KNOB DOOR KNOB DOOR KNOB DOOR KNOB DOOR KNOB DOOR KNOB
1,000

FFL FFL FFL FFL FFL FFL FFL FFL

QUANTITY 1 1 1 1 1 1 1 1
WALL OPENING 1,180×2,438 2,920×2,400 801×2,125 751×2,125 800×2,400 800×2,400 800×2,400 700×2,400
LEAF/PANEL DIM... 685×2,100 2,840×2,100 750×2,100 700×2,100 744×2,112 744×2,112 744×2,112 644×2,112
FLOOR LEVEL GROUND FLOOR GROUND FLOOR GROUND FLOOR GROUND FLOOR SECOND FLOOR SECOND FLOOR SECOND FLOOR SECOND FLOOR
LOCATION FOYER ALFRESCO HOME OFFICE STAIRS BEDROOM 2 HALLWAY to BALCONY MASTER BEDROOM COMMON T&B

WOOD-FRAMED SLIDING DOOR, 6mm THK FROSTED GLASS WOOD-FRAMED SLIDING DOOR, 6mm THK FROSTED GLASS WOOD-FRAMED SWING DOOR, 6mm THK FROSTED GLASS WOOD-FRAMED SLIDING SWING, 6mm THK FROSTED GLASS WOOD-FRAMED SWING DOOR, 6mm THK FROSTED GLASS
PANEL ALUMINUM FRAME, POWDER COATED (WOOD-WOOD GRAIN), 10mm THK CLEAR GLASS PANEL
PANEL
SOLID WOOD PANEL, SLIDING DOOR
PANEL PANEL PANEL PANEL

SCREEN
DOOR JAMB

DOOR SCHEDULE
ID D-08 D-08 D-09 D-10 D-10

PLAN VIEW

800
800 900

800 900

TOP OF TOP OF TOP OF TOP OF


JAMB JAMB TRANSOM JAMB

800
300

HEIGHT OF HEIGHT OF HEIGHT OF HEIGHT OF


DOOR LEAF DOOR LEAF DOOR LEAF DOOR LEAF

ELEVATION

2,400
2,100

2,100

HEIGHT OF HEIGHT OF HEIGHT OF HEIGHT OF


DOOR KNOB DOOR KNOB DOOR KNOB DOOR KNOB

FFL FFL FFL FFL

QUANTITY 1 1 1 1 1
WALL OPENING 751×2,125 751×2,125 800×2,400 800×2,100 900×2,400
LEAF/PANEL DIM... 700×2,100 700×2,100 744×2,112 744×2,072 844×2,112
FLOOR LEVEL SECOND FLOOR SECOND FLOOR SECOND FLOOR ROOF DECK GROUND FLOOR
LOCATION MASTER BEDROOM MASTER T&B HALLWAY to BALCONY ROOF DECK DINING AREA

WOOD-FRAMED SLIDING DOOR, 6mm THK FROSTED GLASS WOOD-FRAMED SLIDING DOOR, 6mm THK FROSTED GLASS WOOD-FRAMED SWING DOOR, 6mm THK FROSTED GLASS WOOD-FRAMED SWING DOOR, 6mm THK FROSTED GLASS WOOD-FRAMED SWING DOOR, 6mm
PANEL PANEL PANEL PANEL PANEL THK FROSTED GLASS PANEL

SCREEN
DOOR JAMB

SCHEDULE OF DOORS
A-07 SCALE: 1:1.19
Site Orientation Sun Path Wind Direction

IMPORTANT:
BIM BY : KIR PROJECT TITLE: OWNER: SHEET CONTENTS: SHEET NUMBER:
REPUBLIC ACT No.9266

KATHLEEN I. RUNAS OWNERSHIP OF PLANS, SPECIFICATIONS AND OTHER CONTRACT


DOCUMENTS-DRAWINGS AND SPECIFICATIONS AND OTHER
CONTRACT DOCUMENTS DULY SIGNED, STAMPED OR SEALED, AS AN
DATE : 15/03/2021
Door List
INSTRUMENT OF SERVICE, ARE THE INTELLECTUAL PROPERTY AND
ARCHITECT DESIGNED BY : KIR
A-07
DOCUMENTS OF THE ARCHITECT, WHETHER THE OBJECT FOR WHICH

P.T.R. NO.: 0696129 PRC NO.: 32779 REG.DATE: FEBRUARY 5, 2014


THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR
ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID
DOCUMENTS FOR USE IN THE REPETITION OF AND FOR OTHER
PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN A
WHOLE, WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT OR
DATE : 15/03/2021
TATLONGHARI RESIDENCE Atty. RENEL and Mrs. ANGEL ANNE TATLONGHARI
AUTHOR OF SAID DOCUMENTS.

DATE ISSUED: JARUNARY 05, 2021 T.I.N.: 314-192-442-0000 -ALL MEASUREMENTS ARE TO BE VERIFIED ON SITE BY CONTRACTOR. CHECKED BY : KIR
-ALL DISCREPANCIES ARE TO BE IMMEDIATELY REPORTED TO
ARCHITECTS AND PROJECT MANAGERS.
-CONTRACTORS ARE TO PREPARE AND SUBMIT SHOP DRAWINGS TO APPROVED BY : KIR ADDRESS: LOT 7, BLOCK 33, BRGY. SINALHAN, STA. ROSA, LAGUNA PHILIPPINES ADDRESS: LOT 7, BLOCK 33, BRGY. SINALHAN, STA. ROSA, LAGUNA PHILIPPINES
"A truly great structure, one that is meant to stand the test of time,
never disregards its environment"
PLACE ISSUED: CALAPAN CITY IAPOA NO.: 28311-306999-122320 ARCHITECTS PRIOR TO COMMENCEMENT OF WORK.
SHT. 7 OF 37
- Lake House -
WINDOWS SCHEDULE
ID CW-01 CWD-02 CWD-02 W-01 W-02 W-03 W-04 W-05 W-06

PLAN

600 600 600 600 400

400
1,800

768 1,516
1,500

1,500

1,500

1,900
ELEVATION

1,500

2,300

500

500

2,100
QUANTITY 2 1 1 1 3 3 1 1 3
FLOOR LEVEL SECOND FLOOR SECOND FLOOR SECOND FLOOR GROUND FLOOR GROUND FLOOR GROUND FLOOR GROUND FLOOR GROUND FLOOR SECOND FLOOR
OPEN BELOW TO LIVING
LOCATION <Undefined> BALCONY BEDROOM 1 HOME OFFICE <Undefined> <Undefined> COFFEE BAR 2-CAR GARAGE
ROOM
DIMENSIONS 600×1,500 600×1,500 600×1,500 1,800×1,500 600×2,300 400×1,900 768×500 1,516×500 400×2,100
ALUMINUM, POWDER COATED ALUMINUM, POWDER ALUMINUM, POWDER ALUMINUM, POWDER ALUMINUM, POWDER COATED ALUMINUM, POWDER
FRAME FINISH (Wood-Grain) COATED (Wood-Grain) COATED (Wood-Grain)
ALUMINUM, POWDER COATED (Wood-Grain)
COATED (Wood-Grain) (Wood-Grain)
ALUMINUM, POWDER COATED (Wood-Grain)
COATED (Wood-Grain)
GLAZING 6mm THK CLEAR GLASS 6mm THK CLEAR GLASS 6mm THK CLEAR GLASS 6mm THK CLEAR GLASS GLASS BLOCK (For Approval) 6mm THK CLEAR GLASS 6mm THK CLEAR GLASS 6mm THK CLEAR GLASS 6mm THK CLEAR GLASS

WINDOWS SCHEDULE
ID W-07 W-08 W-09 W-10 W-11 W-12

PLAN

900

2,839
1,800 2,400 278 1,600

300
400

400
1,550

1,127

ELEVATION
2,100

QUANTITY 1 1 1 2 1 1
FLOOR LEVEL SECOND FLOOR SECOND FLOOR SECOND FLOOR SECOND FLOOR SECOND FLOOR SECOND FLOOR
LOCATION <Undefined> STAIRS TO ROOF DECK MASTER BEDROOM MASTER BEDROOM MASTER BEDROOM MASTER T&B
DIMENSIONS 900×1,550 1,800×2,100 2,400×1,127 278×400 1,600×400 2,839×300
ALUMINUM, POWDER COATED (Wood- ALUMINUM, POWDER
FRAME FINISH Grain)
ALUMINUM, POWDER COATED (Wood-Grain) ALUMINUM, POWDER COATED (Wood-Grain)
COATED (Wood-Grain)
ALUMINUM, POWDER COATED (Wood-Grain) ALUMINUM, POWDER COATED (Wood-Grain)

GLAZING 6mm THK CLEAR GLASS 6mm THK CLEAR GLASS 6mm THK CLEAR GLASS 6mm THK CLEAR GLASS 6mm THK CLEAR GLASS 6mm THK CLEAR GLASS

SCHEDULE OF WINDOWS 1
A-08 SCALE: 1:0.76
Site Orientation Sun Path Wind Direction

IMPORTANT:
BIM BY : KIR PROJECT TITLE: OWNER: SHEET CONTENTS: SHEET NUMBER:
REPUBLIC ACT No.9266

KATHLEEN I. RUNAS OWNERSHIP OF PLANS, SPECIFICATIONS AND OTHER CONTRACT


DOCUMENTS-DRAWINGS AND SPECIFICATIONS AND OTHER
CONTRACT DOCUMENTS DULY SIGNED, STAMPED OR SEALED, AS AN
DATE : 15/03/2021
Window List
INSTRUMENT OF SERVICE, ARE THE INTELLECTUAL PROPERTY AND
ARCHITECT DESIGNED BY : KIR
A-08
DOCUMENTS OF THE ARCHITECT, WHETHER THE OBJECT FOR WHICH

P.T.R. NO.: 0696129 PRC NO.: 32779 REG.DATE: FEBRUARY 5, 2014


THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR
ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID
DOCUMENTS FOR USE IN THE REPETITION OF AND FOR OTHER
PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN A
WHOLE, WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT OR
DATE : 15/03/2021
TATLONGHARI RESIDENCE Atty. RENEL and Mrs. ANGEL ANNE TATLONGHARI
AUTHOR OF SAID DOCUMENTS.

DATE ISSUED: JARUNARY 05, 2021 T.I.N.: 314-192-442-0000 -ALL MEASUREMENTS ARE TO BE VERIFIED ON SITE BY CONTRACTOR. CHECKED BY : KIR
-ALL DISCREPANCIES ARE TO BE IMMEDIATELY REPORTED TO
ARCHITECTS AND PROJECT MANAGERS.
-CONTRACTORS ARE TO PREPARE AND SUBMIT SHOP DRAWINGS TO APPROVED BY : KIR ADDRESS: LOT 7, BLOCK 33, BRGY. SINALHAN, STA. ROSA, LAGUNA PHILIPPINES ADDRESS: LOT 7, BLOCK 33, BRGY. SINALHAN, STA. ROSA, LAGUNA PHILIPPINES
"A truly great structure, one that is meant to stand the test of time,
never disregards its environment"
PLACE ISSUED: CALAPAN CITY IAPOA NO.: 28311-306999-122320 ARCHITECTS PRIOR TO COMMENCEMENT OF WORK.
SHT. 8 OF 37
- Lake House -
WINDOWS SCHEDULE
ID W-13a W-13b W-13b W-49 W-49 W-50

PLAN

900 900 900

1,200 1,800 1,200


1,500

1,500

1,500

1,180

1,180

1,180
ELEVATION

QUANTITY 2 1 1 1 1 1
FLOOR LEVEL SECOND FLOOR SECOND FLOOR SECOND FLOOR ROOF DECK ROOF DECK ROOF DECK
LOCATION <Undefined> <Undefined> BEDROOM 1 <Undefined> <Undefined> <Undefined>
DIMENSIONS 900×1,500 900×1,500 900×1,500 1,200×1,180 1,800×1,180 1,200×1,180
ALUMINUM, POWDER COATED (Wood- ALUMINUM, POWDER COATED (Wood- ALUMINUM, POWDER COATED (Wood-
FRAME FINISH Grain) Grain) Grain)
ALUMINUM, POWDER COATED (Wood-Grain) ALUMINUM, POWDER COATED (Wood-Grain) ALUMINUM, POWDER COATED (Wood-Grain)

GLAZING 6mm THK CLEAR GLASS 6mm THK CLEAR GLASS 6mm THK CLEAR GLASS 6mm THK CLEAR GLASS 6mm THK CLEAR GLASS

WINDOWS SCHEDULE
ID W-51 W-52 W-Empty Opening

PLAN

300

3,446 2,000
780

1,180

1,950
ELEVATION

QUANTITY 1 1 3
FLOOR LEVEL ROOF DECK ROOF DECK GROUND FLOOR
LOCATION <Undefined> <Undefined> <Undefined>
DIMENSIONS 3,446×780 2,000×1,180 300×1,950

FRAME FINISH ALUMINUM, POWDER COATED (Wood-Grain) ALUMINUM, POWDER COATED (Wood-Grain)

GLAZING 6mm THK CLEAR GLASS 6mm THK CLEAR GLASS

SCHEDULE OF WINDOWS 2
A-09 SCALE: 1:0.76
Site Orientation Sun Path Wind Direction

IMPORTANT:
BIM BY : KIR PROJECT TITLE: OWNER: SHEET CONTENTS: SHEET NUMBER:
REPUBLIC ACT No.9266

KATHLEEN I. RUNAS OWNERSHIP OF PLANS, SPECIFICATIONS AND OTHER CONTRACT


DOCUMENTS-DRAWINGS AND SPECIFICATIONS AND OTHER
CONTRACT DOCUMENTS DULY SIGNED, STAMPED OR SEALED, AS AN
DATE : 15/03/2021
Window List
INSTRUMENT OF SERVICE, ARE THE INTELLECTUAL PROPERTY AND
ARCHITECT DESIGNED BY : KIR
A-09
DOCUMENTS OF THE ARCHITECT, WHETHER THE OBJECT FOR WHICH

P.T.R. NO.: 0696129 PRC NO.: 32779 REG.DATE: FEBRUARY 5, 2014


THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR
ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID
DOCUMENTS FOR USE IN THE REPETITION OF AND FOR OTHER
PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN A
WHOLE, WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT OR
DATE : 15/03/2021
TATLONGHARI RESIDENCE Atty. RENEL and Mrs. ANGEL ANNE TATLONGHARI
AUTHOR OF SAID DOCUMENTS.

DATE ISSUED: JARUNARY 05, 2021 T.I.N.: 314-192-442-0000 -ALL MEASUREMENTS ARE TO BE VERIFIED ON SITE BY CONTRACTOR. CHECKED BY : KIR
-ALL DISCREPANCIES ARE TO BE IMMEDIATELY REPORTED TO
ARCHITECTS AND PROJECT MANAGERS.
-CONTRACTORS ARE TO PREPARE AND SUBMIT SHOP DRAWINGS TO APPROVED BY : KIR ADDRESS: LOT 7, BLOCK 33, BRGY. SINALHAN, STA. ROSA, LAGUNA PHILIPPINES ADDRESS: LOT 7, BLOCK 33, BRGY. SINALHAN, STA. ROSA, LAGUNA PHILIPPINES
"A truly great structure, one that is meant to stand the test of time,
never disregards its environment"
PLACE ISSUED: CALAPAN CITY IAPOA NO.: 28311-306999-122320 ARCHITECTS PRIOR TO COMMENCEMENT OF WORK.
SHT. 9 OF 37
- Lake House -
R1
LED PIN LIGHT R1 LED PIN LIGHT DL1
LED DROPLIGHT 3-6W LED WALL LAMP 1W LED WALL LAMP 4W per 1m LED TAPELIGHT LED TUBE LAMP 3W LED SPOT LIGHT
CYLINDRICAL FIXTURE (R-Recessed, S-Surface Mounted)
N3w
MOVEABLE FIXTURE: (R-Recessed, S-Surface Mounted) FIXTURE (As Per Interior Design Specification) FIXTURE (R-Recessed, S-Surface Mounted) RECTANGULAR FIXTURE (R-Recessed; S-Surface Mounted)) n 1-Warm White; 2-Cool White; FIXTURES (R-Recessed; S-Surface Mounted; SP-Suspended) FIXTURE (Mount Type: CM-Ceiling; WM-Wall; FM: Floor)
LEGEND N3w
1-Warm White; 2-Cool White; 3-Daylight; 4-Other as Designed
R1
N3w 1-Warm White; 2-Cool White; 3-Daylight; 4-Other as Designed N3w
1-Warm White; 2-Cool White; 3-Daylight; 4-Other as Designed As per Architect's Approval As per Architect s Approval 3-Daylight; 4-Other as Designed
T# N3w
1-Warm White; 2-Cool White; 3-Daylight; 4-Other as Designed 1-Warm White; 2-Cool White; 3-Daylight; 4-Other as Designed
N3w Schedule & Wattage N3w Schedule & Wattage N3w Schedule & Wattage 1-Warm White; 2-Cool White; 3-Daylight; 4-Other as Designed 1-Warm White; 2-Cool White; 3-Daylight
RECESSED LED TUBE LAMP LED GARDEN LAMP SOLAR POWER 1-GANG C.O. 2-GANG C.O. 3-GANG C.O. FLOOR ACU C.O. DUPLEX UNIVERSAL INDUCTION COOKTOP 1-GANG 1-GANG T.V.
PANEL BOARD
T1
RECTANGULAR LAMP, with DIFFUSER GROUND TYPE (As per Architect's Approval) Wall Mounted Wall Mounted Wall Mounted RECEPTACLE OUTLET W/ GROUND (Panasonic - Full Color Wide Series) REFRIGERATOR C.O. (CABLE) TERMINAL
BATTERIES
N3w

1-Warm White; 2-Cool White; 3-Daylight; 4-Other as Designed N3w 1-Warm White; 2-Cool White; 3-Daylight; 4-Other as Designed W- Weather Proof Outlet W W- Weather Proof Outlet W W- Weather Proof Outlet F Wall Mounted IN REF

N3w Schedule & Wattage N3w Schedule & Wattage (Panasonic - Full Color Wide Series) (Panasonic - Full Color Wide Series) (Panasonic - Full Color Wide Series) C.O. (Panasonic - Full Color Wide Series) (Panasonic - Full Color Wide Series)

CEILING CF-01 T&G PVC EAVES SOFFIT CF-02 10mm REGULAR GYPSUM CEILING CF-03 12mm MISTURE RESISTANT GYPSUM CF-04 FICEM BOARD CEILING CF-05 WOOD CEILING CLADDING CF-06 CONCRETE SLAB SOFFIT CF-07 POLYCARBONATE ROOF SOFFIT
1-Wood Grained Finish Suspended on Steel Frames & Channels Suspended on Steel Frames & Channels Suspended on Steel Frames & Channels (As per Architect's Approval) FINISH: Paint, BOYSEN HealthyHome (White, Satin)
FINISHES FINISH: Paint, BOYSEN HealthyHome (White, Satin) FINISH: Paint, BOYSEN HealthyHome (White, Satin) FINISH: Paint, BOYSEN HealthyHome (White, Satin)

A A' B B' B'' C D A A' B B' B'' C D A' B B' B''

10,000 10,000
2,603 71 1,154 6,172 2,701 2,223 100 2,976 2,000

161 550 1,413 550 50 2,151 50 50 3,104 100 926

1 1
3,839
750 2,345 750

ALFRESCO VEGETABLE
GARDEN A: 7.97 m2
2,125

GARDEN
A: 7.87 m2 R2 R2 R2
A: 4.00 m2 AM3[7w] CF-01 AM2[7w] AM1[7w]
R1

750

750
CF-01 CLNG HGT: Verify on-site

1' 1'
AP3[9w]
LINE OF 2F SLAB R1 (Texture as per Architect's Approval)
CF-01
CF-01

780
AM4[7w]
R1
CF-06
CLNG HGT: (+2.700m)
STAIRS TO ROOF
SHADOWLINE +50mm from Ceiling Finish

SHADOWLINE +50mm from Ceiling Finish

Finish: Air-Cleaning, Low-VOC Paint P[9w]


DECK

100
Color: Satin, White

2 SHADOWLINE +50mm from Ceiling Finish LINE OF


2 SHADOWLINE +50mm from Ceiling Finish
A: R2.37 m2
2
R1
AE2[7w]
R1
AE3[7w]
R2
1
2

2F SLAB SHADOWLINE +50mm from Ceiling Finish


AN[9w] AN[9w]
CF-02

500
R1 R1

SHADOWLINE +50mm from Ceiling Finish


R1 R1 CLNG HGT: (+2.500m)
K1[7w] K2[7w] U1[7w] Finish: Air-Cleaning, Low-VOC Paint U8[7w] MASTER
LAUNDRY &
SHADOWLINE +50mm from Ceiling Finish
Color: Satin, White
BEDROOM

SHADOWLINE +50mm from Ceiling Finish


UP

3 DRYING AREA A: 9.84 m2


A: 4.96 m2

SHADOWLINE +50mm from Ceiling Finish


R2
STAIRS

SHADOWLINE +50mm from Ceiling Finish


R1 DINING AREA
2,139

A: 6.36 m2 E3[9w] A: 9.98 m2 R3 Z[9w] SERIES 12


S2(Ae1-4,Af)
R2
F
AFF[52w]
CF-02
S1(FAf)(Ceilign Fan) CLNG HGT: (+2.500m)
WORKSTATION AWL[9w] R1 R1

SHADOWLINE +50mm from Ceiling Finish


DL1 DL1 DL1 OB[9w] Finish: Air-Cleaning, Low-VOC Paint
CF-02

5,188

3,690

3,690
5,188
Color: Satin, White
4
L1[5w] L2[5w] L3[5w]
R1 A: 2.14 m2 SERIES 11
S2(W1-2,X1-2)(3-Way) CLNG HGT: (+2.500m) AP4[9w] AP2[9w]
S3(Z,An, Am1-4)(3-Way) Finish: Air-Cleaning, Low-VOC Paint
CF-05 V1[12w] S1(FW)(Ceiling Fan) (3-Way) Color: Satin, White
5
R1 R1
DOWN
CLNG HGT: (+2.550m)
R1 R1
(Texture, as per Architect's Approval) CF-01 R1
U2[7w] U7[7w] X1[9w] X2[9w]
SHADOWLINE +50mm from Ceiling Finish

SHADOWLINE +50mm from Ceiling Finish

6
AO[9w] CF-01
OPEN ABOVE CF-05
R1 R1
ROOF DECK
R1 R1 AE1[7w] AE4[7w] COMMON
CLNG HGT: (+2.500m) CF-07 A: 25.09 m2
2' LIVING AREA
(Texture, as per Architect's Approval) K4[7w]
F MF[52w]
K3[7w]
CLNG HGT: (+2.800m)
2' FAMILY HALL

3,608
4,818
ACTIVITY
SHADOWLINE +50mm from Ceiling Finish

ML[9w]
F A: 8.65 m2
R1
A: 14.26 m2 VF[61w] AREA
SHADOWLINE +50mm from Ceiling Finish
SHADOWLINE +50mm from Ceiling Finish

SERIES 15 T52

Under-The-Cabinet
S3(Ah, Ai, Aj)
J[9w] R1 A: 5.11 m2 R2
AJ3[8w]

R3 R3

SHADOWLINE +50mm from Ceiling Finish


SHADOWLINE +50mm from Ceiling Finish

SHADOWLINE +50mm from Ceiling Finish


E2[9w] R1 AG[9w]

R3
M2[9w] OA[9w]
R1
CF-05
R1 F MASTER WIC
WF[52w]
POWDER COFFEE BAR AUXILIARY U3[7w]
CLNG HGT: (+5.550m)
(Texture, as per Architect's Approval)
U6[7w]
CF-02
WL[9w] A: 2.73 m2
M1[9w] CF-01
SERIES 14 R2
SHADOWLINE +50mm from Ceiling Finish

ROOM A: 1.57 m2 CF-02 KITCHEN R1 CLNG HGT: (+2.500m) CF-02 S1(Ag)


2,677

Inside-Cabinet Inside-Cabinet CLNG HGT: Verify on-site

SHADOWLINE +50mm from Ceiling Finish


CLNG HGT: (+2.500m) Finish: Air-Cleaning, Low-VOC Paint
A: 3.52 m2 KITCHEN A: 4.32 m2 CLNG HGT: (+2.500m) AH[9w] (Texture as R
per
1 Architect's Approval)

SHADOWLINE +50mm from Ceiling Finish


Finish: Air-Cleaning, Low-VOC Paint Color: Satin, White

SHADOWLINE +50mm from Ceiling Finish

SHADOWLINE +50mm from Ceiling Finish

750

750
V2[12w] AG2[8w] T52Low-VOC Paint
T52 Finish: Air-Cleaning, AG2[8w] CF-01
Color: Satin, White2
A: 6.17 m with Auto-Switch Color: Satin, White
with Auto-Switch
CLNG HGT: Verify on-site AP1[9w]
SHADOWLINE +50mm from Ceiling Finish (Texture as per Architect's Approval)

CF-06 LINE OF KITCHEN CABINET MASTER T&B


A: 4.09 m2
SHADOWLINE +50mm from Ceiling Finish
CLNG HGT: (Verify Actual) SHADOWLINE +50mm from Ceiling Finish
T52

Under-The-Cabinet
12,500

12,500

12,500

12,500
SHADOWLINE +50mm from Ceiling Finish

Finish: Air-Cleaning, Low-VOC Paint


AJ2[8w] CF-03
Color: Satin, White
R1 R1 COMMON T&B CLNG HGT: (+2.500m)
R1 R1 HALLWAY R1 750 2,345 750
A: 3.09 m2
3 3
Finish: Air-Cleaning, Low-VOC Paint

SHADOWLINE +50mm from Ceiling Finish

SHADOWLINE +50mm from Ceiling Finish


E4[9w] E1[9w] CF-02
H[9w] R1 R1 A: 3.70 m2 Color: Satin, White

560
W1[9w] W2[9w]
CLNG HGT: (+2.500m)
U4[7w] SERIES 9 U5[7w] R2
3,839
Finish: Air-Cleaning,
S3(U1-4,U5-8Low-VOC
,V1-2)(3-Way)
Paint
Color: Satin, White
S1(FV)(Ceiling Fan)(3-Way) SERIES 16
S1(FW)(Ceiling Fan) (3-Way) S1(Ad,Exhaust Fan) AD[9w] R2
SHADOWLINE +50mm from Ceiling Finish SHADOWLINE +50mm from Ceiling Finish
SHADOWLINE +50mm from Ceiling Finish
CF-03
SERIES 10a AI[9w]

50
3' 3' SHADOWLINE +50mm from Ceiling Finish
S2(Aa, Ak4) CLNG HGT: (+2.500m)
121

S3(Ak1-2,Ak3,5,6,Al1-3) Finish: Air-Cleaning, Low-VOC Paint


SERIES 13 Color: Satin, White
R1 R1 S2(Ab ,Ab )
1-2 3-4

R1 Inside-Cabinet S1(FAb)(Ceiling Fan)


F2[7w] F1[7w] SHADOWLINE +50mm from Ceiling Finish

698
Railing-Post Light
AK1[7w] AG2[8w]
T52
HALLWAY to
SHADOWLINE +50mm from Ceiling Finish

3'' 3''
with Auto-Switch

CF-05
HOME OFFICE CLNG HGT: (+2.500m) CF-06 CF-04
CF-01 R1
AB1[7W]
R1
AB2[7w]
BALCONY R1 R1

A: 6.60 m2 (Texture, as per Architect's Approval) CLNG HGT: (+2.700m)


Finish: Air-Cleaning, Low-VOC Paint
CLNG HGT: (+2.700m)
Finish: Air-Cleaning, Low-VOC Paint BEDROOM 2 A: 3.14 m2 AC1[7w] AC2[7w]

Color: Satin, White Color: Satin, White


A: 6.93 m2
SHADOWLINE +50mm from Ceiling Finish

FOYER
2,318

SHADOWLINE +50mm from Ceiling Finish

SHADOWLINE +50mm from Ceiling Finish

SHADOWLINE +50mm from Ceiling Finish

SHADOWLINE +50mm from Ceiling Finish

SHADOWLINE +50mm from Ceiling Finish

SHADOWLINE +50mm from Ceiling Finish


R2 CF-01
F R1 BEDROOM 1
GF[52w] A: 4.23 m2

2,739
R2
GL[9w]
CF-02
G[9w]
R1 F AA[9w] A: 7.31 m2
ABF[52w]
CLNG HGT: (+2.500m)
ABL[9w]
D[9w]
Finish: Air-Cleaning, Low-VOC Paint
Color: Satin, White F ACF[52w]
CF-02 SERIES 17 T52 ACL[9w]
R1 R1
S2(Ac ,Ac ) 1-2 3-4 AG2[8w]
AK2[7w] CLNG HGT: (+2.500m) with Auto-Switch AK6[7w]
S1(FA)(Ceiling Fan)
R1 R1 CF-02 Finish: Air-Cleaning, Low-VOC Paint
Color: Satin, White CF-01

Inside-Cabinet
CLNG HGT: (+2.500m)

2,825
F3[7w] F4[7w]
Finish: Air-Cleaning, Low-VOC Paint CF-02
Color: Satin, White CLNG HGT: (+2.500m)
SHADOWLINE +50mm from Ceiling Finish
R1 R1 R1 Finish: Air-Cleaning, Low-VOC Paint R1

4 PORCH
4 CF-01 AB3[7w] AB4[7w] AC3[7w]Color: Satin, White AC4[7w]

SHADOWLINE +50mm from Ceiling Finish

A: 3.89 m2
SHADOWLINE +50mm from Ceiling Finish SHADOWLINE +50mm from Ceiling Finish SHADOWLINE +50mm from Ceiling Finish
921

R1 SP1

4' 4'
R1
C[9w]
AL3[9w]
CF-01 LINE OF A[9w] 2-CAR Railing-Post Light
2F SLAB
CLNG HGT: Verify on-site
(Texture as per Architect's Approval)
CF-01 GARAGE R1
CLNG HGT: Verify on-site
CF-01 R1 CF-01
CLNG HGT: Verify on-site
R1
AK3[7w] AK4[7w] AK5[7w]
CLNG HGT: Verify on-site
(Texture as per Architect's Approval)
A: 36.00 m2 (Texture as per Architect's Approval) (Texture as per Architect's Approval)

LINE OF
ROOF
FRONT LAWN
A: 8.10 m2

BALCONY
2,200

A: 15.86 m2
CF-07
CLNG HGT: (+2.800m)

SP1
SP1
AL1[9w] AL2[9w]

5 5
Railing-Post Light
Railing-Post Light

10,000

GROUND FLOOR - REFLECTED CEILING PLAN SECOND FLOOR - REFLECTED CEILING PLAN ROOF DECK - RCP
A.15 A.16 A.17
SCALE: 1:50 SCALE: 1:50 SCALE: 1:50

ARCHITECTURAL REFLECTED CEILING PLAN 1


A-10 SCALE: 1:50
Site Orientation Sun Path Wind Direction

IMPORTANT:
BIM BY : KIR PROJECT TITLE: OWNER: SHEET CONTENTS: SHEET NUMBER:
REPUBLIC ACT No.9266

KATHLEEN I. RUNAS OWNERSHIP OF PLANS, SPECIFICATIONS AND OTHER CONTRACT


DOCUMENTS-DRAWINGS AND SPECIFICATIONS AND OTHER
CONTRACT DOCUMENTS DULY SIGNED, STAMPED OR SEALED, AS AN
DATE : 15/03/2021
GROUND FLOOR - REFLECTED CEILING PLAN, SECOND FLOOR
INSTRUMENT OF SERVICE, ARE THE INTELLECTUAL PROPERTY AND
ARCHITECT - REFLECTED CEILING PLAN, ROOF DECK - RCP
DESIGNED BY : KIR
A-10
DOCUMENTS OF THE ARCHITECT, WHETHER THE OBJECT FOR WHICH

P.T.R. NO.: 0696129 PRC NO.: 32779 REG.DATE: FEBRUARY 5, 2014


THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR
ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID
DOCUMENTS FOR USE IN THE REPETITION OF AND FOR OTHER
PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN A
WHOLE, WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT OR
DATE : 15/03/2021
TATLONGHARI RESIDENCE Atty. RENEL and Mrs. ANGEL ANNE TATLONGHARI
AUTHOR OF SAID DOCUMENTS.

DATE ISSUED: JARUNARY 05, 2021 T.I.N.: 314-192-442-0000 -ALL MEASUREMENTS ARE TO BE VERIFIED ON SITE BY CONTRACTOR. CHECKED BY : KIR
-ALL DISCREPANCIES ARE TO BE IMMEDIATELY REPORTED TO
ARCHITECTS AND PROJECT MANAGERS.
-CONTRACTORS ARE TO PREPARE AND SUBMIT SHOP DRAWINGS TO APPROVED BY : KIR ADDRESS: LOT 7, BLOCK 33, BRGY. SINALHAN, STA. ROSA, LAGUNA PHILIPPINES ADDRESS: LOT 7, BLOCK 33, BRGY. SINALHAN, STA. ROSA, LAGUNA PHILIPPINES
"A truly great structure, one that is meant to stand the test of time,
never disregards its environment"
PLACE ISSUED: CALAPAN CITY IAPOA NO.: 28311-306999-122320 ARCHITECTS PRIOR TO COMMENCEMENT OF WORK.
SHT. 10 OF 37
- Lake House -
LED PIN LIGHT R1
LED PIN LIGHT DL1 LED DROPLIGHT 3-6W LED WALL LAMP W1 1W LED WALL LAMP LED TAPELIGHT LED TUBE LAMP LED SPOT LIGHT
LEGEND
R1 N3w
SP1
CYLINDRICAL FIXTURE (R-Recessed; S-Surface Mounted) DIRECTIONAL FIXTURE: (R-Recessed; S-Surface Mounted) FIXTURE (As per Architect's Approval/Owner's Preference) W1
FIXTURE (As per Architect's Approval/Owners' Preference) 3w
FIXTURE (As per Architect's Approval/Owners' Preference) 1 3w
FIXTURE (As per Architect's Approval/Owners' Preference) FIXTURE: (R-Recessed; S-Surface Mounted) FIXTURE (CL-Ceiling Mounted;WL-Wall Mounter; FL-Floor Mounted)
R 1 N 3w N SL -N
N3w
1-Warm White; 2-Cool White; 3-Daylight N3w
1-Warm White; 2-Cool White; 3-Daylight 1-Warm White; 2-Cool White; 3-Daylight N3w 1-Warm White; 2-Cool White; 3-Daylight 1-Warm White; 2-Cool White; 3-Daylight 1-Warm White; 2-Cool White; 3-Daylight T5/8[R1]
N3w
1-Warm White; 2-Cool White; 3-Daylight N3w 1-Warm White; 2-Cool White; 3-Daylight
N3w Schedule & Wattage N3w Schedule & Wattage N3w Schedule & Wattage N3w Schedule & Wattage N3w Schedule & Wattage 4w per 1meter N3w Schedule & Wattage N3w Schedule & Wattage

T1 RECESSED LED TUBE LAMP LED GARDEN LAMP SOLAR POWER 1-GANG C.O. 2-GANG C.O. 3-GANG C.O. FLOOR ACU C.O. DUPLEX UNIVERSAL INDUCTION COOKTOP 1-GANG 1-GANG T.V.
RECTANGULAR LAMP with DIFFUSER GROUND TYPE (As per Architect's Approval) PANEL BOARD Wall Mounted Wall Mounted Wall Mounted RECEPTACLE OUTLET W/ GROUND (Panasonic - Full Color Wide Series) REFRIGERATOR C.O. (CABLE) TERMINAL
N3w 1-Warm White; 2-Cool White; 3-Daylight N3w 1-Warm White; 2-Cool White; 3-Daylight BATTERIES WP- Weather Proof Outlet W WP- Weather Proof Outlet W WP- Weather Proof Outlet F
C.O. ACU Wall Mounted IN REF
(Panasonic - Full Color Wide Series)
N3w Schedule & Wattage N3w Schedule & Wattage (Panasonic - Full Color Wide Series) (Panasonic - Full Color Wide Series) (Panasonic - Full Color Wide Series) (Panasonic - Full Color Wide Series)

SWITCH SCHEDULE

A A' B B' B'' C D A A' B B' B'' C D

10,000 10,000

1 1

ALFRESCO VEGETABLE
GARDEN A: 7.97 m2 GARDEN
A: 7.87 m2 R2 R2 R2
A: 4.00 m2 AM3[7w] AM2[7w] AM1[7w]

1' LINE OF 2F SLAB


1' R1

AM4[7w]
R1
R1
R1 STAIRS TO ROOF

7
Q1[6w] P[9w] Q2[6w] 3 DECK
2 LINE OF
2 A: R2.37 m2
2
R1
AE2[7w]
R1
AE3[7w]
SERIES 6
1
2

2F SLAB 2 AN[9w]
S2(K1-4,L1-3) (3-Way)
SERIES 5 S2(Q1-4,P)
S3(E1-4,U1-8,V1-2) (3-Way) R1 R1 R1 R1 1
S1(Ceiling Fan FV) K1[7w] K2[7w] U1[7w] U8[7w] MASTER
LAUNDRY & UP
BEDROOM
UP

3 DRYING AREA A: 9.84 m2


STAIRS A: 4.96 m2 R2
R1 DINING AREA
A: 6.36 m2 E3[9w] A: 9.98 m2 R3 Z[9w] SERIES 12
S2(Ae1-4,Af)
R2
F
AFF[52w]
S1(FAf)(Ceilign Fan)
DL1 DL1 DL1 OB[9w] WORKSTATION AWL[9w]

4
L1[5w] L2[5w] L3[5w]
R1 A: 2.14 m2 SERIES 11
S2(W1-2,X1-2)(3-Way)
S3(Z,An, Am1-4)(3-Way)
V1[12w] S1(FW)(Ceiling Fan) (3-Way)
5
OPEN BELOW R1 R1
R1 R
6 U2[7w] TO LIVING 1

U7[7w] X1[9w] X2[9w]


ROOM R1 R1
R1 R1 A: 7.04 m2 AE1[7w] AE4[7w]

2' LIVING AREA


K4[7w]
F MF[52w]
ML[9w]
K3[7w]
2' FAMILY
ACTIVITY
A: 14.26 m2 F
R1 VF[61w] AREA SERIES 15 T52

Under-The-Cabinet
S3(Ah, Ai, Aj)
2 A: 5.11 m2 AJ3[8w]
Under-The-Cabinet

J[9w] R1 T5 R2
NB1[8w] R3 R3
E2[9w] R1 AG[9w]

R3
M2[9w] OA[9w]
R1 R1 F MASTER WIC
WF[52w]
POWDER COFFEE BAR AUXILIARY U3[7w] U6[7w] WL[9w] A: 2.73 m2
M1[9w]
SERIES 14 R2
ROOM A: 1.57 m2 T52 KITCHEN R1
Inside-Cabinet Inside-Cabinet S1(Ag)
Under-The-Cabinet

A: 3.52 m2 NB2[8w] KITCHEN SERIES 7


S3(M1-2,OB,OA2)
A: 4.32 m2 V2[12w] T52 AG2[8w] T52 AG2[8w]
AH[9w]

A: 6.17 m2 with Auto-Switch with Auto-Switch

MASTER T&B
T52 A: 4.09 m2

Under-The-Cabinet
12,500

12,500

12,500

12,500
SERIES 2
S2(K ,L ) (3-Way)
1-2 1-3 AJ2[8w]
R1 R1 S3(M1-2,NA1-3,NB1-2)
Under-The-Cabinet Under-The-Cabinet
MAIN STAIRS COMMON T&B
R1 R1 HALLWAY R1
NA1[8w] NA2[18w]
A: 3.09 m2
3 3
T52 T52
E4[9w] E1[9w] A: 5.57 m2
Under-The-Cabinet

H[9w] R 1 R1 W1[9w] A: 3.70 m2 W2[9w]


U4[7w] SERIES 9 U5[7w] R2
S3(U1-4,U5-8,V1-2)(3-Way)
T52 S1(FV)(Ceiling Fan)(3-Way) SERIES 16
SERIES 4 S1(FW)(Ceiling Fan) (3-Way) S1(Ad,Exhaust Fan) AD[9w] R2
I[8w]
S3(H,I,J)
SERIES 10a AI[9w]

3' R1 R1
3' SERIES 13
S2(Ab ,Ab )
1-2 3-4
S2(Aa, Ak4)
S3(Ak1-2,Ak3,5,6,Al1-3)

R1 Inside-Cabinet S1(FAb)(Ceiling Fan)


F2[7w] F1[7w]
AK1[7w] AG2[8w]
T52
HALLWAY to
3'' 3''
T53 R1[8w] T53 R2[8w] with Auto-Switch

HOME OFFICE R1
AB1[7W]
R1
AB2[7w]
BALCONY R1 R1

A: 6.60 m2 BEDROOM 2 A: 3.14 m2 AC1[7w] AC2[7w]

R2 SERIES 3 FOYER A: 6.93 m2 BEDROOM 1


F GF[52w]
S2(F1-4,G)
S1(FG) A: 4.23 m2 R2
R1

GL[9w]
G[9w]
R1
SERIES 8
S2(R1-2,S1-2) F AA[9w] A: 7.31 m2
F
AB [52w]
ABL[9w]
D[9w]
F ACF[52w]
SERIES 17 T52 ACL[9w]
R1 R1
S2(Ac ,Ac )
1-2 3-4 AG2[8w]
AK2[7w] S1(FA)(Ceiling Fan) with Auto-Switch AK6[7w]
R1 R1
SERIES 1

Inside-Cabinet
F3[7w] F4[7w] S2(D,E )1-4

S3(A,R,S)
S3(B,C,T)
R1 R1 R1 R1

4 PORCH
4 AB3[7w] AB4[7w] AC3[7w] AC4[7w]

R1
R1
B[6w]
A: 3.89 m2 SP1

4' 4'
R1
C[9w]
AL3[9w]
LINE OF A[9w] 2-CAR Railing-Post Light
2F SLAB
GARAGE R1 R1 R1
AK3[7w] AK4[7w] AK5[7w]
A: 36.00 m2
LINE OF
ROOF
FRONT LAWN
A: 8.10 m2

BALCONY
A: 15.86 m2
T53 S1[8w] T53 S2[8w]

SP1
SP1
AL1[9w] AL2[9w]

5 5
Railing-Post Light
Railing-Post Light

R1
R1
T2[6w] R1 R1
T1[6w]
T3[6w] T4[6w]

10,000

GROUND FLOOR - LIGHTING LAY-OUT SECOND FLOOR - LIGHTING LAY-OUT


A.21 A.22
SCALE: 1:50 SCALE: 1:50

LIGHTING LAY-OUT 1
A-12 SCALE: 1:50
Site Orientation Sun Path Wind Direction

IMPORTANT:
BIM BY : KIR PROJECT TITLE: OWNER: SHEET CONTENTS: SHEET NUMBER:
REPUBLIC ACT No.9266

KATHLEEN I. RUNAS OWNERSHIP OF PLANS, SPECIFICATIONS AND OTHER CONTRACT


DOCUMENTS-DRAWINGS AND SPECIFICATIONS AND OTHER
CONTRACT DOCUMENTS DULY SIGNED, STAMPED OR SEALED, AS AN
DATE : 15/03/2021
GROUND FLOOR - LIGHTING LAY-OUT, SECOND FLOOR -
INSTRUMENT OF SERVICE, ARE THE INTELLECTUAL PROPERTY AND
ARCHITECT LIGHTING LAY-OUT
DESIGNED BY : KIR
A-12
DOCUMENTS OF THE ARCHITECT, WHETHER THE OBJECT FOR WHICH

P.T.R. NO.: 0696129 PRC NO.: 32779 REG.DATE: FEBRUARY 5, 2014


THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR
ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID
DOCUMENTS FOR USE IN THE REPETITION OF AND FOR OTHER
PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN A
WHOLE, WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT OR
DATE : 15/03/2021
TATLONGHARI RESIDENCE Atty. RENEL and Mrs. ANGEL ANNE TATLONGHARI
AUTHOR OF SAID DOCUMENTS.

DATE ISSUED: JARUNARY 05, 2021 T.I.N.: 314-192-442-0000 -ALL MEASUREMENTS ARE TO BE VERIFIED ON SITE BY CONTRACTOR. CHECKED BY : KIR
-ALL DISCREPANCIES ARE TO BE IMMEDIATELY REPORTED TO
ARCHITECTS AND PROJECT MANAGERS.
-CONTRACTORS ARE TO PREPARE AND SUBMIT SHOP DRAWINGS TO APPROVED BY : KIR ADDRESS: LOT 7, BLOCK 33, BRGY. SINALHAN, STA. ROSA, LAGUNA PHILIPPINES ADDRESS: LOT 7, BLOCK 33, BRGY. SINALHAN, STA. ROSA, LAGUNA PHILIPPINES
"A truly great structure, one that is meant to stand the test of time,
never disregards its environment"
PLACE ISSUED: CALAPAN CITY IAPOA NO.: 28311-306999-122320 ARCHITECTS PRIOR TO COMMENCEMENT OF WORK.
SHT. 12 OF 37
- Lake House -
LED PIN LIGHT R1
LED PIN LIGHT DL1 LED DROPLIGHT 3-6W LED WALL LAMP W1 1W LED WALL LAMP LED TAPELIGHT LED TUBE LAMP LED SPOT LIGHT
LEGEND
R1 N3w
SP1
CYLINDRICAL FIXTURE (R-Recessed; S-Surface Mounted) DIRECTIONAL FIXTURE: (R-Recessed; S-Surface Mounted) FIXTURE (As per Architect's Approval/Owner's Preference) W1
FIXTURE (As per Architect's Approval/Owners' Preference) 3w
FIXTURE (As per Architect's Approval/Owners' Preference) 1 3w
FIXTURE (As per Architect's Approval/Owners' Preference) FIXTURE: (R-Recessed; S-Surface Mounted) FIXTURE (CL-Ceiling Mounted;WL-Wall Mounter; FL-Floor Mounted)
R1 N3w N SL -N
N3w
1-Warm White; 2-Cool White; 3-Daylight N3w
1-Warm White; 2-Cool White; 3-Daylight 1-Warm White; 2-Cool White; 3-Daylight N3w 1-Warm White; 2-Cool White; 3-Daylight 1-Warm White; 2-Cool White; 3-Daylight 1-Warm White; 2-Cool White; 3-Daylight T5/8[R1]
N3w
1-Warm White; 2-Cool White; 3-Daylight N3w 1-Warm White; 2-Cool White; 3-Daylight
N3w Schedule & Wattage N3w Schedule & Wattage N3w Schedule & Wattage N3w Schedule & Wattage N3w Schedule & Wattage 4w per 1meter N3w Schedule & Wattage N3w Schedule & Wattage

T1 RECESSED LED TUBE LAMP LED GARDEN LAMP SOLAR POWER 1-GANG C.O. 2-GANG C.O. 3-GANG C.O. FLOOR ACU C.O. DUPLEX UNIVERSAL INDUCTION COOKTOP 1-GANG 1-GANG T.V.
RECTANGULAR LAMP with DIFFUSER GROUND TYPE (As per Architect's Approval) PANEL BOARD Wall Mounted Wall Mounted Wall Mounted RECEPTACLE OUTLET W/ GROUND (Panasonic - Full Color Wide Series) REFRIGERATOR C.O. (CABLE) TERMINAL
N3w 1-Warm White; 2-Cool White; 3-Daylight N3w 1-Warm White; 2-Cool White; 3-Daylight BATTERIES WP- Weather Proof Outlet W WP- Weather Proof Outlet W WP- Weather Proof Outlet F
C.O. ACU Wall Mounted IN REF
(Panasonic - Full Color Wide Series)
N3w Schedule & Wattage N3w Schedule & Wattage (Panasonic - Full Color Wide Series) (Panasonic - Full Color Wide Series) (Panasonic - Full Color Wide Series) (Panasonic - Full Color Wide Series)

SWITCH SCHEDULE

A A' B B' B'' C D A A' B B' B'' C D

10,000 10,000

1 1

ALFRESCO VEGETABLE
GARDEN A: 7.97 m2 GARDEN
A: 7.87 m2
A: 4.00 m2

1' LINE OF 2F SLAB


1'
STAIRS TO ROOF

7
3 DECK
2 LINE OF
2 A: 2.37 m2
1
2

2F SLAB 2

1
MASTER
LAUNDRY & UP
BEDROOM
UP

3 DRYING AREA LAN


A: 9.84 m2
STAIRS A: 4.96 m2
DINING AREA LAN
TV

A: 6.36 m2 A: 9.98 m2
ACU

WORKSTATION
A: 2.14 m2

W
4

W
5
OPEN BELOW
6
TO LIVING
ROOM F

ACU
A: 7.04 m2
2' 2'
LAN
FAMILY
TV
LIVING AREA ACTIVITY
A: 14.26 m2 AREA Multi-Point
Water Heater

A: 5.11 m2 LAN

TV
BELOW-
COUNTER
C.O.
MASTER WIC
POWDER COFFEE BAR AUXILIARY A: 2.73 m2
ROOM A: 1.57 m2 KITCHEN
A: 3.52 m2 KITCHEN A: 4.32 m2
A: 6.17 m2
MASTER T&B
RE F Multi-Point
A: 4.09 m2
12,500

12,500

12,500

12,500
Water Heater
ABOVE-
COUNTER
MAIN STAIRS COMMON T&B
HALLWAY
C.O.

A: 3.09 m2
3 3
REF
IN
A: 5.57 m2 A: 3.70 m2

ACU
W
Multi-Point
Water Heater

3' 3'
HALLWAY to
3'' HOME OFFICE 3'' BALCONY ACU

A: 6.60 m2 BEDROOM 2 A: 3.14 m2


FOYER LAN
A: 6.93 m2 BEDROOM 1
A: 4.23 m2 A: 7.31 m2
W
ACU

4 PORCH
4 LAN

A: 3.89 m2

4' LINE OF
2F SLAB
2-CAR 4' W W
GARAGE
A: 36.00 m2
LINE OF
ROOF
FRONT LAWN
A: 8.10 m2

BALCONY
A: 15.86 m2

5 5

10,000

GROUND FLOOR - POWER & AUXILIARY LAY-OUT SECOND FLOOR - POWER & AUXILIARY LAY-OUT
A.23 A.24
SCALE: 1:50 SCALE: 1:50

POWER & AUXILIARY LAY-OUT 1


A-13 SCALE: 1:50
Site Orientation Sun Path Wind Direction

IMPORTANT:
BIM BY : KIR PROJECT TITLE: OWNER: SHEET CONTENTS: SHEET NUMBER:
REPUBLIC ACT No.9266

KATHLEEN I. RUNAS OWNERSHIP OF PLANS, SPECIFICATIONS AND OTHER CONTRACT


DOCUMENTS-DRAWINGS AND SPECIFICATIONS AND OTHER
CONTRACT DOCUMENTS DULY SIGNED, STAMPED OR SEALED, AS AN
DATE : 15/03/2021
GROUND FLOOR - POWER & AUXILIARY LAY-OUT, SECOND
INSTRUMENT OF SERVICE, ARE THE INTELLECTUAL PROPERTY AND
ARCHITECT FLOOR - POWER & AUXILIARY LAY-OUT
DESIGNED BY : KIR
A-13
DOCUMENTS OF THE ARCHITECT, WHETHER THE OBJECT FOR WHICH

P.T.R. NO.: 0696129 PRC NO.: 32779 REG.DATE: FEBRUARY 5, 2014


THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR
ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID
DOCUMENTS FOR USE IN THE REPETITION OF AND FOR OTHER
PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN A
WHOLE, WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT OR
DATE : 15/03/2021
TATLONGHARI RESIDENCE Atty. RENEL and Mrs. ANGEL ANNE TATLONGHARI
AUTHOR OF SAID DOCUMENTS.

DATE ISSUED: JARUNARY 05, 2021 T.I.N.: 314-192-442-0000 -ALL MEASUREMENTS ARE TO BE VERIFIED ON SITE BY CONTRACTOR. CHECKED BY : KIR
-ALL DISCREPANCIES ARE TO BE IMMEDIATELY REPORTED TO
ARCHITECTS AND PROJECT MANAGERS.
-CONTRACTORS ARE TO PREPARE AND SUBMIT SHOP DRAWINGS TO APPROVED BY : KIR ADDRESS: LOT 7, BLOCK 33, BRGY. SINALHAN, STA. ROSA, LAGUNA PHILIPPINES ADDRESS: LOT 7, BLOCK 33, BRGY. SINALHAN, STA. ROSA, LAGUNA PHILIPPINES
"A truly great structure, one that is meant to stand the test of time,
never disregards its environment"
PLACE ISSUED: CALAPAN CITY IAPOA NO.: 28311-306999-122320 ARCHITECTS PRIOR TO COMMENCEMENT OF WORK.
SHT. 13 OF 37
- Lake House -
LED PIN LIGHT R1
LED PIN LIGHT DL1 LED DROPLIGHT 3-6W LED WALL LAMP W1 1W LED WALL LAMP LED TAPELIGHT LED TUBE LAMP LED SPOT LIGHT
LEGEND
R1 N3w
SP1
CYLINDRICAL FIXTURE (R-Recessed; S-Surface Mounted) DIRECTIONAL FIXTURE: (R-Recessed; S-Surface Mounted) FIXTURE (As per Architect's Approval/Owner's Preference) W1
FIXTURE (As per Architect's Approval/Owners' Preference) 3w
FIXTURE (As per Architect's Approval/Owners' Preference) 1 3w
FIXTURE (As per Architect's Approval/Owners' Preference) FIXTURE: (R-Recessed; S-Surface Mounted) FIXTURE (CL-Ceiling Mounted;WL-Wall Mounter; FL-Floor Mounted)
R1 N3w N SL -N
N3w
1-Warm White; 2-Cool White; 3-Daylight N3w
1-Warm White; 2-Cool White; 3-Daylight 1-Warm White; 2-Cool White; 3-Daylight N3w 1-Warm White; 2-Cool White; 3-Daylight 1-Warm White; 2-Cool White; 3-Daylight 1-Warm White; 2-Cool White; 3-Daylight T5/8[R1]
N3w
1-Warm White; 2-Cool White; 3-Daylight N3w 1-Warm White; 2-Cool White; 3-Daylight
N3w Schedule & Wattage N3w Schedule & Wattage N3w Schedule & Wattage N3w Schedule & Wattage N3w Schedule & Wattage 4w per 1meter N3w Schedule & Wattage N3w Schedule & Wattage

T1 RECESSED LED TUBE LAMP LED GARDEN LAMP SOLAR POWER 1-GANG C.O. 2-GANG C.O. 3-GANG C.O. FLOOR ACU C.O. DUPLEX UNIVERSAL INDUCTION COOKTOP 1-GANG 1-GANG T.V.
RECTANGULAR LAMP with DIFFUSER GROUND TYPE (As per Architect's Approval) PANEL BOARD Wall Mounted Wall Mounted Wall Mounted RECEPTACLE OUTLET W/ GROUND (Panasonic - Full Color Wide Series) REFRIGERATOR C.O. (CABLE) TERMINAL
N3w 1-Warm White; 2-Cool White; 3-Daylight N3w 1-Warm White; 2-Cool White; 3-Daylight BATTERIES WP- Weather Proof Outlet W WP- Weather Proof Outlet W WP- Weather Proof Outlet F
C.O. ACU Wall Mounted IN REF
(Panasonic - Full Color Wide Series)
N3w Schedule & Wattage N3w Schedule & Wattage (Panasonic - Full Color Wide Series) (Panasonic - Full Color Wide Series) (Panasonic - Full Color Wide Series) (Panasonic - Full Color Wide Series)

SWITCH SCHEDULE

A A' B B' B'' C D A A' B B' B'' C D

1 1

R1

1' 1'
AP3[9w]

SP1

2 2
AQ4[9w]
Railing-Post Light
R2

AN[9w]

R1 R1

AP4[9w] AP2[9w]

DOWN DOWN

R1
W
AO[9w]
SERIES 19 ROOF DECK ROOF DECK
COMMON S3(U1-4,U5-8,V1-2)(3-Way) COMMON
A: 25.09 m2 A: 25.09 m2
2' 2'
S3(U1-4,U5-8,V1-2)(3-Way)

HALL SP1 HALL


A: 8.65 m2 AQ3[9w]
Railing-Post Light A: 8.65 m2

R1

AP1[9w]

3 3

3' SP1 SP1


3'
AQ1[9w] AQ2[9w]
Railing-Post Light Railing-Post Light

3'' 3''

4 4

4' 4'

5 5

ROOF DECK - LIGHTING LAYOUT ROOF DECK - POWER & AUXILIARY LAY-OUT
A.25 A.26
SCALE: 1:50 SCALE: 1:50

LIGHTING & POWER LAY-OUT 2


A-14 SCALE: 1:50
Site Orientation Sun Path Wind Direction

IMPORTANT:
BIM BY : KIR PROJECT TITLE: OWNER: SHEET CONTENTS: SHEET NUMBER:
REPUBLIC ACT No.9266

KATHLEEN I. RUNAS OWNERSHIP OF PLANS, SPECIFICATIONS AND OTHER CONTRACT


DOCUMENTS-DRAWINGS AND SPECIFICATIONS AND OTHER
CONTRACT DOCUMENTS DULY SIGNED, STAMPED OR SEALED, AS AN
DATE : 15/03/2021
ROOF DECK - LIGHTING LAYOUT, ROOF DECK - POWER &
INSTRUMENT OF SERVICE, ARE THE INTELLECTUAL PROPERTY AND
ARCHITECT AUXILIARY LAY-OUT
DESIGNED BY : KIR
A-14
DOCUMENTS OF THE ARCHITECT, WHETHER THE OBJECT FOR WHICH

P.T.R. NO.: 0696129 PRC NO.: 32779 REG.DATE: FEBRUARY 5, 2014


THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR
ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID
DOCUMENTS FOR USE IN THE REPETITION OF AND FOR OTHER
PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN A
WHOLE, WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT OR
DATE : 15/03/2021
TATLONGHARI RESIDENCE Atty. RENEL and Mrs. ANGEL ANNE TATLONGHARI
AUTHOR OF SAID DOCUMENTS.

DATE ISSUED: JARUNARY 05, 2021 T.I.N.: 314-192-442-0000 -ALL MEASUREMENTS ARE TO BE VERIFIED ON SITE BY CONTRACTOR. CHECKED BY : KIR
-ALL DISCREPANCIES ARE TO BE IMMEDIATELY REPORTED TO
ARCHITECTS AND PROJECT MANAGERS.
-CONTRACTORS ARE TO PREPARE AND SUBMIT SHOP DRAWINGS TO APPROVED BY : KIR ADDRESS: LOT 7, BLOCK 33, BRGY. SINALHAN, STA. ROSA, LAGUNA PHILIPPINES ADDRESS: LOT 7, BLOCK 33, BRGY. SINALHAN, STA. ROSA, LAGUNA PHILIPPINES
"A truly great structure, one that is meant to stand the test of time,
never disregards its environment"
PLACE ISSUED: CALAPAN CITY IAPOA NO.: 28311-306999-122320 ARCHITECTS PRIOR TO COMMENCEMENT OF WORK.
SHT. 14 OF 37
- Lake House -

You might also like