Download as pdf or txt
Download as pdf or txt
You are on page 1of 36

ARAGE-PORCH

VENT RIDGE
STEEL GUTTER

BUILDING LINE

A.51
POWDER ROO
W.C.
ROOF 1
Slope: 25 degre
CLAY ROOF TILE

SECRET GARD
POWDER RO
C

17,200
2,147
A: 16.25 m
PORCH 2
A-13

A: 2.34 m

FOR LANDSCAP
A: 5.08 m

A: 5.44 m
ROOF 2A
FOYER

ROOF 2B LINE
STEPS BLOW-U
CLAY ROOF TILE

3,92

DETAILING
2,5316
4,05

es
15,6
es

D-04B
Slope: 15 degre

15,690
14,2882

M KITCHEN BLO A.49


D-01

BUILDING LINE
90

OVEN CABINET

4
2
BUILDING LINE
C

2
E
OM

14,200
ROOF LINE VENT RIDGE CLAY ROOF TILE
A-13

693
es

EN
Slope: 12-13 degre
DOWN

P PLANS
UP
AY WALL
5 NICHE AND DISPL

LAV
SHOWCASE KIT
DS
4

A.71
1

W-UP PLANS
W-03
22
CLAY ROOF

COUNTER

SHOWCASE KITC
3

ISLAND
W-03
TILE PANEL

W-09B
2

132
2 21

SALAD GARD
AY Slope: 15

RANGE
PEDESTAL DISPL BOARD

ROOF 2A LINE
degrees

BUILDING LINE

FOUNTAIN
1
3

GARDEN
W-09A
20

A: 11.81 m
4
D

2,40
A: 4.73 m
19
5
A-14

7,97
CLAY ROOF TILE

ROOF 2A
18

0 5
es

STAIRCA

D-05
Slope: 15 degre

3,123

1,100
6
17

A: 11.40 m

HEN BLOW-UP
2
7
16

2
Slope: 25 degre
CLAY ROOF TILE

CHEN
Slope: 25 degre
CLAY ROOF TILE
8

EN
W-09A
15

VENTSE

5
HOUSE
FARM
SINK
A-14
9

W-09B
14

PHOTOVOLTAIC
ROOF 2B LINE

PANELS - 350W
VEH6,09

RIDGE
2
REF
10
W-18

BUILDING LINE
13
VENT RIDGE

SOLAR
es

W-10

PLANS AUXILIA
11

es
A-15

ICU0LAR CLEARA
12

GARAGE
A: 45.49 m
COUNT

PHOTOVOLTAIC
PANELS - 350W
W-19
ERTOP
E

OUTDOOR SERV

2,237
A-15

A.50
SOLAR

AUXILIARY KIT2
LAUND
5,663

AREA
ROOF 2B LINE
E

RY
F

D-07
BUILD

FOLDABLE IRON
RECO
WHEAT
W-18 ING
A-16

DRYING
2

RY KITCHEN BLO
CLAY ROOF TILE

A: 11.67 m
F

VERY

TABLE
es
Slope: 15 degre

SINK
BUILDING LINE

LINE

A: 8.79

4,460
A-16

SERV. T&2B
2,967

6
D-04

NCE

W-10
A: 1.37 m
BUILDING LINE G

ING
3
2
1
A-17

W-17
PROP
G

m2
PROP

CHEN

SINK
REF

ICE AREA
W-11

DRYING AREA
A-17

DS
SERVICE DININ
ERTY

W-UP PLANS
ERTY

2,223
ROOF 4 LINE
A-18

DS
D-08

W-13
LINE
H

LINE

RECOVERY

1,442
DRYING
A-18

HEAT

W-12
O-01
UP

D-09
199

G AREA

W
H

608

10
9
8
7
6
5
4
3
2
1

6
FIREWALL
FIREWALL PROPERTY LINE
PROPERTY LINE

A-24
A-23

N
A-22

M
A-21

L
A-20

A.56
K

SERVICE T&B
A-19

A.73
STONE GARDEN
1

A.48
QUARTERS STA
2,750
600 SETBACK800

A.63
GARAGE BLOW-U
A.66
860

FOYER NICHE
1,897 4,816
400 1,897 4,210 2,000

KITCHEN BLOW-U
3,650 3,7904
2,75

2
00 16,01011,010

BLOW-UP PLANS
6,45
5,28
1,321 16,010

IRS BLOW-UP PLA


BLOW-UP PLANS
3,000

P PLANS
3

P PLANS
SITE DEVELOPMENT PLAN

NS
4
5

Scale: 1:120 MTS

IMPORTANT:
REPUBLIC ACT No.9266 DRAWN BY: KIR PROJECT TITLE DRAWING CONTENTS LAYOUT
MA. LUISA DAYA-GARCIA OWNERSHIP OF PLANS, SPECIFICATIONS AND OTHER CONTRACT
DATE: ABANILLA RESIDENCE EXTERIOR PERSPECTIVE, LOCATION MAP , VICINITY MAP ,
ARCHITECT
DOCUMENTS-DRAWINGS AND SPECIFICATIONS AND OTHER CONTRACT DOCUMENTS
DULY SIGNED, STAMPED OR SEALED, AS AN INSTRUMENT OF SERVICE, ARE THE
INTELLECTUAL PROPERTY AND DOCUMENTS OF THE ARCHITECT, WHETHER THE OBJECT
2/28/2018
ADDRESS: Portofino Phase 8, Molino IV, Cavite
GROUND FLOOR PLAN, ROOF PLAN A.01
FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY
PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE
DESIGNED BY: MLDDG
REPETITION OF AND FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED
PARTLY OR IN A WHOLE, WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT OR
DATE: 2/28/2018 OWNER SHEET NUMBER
P.T.R. NO.: 6018530 PRC NO.: 10745 REG.DATE: FEB. 20, 1992 AUTHOR OF SAID DOCUMENTS.

28F Tower 2, The Enterprise Center, Ayala Ave., cor.


DATE ISSUED: JANUARY 11, 2017 T.I.N.: 132 441 482 000
-ALL MEASUREMENTS ARE TO BE VERIFIED ON SITE BY CONTRACTOR.
CHECKED BY: MLDDG Mr. Gee & Mrs. Karen Abanilla
Paseo de Roxas, 6766 Makati City, 1226 -ALL DISCREPANCIES ARE TO BE IMMEDIATELY REPORTED TO ARCHITECTS AND PROJECT
MANAGERS. 1 /61
Tel: 885-8437/788 4123 office@ldg-architects.com PLACE ISSUED: MANILA CITY IAPOA NO.: 08810-202957-083117
-CONTRACTORS ARE TO PREPARE AND SUBMIT SHOP DRAWINGS TO ARCHITECTS PRIOR TO
COMMENCEMENT OF WORK. DATE: 2/28/2018 ADDRESS: Portofino Phase 8, Molino IV, Cavite
GSPublisherVersion 0.0.100.100
1 2 2' 3 4 A.51
4 5 6 6 4 4 5 6 6
POWDER ROOM KITCHEN BLOW-UP PLANS
LINE OF A.49 A.50
SETBACK SHOWCASE KITCHEN BLOW-UP PLANS AUXILIARY KITCHEN BLOW-UP PLANS
17,200
3,000 14,200
2,000 1,000 9,740 4,460 4,810
SETBACK 4,500 2,147 693 2,400 2,237 2,223

N
2,588 2,222

A-16

A-17

A-18

A-16

A-17

A-18
A-15

A-15
A-11

A-12

A-13

A-14

A-13

A-14
G

G
H

H
C

D
E

E
F

F
A

B
A.51
PROPERTY LINE SECRET GARDEN
E'

LINE
GARDEN GATE
Height: 1.8 meters GARDEN
DRYING AREA

PROPERTY
FOUNTAIN
SETBACK

SETBACK
SALAD GARDEN
2,000

2,000

2,000

2,000
LINE
SECRET GARDEN A: 4.73 m2

PROPERTY
GARDEN A: 5.44 m2 OUTDOOR SERVICE AREA STEEL GUTTER
ENTRANCE FOR LANDSCAPE
DETAILING A: 8.79 m2

2,200
LINE OF GROUND FLOOR WALLS

ALFRESCO GARDEN
W-15

E
W-22B
D-05 W-10 D-07 D-05
W-09B W-09A W-09A W-09B W-09A W-09A
A: 35.10 m2 D-04B W-10
SINK W
D-04B

A-24 A-24 A-24


1,000

BOARD
SINK

PANEL
W-12
N N N

W-18
W-11
LAV W-13
W.C.
1,700

POWDER ROOM HEAT PRE-PAINTED


A: 2.34 m2 REF RECOVERY METAL SHEET

FIREWALL
OVEN CABINET DRYING Slope: 3.5 degrees

2,750
100
700

AUXILIARY KITCHEN STORAGE 3


D'
FARM
D-03B HOUSE
SINK
A: 11.67 m2 A: 11.00 m2

4,210
A-23 A-23 A-23

4,210

4,210
FIREWALL
SHOWCASE KITCHEN FOLDABLE IRONING OPEN TO MAIN

W-15
TABLE KITCHEN
M DINING AREA A: 11.81 m2 SERVICE DINING AREA M M

COUNT
ERTOP
A: 19.03 m2
1,100
2,510

LAUND
D-03B

600
RANGE RY
AREA CLEAR
SERV. T&B
D-09

A.56 POLYCARBONATE
SHEET
A: 1.37 m2 SERVICE T&B KITCHEN BLOW-UP PLANS Slope: 3.5 degrees

REF

W-19
A-22 A-22 A-22

D-08

860
ISLAND
COUNTER
W HEAT
RECOVERY
L W-18
DRYING L L
D
W-05 W-17
O-01 D-11
5,246

STAIRS

DOWN

STAIRS CLEARANCE
LANDING

A.73 STAIRCASE
W-16
11,010

11,010
STONE GARDEN BLOW-UP PLANS

2,600
22

21

20

19

18

17

16

15

14

13

12
2,736

2,750
STAIRCASE

D-04
6,979

10

11
A: 11.40 m2
16,010

16,010
4,282 2,697

UP
2,941 1,341 2,697
A-21 A-21 A-21
K LIVING AREA
UP
K W-20A K
C A: 38.26 m2 1
D-11

400
4
2

STORAGE 1
W-05

QUARTERS 1
3
3 4 A.64
A: 6.05 m2 QUARTERS 1 BLOW-UP PLANS

W-03
A-20 A-20 A-20
5

A: 3.98 m2
2
A.67

1,918
6
1
POND BLOW-UP PLANS
J J J
7
8
A.48
QUARTERS STAIRS BLOW-UP PLANS
9

NICHE AND DISPLAY WALL

3,000
10

W-20A
PEDESTAL DISPLAY
DOWN
STORAGE 2
3,714

A.63

4,200

4,200
4,064

GARAGE BLOW-UP PLANS


QUARTERS 2 A: 2.05 m2

3,650
A.66
GARAGE A: 5.57 m2

FIREWALL
FOYER NICHE BLOW-UP PLANS
FOYER A: 45.49 m2
D-02B

2,082
D-11 D-11

A: 5.08 m2

6,450
A-19 A-19 A-19
W-03

COMMON SPACE

FIREWALL
I I I

7,200

1,200
A.65

D-11
A: 6.30 m2 FOYER QUARTERS 2 BLOW-UP PLANS
W-02

W-01A
D-02A D-01 D-01

B
350

200
W-20 W-20

PORCH
A: 16.25 m2
SETBACK
3,000
3,000

3,000
4 5

3,000
3
PROPERTY LINE

2
5

6,283

A PROPERTY LINE
A-17 PROPERTY LINE

A-18

A-17

A-18
A-16

A-16
A-11

A-12

A-13

A-14

A-13

A-14
A-15

A-15
G

G
H

H
C

D
A

E
F

F
0 1 2 3 4 5 0 1 2 3 4 5
6,283
SETBACK 1,100 1,170 GATE 3,926 132 VEHICULAR CLEARANCE
2,000 2,270 1,500 4,058 5,663 199
15,690
A.72 A.71
ENTRANCE-PORCH STEPS BLOW-UP PLANS GARAGE-PORCH STEPS BLOW-UP PLANS

A.02 GROUND FLOOR PLAN A.03 MEZZANINE FLOOR PLAN


1:150 1:150
IMPORTANT:
REPUBLIC ACT No.9266 DRAWN BY: KIR PROJECT TITLE DRAWING CONTENTS LAYOUT
MA. LUISA DAYA-GARCIA OWNERSHIP OF PLANS, SPECIFICATIONS AND OTHER CONTRACT
DATE: ABANILLA RESIDENCE GROUND FLOOR PLAN, MEZZANINE FLOOR PLAN
ARCHITECT
DOCUMENTS-DRAWINGS AND SPECIFICATIONS AND OTHER CONTRACT DOCUMENTS
DULY SIGNED, STAMPED OR SEALED, AS AN INSTRUMENT OF SERVICE, ARE THE
INTELLECTUAL PROPERTY AND DOCUMENTS OF THE ARCHITECT, WHETHER THE OBJECT
2/28/2018
ADDRESS: Portofino Phase 8, Molino IV, Cavite
A.02
FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY
PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE
DESIGNED BY: MLDDG
REPETITION OF AND FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED
PARTLY OR IN A WHOLE, WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT OR
DATE: 2/28/2018 OWNER SHEET NUMBER
P.T.R. NO.: 6018530 PRC NO.: 10745 REG.DATE: FEB. 20, 1992 AUTHOR OF SAID DOCUMENTS.

28F Tower 2, The Enterprise Center, Ayala Ave., cor.


DATE ISSUED: JANUARY 11, 2017 T.I.N.: 132 441 482 000
-ALL MEASUREMENTS ARE TO BE VERIFIED ON SITE BY CONTRACTOR.
CHECKED BY: MLDDG Mr. Gee & Mrs. Karen Abanilla
Paseo de Roxas, 6766 Makati City, 1226 -ALL DISCREPANCIES ARE TO BE IMMEDIATELY REPORTED TO ARCHITECTS AND PROJECT
MANAGERS. 2 /61
Tel: 885-8437/788 4123 office@ldg-architects.com PLACE ISSUED: MANILA CITY IAPOA NO.: 08810-202957-083117
-CONTRACTORS ARE TO PREPARE AND SUBMIT SHOP DRAWINGS TO ARCHITECTS PRIOR TO
COMMENCEMENT OF WORK. DATE: 2/28/2018 ADDRESS: Portofino Phase 8, Molino IV, Cavite
GSPublisherVersion 0.0.100.100
1 2 2' 3 4 4 5 6 6 3 4 4 5 6 6

17,200
1,600 13,352 2,248
SETBACK 8,090 5,262 821 1,443
1,600 4,600 1,300 7,452 3,696 3,009

N
1,400 3,200 3,646 3,596 100 STAIRS CLEARANCE

A-16

A-17

A-18

A-16

A-17

A-18
A-15

A-15
A-11

A-12

A-13

A-14

A-12

A-13

A-14
G

G
H

H
C

D
E

E
F

F
A

B
E'
PROPERTY LINE

A.53 A.54
A.58

LINE

LINE
A.52 T&B 1 BLOW-UP PLANS T&B 2 BLOW-UP PLANS
MASTER W.I.C. and T&B BEDROOM 1 BLOW-UP PLANS

PROPERTY

PROPERTY
1,600

1,590
2,000

LINE OF ROOF 4
PRE-PAINTED METAL SHEET
BALCONY 1 Slope: 3.5 degrees
A: 2.84 m2
W-29A W-30A W-031A W-32A
D-019
400

E
1,095

LAV.

1,400
SHOWER SHOWER
A-24
W.C.
AREA AREA W-29A
A-24 A-24
T&B 2
N A: 5.36 m2
N N
MASTER T&B D-15

A: 4.39 m2 W.C.
BEDROOM 1 A.59
MASTER W.I.C.
TV WALL
A: 12.28 m2 BEDROOM 2 BLOW-UP PLANS
1,720

2F CEILING SOLAR BATTERY STORAGE


T&B 1
D'
3,410

W-028A
A: 11.06 m2 A: 20.53 m2 A: 14.55 m2
A: 4.89
LAV.
m2 2F CEILING
A-23 A-23 A: 13.84 m2 A-23

D-21
M M M

D-15

3,210
BEDROOM 2 BALCONY 2
A: 12.30 m2
995

A: 2.60 m2 LINE OF ROOF 2B W-015

STORAGE INSIDE 2F CEILING


D-14
D-16

A-22 A-22 A-22

900
D-14
COMMON AREA
LINE OF ROOF 2B

L L L

STORAGE INSIDE 2F CEILING


A: 11.39 m2
D LINE OF ROOF 4 LINE OF ROOF 4

BALCONY A.62

13,400
2,526

EXERCISE ROOM

DOWN

DOWN
A: 8.79 m2 A.46 EXERCISE BLOW-UP PLANS
D-20

CALIFORNIA KING SIZE BED


(2.03 x 2.03)
MAIN STARICASE BLOW-UP PLANS A: 14.89 m2

3,600
W-16
STORAGE @ CEILING W-16
11,010

11,810
2,600
22

21

20

19

18

17

16

15

14

13

12

22

21

20

19

18

17

16

15

14

13

12
A: 1.75 m2

2,700
W-015
W-35

W-34
STAIRCASE OPENING OPEN TO STAIRS

10

11

10

11

W-35
A: 7.69 m2
A: 11.61 m2
16,010

16,000
W-25 BEDROOM CEILING
A: 23.26 m2
2,191
A-21 A-21 A-21

D-13
1,446 1,394
K MASTER BEDROOM K K
C A: 26.34 m2
W-27 W-27 W-27 W-27
2,674

D-26

8,400
W-21A

A-20 A-20 A-20


LINE OF ROOF 3 LINE OF ROOF 2B
T&B 3 LAV.
A.55

1,694
A.57

W-015
A: 2.31 m2 OPEN TO FAMILY ROOM T&B 3JBLOW-UP PLANS
J BLOW-UP PLANS
MASTER BEDROOM J A.60 A: 5.99 m2
TV WALL FAMILY ROOM BLOW-UP PLANS

CLEAR POLYCARBONATE SHEET


5,074

A.47

D-12
W-25 LINE OF MEZZANINE
PRE-PAINTED FAMILY LOFT STAIRS BLOW-UP PLANS

Slope: 3.5 degrees


W-26A METAL SHEET D-25

Slope: 15 degrees

4,600

4,500
W-36
FAMILY AREA LINE OF ROOF 2B
1,900

A: 20.53 m2

FIREWALL
W-24
OPEN BELOW OPEN TO GROUND LEVEL

2,806
A: 15.76 m2 A: 12.27 m2
A-19 A-19 FAMILY AREA LOFT
A: 13.44 m2
A-19
I I I
W-23A
W-21A A.61

B FAMILY ROOM LOFT BLOW-UP PLANS


W-01A W-01A
W-24

W-21 W-21 W-21 W-21 W-21 W-21

LINE OF ROOF 2A
2,715

300
PRE-PAINTED
METAL SHEET
SETBACK

Slope: 7 degrees
3,000

SETBACK
CLAY ROOF TILE
Slope: 17.8

2,600
LINE OF ROOF 1 LINE OF ROOF 2A
PROPERTY LINE

degrees
785

A PROPERTY LINE
A-17
PROPERTY LINE

A-18

A-17

A-18
A-16

A-16
A-11

A-12

A-13

A-14

A-12

A-13

A-14
A-15

A-15
G

G
H

H
C

D
A

E
F

F
0 1 2 3 4 5 700 794 0 1 2 3
2,770 3,945 711 1,158 1,156 1,438 1,546 1,494
6,696 4,482 3,040 3,688
SETBACK
SETBACK 1,000 11,178 6,728
2,000 12,178 1600
15,690

A.04 SECOND FLOOR PLAN A.05 ATTIC PLAN


1:150 1:150
IMPORTANT:
REPUBLIC ACT No.9266 DRAWN BY: KIR PROJECT TITLE DRAWING CONTENTS LAYOUT
MA. LUISA DAYA-GARCIA OWNERSHIP OF PLANS, SPECIFICATIONS AND OTHER CONTRACT
DATE: ABANILLA RESIDENCE SECOND FLOOR PLAN, ATTIC PLAN
ARCHITECT
DOCUMENTS-DRAWINGS AND SPECIFICATIONS AND OTHER CONTRACT DOCUMENTS
DULY SIGNED, STAMPED OR SEALED, AS AN INSTRUMENT OF SERVICE, ARE THE
INTELLECTUAL PROPERTY AND DOCUMENTS OF THE ARCHITECT, WHETHER THE OBJECT
2/28/2018
ADDRESS: Portofino Phase 8, Molino IV, Cavite
A.03
FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY
PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE
DESIGNED BY: MLDDG
REPETITION OF AND FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED
PARTLY OR IN A WHOLE, WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT OR
DATE: 2/28/2018 OWNER SHEET NUMBER
P.T.R. NO.: 6018530 PRC NO.: 10745 REG.DATE: FEB. 20, 1992 AUTHOR OF SAID DOCUMENTS.

28F Tower 2, The Enterprise Center, Ayala Ave., cor.


DATE ISSUED: JANUARY 11, 2017 T.I.N.: 132 441 482 000
-ALL MEASUREMENTS ARE TO BE VERIFIED ON SITE BY CONTRACTOR.
CHECKED BY: MLDDG Mr. Gee & Mrs. Karen Abanilla
Paseo de Roxas, 6766 Makati City, 1226 -ALL DISCREPANCIES ARE TO BE IMMEDIATELY REPORTED TO ARCHITECTS AND PROJECT
MANAGERS. 3 /61
Tel: 885-8437/788 4123 office@ldg-architects.com PLACE ISSUED: MANILA CITY IAPOA NO.: 08810-202957-083117
-CONTRACTORS ARE TO PREPARE AND SUBMIT SHOP DRAWINGS TO ARCHITECTS PRIOR TO
COMMENCEMENT OF WORK. DATE: 2/28/2018 ADDRESS: Portofino Phase 8, Molino IV, Cavite
GSPublisherVersion 0.0.100.100
1 2 2' 3 4 4 5 6 6

17,200
800 14,958 1,442
7,783 7,975

A-16

A-17

A-18
A-15
A-11

A-12

A-13

A-14

H
C

F
A

B
E'
PROPERTY LINE

LINE
800

800
PROPERTY
ROOF 4 LINE

DS DS

BUILDING LINE BUILDING LINE

Slope: 12-13 degrees


VENT RIDGE

CLAY ROOF TILE


A-24 A-24
N N
SOLAR
PHOTOVOLTAIC
PANELS - 350W

4,816
BUILDING LINE
D'

ROOF 4 LINE
A-23 A-23
M M

Slope: 12-13 degrees


ROOF 2B LINE

CLAY ROOF TILE


8,830
BUILDING LINE
BUILDING LINE
ROOF 2B LINE

A-22 A-22
BUILDING LINE
L L
D

BUILDING LINE

1,897
CLAY ROOF TILE
13,598

Slope: 25 degrees

DOWN

3,794
22

21

20

19

18

17

16

15

14

13

12
VENT RIDGE

10

11
16,010

16,010
BUILDING LINE
CLAY ROOF TILE
A-21 A-21

1,897
Slope: 25 degrees

ROOF 2A LINE
K K
ROOF 2A
C

VENT RIDGE
Slope: 15 degrees
CLAY ROOF TILE

CLAY ROOF
ROOF 2B LINE

Slope: 15
degrees
TILE
BUILDING LINE
A-20 A-20
J DS

J
981

ROOF 4 LINE

DS

CLAY ROOF TILE


2,023

Slope: 25 degrees VENT RIDGE SOLAR


DS
DS

BUILDING LINE PHOTOVOLTAIC


PANELS - 350W
1,042

ROOF 3
Slope: 25 degrees

Slope: 25 degrees
CLAY ROOF TILE

CLAY ROOF TILE


VENT RIDGE

Slope: 15 degrees
CLAY ROOF TILE

5,280
A-19 A-19
ROOF 1

VENT RIDGE
I I

BUILDING LINE
Slope: 15 degrees
CLAY ROOF TILE
1,946

CLAY ROOF TILE


Slope: 25 degrees

ROOF LINE
B
ROOF 3 LINE

DS
BUILDING LINE ROOF 2A
CLAY ROOF TILE
Slope: 25 degrees BUILDING LINE
STEEL GUTTER

DS

ROOF 2A LINE
DS DS
2,412

ROOF 1 LINE
PROPERTY LINE

STEEL GUTTER

1,321
A PROPERTY LINE

A-17

A-18
A-16
A-11

A-12

A-13

A-14

A-15

H
C

D
A

F
0 1 2 3 4 5
817 991 3,123 2,967
1,391 1,640 820 1,809 2,531 6,090
800 14,282 608
15,690

A.06 ROOF PLAN


1:150
IMPORTANT:
REPUBLIC ACT No.9266 DRAWN BY: KIR PROJECT TITLE DRAWING CONTENTS LAYOUT
MA. LUISA DAYA-GARCIA OWNERSHIP OF PLANS, SPECIFICATIONS AND OTHER CONTRACT
DATE: ABANILLA RESIDENCE ROOF PLAN
ARCHITECT
DOCUMENTS-DRAWINGS AND SPECIFICATIONS AND OTHER CONTRACT DOCUMENTS
DULY SIGNED, STAMPED OR SEALED, AS AN INSTRUMENT OF SERVICE, ARE THE
INTELLECTUAL PROPERTY AND DOCUMENTS OF THE ARCHITECT, WHETHER THE OBJECT
2/28/2018
ADDRESS: Portofino Phase 8, Molino IV, Cavite
A.04
FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY
PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE
DESIGNED BY: MLDDG
REPETITION OF AND FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED
PARTLY OR IN A WHOLE, WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT OR
DATE: 2/28/2018 OWNER SHEET NUMBER
P.T.R. NO.: 6018530 PRC NO.: 10745 REG.DATE: FEB. 20, 1992 AUTHOR OF SAID DOCUMENTS.

28F Tower 2, The Enterprise Center, Ayala Ave., cor.


DATE ISSUED: JANUARY 11, 2017 T.I.N.: 132 441 482 000
-ALL MEASUREMENTS ARE TO BE VERIFIED ON SITE BY CONTRACTOR.
CHECKED BY: MLDDG Mr. Gee & Mrs. Karen Abanilla
Paseo de Roxas, 6766 Makati City, 1226 -ALL DISCREPANCIES ARE TO BE IMMEDIATELY REPORTED TO ARCHITECTS AND PROJECT
MANAGERS. 4 /61
Tel: 885-8437/788 4123 office@ldg-architects.com PLACE ISSUED: MANILA CITY IAPOA NO.: 08810-202957-083117
-CONTRACTORS ARE TO PREPARE AND SUBMIT SHOP DRAWINGS TO ARCHITECTS PRIOR TO
COMMENCEMENT OF WORK. DATE: 2/28/2018 ADDRESS: Portofino Phase 8, Molino IV, Cavite
GSPublisherVersion 0.0.100.100
1 2 2' 3 4 4 5 A B C D D' E E'

+12,000
6 Roof Apex 6 Roof Apex
CLAY ROOF TILES CLAY ROOF
TILES

W-33 W-33
SOLAR PHOTOVOLTAIC PANELS
350W W-35
CLAY ROOF TILES

SOLAR
CLAY ROOF TILES PHOTOVOLTAIC
CLAY PANELS
ROOF 350W
TILES
W-36
+8,050
W-01A
5 Attic
W-21 W-21 W-21

W-16 W-29A
W-01A D-21
W-21A W-21A
W-25 W-24

FIREWALL
SOLID CONCRETE SOLID
SOLID CONCRETE W-01A
RAILING RAILING CONCRETE
+5,000 RAILING

1,827
4 Second Floor CLAY ROOF TILES 4 Second Floor

391
PAINTED CONCRETE GUTTER
W-15

4,932 (HEIGHT OF FIREWALL)


W-20
W-20 LINE OF BUILDING
LINE OF BUILDING

568
W-05 W-01A
+2,900
3 Mezzanine 3 Mezzanine

3,000 (HEIGHT OF FIREWALL)


3,105
D-01 FIREWALL
FIREWALL
FIREWALL
W-01A

2,432
2,000 (Height of Visible Gate)
1,000

SEE THROUGH GATE


(for detailing by the Landscape Architect) SEE THROUGH GATE
(for detailing by the Landscape Architect)
PERIMETER
WALL
+1,000
2 Ground Floor 2 Ground Floor
SOLID PERIMETER GATE
VEHICULAR ENTRANCE
NGL
1,000

PEDESTRIAN SOLID PERIMETER GATE (Gate Details as per Landscape Architect)


(for detailing by the Landscape Architect) GATE ENTRACE (for detailing by the Landscape Architect)
(For VERIFICATION)
+150
±0
+0.000 +0.000
1 Garage
Natural
0 NGL Grade Line Natural Grade Line
(For Verification) (For Verification)

A.07 FRONT ELEVATION A.10 RIGHT SIDE ELEVATION


1:150 1:150
IMPORTANT:
REPUBLIC ACT No.9266 DRAWN BY: KIR PROJECT TITLE DRAWING CONTENTS LAYOUT
MA. LUISA DAYA-GARCIA OWNERSHIP OF PLANS, SPECIFICATIONS AND OTHER CONTRACT
DATE: ABANILLA RESIDENCE FRONT ELEVATION, RIGHT SIDE ELEVATION
ARCHITECT
DOCUMENTS-DRAWINGS AND SPECIFICATIONS AND OTHER CONTRACT DOCUMENTS
DULY SIGNED, STAMPED OR SEALED, AS AN INSTRUMENT OF SERVICE, ARE THE
INTELLECTUAL PROPERTY AND DOCUMENTS OF THE ARCHITECT, WHETHER THE OBJECT
2/28/2018
ADDRESS: Portofino Phase 8, Molino IV, Cavite
A.05
FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY
PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE
DESIGNED BY: MLDDG
REPETITION OF AND FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED
PARTLY OR IN A WHOLE, WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT OR
DATE: 2/28/2018 OWNER SHEET NUMBER
P.T.R. NO.: 6018530 PRC NO.: 10745 REG.DATE: FEB. 20, 1992 AUTHOR OF SAID DOCUMENTS.

28F Tower 2, The Enterprise Center, Ayala Ave., cor.


DATE ISSUED: JANUARY 11, 2017 T.I.N.: 132 441 482 000
-ALL MEASUREMENTS ARE TO BE VERIFIED ON SITE BY CONTRACTOR.
CHECKED BY: MLDDG Mr. Gee & Mrs. Karen Abanilla
Paseo de Roxas, 6766 Makati City, 1226 -ALL DISCREPANCIES ARE TO BE IMMEDIATELY REPORTED TO ARCHITECTS AND PROJECT
MANAGERS. 5 /61
Tel: 885-8437/788 4123 office@ldg-architects.com PLACE ISSUED: MANILA CITY IAPOA NO.: 08810-202957-083117
-CONTRACTORS ARE TO PREPARE AND SUBMIT SHOP DRAWINGS TO ARCHITECTS PRIOR TO
COMMENCEMENT OF WORK. DATE: 2/28/2018 ADDRESS: Portofino Phase 8, Molino IV, Cavite
GSPublisherVersion 0.0.100.100
5 4 4 3 2' 2 1 E' E D' D C B A

+12.000
6 Roof Apex 6 Roof Apex
CLAY ROOF TILES
CLAY ROOF TILES

W-015 CLAY ROOF TILES


W-015 CLAY ROOF TILES
CLAY ROOF TILES

CLAY ROOF TILES

+8.050
5 Attic

W-30A
W-32A W-031A W-29A W-028A
D-20
D-019
W-24

SOLID CONCRETE SOLID CONCRETE SOLID CONCRETE SOLID CONCRETE


RAILING RAILING RAILING RAILING SOLID CONCRETE
RAILING

+5.000
4 Second Floor 4 Second Floor
W-15
W-22B
W-07B W-07A
D-05 W-05
W-09A W-09A
+2.900
3 Mezzanine 3 Mezzanine
D-02B
PERIMETER FENCE

PERIMETER
WALL
2.000

1.195
+1.000

2.000
PERIMETER
2 Ground Floor 2 Ground Floor WALL
0.890

0.805
+0.150 EARTH FILL
±0.000
+0.000 +0.000
1 Garage
Natural
0 NGL Grade Line Natural Grade Line
(For Verification) (For Verification)

A.09 REAR ELEVATION A.08 LEFT SIDE ELEVATION


1:150 1:150
IMPORTANT:
REPUBLIC ACT No.9266 DRAWN BY: KIR PROJECT TITLE DRAWING CONTENTS LAYOUT
MA. LUISA DAYA-GARCIA OWNERSHIP OF PLANS, SPECIFICATIONS AND OTHER CONTRACT
DATE: ABANILLA RESIDENCE REAR ELEVATION, LEFT SIDE ELEVATION
ARCHITECT
DOCUMENTS-DRAWINGS AND SPECIFICATIONS AND OTHER CONTRACT DOCUMENTS
DULY SIGNED, STAMPED OR SEALED, AS AN INSTRUMENT OF SERVICE, ARE THE
INTELLECTUAL PROPERTY AND DOCUMENTS OF THE ARCHITECT, WHETHER THE OBJECT
2/28/2018
ADDRESS: Portofino Phase 8, Molino IV, Cavite
A.06
FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY
PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE
DESIGNED BY: MLDDG
REPETITION OF AND FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED
PARTLY OR IN A WHOLE, WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT OR
DATE: 2/28/2018 OWNER SHEET NUMBER
P.T.R. NO.: 6018530 PRC NO.: 10745 REG.DATE: FEB. 20, 1992 AUTHOR OF SAID DOCUMENTS.

28F Tower 2, The Enterprise Center, Ayala Ave., cor.


DATE ISSUED: JANUARY 11, 2017 T.I.N.: 132 441 482 000
-ALL MEASUREMENTS ARE TO BE VERIFIED ON SITE BY CONTRACTOR.
CHECKED BY: MLDDG Mr. Gee & Mrs. Karen Abanilla
Paseo de Roxas, 6766 Makati City, 1226 -ALL DISCREPANCIES ARE TO BE IMMEDIATELY REPORTED TO ARCHITECTS AND PROJECT
MANAGERS. 6 /61
Tel: 885-8437/788 4123 office@ldg-architects.com PLACE ISSUED: MANILA CITY IAPOA NO.: 08810-202957-083117
-CONTRACTORS ARE TO PREPARE AND SUBMIT SHOP DRAWINGS TO ARCHITECTS PRIOR TO
COMMENCEMENT OF WORK. DATE: 2/28/2018 ADDRESS: Portofino Phase 8, Molino IV, Cavite
GSPublisherVersion 0.0.100.100
A B C D D' E E' E' E D' D C B A

+12,000 ROOF 4
6 Roof Apex 6 Roof Apex
W-35 W-015 ROOF 2

REFER TO CEILING
DETAILS

REFER TO CEILING DETAILS ROOF 1


REFER TO CEILING
REFER TO CEILING DETAILS REFER TO CEILING DETAILS DETAILS
+8,050 REFER TO CEILING DETAILS

5 Attic
W-028A

ACCENT WALL
D-20
D-15 D-13
W-24 D-12
VANITY COUNTER
WORKSTATION

GARAGE ROOF

+5,000 MASTER BEDROOM


TOILET
AREA MASTER T&B
SHOWER
AREA BEDROOM 2 T&B MASTER BEDROOM
4 Second Floor REFER TO CEILING DETAILS 4 Second Floor

+2,900
MAIN STAIRCASE
3 Mezzanine ACCENT WALL 3 Mezzanine
D-02B
D-04 W-03 W-03

PERIMETER FENCE

+1,000 LIVING AREA ALFRESCO DINING ALFRESCO SHOWCASE KITCHEN LIVING ROOM PORCH
2 Ground Floor 2 Ground Floor
+150
±0
+0.000 +0.000
1 Garage 1 Garage
Natural
0 NGL Grade Line Natural Grade Line
(For Verification)
(For Verification)

A.11 SECTION VIEW A A.12 SECTION VIEW B


1:150 1:150
IMPORTANT:
REPUBLIC ACT No.9266 DRAWN BY: KIR PROJECT TITLE DRAWING CONTENTS LAYOUT
MA. LUISA DAYA-GARCIA OWNERSHIP OF PLANS, SPECIFICATIONS AND OTHER CONTRACT
DATE: ABANILLA RESIDENCE SECTION VIEW A, SECTION VIEW B
ARCHITECT
DOCUMENTS-DRAWINGS AND SPECIFICATIONS AND OTHER CONTRACT DOCUMENTS
DULY SIGNED, STAMPED OR SEALED, AS AN INSTRUMENT OF SERVICE, ARE THE
INTELLECTUAL PROPERTY AND DOCUMENTS OF THE ARCHITECT, WHETHER THE OBJECT
2/28/2018
ADDRESS: Portofino Phase 8, Molino IV, Cavite
A.07
FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY
PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE
DESIGNED BY: MLDDG
REPETITION OF AND FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED
PARTLY OR IN A WHOLE, WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT OR
DATE: 2/28/2018 OWNER SHEET NUMBER
P.T.R. NO.: 6018530 PRC NO.: 10745 REG.DATE: FEB. 20, 1992 AUTHOR OF SAID DOCUMENTS.

28F Tower 2, The Enterprise Center, Ayala Ave., cor.


DATE ISSUED: JANUARY 11, 2017 T.I.N.: 132 441 482 000
-ALL MEASUREMENTS ARE TO BE VERIFIED ON SITE BY CONTRACTOR.
CHECKED BY: MLDDG Mr. Gee & Mrs. Karen Abanilla
Paseo de Roxas, 6766 Makati City, 1226 -ALL DISCREPANCIES ARE TO BE IMMEDIATELY REPORTED TO ARCHITECTS AND PROJECT
MANAGERS. 7 /61
Tel: 885-8437/788 4123 office@ldg-architects.com PLACE ISSUED: MANILA CITY IAPOA NO.: 08810-202957-083117
-CONTRACTORS ARE TO PREPARE AND SUBMIT SHOP DRAWINGS TO ARCHITECTS PRIOR TO
COMMENCEMENT OF WORK. DATE: 2/28/2018 ADDRESS: Portofino Phase 8, Molino IV, Cavite
GSPublisherVersion 0.0.100.100
E' E D' D C B A E' E D' D C B A

+12,000
6 Roof Apex W-34 6 Roof Apex
W-35

W-015 D-26

W-36
+8,050
5 Attic

W-16 W-16 W-21A W-21A


D-14 D-21
D-12

+5,000
4 Second Floor 4 Second Floor
D-11 D-11

+2,900 W-18
3 Mezzanine 3 Mezzanine
D-04 W-03 W-03 D-04

+1,000
2 Ground Floor 2 Ground Floor
850

+150
±0
+0.000 +0.000
1
0 Garage
NGL Grade Line
Natural Natural Grade Line
(For Verification) (For Verification)

A.13 SECTION VIEW C A.14 SECTION VIEW D


1:150 1:150
IMPORTANT:
REPUBLIC ACT No.9266 DRAWN BY: KIR PROJECT TITLE DRAWING CONTENTS LAYOUT
MA. LUISA DAYA-GARCIA OWNERSHIP OF PLANS, SPECIFICATIONS AND OTHER CONTRACT
DATE: ABANILLA RESIDENCE SECTION VIEW D, SECTION VIEW C
ARCHITECT
DOCUMENTS-DRAWINGS AND SPECIFICATIONS AND OTHER CONTRACT DOCUMENTS
DULY SIGNED, STAMPED OR SEALED, AS AN INSTRUMENT OF SERVICE, ARE THE
INTELLECTUAL PROPERTY AND DOCUMENTS OF THE ARCHITECT, WHETHER THE OBJECT
2/28/2018
ADDRESS: Portofino Phase 8, Molino IV, Cavite
A.08
FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY
PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE
DESIGNED BY: MLDDG
REPETITION OF AND FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED
PARTLY OR IN A WHOLE, WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT OR
DATE: 2/28/2018 OWNER SHEET NUMBER
P.T.R. NO.: 6018530 PRC NO.: 10745 REG.DATE: FEB. 20, 1992 AUTHOR OF SAID DOCUMENTS.

28F Tower 2, The Enterprise Center, Ayala Ave., cor.


DATE ISSUED: JANUARY 11, 2017 T.I.N.: 132 441 482 000
-ALL MEASUREMENTS ARE TO BE VERIFIED ON SITE BY CONTRACTOR.
CHECKED BY: MLDDG Mr. Gee & Mrs. Karen Abanilla
Paseo de Roxas, 6766 Makati City, 1226 -ALL DISCREPANCIES ARE TO BE IMMEDIATELY REPORTED TO ARCHITECTS AND PROJECT
MANAGERS. 8 /61
Tel: 885-8437/788 4123 office@ldg-architects.com PLACE ISSUED: MANILA CITY IAPOA NO.: 08810-202957-083117
-CONTRACTORS ARE TO PREPARE AND SUBMIT SHOP DRAWINGS TO ARCHITECTS PRIOR TO
COMMENCEMENT OF WORK. DATE: 2/28/2018 ADDRESS: Portofino Phase 8, Molino IV, Cavite
GSPublisherVersion 0.0.100.100
A B C D D' E E' E' E D' D C B A

+12.000
6 Roof Apex W-34 6 Roof Apex
W-35

W-015

W-36
+8.050
5 Attic
W-29A

W-16 W-21A W-21A


D-13 D-14 D-21
D-12

+5.000
4 Second Floor 4 Second Floor W-15

D-11

+2.900
3 Mezzanine W-18 3 Mezzanine
W-03 W-03 W-19
D-04
D-08

+1.000
2 Ground Floor 2 Ground Floor
+0.150
±0.000
+0.000 +0.000
1 Garage
0Natural
NGL Grade Line Natural Grade Line
(For Verification) (For Verification)

A.15 SECTION VIEW E A.16 SECTION VIEW F


1:150 1:150
IMPORTANT:
REPUBLIC ACT No.9266 DRAWN BY: KIR PROJECT TITLE DRAWING CONTENTS LAYOUT
MA. LUISA DAYA-GARCIA OWNERSHIP OF PLANS, SPECIFICATIONS AND OTHER CONTRACT
DATE: ABANILLA RESIDENCE SECTION VIEW F, SECTION VIEW E
ARCHITECT
DOCUMENTS-DRAWINGS AND SPECIFICATIONS AND OTHER CONTRACT DOCUMENTS
DULY SIGNED, STAMPED OR SEALED, AS AN INSTRUMENT OF SERVICE, ARE THE
INTELLECTUAL PROPERTY AND DOCUMENTS OF THE ARCHITECT, WHETHER THE OBJECT
2/28/2018
ADDRESS: Portofino Phase 8, Molino IV, Cavite
A.09
FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY
PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE
DESIGNED BY: MLDDG
REPETITION OF AND FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED
PARTLY OR IN A WHOLE, WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT OR
DATE: 2/28/2018 OWNER SHEET NUMBER
P.T.R. NO.: 6018530 PRC NO.: 10745 REG.DATE: FEB. 20, 1992 AUTHOR OF SAID DOCUMENTS.

28F Tower 2, The Enterprise Center, Ayala Ave., cor.


DATE ISSUED: JANUARY 11, 2017 T.I.N.: 132 441 482 000
-ALL MEASUREMENTS ARE TO BE VERIFIED ON SITE BY CONTRACTOR.
CHECKED BY: MLDDG Mr. Gee & Mrs. Karen Abanilla
Paseo de Roxas, 6766 Makati City, 1226 -ALL DISCREPANCIES ARE TO BE IMMEDIATELY REPORTED TO ARCHITECTS AND PROJECT
MANAGERS. 9 /61
Tel: 885-8437/788 4123 office@ldg-architects.com PLACE ISSUED: MANILA CITY IAPOA NO.: 08810-202957-083117
-CONTRACTORS ARE TO PREPARE AND SUBMIT SHOP DRAWINGS TO ARCHITECTS PRIOR TO
COMMENCEMENT OF WORK. DATE: 2/28/2018 ADDRESS: Portofino Phase 8, Molino IV, Cavite
GSPublisherVersion 0.0.100.100
1 2 2' 3 4 4 5 6 6 1 2 2' 3 4 4 5 6 6

+12.000
6 Roof Apex
W-33 W-33

W-27 W-27 W-27 W-27

+8.050
5 Attic
W-26A
W-25 W-25
D-16 W-27 W-27

+5.000
4 Second Floor 4 Second Floor
W-07B W-20A
D-11 D-11 D-11

+2.900 W-05 W-05


W-17
3 Mezzanine
D-03B

+1.000
2 Ground Floor 2 Ground Floor
+0.150
±0.000
+0.000 +0.000
1
0 Garage
NGL Grade Line
Natural Natural Grade Line
(For Verification) (For Verification)

A.19 SECTION VIEW I A.20 SECTION VIEW J


1:150 1:150
IMPORTANT:
REPUBLIC ACT No.9266 DRAWN BY: KIR PROJECT TITLE DRAWING CONTENTS LAYOUT
MA. LUISA DAYA-GARCIA OWNERSHIP OF PLANS, SPECIFICATIONS AND OTHER CONTRACT
DATE: ABANILLA RESIDENCE SECTION VIEW J, SECTION VIEW I
ARCHITECT
DOCUMENTS-DRAWINGS AND SPECIFICATIONS AND OTHER CONTRACT DOCUMENTS
DULY SIGNED, STAMPED OR SEALED, AS AN INSTRUMENT OF SERVICE, ARE THE
INTELLECTUAL PROPERTY AND DOCUMENTS OF THE ARCHITECT, WHETHER THE OBJECT
2/28/2018
ADDRESS: Portofino Phase 8, Molino IV, Cavite
A.11
FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY
PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE
DESIGNED BY: MLDDG
REPETITION OF AND FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED
PARTLY OR IN A WHOLE, WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT OR
DATE: 2/28/2018 OWNER SHEET NUMBER
P.T.R. NO.: 6018530 PRC NO.: 10745 REG.DATE: FEB. 20, 1992 AUTHOR OF SAID DOCUMENTS.

28F Tower 2, The Enterprise Center, Ayala Ave., cor.


DATE ISSUED: JANUARY 11, 2017 T.I.N.: 132 441 482 000
-ALL MEASUREMENTS ARE TO BE VERIFIED ON SITE BY CONTRACTOR.
CHECKED BY: MLDDG Mr. Gee & Mrs. Karen Abanilla
Paseo de Roxas, 6766 Makati City, 1226 -ALL DISCREPANCIES ARE TO BE IMMEDIATELY REPORTED TO ARCHITECTS AND PROJECT
MANAGERS. 11 /61
Tel: 885-8437/788 4123 office@ldg-architects.com PLACE ISSUED: MANILA CITY IAPOA NO.: 08810-202957-083117
-CONTRACTORS ARE TO PREPARE AND SUBMIT SHOP DRAWINGS TO ARCHITECTS PRIOR TO
COMMENCEMENT OF WORK. DATE: 2/28/2018 ADDRESS: Portofino Phase 8, Molino IV, Cavite
GSPublisherVersion 0.0.100.100
1 2 2' 3 4 4 5 6 6 1 2 2' 3 4 4 5 6 6

+12.000
6 Roof Apex

W-015 W-015

+8.050
5 Attic

W-25
D-16 D-16 D-14 D-15

+5.000
4 Second Floor 4 Second Floor
D-11

+2.900 W-05 D-05


W-17
3 Mezzanine
W-18
D-09

+1.000
2 Ground Floor 2 Ground Floor
+0.150
±0.000
+0.000 +0.000
1
0 Garage
NGL Grade Line
Natural Natural Grade Line
(For Verification) (For Verification)

A.21 SECTION VIEW K A.22 SECTION VIEW L


1:150 1:150
IMPORTANT:
REPUBLIC ACT No.9266 DRAWN BY: KIR PROJECT TITLE DRAWING CONTENTS LAYOUT
MA. LUISA DAYA-GARCIA OWNERSHIP OF PLANS, SPECIFICATIONS AND OTHER CONTRACT
DATE: ABANILLA RESIDENCE SECTION VIEW K, SECTION VIEW L
ARCHITECT
DOCUMENTS-DRAWINGS AND SPECIFICATIONS AND OTHER CONTRACT DOCUMENTS
DULY SIGNED, STAMPED OR SEALED, AS AN INSTRUMENT OF SERVICE, ARE THE
INTELLECTUAL PROPERTY AND DOCUMENTS OF THE ARCHITECT, WHETHER THE OBJECT
2/28/2018
ADDRESS: Portofino Phase 8, Molino IV, Cavite
A.12
FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY
PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE
DESIGNED BY: MLDDG
REPETITION OF AND FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED
PARTLY OR IN A WHOLE, WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT OR
DATE: 2/28/2018 OWNER SHEET NUMBER
P.T.R. NO.: 6018530 PRC NO.: 10745 REG.DATE: FEB. 20, 1992 AUTHOR OF SAID DOCUMENTS.

28F Tower 2, The Enterprise Center, Ayala Ave., cor.


DATE ISSUED: JANUARY 11, 2017 T.I.N.: 132 441 482 000
-ALL MEASUREMENTS ARE TO BE VERIFIED ON SITE BY CONTRACTOR.
CHECKED BY: MLDDG Mr. Gee & Mrs. Karen Abanilla
Paseo de Roxas, 6766 Makati City, 1226 -ALL DISCREPANCIES ARE TO BE IMMEDIATELY REPORTED TO ARCHITECTS AND PROJECT
MANAGERS. 12 /61
Tel: 885-8437/788 4123 office@ldg-architects.com PLACE ISSUED: MANILA CITY IAPOA NO.: 08810-202957-083117
-CONTRACTORS ARE TO PREPARE AND SUBMIT SHOP DRAWINGS TO ARCHITECTS PRIOR TO
COMMENCEMENT OF WORK. DATE: 2/28/2018 ADDRESS: Portofino Phase 8, Molino IV, Cavite
GSPublisherVersion 0.0.100.100
1 2 2' 3 4 4 5 6 6 1 2 2' 3 4 4 5 6 6

+12.000
6 Roof Apex

+8.050
5 Attic W-30A W-30A
W-29A W-031A W-29A W-031A W-32A

D-019 D-15 D-019

+5.000
4 Second Floor 4 Second Floor W-15

W-09A

+2.900 D-05 W-09A D-05


3 Mezzanine W-13
W-09B W-09B
D-04B
W-10 D-07 W-10 W-12 W-10 D-07 W-10

+1.000
2 Ground Floor 2 Ground Floor
+0.150
±0.000
+0.000 +0.000
1
0 Garage
NGL Grade Line
Natural Natural Grade Line
(For Verification) (For Verification)

A.23 SECTION VIEW M A.24 SECTION VIEW N


1:150 1:150
IMPORTANT:
REPUBLIC ACT No.9266 DRAWN BY: KIR PROJECT TITLE DRAWING CONTENTS LAYOUT
MA. LUISA DAYA-GARCIA OWNERSHIP OF PLANS, SPECIFICATIONS AND OTHER CONTRACT
DATE: ABANILLA RESIDENCE SECTION VIEW M, SECTION VIEW N
ARCHITECT
DOCUMENTS-DRAWINGS AND SPECIFICATIONS AND OTHER CONTRACT DOCUMENTS
DULY SIGNED, STAMPED OR SEALED, AS AN INSTRUMENT OF SERVICE, ARE THE
INTELLECTUAL PROPERTY AND DOCUMENTS OF THE ARCHITECT, WHETHER THE OBJECT
2/28/2018
ADDRESS: Portofino Phase 8, Molino IV, Cavite
A.13
FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY
PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE
DESIGNED BY: MLDDG
REPETITION OF AND FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED
PARTLY OR IN A WHOLE, WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT OR
DATE: 2/28/2018 OWNER SHEET NUMBER
P.T.R. NO.: 6018530 PRC NO.: 10745 REG.DATE: FEB. 20, 1992 AUTHOR OF SAID DOCUMENTS.

28F Tower 2, The Enterprise Center, Ayala Ave., cor.


DATE ISSUED: JANUARY 11, 2017 T.I.N.: 132 441 482 000
-ALL MEASUREMENTS ARE TO BE VERIFIED ON SITE BY CONTRACTOR.
CHECKED BY: MLDDG Mr. Gee & Mrs. Karen Abanilla
Paseo de Roxas, 6766 Makati City, 1226 -ALL DISCREPANCIES ARE TO BE IMMEDIATELY REPORTED TO ARCHITECTS AND PROJECT
MANAGERS. 13 /61
Tel: 885-8437/788 4123 office@ldg-architects.com PLACE ISSUED: MANILA CITY IAPOA NO.: 08810-202957-083117
-CONTRACTORS ARE TO PREPARE AND SUBMIT SHOP DRAWINGS TO ARCHITECTS PRIOR TO
COMMENCEMENT OF WORK. DATE: 2/28/2018 ADDRESS: Portofino Phase 8, Molino IV, Cavite
GSPublisherVersion 0.0.100.100
DOOR SCHEDULE
ID D-01 D-02A D-02B D-03B D-03B D-04 D-04B

PLAN VIEW 2,586


2,510 4,450
1,243 2,050
800

1,300

1,300 1,243 2,050

2,510 4,450 800


2,586

ELEVATION
2,408

2,408
2,400

2,100

2,100

2,100
2,050
QUANTITY 1 1 1 1 1 1 1
DIMENSIONS 1,300x2,400 1,243x2,408 2,050x2,408 2,510x2,100 4,450x2,100 2,586x2,050 800x2,100
LOCATION FOYER LIVING AREA LIVING AREA ALFRESCO GARDEN ALFRESCO GARDEN STONE GARDEN POWDER ROOM
6mm CLEAR LOW-E GLASS or with NANO COAT TREATMENT
PANEL STEEL DOOR PANEL DOOR
on ALUMINUM FRAME
6mm CLEAR GLASS on ALUMINUM FRAME 6mm CLEAR LOW-E GLASS or with NANO COAT TREATMENT on ALUMINUM FRAME 6mm CLEAR GLASS on ALUMINUM FRAME

SCREEN
DOOR JAMB WOOD FRAME

DOOR SCHEDULE
ID D-05 D-07 D-08 D-09 D-11 D-11 D-11 D-11 D-11 D-12 D-13

3,355
PLAN VIEW 1,100 900
860 835

800 800 800 800 800


1,512

1,100

3,355 900

1,512

860 835

800 800 800 800 800


ELEVATION
3,580

2,450
2,310

2,100

2,100
2,012

1,930
1,800

1,800

1,800
1,690

QUANTITY 1 1 1 1 1 1 1 1 1 1 1
DIMENSIONS 1,100x3,580 1,512x2,310 860x2,012 835x2,100 800x1,690 800x1,800 800x1,800 800x1,800 800x1,930 3,355x2,100 900x2,450
LOCATION SALAD GARDEN OUTDOOR SERVICE AREA STONE GARDEN AUXILIARY KITCHEN STORAGE 3 QUARTERS 1 QUARTERS 2 STORAGE 2 STORAGE 1 COMMON AREA COMMON AREA
LOUVER WOOD PANEL DOOR, LOUVER WOOD PANEL LOUVER WOOD PANEL DOOR, LOUVER WOOD PANEL DOOR, LOUVER WOOD PANEL DOOR,
PANEL 6mm CLEAR GLASS on ALUMINUM FRAME 6mm CLEAR GLASS LOUVER PANEL on ALUMINUM FRAME WOOD PANEL DOOR WOOD PANEL DOOR, SWING FOOR
SWING FOOR DOOR, SWING FOO SWING FOOR SWING FOO SWING FOOR
6mm CLEAR GLASS0, TEMPERED, FRAMELESS WOOD PANEL DOOR, SWING FOOR

SCREEN
DOOR JAMB
IMPORTANT:
REPUBLIC ACT No.9266 DRAWN BY: KIR PROJECT TITLE DRAWING CONTENTS LAYOUT
MA. LUISA DAYA-GARCIA OWNERSHIP OF PLANS, SPECIFICATIONS AND OTHER CONTRACT
DATE: ABANILLA RESIDENCE Door List
ARCHITECT
DOCUMENTS-DRAWINGS AND SPECIFICATIONS AND OTHER CONTRACT DOCUMENTS
DULY SIGNED, STAMPED OR SEALED, AS AN INSTRUMENT OF SERVICE, ARE THE
INTELLECTUAL PROPERTY AND DOCUMENTS OF THE ARCHITECT, WHETHER THE OBJECT
2/28/2018
ADDRESS: Portofino Phase 8, Molino IV, Cavite
A.14
FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY
PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE
DESIGNED BY: MLDDG
REPETITION OF AND FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED
PARTLY OR IN A WHOLE, WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT OR
DATE: 2/28/2018 OWNER SHEET NUMBER
P.T.R. NO.: 6018530 PRC NO.: 10745 REG.DATE: FEB. 20, 1992 AUTHOR OF SAID DOCUMENTS.

28F Tower 2, The Enterprise Center, Ayala Ave., cor.


DATE ISSUED: JANUARY 11, 2017 T.I.N.: 132 441 482 000
-ALL MEASUREMENTS ARE TO BE VERIFIED ON SITE BY CONTRACTOR.
CHECKED BY: MLDDG Mr. Gee & Mrs. Karen Abanilla
Paseo de Roxas, 6766 Makati City, 1226 -ALL DISCREPANCIES ARE TO BE IMMEDIATELY REPORTED TO ARCHITECTS AND PROJECT
MANAGERS. 14 /61
Tel: 885-8437/788 4123 office@ldg-architects.com PLACE ISSUED: MANILA CITY IAPOA NO.: 08810-202957-083117
-CONTRACTORS ARE TO PREPARE AND SUBMIT SHOP DRAWINGS TO ARCHITECTS PRIOR TO
COMMENCEMENT OF WORK. DATE: 2/28/2018 ADDRESS: Portofino Phase 8, Molino IV, Cavite
GSPublisherVersion 0.0.100.100
DOOR SCHEDULE
ID D-14 D-15 D-15 D-16 D-019 D-20 D-21 D-25 D-26

PLAN VIEW 800 700 700 900 700 700


2,690 2,526 2,245

800 900 2,690 2,526 2,245

700 700 700 700

ELEVATION

3,311
2,700

2,700

2,700

2,700

2,700
2,450

2,100

2,100
QUANTITY 2 1 1 1 1 1 1 1 1
DIMENSIONS 800x2,450 700x2,700 700x2,700 900x2,700 2,690x2,700 2,526x3,311 2,245x2,700 700x2,100 700x2,100
LOCATION COMMON AREA BEDROOM 1 BEDROOM 2 MASTER W.I.C. BALCONY 1 BALCONY BALCONY 2 EXERCISE ROOM T&B 3

PANEL WOOD PANEL DOOR, SWING FOOR 6mm FRAMELESS CLEAR GLASS, SLIDING 6mm FRAMELESS CLEAR GLASS, SLIDING 6mm FRAMELESS CLEAR GLASS, SLIDING 6mm CLEAR GLASS on ALUMINUM FRAME 6mm CLEAR LOW-E GLASS or with NANO COAT TREATMENT on ALUMINUM FRAME 6mm CLEAR LOW-E GLASS or with NANO COAT TREATMENT on ALUMINUM FRAME

SCREEN
DOOR JAMB

IMPORTANT:
REPUBLIC ACT No.9266 DRAWN BY: KIR PROJECT TITLE DRAWING CONTENTS LAYOUT
MA. LUISA DAYA-GARCIA OWNERSHIP OF PLANS, SPECIFICATIONS AND OTHER CONTRACT
DATE: ABANILLA RESIDENCE Door List
ARCHITECT
DOCUMENTS-DRAWINGS AND SPECIFICATIONS AND OTHER CONTRACT DOCUMENTS
DULY SIGNED, STAMPED OR SEALED, AS AN INSTRUMENT OF SERVICE, ARE THE
INTELLECTUAL PROPERTY AND DOCUMENTS OF THE ARCHITECT, WHETHER THE OBJECT
2/28/2018
ADDRESS: Portofino Phase 8, Molino IV, Cavite
A.15
FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY
PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE
DESIGNED BY: MLDDG
REPETITION OF AND FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED
PARTLY OR IN A WHOLE, WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT OR
DATE: 2/28/2018 OWNER SHEET NUMBER
P.T.R. NO.: 6018530 PRC NO.: 10745 REG.DATE: FEB. 20, 1992 AUTHOR OF SAID DOCUMENTS.

28F Tower 2, The Enterprise Center, Ayala Ave., cor.


DATE ISSUED: JANUARY 11, 2017 T.I.N.: 132 441 482 000
-ALL MEASUREMENTS ARE TO BE VERIFIED ON SITE BY CONTRACTOR.
CHECKED BY: MLDDG Mr. Gee & Mrs. Karen Abanilla
Paseo de Roxas, 6766 Makati City, 1226 -ALL DISCREPANCIES ARE TO BE IMMEDIATELY REPORTED TO ARCHITECTS AND PROJECT
MANAGERS. 15 /61
Tel: 885-8437/788 4123 office@ldg-architects.com PLACE ISSUED: MANILA CITY IAPOA NO.: 08810-202957-083117
-CONTRACTORS ARE TO PREPARE AND SUBMIT SHOP DRAWINGS TO ARCHITECTS PRIOR TO
COMMENCEMENT OF WORK. DATE: 2/28/2018 ADDRESS: Portofino Phase 8, Molino IV, Cavite
GSPublisherVersion 0.0.100.100
WINDOWS SCHEDULE
ID W-01A W-01A W-01A W-02 W-03 W-05 W-05 W-07A W-07B W-09A W-09A W-09B W-09B

2D Symbol

150
450 450
300
600
2,710 4,350 300
600 600 600 300 350
ELEVATION

3,500

1,505

3,580

3,580

1,175

1,175

1,400

2,574
600

600

600

494

494
QUANTITY 1 2 2 1 2 1 1 1 1 1 1 1 1
OPEN TO GROUND SHOWCASE SHOWCASE
LOCATION LEVEL
PORCH FOYER GARAGE DINING AREA
KITCHEN
SHOWCASE KITCHEN SHOWCASE KITCHEN
KITCHEN
DIMENSIONS 600x600 600x600 600x600 150x3,500 600x1,505 450x3,580 450x3,580 2,710x1,175 4,350x1,175 300x1,400 300x2,574 300x494 350x494

ALUMINUM, POWDER ALUMINUM, POWDER ALUMINUM, POWDER ALUMINUM, ALUMINUM, ALUMINUM, ALUMINUM,
ALUMINUM, POWDER ALUMINUM, POWDER COAT, ALUMINUM, POWDER ALUMINUM, POWDER ALUMINUM,
FRAME FINISH COAT, HORIZONTAL COAT, HORIZONTAL COAT, HORIZONTAL POWDER COAT, POWDER COAT,
COAT, LOUVER
POWDER COAT,
LOUVER
ALUMINUM, POWDER COAT, LOUVER POWDER COAT,
COAT, LOUVER COAT POWDER COAT
PIVOT HINGE PIVOT HINGE PIVOT HINGE FIXED FRAME LOUVER LOUVER LOUVER

6mm CLEAR 6mm FROSTED 6mm CLEAR 6mm CLEAR 6mm CLEAR
GLAZING 6mm CLEAR GLASS 6mm CLEAR GLASS 6mm CLEAR GLASS
GLASS GLASS
6mm CLEAR GLASS
GLASS
6mm CLEAR GLASS 6mm CLEAR GLASS
GLASS
6mm CLEAR GLASS 6mm CLEAR GLASS
GLASS

WINDOWS SCHEDULE
ID W-10 W-10 W-11 W-12 W-13 W-15 W-15 W-015 W-015 W-015 W-16 W-17

2D Symbol

2,600

2,600

700 1,042 3,988


1,742 2,387 1,597 3,546 1,194
300 300
ELEVATION

2,948

7,177
690

540

554

707

707

529

700
400

400

519
QUANTITY 1 1 1 1 1 1 1 1 1 1 1 1
LOCATION AUXILIARY KITCHEN AUXILIARY KITCHEN OUTDOOR SERVICE AREA EXERCISE ROOM OPEN TO STAIRS STONE GARDEN
DIMENSIONS 300x400 300x400 700x690 1,042x540 1,742x554 2,387x707 3,988x707 1,597x529 3,546x519 2,600x2,948 2,600x7,177 1,194x700

ALUMINUM, POWDER ALUMINUM, POWDER ALUMINUM, POWDER ALUMINUM, ALUMINUM, POWDER ALUMINUM, POWDER COAT, ALUMINUM, POWDER COAT, ALUMINUM, POWDER
FRAME FINISH COAT COAT COAT, LOUVER POWDER COAT COAT, LOUVER LOUVER LOUVER COAT, LOUVER

6mm CLEAR
GLAZING 6mm CLEAR GLASS 6mm CLEAR GLASS 6mm CLEAR GLASS
GLASS
6mm CLEAR GLASS 6mm CLEAR GLASS 6mm LOW-E CLEAR GLASS 6mm CLEAR GLASS

IMPORTANT:
REPUBLIC ACT No.9266 DRAWN BY: KIR PROJECT TITLE DRAWING CONTENTS LAYOUT
MA. LUISA DAYA-GARCIA OWNERSHIP OF PLANS, SPECIFICATIONS AND OTHER CONTRACT
DATE: ABANILLA RESIDENCE Window List
ARCHITECT
DOCUMENTS-DRAWINGS AND SPECIFICATIONS AND OTHER CONTRACT DOCUMENTS
DULY SIGNED, STAMPED OR SEALED, AS AN INSTRUMENT OF SERVICE, ARE THE
INTELLECTUAL PROPERTY AND DOCUMENTS OF THE ARCHITECT, WHETHER THE OBJECT
2/28/2018
ADDRESS: Portofino Phase 8, Molino IV, Cavite
A.16
FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY
PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE
DESIGNED BY: MLDDG
REPETITION OF AND FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED
PARTLY OR IN A WHOLE, WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT OR
DATE: 2/28/2018 OWNER SHEET NUMBER
P.T.R. NO.: 6018530 PRC NO.: 10745 REG.DATE: FEB. 20, 1992 AUTHOR OF SAID DOCUMENTS.

28F Tower 2, The Enterprise Center, Ayala Ave., cor.


DATE ISSUED: JANUARY 11, 2017 T.I.N.: 132 441 482 000
-ALL MEASUREMENTS ARE TO BE VERIFIED ON SITE BY CONTRACTOR.
CHECKED BY: MLDDG Mr. Gee & Mrs. Karen Abanilla
Paseo de Roxas, 6766 Makati City, 1226 -ALL DISCREPANCIES ARE TO BE IMMEDIATELY REPORTED TO ARCHITECTS AND PROJECT
MANAGERS. 16 /61
Tel: 885-8437/788 4123 office@ldg-architects.com PLACE ISSUED: MANILA CITY IAPOA NO.: 08810-202957-083117
-CONTRACTORS ARE TO PREPARE AND SUBMIT SHOP DRAWINGS TO ARCHITECTS PRIOR TO
COMMENCEMENT OF WORK. DATE: 2/28/2018 ADDRESS: Portofino Phase 8, Molino IV, Cavite
GSPublisherVersion 0.0.100.100
WINDOWS SCHEDULE
ID W-18 W-18 W-19 W-20 W-20 W-20A W-20A W-21 W-21A W-22B W-23A W-24 W-24

2D Symbol

1,243 2,050

450
150

821
666 878
2,341 917 300
3,441 1,013 2,698
ELEVATION

1,810

2,009

3,800

1,300

1,177

3,500

5,226

5,226
809

809

809

809
500

QUANTITY 1 1 1 1 1 1 1 3 2 1 1 1 1
OPEN TO GROUND
LOCATION SHOWCASE KITCHEN STORAGE 3 COMMON SPACE QUARTERS 2 QUARTERS 1 QUARTERS 1 FAMILY AREA OPEN BELOW
LEVEL
DIMENSIONS 821x500 666x1,810 878x2,009 3,441x809 2,341x809 1,013x809 2,698x809 450x3,800 917x1,300 300x1,177 150x3,500 1,243x5,226 2,050x5,226

ALUMINUM,
ALUMINUM, ALUMINUM, POWDER COAT, ALUMINUM, POWDER ALUMINUM, POWDER ALUMINUM, ALUMINUM, ALUMINUM, POWDER ALUMINUM, POWDER
FRAME FINISH POWDER COAT
POWDER COAT,
LOUVER COAT, LOUVER COAT POWDER COAT POWDER COAT COAT COAT
LOUVER

6mm FROSTED 6mm CLEAR 6mm CLEAR


GLAZING GLASS
6mm CLEAR GLASS 6mm CLEAR GLASS 6mm CLEAR GLASS 6mm CLEAR GLASS
GLASS GLASS
6mm CLEAR GLASS 6mm CLEAR GLASS

WINDOWS SCHEDULE
ID W-25 W-25 W-26A W-27 W-27 W-028A W-29A W-29A W-30A W-031A W-32A W-33

2D Symbol

900 1,000
500
500 1,250
1,500 3,510 1,200 3,663
1,150
1,294
3,050
ELEVATION
3,086

1,500

1,961

2,650

1,200
3,111

900

900

900

900

834
400
QUANTITY 1 1 1 2 2 1 1 1 1 1 1 1
LOCATION BEDROOM CEILING BEDROOM CEILING MASTER BEDROOM FAMILY AREA MASTER T&B MASTER T&B T&B 2 MASTER W.I.C. T&B 1 T&B 2
DIMENSIONS 900x3,086 1,000x3,111 1,500x1,500 500x1,961 500x2,650 3,510x900 1,250x900 1,150x1,200 3,050x400 1,200x900 3,663x900 1,294x834

ALUMINUM, POWDER ALUMINUM, ALUMINUM, ALUMINUM, POWDER


FRAME FINISH COAT
FRAMELESS ALUMINUM, POWDER COAT
POWDER COAT POWDER COAT COAT
ALUMINUM, POWDER COAT

6mm CLEAR
GLAZING 6mm CLEAR GLASS
GLASS
6mm CLEAR GLASS 6mm CLEAR GLASS 6mm CLEAR GLASS 6mm CLEAR GLASS 6mm CLEAR GLASS 6mm CLEAR GLASS

IMPORTANT:
REPUBLIC ACT No.9266 DRAWN BY: KIR PROJECT TITLE DRAWING CONTENTS LAYOUT
MA. LUISA DAYA-GARCIA OWNERSHIP OF PLANS, SPECIFICATIONS AND OTHER CONTRACT
DATE: ABANILLA RESIDENCE Window List
ARCHITECT
DOCUMENTS-DRAWINGS AND SPECIFICATIONS AND OTHER CONTRACT DOCUMENTS
DULY SIGNED, STAMPED OR SEALED, AS AN INSTRUMENT OF SERVICE, ARE THE
INTELLECTUAL PROPERTY AND DOCUMENTS OF THE ARCHITECT, WHETHER THE OBJECT
2/28/2018
ADDRESS: Portofino Phase 8, Molino IV, Cavite
A.17
FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY
PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE
DESIGNED BY: MLDDG
REPETITION OF AND FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED
PARTLY OR IN A WHOLE, WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT OR
DATE: 2/28/2018 OWNER SHEET NUMBER
P.T.R. NO.: 6018530 PRC NO.: 10745 REG.DATE: FEB. 20, 1992 AUTHOR OF SAID DOCUMENTS.

28F Tower 2, The Enterprise Center, Ayala Ave., cor.


DATE ISSUED: JANUARY 11, 2017 T.I.N.: 132 441 482 000
-ALL MEASUREMENTS ARE TO BE VERIFIED ON SITE BY CONTRACTOR.
CHECKED BY: MLDDG Mr. Gee & Mrs. Karen Abanilla
Paseo de Roxas, 6766 Makati City, 1226 -ALL DISCREPANCIES ARE TO BE IMMEDIATELY REPORTED TO ARCHITECTS AND PROJECT
MANAGERS. 17 /61
Tel: 885-8437/788 4123 office@ldg-architects.com PLACE ISSUED: MANILA CITY IAPOA NO.: 08810-202957-083117
-CONTRACTORS ARE TO PREPARE AND SUBMIT SHOP DRAWINGS TO ARCHITECTS PRIOR TO
COMMENCEMENT OF WORK. DATE: 2/28/2018 ADDRESS: Portofino Phase 8, Molino IV, Cavite
GSPublisherVersion 0.0.100.100
WINDOWS SCHEDULE
ID W-33 W-34 W-35 W-35 W-36

2D Symbol

2,600
2,600 2,600 4,300

420
1,300 1,300
L/2 L/2
1,446
ELEVATION

1,534

1,534

1,762
820

1,113
512

QUANTITY 1 1 1 1 1
LOCATION EXERCISE ROOM OPEN TO STAIRS FAMILY AREA LOFT
DIMENSIONS 1,446x820 2,600x512 2,600x1,534 2,600x1,534 4,300x1,762

FRAME FINISH ALUMINUM, POWDER COAT ALUMINUM, POWDER COAT, LOUVER

GLAZING 6mm CLEAR GLASS 6mm CLEAR GLASS

IMPORTANT:
REPUBLIC ACT No.9266 DRAWN BY: KIR PROJECT TITLE DRAWING CONTENTS LAYOUT
MA. LUISA DAYA-GARCIA OWNERSHIP OF PLANS, SPECIFICATIONS AND OTHER CONTRACT
DATE: ABANILLA RESIDENCE Window List
ARCHITECT
DOCUMENTS-DRAWINGS AND SPECIFICATIONS AND OTHER CONTRACT DOCUMENTS
DULY SIGNED, STAMPED OR SEALED, AS AN INSTRUMENT OF SERVICE, ARE THE
INTELLECTUAL PROPERTY AND DOCUMENTS OF THE ARCHITECT, WHETHER THE OBJECT
2/28/2018
ADDRESS: Portofino Phase 8, Molino IV, Cavite
A.18
FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY
PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE
DESIGNED BY: MLDDG
REPETITION OF AND FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED
PARTLY OR IN A WHOLE, WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT OR
DATE: 2/28/2018 OWNER SHEET NUMBER
P.T.R. NO.: 6018530 PRC NO.: 10745 REG.DATE: FEB. 20, 1992 AUTHOR OF SAID DOCUMENTS.

28F Tower 2, The Enterprise Center, Ayala Ave., cor.


DATE ISSUED: JANUARY 11, 2017 T.I.N.: 132 441 482 000
-ALL MEASUREMENTS ARE TO BE VERIFIED ON SITE BY CONTRACTOR.
CHECKED BY: MLDDG Mr. Gee & Mrs. Karen Abanilla
Paseo de Roxas, 6766 Makati City, 1226 -ALL DISCREPANCIES ARE TO BE IMMEDIATELY REPORTED TO ARCHITECTS AND PROJECT
MANAGERS. 18 /61
Tel: 885-8437/788 4123 office@ldg-architects.com PLACE ISSUED: MANILA CITY IAPOA NO.: 08810-202957-083117
-CONTRACTORS ARE TO PREPARE AND SUBMIT SHOP DRAWINGS TO ARCHITECTS PRIOR TO
COMMENCEMENT OF WORK. DATE: 2/28/2018 ADDRESS: Portofino Phase 8, Molino IV, Cavite
GSPublisherVersion 0.0.100.100
1 2 2' 3 4 4 5 6 6

E'
GARDEN GATE
Height: 1.8 meters GARDEN
FOUNTAIN

LINE OF 2F EAVES SALAD GARDEN


SECRET GARDEN A: 4.73 m2
A: 5.44 m2 OUTDOOR SERVICE AREA
PL-R1 PL-S1 PL-S1 A: 8.79 m2
PL-S1

ALFRESCO GARDEN
E PL-R1 A: 35.10PL-R1
m2 PL-R1 PL-R1
D-04B S3
AV, AW, (AZ,BA)
WL
W-09B W-09A
BB-3w
D-05

S3 X,Y, (BB,BC)
BC-3w
W-09A W-09B W-10
BD-3w

S2 (BD,BE), BF
D-07
BE-3w
W-10
PL-R1

BG-6w BH-6w BI-6w BJ-6w PL-R1 PL-R1 AZ-3w S2 AB,AE BF-6w


W-12

W-18
W-11 W-13
PL-R1
AV-6w AW-6w T1

POWDER ROOM AB-6w


CF-04
A: 2.34 m2
WL
BA-3w PANEL BOARD HEAT
RECOVERY
X-6w DRYING
Q1-4w R-4w

S2 Q,R AUXILIARY KITCHEN


D'
PL-R1
S3 (BI,BJ), (BH.BG), (BK,BL)
BK-6w
D-03B
S3 P, (MNO), U A: 11.67 m2
T1 PL-R1 PL-R1

SHOWCASE KITCHEN AC-6w AD-6w

DINING AREA U-6w A: 11.81 m2 CF-02


A: 19.03 m2
T1

S1 AF

D-03B
PL-R1
AE-4w S3 AC,AD,AH
T1 CF-05 Y-4w
BL-6w
SERV. T&B
DL-1 D-09
DL-1 DL-1 V-6w PL-R1
T1 S1 AG
M-4w N-4w O-4w
T-6w
AF-6w A: 1.37 m2
PL-R1 PL-R1
CF-03

W-19

D-08
HEAT
AG-3w AH-3w
W-6w RECOVERY
W-18
DRYING

D
W-05 W-17
O-01

P-4w
S3 A,AA, (AI,AJ,AK)

LINE OF 2F EAVES
PL-R1

BM-6w WL
AI-3w
CF-04 PL-R1 PL-R1 PL-R1

STAIRCASE

D-04
L-6w Z-3w WL

S-3w
A: 11.40 m2 CF-02
AJ-3w

LINE OF 2F EAVES
A7-A12 WL
AK-3w
S3 T,U,W
FL-R1 FL-R1 FL-R1 FL-R1 FL-R1 FL-R1

LIVING AREA S2 G,A1-A12 A1-1W A2-1W A3-1W A4-1W A5-1W A6-1W


AA-4w

C W-05
S3 J,BN,BM
S1 BO series
A: 38.26 m2
CF-02
PL-R1 S3 AL, AM, (AI,AJ,AK)
PL-R1
G5-4w
AL-3w
AM-3w

W-03
PL-R1

LINE OF 2F EAVES
PL-R1
K-6w
BN-6w

CF-04 G4-4w

J-4w T8 AN-8w T8 AO-8w

PL-R1

G3-4w AP-3w
CF-02
DL-1
GARAGE
FOYER A: 45.49 m2
D-02B

I-4w
QTY: 5 (Accent Drop Light) CF-04
A: 5.08 m2 G2-4w

S3 K,L,S

W-03
PL-R1
H-4w S3 H,I
F-6w PL-R1 PL-R1 PL-R1
S3 B,D,F
S3 A,E,C G1-4w S2 AP, (AN,AO)
AQ-3w AR-3w AS-3w

W-02
W-01A
D-02A D-01 S2 (AT,AU),(AQ,AR,AS)
B BO1-4w
BO2-4w
BO3-4w
WL (QTY: 5 - Refer to Elevation for Height)
E1-3w
BO4-4w E2-3w
(Refer to Brise Soleil Detail & Elevation) E3-3w
E4-3w
PORCH PL-R1

E5-3w
A: 16.25 m2 D-3w

PL-R1

A-6w

CF-04 CF-01
PL-R1 PL-R1

C-3w B-3w T8 AT-8w T8 AU-8w

LINE OF PORCH CANOPY

LINE OF PORCH CANOPY

A.02 GROUND FLOOR - REFLECTED CEILING PLAN


1:150
IMPORTANT:
REPUBLIC ACT No.9266 DRAWN BY: KIR PROJECT TITLE DRAWING CONTENTS LAYOUT
MA. LUISA DAYA-GARCIA OWNERSHIP OF PLANS, SPECIFICATIONS AND OTHER CONTRACT
DATE: ABANILLA RESIDENCE GROUND FLOOR - REFLECTED CEILING PLAN
ARCHITECT
DOCUMENTS-DRAWINGS AND SPECIFICATIONS AND OTHER CONTRACT DOCUMENTS
DULY SIGNED, STAMPED OR SEALED, AS AN INSTRUMENT OF SERVICE, ARE THE
INTELLECTUAL PROPERTY AND DOCUMENTS OF THE ARCHITECT, WHETHER THE OBJECT
2/28/2018
ADDRESS: Portofino Phase 8, Molino IV, Cavite
A.19.1
FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY
PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE
DESIGNED BY: MLDDG
REPETITION OF AND FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED
PARTLY OR IN A WHOLE, WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT OR
DATE: 2/28/2018 OWNER SHEET NUMBER
P.T.R. NO.: 6018530 PRC NO.: 10745 REG.DATE: FEB. 20, 1992 AUTHOR OF SAID DOCUMENTS.

28F Tower 2, The Enterprise Center, Ayala Ave., cor.


DATE ISSUED: JANUARY 11, 2017 T.I.N.: 132 441 482 000
-ALL MEASUREMENTS ARE TO BE VERIFIED ON SITE BY CONTRACTOR.
CHECKED BY: MLDDG Mr. Gee & Mrs. Karen Abanilla
Paseo de Roxas, 6766 Makati City, 1226 -ALL DISCREPANCIES ARE TO BE IMMEDIATELY REPORTED TO ARCHITECTS AND PROJECT
MANAGERS. 19 /61
Tel: 885-8437/788 4123 office@ldg-architects.com PLACE ISSUED: MANILA CITY IAPOA NO.: 08810-202957-083117
-CONTRACTORS ARE TO PREPARE AND SUBMIT SHOP DRAWINGS TO ARCHITECTS PRIOR TO
COMMENCEMENT OF WORK. DATE: 2/28/2018 ADDRESS: Portofino Phase 8, Molino IV, Cavite
GSPublisherVersion 0.0.100.100
1 2 2' 3 4 4 5 6 6

E'

LINE OF GROUND FLOOR WALLS


W-15

E
W-22B
D-05
W-09A W-09A
D-04B

W-07B
STORAGE 3
D' D-03B A: 11.00 m2
T8 BX-8w

W-15
CF-02

D-03B
W-07A
S1 BX
D
W-05
D-11
FL-R1 FL-R1 FL-R1 FL-R1 FL-R1 FL-R1

A12-1W A11-1W A10-1W A9-1W A8-1W A7-1W

W-16

FL-R1 FL-R1 FL-R1 FL-R1 FL-R1 FL-R1


W-20A
A1-1W A2-1W A3-1W A4-1W A5-1W A6-1W

S1 BV
D-11
S1 BQ
STORAGE 1
W-05

QUARTERS 1
A: 6.05 m2 A: 3.98 m2 PL-R1

BV-6w
T8 BQ-8w
CF-02
CF-02 T8 BR-8w

W-20A
CF-02

STORAGE 2

S2 BU,BV
PL-R1

QUARTERS 2 A: 2.05 m2
BS-6w
PL-R1

A: 5.57 m2 BU-6w

CF-02 S1 BS S1 BR
D-02B

W-24
D-11 D-11

T8 BP-8w S1 BP

COMMON SPACE PL-R1

D-11
W-23A
A: 6.30
BT-6w
m2
CF-02

W-02
D-02A D-01

B
W-01A
W-24
BO1-4w W-20 W-20
BO2-4w
BO3-4w
BO4-4w
(Refer to Brise Soleil Detail & Elevation)

BRISE SOLEIL

OPEN TO GARAGE
CF-01

T8 AT-8w T8 AU-8w

A.02 MEZZANINE - REFLECTED CEILING PLAN


1:150
IMPORTANT:
REPUBLIC ACT No.9266 DRAWN BY: KIR PROJECT TITLE DRAWING CONTENTS LAYOUT
MA. LUISA DAYA-GARCIA OWNERSHIP OF PLANS, SPECIFICATIONS AND OTHER CONTRACT
DATE: ABANILLA RESIDENCE MEZZANINE - REFLECTED CEILING PLAN
ARCHITECT
DOCUMENTS-DRAWINGS AND SPECIFICATIONS AND OTHER CONTRACT DOCUMENTS
DULY SIGNED, STAMPED OR SEALED, AS AN INSTRUMENT OF SERVICE, ARE THE
INTELLECTUAL PROPERTY AND DOCUMENTS OF THE ARCHITECT, WHETHER THE OBJECT
2/28/2018
ADDRESS: Portofino Phase 8, Molino IV, Cavite
A.19.2
FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY
PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE
DESIGNED BY: MLDDG
REPETITION OF AND FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED
PARTLY OR IN A WHOLE, WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT OR
DATE: 2/28/2018 OWNER SHEET NUMBER
P.T.R. NO.: 6018530 PRC NO.: 10745 REG.DATE: FEB. 20, 1992 AUTHOR OF SAID DOCUMENTS.

28F Tower 2, The Enterprise Center, Ayala Ave., cor.


DATE ISSUED: JANUARY 11, 2017 T.I.N.: 132 441 482 000
-ALL MEASUREMENTS ARE TO BE VERIFIED ON SITE BY CONTRACTOR.
CHECKED BY: MLDDG Mr. Gee & Mrs. Karen Abanilla
Paseo de Roxas, 6766 Makati City, 1226 -ALL DISCREPANCIES ARE TO BE IMMEDIATELY REPORTED TO ARCHITECTS AND PROJECT
MANAGERS. 20 /61
Tel: 885-8437/788 4123 office@ldg-architects.com PLACE ISSUED: MANILA CITY IAPOA NO.: 08810-202957-083117
-CONTRACTORS ARE TO PREPARE AND SUBMIT SHOP DRAWINGS TO ARCHITECTS PRIOR TO
COMMENCEMENT OF WORK. DATE: 2/28/2018 ADDRESS: Portofino Phase 8, Molino IV, Cavite
GSPublisherVersion 0.0.100.100
1 2 2' 3 4 4 5 6 6

E'
PROPERTY LINE

LINE
PROPERTY
LINE OF ROOF 4
LINE OF ROOF 4
PL-R1 PL-R1 PL-R1 PL-R1 BALCONY 1
PL-R1 PL-R1 PL-R1 PL-R1 PL-R1

FD-3w FC-3w FB-3w FA-3w A: 2.84


EZ-3w m2
CF-01 EY-3w EX-3w EW-3w EV-3w
W-29A W-30A W-031A W-32A
D-019

E PL-R1

DE-4w (Inside Cabinet Lighting)


PL-R1
S2 (EZ,EY), (EX,EW)
S1 DQ DQ-3w

PL-R1
W-29A
PL-R1 DA-3w
DJ-3w
CF-03 T&B 2 DO-3w PL-R1
S1 FD,FC,FB,FA PL-R1
FE-3w
A: 5.36 m2 DP-3w
EU-3w
S2 DO,DP
CZ1-3w
MASTER T&B PL-R1

D-15

A: 4.39 m2
PL-R1
BEDROOM
DH-6w
1 S2 (ET,ES),
PL-R1 MASTER W.I.C.
PL-R1
DI-3w
A: 12.28 m2 (EU,EV)

T&B 1
D'
W-028A
PL-R1
CZ-3w A: 11.06
CY-3w m2
CF-02

S2 DI,DJ
A: 4.89 m2

(Inside Cabinet Lighting)


FF-3w CF-03 DK-3w PL-R1
CF-03 PL-R1

S1 DK
ET-3w
S3 CV,CW,CZ1

D-21
DN-6w

DD-4w

D-15
PL-R1
PL-R1
PL-R1
BEDROOM 2 BALCONY 2
CX-3w
DB-3w
DC-4w (Inside Cabinet Lighting)
LINE OF ROOF 2B
DG-6w
A: 12.30 m2 A: 2.60 m2
PL-R1
S2 DF,DG,DH DF-4w S3 DL,DM,DN CF-02 CF-01
FG-3w
S3 CX,CY,CZ
D-14 PL-R1
D-16
S1 FH,FF,FE PL-R1
PL-R1 PL-R1
PL-R1 ES-3w

D-14
PL-R1 PL-R1
COMMON AREA
LINE OF ROOF 2B
CJ-3w DM-6w
CC-6w CD-6w
CR-6w CQ-6w
DL-4w
A: 11.39 m2
D FL-R1 FL-R1 FL-R1 FL-R1 FL-R1 FL-R1
CA-4w LINE OF ROOF 4

BALCONY A12-1W A11-1W A10-1W A9-1W A8-1W A7-1W

A: 8.79 m2

D-20
CF-01 S2 CC,CD
S2 CB, CE
W-16
PL-R1 DL-1
PL-R1 PL-R1

CJ-3w CU-6w CB-6w STAIRCASE OPENING BZ-4w


QTY: 5
PL-R1 PL-R1
CF-02 A: 11.61 m2 (Accent
Drop Light)
W-25

PL-R1 S2 CJ,(FH,FI)
CS-6w CP-6w
CF-02
S2 CV,CW

D-13
FH-3w CV-4w
S3 (CO,CT)
MASTER BEDROOM
FL-R1 FL-R1 FL-R1 FL-R1 FL-R1 FL-R1
(CS,CM) S3
(CR,CQ) BZ,CA,(A1-A12 Series)
A1-1W A2-1W A3-1W A4-1W A5-1W A6-1W

C A: 26.34 m2
CF-02
S2 CU,CN
S3 CL,CJ,CK
S2 CF,CH
W-27 W-27
CL-4w

CF-02
S3 CG,CI,CM W-21A
LINE OF ROOF 3 LINE OF ROOF 2B
PL-R1
PL-R1 PL-R1
PL-R1
CE-6w CJ-6w CK-6w
CF-6w
PL-R1 PL-R1 CF-02
PL-R1 CT-6w CO-6w
CW-4w CN-4w
FI-3w

D-12
W-25

W-26A
PL-R1
LINE OF ROOF 4

FAMILY AREA
LINE OF ROOF 2B CG-6w
DL-1

A: 20.53 m2

FIREWALL
W-24
OPEN BELOW
I-4w
CF-02
A: 15.76 m2 CF-02
H-4w PL-R1
PL-R1

CH-6w CI-6w
W-23A

S2 (DR,DS,DEI), (FQ,FP,FO) W-21A

B
W-01A
W-24
CM-4w
WL (QTY: 5 - Refer to Elevation for Height)
E1-3w W-21 W-21 W-21
CF-01 E2-3w
E3-3w
PL-R1 PL-R1 PL-R1

LINE OF ROOF 3 E4-3w


CF-01 DR-6w DS-6w DT-6w

LINE OF ROOF 2A
E5-3w

PL-R1 PL-R1 PL-R1

FO-3w FP-3w FQ-3w CF-01

LINE OF ROOF 1 LINE OF ROOF 2A


PROPERTY LINE

A PROPERTY LINE

A.02 SECOND FLOOR - REFLECTED CEILING PLAN


1:150
IMPORTANT:
REPUBLIC ACT No.9266 DRAWN BY: KIR PROJECT TITLE DRAWING CONTENTS LAYOUT
MA. LUISA DAYA-GARCIA OWNERSHIP OF PLANS, SPECIFICATIONS AND OTHER CONTRACT
DATE: ABANILLA RESIDENCE SECOND FLOOR - REFLECTED CEILING PLAN
ARCHITECT
DOCUMENTS-DRAWINGS AND SPECIFICATIONS AND OTHER CONTRACT DOCUMENTS
DULY SIGNED, STAMPED OR SEALED, AS AN INSTRUMENT OF SERVICE, ARE THE
INTELLECTUAL PROPERTY AND DOCUMENTS OF THE ARCHITECT, WHETHER THE OBJECT
2/28/2018
ADDRESS: Portofino Phase 8, Molino IV, Cavite
A.19.3
FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY
PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE
DESIGNED BY: MLDDG
REPETITION OF AND FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED
PARTLY OR IN A WHOLE, WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT OR
DATE: 2/28/2018 OWNER SHEET NUMBER
P.T.R. NO.: 6018530 PRC NO.: 10745 REG.DATE: FEB. 20, 1992 AUTHOR OF SAID DOCUMENTS.

28F Tower 2, The Enterprise Center, Ayala Ave., cor.


DATE ISSUED: JANUARY 11, 2017 T.I.N.: 132 441 482 000
-ALL MEASUREMENTS ARE TO BE VERIFIED ON SITE BY CONTRACTOR.
CHECKED BY: MLDDG Mr. Gee & Mrs. Karen Abanilla
Paseo de Roxas, 6766 Makati City, 1226 -ALL DISCREPANCIES ARE TO BE IMMEDIATELY REPORTED TO ARCHITECTS AND PROJECT
MANAGERS. 21 /61
Tel: 885-8437/788 4123 office@ldg-architects.com PLACE ISSUED: MANILA CITY IAPOA NO.: 08810-202957-083117
-CONTRACTORS ARE TO PREPARE AND SUBMIT SHOP DRAWINGS TO ARCHITECTS PRIOR TO
COMMENCEMENT OF WORK. DATE: 2/28/2018 ADDRESS: Portofino Phase 8, Molino IV, Cavite
GSPublisherVersion 0.0.100.100
1 2 2' 3 4 4 5 6 6

LINE OF ROOF 1
E'
PROPERTY LINE

LINE
PROPERTY
LINE OF ROOF 4
LINE OF ROOF 4
PL-R1 PL-R1 PL-R1 PL-R1 PL-R1 PL-R1 PL-R1 PL-R1 PL-R1

FD-3w FC-3w FB-3w FA-3w EZ-3w EY-3w EX-3w EW-3w EV-3w


CF-01

E
PL-R1
PL-R1
FE-3w
EU-3w

2F CEILING SOLAR BATTERY STORAGE


D' PL-R1

FF-3w
A: 20.53 m2 A: 14.55 m2
2F CEILING PL-R1

A: 13.84 m2 ET-3w

W-015
LINE OF ROOF 2B
PL-R1
CF-01
FG-3w PL-R1
PL-R1 PL-R1
PL-R1 ES-3w
EH-6w EG-6w LINE OF ROOF 2B
CJ-3w

D T8 EI-8w CA-4w LINE OF ROOF 4

EXERCISE ROOM

D-20
CF-01 A: 14.89 m2
CF-02
STORAGE @ CEILING W-16
DL-1 PL-R1
PL-R1 A: 1.75 m2

W-015
W-35

W-34
OPEN TO STAIRS BZ-4w ER-3w
CJ-3w

W-35
A: 7.69 m2 QTY: 5
CF-01
CF-02 (Accent

W-25 BEDROOM CEILING Drop Light)

T8 EJ-8w
PL-R1 A: 23.26 m2
FH-3w
PL-R1 PL-R1

ED-6w S2 (ED,EH),(EG,EF) EF-6w

C PL-R1
W-27 W-27
CL-4w PL-R1

D-26
EQ-3w
LINE OF ROOF 3
EB-6w CF-02 LINE OF ROOF 2B
T&B 3

S2 DU, (EQ,EP,EO)
PL-R1 PL-R1 PL-R1

S2 EB,EC
W-015
A: 2.31 m2 OPEN TO FAMILY ROOM
EA-6w CJ-6w CK-6w
CF-02 PL-R1 A: 5.99 m2
CF-02
PL-R1
EC-6w
FI-3w S3 EA, EJ, EI
PL-R1
PL-R1 D-25
EP-3w
LINE OF ROOF 4 FJ3w

W-36
LINE OF ROOF 2B
DL-1 CF-01
PL-R1 PL-R1 PL-R1 DU-4w
W-24 I-4w
OPEN TO GROUND LEVEL
QTY: 5 (Accent Drop Light)
DX-6w DW-6w DV-6w
PL-R1 A: 12.27 m2
FAMILY AREA LOFT
FK-3w
A: 13.44 m2 S3 (DY,DZ), (DV,DW),DX PL-R1
CF-02 S2 (EK,EL),(EM,EN) EO-3w

S1 (FJ,F,K,FL,FM,FN)
PL-R1 PL-R1

B
W-01A
W-24
DY-6w DZ-6w
PL-R1 PL-R1 PL-R1
CF-01 W-21 W-21 W-21
FL-3w FM-3w FN-3w

LINE OF ROOF 3
CF-01

LINE OF ROOF 2A
PL-R1 PL-R1 PL-R1 PL-R1

EK-3w EL-3w EM-3w CF-01 EN-3w

LINE OF ROOF 1 LINE OF ROOF 2A


PROPERTY LINE

A PROPERTY LINE

A.02 ATTIC/EXERCISE ROOM - REFLECTED CEILING PLAN


1:150
IMPORTANT:
REPUBLIC ACT No.9266 DRAWN BY: KIR PROJECT TITLE DRAWING CONTENTS LAYOUT
MA. LUISA DAYA-GARCIA OWNERSHIP OF PLANS, SPECIFICATIONS AND OTHER CONTRACT
DATE: ABANILLA RESIDENCE ATTIC/EXERCISE ROOM - REFLECTED CEILING PLAN
ARCHITECT
DOCUMENTS-DRAWINGS AND SPECIFICATIONS AND OTHER CONTRACT DOCUMENTS
DULY SIGNED, STAMPED OR SEALED, AS AN INSTRUMENT OF SERVICE, ARE THE
INTELLECTUAL PROPERTY AND DOCUMENTS OF THE ARCHITECT, WHETHER THE OBJECT
2/28/2018
ADDRESS: Portofino Phase 8, Molino IV, Cavite
A.19.4
FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY
PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE
DESIGNED BY: MLDDG
REPETITION OF AND FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED
PARTLY OR IN A WHOLE, WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT OR
DATE: 2/28/2018 OWNER SHEET NUMBER
P.T.R. NO.: 6018530 PRC NO.: 10745 REG.DATE: FEB. 20, 1992 AUTHOR OF SAID DOCUMENTS.

28F Tower 2, The Enterprise Center, Ayala Ave., cor.


DATE ISSUED: JANUARY 11, 2017 T.I.N.: 132 441 482 000
-ALL MEASUREMENTS ARE TO BE VERIFIED ON SITE BY CONTRACTOR.
CHECKED BY: MLDDG Mr. Gee & Mrs. Karen Abanilla
Paseo de Roxas, 6766 Makati City, 1226 -ALL DISCREPANCIES ARE TO BE IMMEDIATELY REPORTED TO ARCHITECTS AND PROJECT
MANAGERS. 22 /61
Tel: 885-8437/788 4123 office@ldg-architects.com PLACE ISSUED: MANILA CITY IAPOA NO.: 08810-202957-083117
-CONTRACTORS ARE TO PREPARE AND SUBMIT SHOP DRAWINGS TO ARCHITECTS PRIOR TO
COMMENCEMENT OF WORK. DATE: 2/28/2018 ADDRESS: Portofino Phase 8, Molino IV, Cavite
GSPublisherVersion 0.0.100.100
1 2 2' 3 4 4 5 6 6 4 4 5 6 6

E'
GARDEN GATE
Height: 1.8 meters GARDEN
FOUNTAIN

LINE OF 2F EAVES SALAD GARDEN


SECRET GARDEN A: 4.73 m2
A: 5.44 m2 OUTDOOR SERVICE AREA
PL-R1 PL-S1 PL-S1 A: 8.79 m2
PL-S1
LINE OF GROUND FLOOR WALLS

ALFRESCO GARDEN
W-15

E BB-3w BC-3w BD-3w BE-3w W-22B


D-05 W-10 D-07 D-05
W-09B W-09A W-09A W-09B W-09A W-09A
PL-R1 A: 35.10PL-R1
m2 PL-R1 PL-R1
D-04B S3 W-10 D-04B
AV, AW, (AZ,BA)
WL
S3 X,Y, (BB,BC) S2 (BD,BE), BF PL-R1

BG-6w BH-6w BI-6w BJ-6w PL-R1 PL-R1 AZ-3w S2 AB,AE BF-6w


W-12

W-18
W-11 W-13
PL-R1
AV-6w AW-6w T1

POWDER ROOM AB-6w


CF-04
A: 2.34 m2
WL
BA-3w PANEL BOARD HEAT
RECOVERY
X-6w DRYING
Q1-4w R-4w

S2 Q,R AUXILIARY KITCHEN STORAGE 3


D'
PL-R1
S3 (BI,BJ), (BH.BG), (BK,BL)
BK-6w
D-03B
S3 P, (MNO), U A: 11.67 m2 A: 11.00 m2
T1 PL-R1 PL-R1
T8 BX-8w

SHOWCASE KITCHEN

W-15
AC-6w AD-6w
CF-02
DINING AREA U-6w A: 11.81 m2 CF-02
A: 19.03 m2
T1

S1 AF
D-03B

PL-R1
AE-4w S3 AC,AD,AH
T1 CF-05 Y-4w
BL-6w
SERV. T&B
DL-1 D-09
DL-1 DL-1 V-6w PL-R1
T1 S1 AG
M-4w N-4w O-4w
T-6w
AF-6w A: 1.37 m2
PL-R1 PL-R1
CF-03

W-19

D-08
HEAT
AG-3w AH-3w
W-6w RECOVERY
W-18
DRYING S1 BX
D
W-05 W-17
O-01 D-11
FL-R1 FL-R1 FL-R1 FL-R1 FL-R1 FL-R1
P-4w
S3 A,AA, (AI,AJ,AK)
LINE OF 2F EAVES

A12-1W A11-1W A10-1W A9-1W A8-1W A7-1W

PL-R1

BM-6w WL W-16
AI-3w
CF-04 PL-R1 PL-R1 PL-R1

STAIRCASE

D-04
L-6w Z-3w WL

S-3w
A: 11.40 m2 CF-02
AJ-3w

LINE OF 2F EAVES
A7-A12 WL
AK-3w
S3 T,U,W
FL-R1 FL-R1 FL-R1 FL-R1 FL-R1 FL-R1 FL-R1 FL-R1 FL-R1 FL-R1 FL-R1 FL-R1

LIVING AREA S2 G,A1-A12 A1-1W A2-1W A3-1W A4-1W A5-1W A6-1W


AA-4w
A1-1W A2-1W A3-1W A4-1W A5-1W A6-1W
W-20A

S1 BV
S3 J,BN,BM
S1 BO series
A: 38.26 m2 D-11
PL-R1 S3 AL, AM, (AI,AJ,AK) S1 BQ
W-05
CF-02 STORAGE 1 QUARTERS 1
PL-R1
G5-4w
AL-3w
AM-3w
A: 6.05 m2

W-03
PL-R1
A: 3.98 m2 PL-R1
LINE OF 2F EAVES

PL-R1
K-6w
BV-6w
BN-6w
T8 BQ-8w
CF-02
CF-04 G4-4w
CF-02 T8 BR-8w

W-20A
CF-02
J-4w T8 AN-8w T8 AO-8w

STORAGE 2

S2 BU,BV
PL-R1 PL-R1

CF-02
G3-4w AP-3w
QUARTERS 2 A: 2.05 m2
BS-6w
PL-R1

DL-1
GARAGE A: 5.57 m2 BU-6w

FOYER A: 45.49 m2 CF-02 S1 BS S1 BR


D-02B

I-4w
QTY: 5 (Accent Drop Light) CF-04 D-11 D-11

A: 5.08 m2 G2-4w
T8 BP-8w S1 BP
S3 K,L,S
W-03

PL-R1
H-4w S3 H,I
F-6w PL-R1 PL-R1 PL-R1
COMMON SPACE PL-R1

S3 B,D,F

D-11
S3 A,E,C AQ-3w AR-3w AS-3w A: 6.30
BT-6w
m2
G1-4w S2 AP, (AN,AO) CF-02
W-02

W-01A
D-02A D-01 S2 (AT,AU),(AQ,AR,AS) D-01

B BO1-4w
BO2-4w
BO3-4w
WL (QTY: 5 - Refer to Elevation for Height)
E1-3w
W-20 W-20

BO4-4w E2-3w
(Refer to Brise Soleil Detail & Elevation) E3-3w
E4-3w
PORCH PL-R1

E5-3w
A: 16.25 m2 D-3w

PL-R1

A-6w OPEN TO GARAGE


CF-04 CF-01 CF-01
PL-R1 PL-R1

C-3w B-3w T8 AT-8w T8 AU-8w T8 AT-8w T8 AU-8w

LINE OF PORCH CANOPY

LINE OF PORCH CANOPY

A.02 GROUND FLOOR - REFLECTED CEILING PLAN A.03 MEZZANINE - REFLECTED CEILING PLAN
1:150 1:150
IMPORTANT:
REPUBLIC ACT No.9266 DRAWN BY: KIR PROJECT TITLE DRAWING CONTENTS LAYOUT
MA. LUISA DAYA-GARCIA OWNERSHIP OF PLANS, SPECIFICATIONS AND OTHER CONTRACT
DATE: ABANILLA RESIDENCE GROUND FLOOR - REFLECTED CEILING PLAN, MEZZANINE -
ARCHITECT
DOCUMENTS-DRAWINGS AND SPECIFICATIONS AND OTHER CONTRACT DOCUMENTS
DULY SIGNED, STAMPED OR SEALED, AS AN INSTRUMENT OF SERVICE, ARE THE
INTELLECTUAL PROPERTY AND DOCUMENTS OF THE ARCHITECT, WHETHER THE OBJECT
2/28/2018
ADDRESS: Portofino Phase 8, Molino IV, Cavite
REFLECTED CEILING PLAN A.19.5
FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY
PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE
DESIGNED BY: MLDDG
REPETITION OF AND FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED
PARTLY OR IN A WHOLE, WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT OR
DATE: 2/28/2018 OWNER SHEET NUMBER
P.T.R. NO.: 6018530 PRC NO.: 10745 REG.DATE: FEB. 20, 1992 AUTHOR OF SAID DOCUMENTS.

28F Tower 2, The Enterprise Center, Ayala Ave., cor.


DATE ISSUED: JANUARY 11, 2017 T.I.N.: 132 441 482 000
-ALL MEASUREMENTS ARE TO BE VERIFIED ON SITE BY CONTRACTOR.
CHECKED BY: MLDDG Mr. Gee & Mrs. Karen Abanilla
Paseo de Roxas, 6766 Makati City, 1226 -ALL DISCREPANCIES ARE TO BE IMMEDIATELY REPORTED TO ARCHITECTS AND PROJECT
MANAGERS. 23 /61
Tel: 885-8437/788 4123 office@ldg-architects.com PLACE ISSUED: MANILA CITY IAPOA NO.: 08810-202957-083117
-CONTRACTORS ARE TO PREPARE AND SUBMIT SHOP DRAWINGS TO ARCHITECTS PRIOR TO
COMMENCEMENT OF WORK. DATE: 2/28/2018 ADDRESS: Portofino Phase 8, Molino IV, Cavite
GSPublisherVersion 0.0.100.100
1 2 2' 3 4 4 5 6 6 4 4 5 6 6

E'
PROPERTY LINE

LINE

LINE
PROPERTY

PROPERTY
LINE OF ROOF 4

LINE OF ROOF 4 LINE OF ROOF 4


PL-R1 PL-R1 PL-R1 PL-R1 BALCONY 1
PL-R1 PL-R1 PL-R1 PL-R1 PL-R1 PL-R1 PL-R1 PL-R1 PL-R1 PL-R1

FD-3w FC-3w FB-3w FA-3w A: 2.84


EZ-3w m2
CF-01 EY-3w EX-3w EW-3w EV-3w FA-3w EZ-3w
CF-01 EY-3w EX-3w EW-3w EV-3w
W-29A W-30A W-031A W-32A
D-019

E PL-R1

DE-4w (Inside Cabinet Lighting)


PL-R1
S2 (EZ,EY), (EX,EW)
S1 DQ DQ-3w

PL-R1
W-29A
PL-R1 DA-3w
DJ-3w
CF-03 T&B 2 DO-3w PL-R1 PL-R1
S1 FD,FC,FB,FA PL-R1
FE-3w
A: 5.36 m2 DP-3w
EU-3w EU-3w
S2 DO,DP
CZ1-3w
MASTER T&B PL-R1

D-15

A: 4.39 m2
PL-R1
BEDROOM 1 DH-6w
S2 (ET,ES),
PL-R1 MASTER W.I.C.
PL-R1
DI-3w
A: 12.28 m2 (EU,EV)
SOLAR BATTERY STORAGE
T&B 1
D'
W-028A
PL-R1
CZ-3w A: 11.06
CY-3w m2
CF-02 A: 14.55 m2

S2 DI,DJ
A: 4.89 m2 2F CEILING

(Inside Cabinet Lighting)


FF-3w CF-03 DK-3w PL-R1 PL-R1
CF-03 PL-R1 A: 13.84 m2

S1 DK
ET-3w ET-3w
S3 CV,CW,CZ1

D-21
DN-6w

DD-4w

D-15
PL-R1
PL-R1
PL-R1
BEDROOM 2 BALCONY 2
CX-3w
DB-3w
DC-4w (Inside Cabinet Lighting)
LINE OF ROOF 2B
DG-6w
A: 12.30 m2 A: 2.60 m2 LINE OF ROOF 2B W-015
PL-R1
S2 DF,DG,DH DF-4w S3 DL,DM,DN CF-02 CF-01 CF-01
FG-3w
S3 CX,CY,CZ
D-14 PL-R1 PL-R1
D-16 PL-R1 PL-R1
S1 FH,FF,FE PL-R1
PL-R1 PL-R1
PL-R1 ES-3w ES-3w

D-14
PL-R1 PL-R1 EH-6w EG-6w
COMMON AREA
LINE OF ROOF 2B LINE OF ROOF 2B
CJ-3w DM-6w
CC-6w CD-6w
CR-6w CQ-6w
DL-4w
A: 11.39 m2
D FL-R1 FL-R1 FL-R1 FL-R1 FL-R1 FL-R1
CA-4w LINE OF ROOF 4 T8 EI-8w CA-4w LINE OF ROOF 4

BALCONY A12-1W A11-1W A10-1W A9-1W A8-1W A7-1W

EXERCISE ROOM
A: 8.79 m2
D-20

CF-01 S2 CC,CD A: 14.89 m2


S2 CB, CE
CF-02
W-16
STORAGE @ CEILING W-16
PL-R1 DL-1 DL-1 PL-R1
PL-R1 PL-R1 A: 1.75 m2

W-015
W-35

W-34
CJ-3w CU-6w CB-6w STAIRCASE OPENING BZ-4w OPEN TO STAIRS BZ-4w ER-3w

W-35
QTY: 5
A: 7.69 m2 QTY: 5
CF-01
PL-R1 PL-R1
CF-02 A: 11.61 m2 (Accent
Drop Light)
CF-02 (Accent
Drop Light)
W-25

PL-R1 S2 CJ,(FH,FI)
CS-6w CP-6w
CF-02 T8 EJ-8w

S2 CV,CW
D-13

FH-3w CV-4w
S3 (CO,CT)
MASTER BEDROOM
FL-R1 FL-R1 FL-R1 FL-R1 FL-R1 FL-R1 PL-R1 PL-R1
(CS,CM) S3
(CR,CQ) BZ,CA,(A1-A12 Series)
A1-1W A2-1W A3-1W A4-1W A5-1W A6-1W ED-6w S2 (ED,EH),(EG,EF) EF-6w

C A: 26.34 m2
CF-02
S2 CU,CN
S3 CL,CJ,CK
S2 CF,CH
W-27 W-27
CL-4w
PL-R1
W-27 W-27
CL-4w PL-R1

CF-02

D-26
EQ-3w
S3 CG,CI,CM W-21A
EB-6w CF-02
LINE OF ROOF 3 LINE OF ROOF 2B LINE OF ROOF 2B
T&B 3

S2 DU, (EQ,EP,EO)
PL-R1
PL-R1 PL-R1 PL-R1 PL-R1 PL-R1

S2 EB,EC
W-015
CE-6w
PL-R1
A: 2.31 m2 OPEN TO FAMILY ROOM
CJ-6w CK-6w EA-6w CJ-6w CK-6w
PL-R1 PL-R1
CF-6w
CF-02 CF-02 PL-R1 A: 5.99 m2
CT-6w CO-6w
CF-02
PL-R1
EC-6w
CW-4w CN-4w
FI-3w S3 EA, EJ, EI
D-12

W-25
PL-R1
W-26A D-25
EP-3w
PL-R1
LINE OF ROOF 4

W-36
FAMILY AREA
LINE OF ROOF 2B CG-6w LINE OF ROOF 2B
DL-1 CF-01
A: 20.53 m2

FIREWALL
DU-4w
OPEN BELOW
PL-R1 PL-R1 PL-R1
W-24 I-4w
CF-02 OPEN TO GROUND LEVEL
QTY: 5 (Accent Drop Light)
DX-6w DW-6w DV-6w
A: 15.76 m2 CF-02 FAMILY AREA LOFT
H-4w PL-R1
PL-R1
A: 13.44 m2 S3 (DY,DZ), (DV,DW),DX PL-R1

CH-6w CI-6w CF-02 S2 (EK,EL),(EM,EN) EO-3w


W-23A
S1 (FJ,F,K,FL,FM,FN)
S2 (DR,DS,DEI), (FQ,FP,FO) W-21A PL-R1 PL-R1

B
W-01A
W-24
DY-6w DZ-6w
CM-4w
WL (QTY: 5 - Refer to Elevation for Height)
E1-3w W-21 W-21 W-21 W-21 W-21 W-21
CF-01 E2-3w
E3-3w
PL-R1 PL-R1 PL-R1

LINE OF ROOF 3 E4-3w


CF-01 DR-6w DS-6w DT-6w CF-01

LINE OF ROOF 2A

LINE OF ROOF 2A
E5-3w

PL-R1 PL-R1 PL-R1 PL-R1 PL-R1 PL-R1 PL-R1

FO-3w FP-3w FQ-3w CF-01 EK-3w EL-3w EM-3w CF-01 EN-3w

LINE OF ROOF 1 LINE OF ROOF 2A LINE OF ROOF 2A


PROPERTY LINE

A PROPERTY LINE PROPERTY LINE

A.27 SECOND FLOOR - REFLECTED CEILING PLAN A.28 ATTIC/EXERCISE ROOM - REFLECTED CEILING PL
1:150 1:150
IMPORTANT:
REPUBLIC ACT No.9266 DRAWN BY: KIR PROJECT TITLE DRAWING CONTENTS LAYOUT
MA. LUISA DAYA-GARCIA OWNERSHIP OF PLANS, SPECIFICATIONS AND OTHER CONTRACT
DATE: ABANILLA RESIDENCE SECOND FLOOR - REFLECTED CEILING PLAN, ATTIC/EXERCISE
ARCHITECT
DOCUMENTS-DRAWINGS AND SPECIFICATIONS AND OTHER CONTRACT DOCUMENTS
DULY SIGNED, STAMPED OR SEALED, AS AN INSTRUMENT OF SERVICE, ARE THE
INTELLECTUAL PROPERTY AND DOCUMENTS OF THE ARCHITECT, WHETHER THE OBJECT
2/28/2018
ADDRESS: Portofino Phase 8, Molino IV, Cavite
ROOM - REFLECTED CEILING PLAN A.19.6
FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY
PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE
DESIGNED BY: MLDDG
REPETITION OF AND FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED
PARTLY OR IN A WHOLE, WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT OR
DATE: 2/28/2018 OWNER SHEET NUMBER
P.T.R. NO.: 6018530 PRC NO.: 10745 REG.DATE: FEB. 20, 1992 AUTHOR OF SAID DOCUMENTS.

28F Tower 2, The Enterprise Center, Ayala Ave., cor.


DATE ISSUED: JANUARY 11, 2017 T.I.N.: 132 441 482 000
-ALL MEASUREMENTS ARE TO BE VERIFIED ON SITE BY CONTRACTOR.
CHECKED BY: MLDDG Mr. Gee & Mrs. Karen Abanilla
Paseo de Roxas, 6766 Makati City, 1226 -ALL DISCREPANCIES ARE TO BE IMMEDIATELY REPORTED TO ARCHITECTS AND PROJECT
MANAGERS. 24 /61
Tel: 885-8437/788 4123 office@ldg-architects.com PLACE ISSUED: MANILA CITY IAPOA NO.: 08810-202957-083117
-CONTRACTORS ARE TO PREPARE AND SUBMIT SHOP DRAWINGS TO ARCHITECTS PRIOR TO
COMMENCEMENT OF WORK. DATE: 2/28/2018 ADDRESS: Portofino Phase 8, Molino IV, Cavite
GSPublisherVersion 0.0.100.100
1 2 2' 3 4 4 5 6 6 4 4 5 6 6

N
E'
GARDEN GATE
Height: 1.8 meters GARDEN
FOUNTAIN

SALAD GARDEN
SECRET GARDEN A: 4.73 m2
A: 5.44 m2 OUTDOOR SERVICE AREA
A: 8.79 m2
LINE OF GROUND FLOOR WALLS

ALFRESCO GARDEN
W-15

E
W-22B
D-05 W-10 D-07 D-05
W-09B W-09A W-09A W-09B W-09A W-09A
A: 35.10 m2 D-04B W-10
W
D-04B

W W-12

W-18
W-11 W-13 W

POWDER ROOM REF


HEAT
A: 2.34 m2 REF RECOVERY
110 220 DRYING

W 110 AUXILIARY KITCHEN STORAGE 3


D' D-03B
220
A: 11.67 m2 A: 11.00 m2
SHOWCASE KITCHEN 220

W-15
DINING AREA A: 11.81 m2 220
A: 19.03 m2 110

W
IN 110
D-03B

UNDER THE COUNTER

SERV. T&B
D-09

REF A: 1.37 m2

REF

W-19

D-08
W HEAT
RECOVERY
W-18
DRYING

D
ACU W W-17

W
W-05
O-01 D-11

DOWN
W-16

22

21

20

19

18

17

16

15

14

13

12
STAIRCASE STONE GARDEN

D-04

10

11
A: 11.40 m2 A: 10.72 m2

UP
LIVING AREA
UP W-20A

C A: 38.26 m2 1
D-11

W
4
2

STORAGE 1
W-05
220
QUARTERS 1
3
3 4

A: 6.05 m2

W-03
5

A: 3.98 m2
2
6
1 7
8
9
10

W-20A
220
DOWN
STORAGE 2
QUARTERS 2 A: 2.05 m2
GARAGE A: 5.57 m2
FOYER A: 45.49 m2
D-02B

D-11 D-11

A: 5.08 m2 W
GARAGE
W-03

ACU
220
A: 39.53 m2 COMMON SPACE

D-11
A: 6.30 m2
W-02

W-01A 220
D-02A D-01 D-01

B
W

W W-20 W-20

PORCH
A: 16.25 m2

GARDEN
5

A: 20.07 m2

0 1 2 3 4 5 0 1 2 3 4 5

A.02 GROUND FLOOR - POWER & AUXILIARY LAY-OUT A.03 MEZZANINE - POWER & AUXILIARY LAY-OUT
1:150 1:150
IMPORTANT:
REPUBLIC ACT No.9266 DRAWN BY: KIR PROJECT TITLE DRAWING CONTENTS LAYOUT
MA. LUISA DAYA-GARCIA OWNERSHIP OF PLANS, SPECIFICATIONS AND OTHER CONTRACT
DATE: ABANILLA RESIDENCE GROUND FLOOR - POWER & AUXILIARY LAY-OUT, MEZZANINE -
ARCHITECT
DOCUMENTS-DRAWINGS AND SPECIFICATIONS AND OTHER CONTRACT DOCUMENTS
DULY SIGNED, STAMPED OR SEALED, AS AN INSTRUMENT OF SERVICE, ARE THE
INTELLECTUAL PROPERTY AND DOCUMENTS OF THE ARCHITECT, WHETHER THE OBJECT
2/28/2018
ADDRESS: Portofino Phase 8, Molino IV, Cavite
POWER & AUXILIARY LAY-OUT A.19.7
FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY
PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE
DESIGNED BY: MLDDG
REPETITION OF AND FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED
PARTLY OR IN A WHOLE, WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT OR
DATE: 2/28/2018 OWNER SHEET NUMBER
P.T.R. NO.: 6018530 PRC NO.: 10745 REG.DATE: FEB. 20, 1992 AUTHOR OF SAID DOCUMENTS.

28F Tower 2, The Enterprise Center, Ayala Ave., cor.


DATE ISSUED: JANUARY 11, 2017 T.I.N.: 132 441 482 000
-ALL MEASUREMENTS ARE TO BE VERIFIED ON SITE BY CONTRACTOR.
CHECKED BY: MLDDG Mr. Gee & Mrs. Karen Abanilla
Paseo de Roxas, 6766 Makati City, 1226 -ALL DISCREPANCIES ARE TO BE IMMEDIATELY REPORTED TO ARCHITECTS AND PROJECT
MANAGERS. 25 /61
Tel: 885-8437/788 4123 office@ldg-architects.com PLACE ISSUED: MANILA CITY IAPOA NO.: 08810-202957-083117
-CONTRACTORS ARE TO PREPARE AND SUBMIT SHOP DRAWINGS TO ARCHITECTS PRIOR TO
COMMENCEMENT OF WORK. DATE: 2/28/2018 ADDRESS: Portofino Phase 8, Molino IV, Cavite
GSPublisherVersion 0.0.100.100
1 2 2' 3 4 4 5 6 6 3 4 4 5 6 6

N
E'
PROPERTY LINE

LINE

LINE
PROPERTY

PROPERTY
LINE OF ROOF 4
BALCONY 1
A: 2.84 m2
W-29A W-30A W-031A W W-32A
D-019

E 220 110

220
W-29A

T&B 2

TV
A: 5.36 m2
MASTER T&B

220
D-15

A: 4.39 m2 BEDROOM 1

220 110
TV
MASTER W.I.C. A: 12.28 m2

110
220
2F CEILING SOLAR BATTERY STORAGE
T&B 1
D'
W-028A
A: 11.06 m2 A: 20.53 m2 A: 14.55 m2
A: 4.89 m2 2F CEILING

220
A: 13.84 m2

D-21
220
D-15
ACU BEDROOM 2 BALCONY 2
A: 12.30 m2 A: 2.60 m2 LINE OF ROOF 2B W-015

ACU
D-14
D-16

220
W

D-14
COMMON AREA
W 220 220 LINE OF ROOF 2B
220 220
ACU
A: 11.39 m2
D
ACU

220

220
LINE OF ROOF 4 LINE OF ROOF 4

BALCONY
EXERCISE ROOM

DOWN

DOWN
A: 8.79 m2

220
D-20

A: 14.89 m2

W-16
STORAGE @ CEILING W-16

22

21

20

19

18

17

16

15

14

13

12

22

21

20

19

18

17

16

15

14

13

12
A: 1.75 m2

W-015
W-35

W-34
STAIRCASE OPENING OPEN TO STAIRS

10

11

10

11

W-35
A: 7.69 m2
A: 11.61 m2 BEDROOM CEILING
W-25
F
A: 23.26 m2

D-13
220 220
MASTER BEDROOM ACU

C A: 26.34 m2
W-27 W-27 W-27 W-27
220

TV
220 110

D-26
ACU
W-21A
ACU
LINE OF ROOF 3 LINE OF ROOF 2B
T&B 3

W-015
A: 2.31 m2 OPEN TO FAMILY ROOM
A: 5.99 m2

220
220

220
TV

D-12
W-25

W-26A D-25

W-36
FAMILY AREA LINE OF ROOF 2B

A: 20.53 m2

FIREWALL
W-24
OPEN BELOW OPEN TO GROUND LEVEL
A: 15.76 m2 A: 12.27 m2
FAMILY AREA LOFT
A: 13.44 m2

W-23A
ACU
W-21A

B
W-01A 220 220 W-01A 220 220
W-24

W-21 W-21 W-21 W-21 W-21 W-21

LINE OF ROOF 2A
LINE OF ROOF 1 LINE OF ROOF 2A
PROPERTY LINE

A PROPERTY LINE PROPERTY LINE

0 1 2 3 4 5 0 1 2 3

A.04 SECOND FLOOR - POWER & AUXILIARY LAY-OUT A.05 ATTIC/EXERCISE ROOM - POWER & AUXILIARY LA
1:150 1:150
IMPORTANT:
REPUBLIC ACT No.9266 DRAWN BY: KIR PROJECT TITLE DRAWING CONTENTS LAYOUT
MA. LUISA DAYA-GARCIA OWNERSHIP OF PLANS, SPECIFICATIONS AND OTHER CONTRACT
DATE: ABANILLA RESIDENCE SECOND FLOOR - POWER & AUXILIARY LAY-OUT,
ARCHITECT
DOCUMENTS-DRAWINGS AND SPECIFICATIONS AND OTHER CONTRACT DOCUMENTS
DULY SIGNED, STAMPED OR SEALED, AS AN INSTRUMENT OF SERVICE, ARE THE
INTELLECTUAL PROPERTY AND DOCUMENTS OF THE ARCHITECT, WHETHER THE OBJECT
2/28/2018
ADDRESS: Portofino Phase 8, Molino IV, Cavite
ATTIC/EXERCISE ROOM - POWER & AUXILIARY LAY-OUT A.19.8
FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY
PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE
DESIGNED BY: MLDDG
REPETITION OF AND FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED
PARTLY OR IN A WHOLE, WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT OR
DATE: 2/28/2018 OWNER SHEET NUMBER
P.T.R. NO.: 6018530 PRC NO.: 10745 REG.DATE: FEB. 20, 1992 AUTHOR OF SAID DOCUMENTS.

28F Tower 2, The Enterprise Center, Ayala Ave., cor.


DATE ISSUED: JANUARY 11, 2017 T.I.N.: 132 441 482 000
-ALL MEASUREMENTS ARE TO BE VERIFIED ON SITE BY CONTRACTOR.
CHECKED BY: MLDDG Mr. Gee & Mrs. Karen Abanilla
Paseo de Roxas, 6766 Makati City, 1226 -ALL DISCREPANCIES ARE TO BE IMMEDIATELY REPORTED TO ARCHITECTS AND PROJECT
MANAGERS. 26 /61
Tel: 885-8437/788 4123 office@ldg-architects.com PLACE ISSUED: MANILA CITY IAPOA NO.: 08810-202957-083117
-CONTRACTORS ARE TO PREPARE AND SUBMIT SHOP DRAWINGS TO ARCHITECTS PRIOR TO
COMMENCEMENT OF WORK. DATE: 2/28/2018 ADDRESS: Portofino Phase 8, Molino IV, Cavite
GSPublisherVersion 0.0.100.100
STRUCTURAL DESIGN CRITERIA II CONSTRUCTION NOTES:
1.0 CODES & STANDARDS: GENERAL
ABBREVIATIONS:
2.4 EARTHQUAKE LOAD (E):
1.1 GOVERNING CODES: 8. FABRICATION/PLACING DRAWINGS.
1. THE STRUCTURAL DRAWINGS SHALL BE USED IN CONJUNCTION a AT
ACI 318-99 BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE , SEISMIC ZONE 4 CONTRACTOR SHALL NOT BE ALLOWED TO START PLACEMENT/INSTALLATION
SEISMIC SOURCE TYPE A WITH THE SPECIFICATIONS, THE ARCHITECTURAL, MECHANICAL, OF REINFORCING BARS FOR FOOTINGS, BEAMS, WALLS, COLUMNS, SLABS & AND
AMERICAN CONCRETE INSTITUTE
SOIL PROFILE TYPE S D , STIFF SOIL PROFILE ELECTRICAL AND CIVIL DRAWINGS . AND OTHER RC STRUCTURAL ELEMENTS, WITHOUT SUBMITTAL AND APPROVAL CL CENTER LINE
AISC 9TH EDITION MANUAL OF STEEL CONSTRUCTION, ALLOWABLE STRESS DESIGN,
DISTANCE FROM KNOWN SEISMIC _SOURCE < 5KM OF PLACING DRAWINGS. ONLY THE STRUCTURAL ENGINEER OF RECORD
AMERICAN INSTITUTE OF STEEL CONSTRUCTION
2. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND AND/OR THE CHURCH AREA ENGINEER ARE AUTHORIZED TO APPROVE Ø DIAMETER
AISI 1996 EDITION COLD-FORMED STEEL DESIGN MANUAL , EARTHQUAKE LOAD, E = r Eh+Ev PLACING DRAWINGS WHICH SHOULD BE SUBMITTED AND RECEIVED BY EITHER
CONDITIONS AT THE SITE, WHICH SHALL INCLUDE THE LOCATION ADD'L ADDITIONAL
AMERICAN IRON AND STEEL INSTITUTE CHURCH ARCHITECTURAL & ENGINEERING DIVISION OFFICE OR THE OFFICE ± PLUS OR MINUS
TOTAL DESIGN BASE SHEAR (USING STATIC FORCE PROCEDURE ): AND DIMENSIONS OF OPENINGS, GROOVES, REGLETS, PIPE SLEEVES,
ASCE 7-95 MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES , OF THE STRUCTURAL ENGINEER OF RECORD AT LEAST TWO(2) WEEKS PRIOR BC BOTTOM CHORD
CONDUITS, EMBEDDED OR ATTACHED ITEMS TO CONCRETE, ETC. TO START OF STRUCTURAL CONCRETE WORKS. PLACING DRAWINGS MUST
AMERICAN SOCIETY OF CIVIL ENGINEERS Cv I
V = W FOLLOW THE SAME DRAWING STANDARDS AS USED IN THE WORKING DRAWINGS BOT BOTTOM
NSCP 6th EDITION NATIONAL STRUCTURAL CODE OF THE PHILIPPINES 2010, VOLUME 1 RT
3. THE CONTRACTOR SHALL PROVIDE ALL MEASURES NECESSARY OF THIS PROJECT AND ONLY CERTIFIED BY THE CONTRACTOR 'S REGISTERED CHB CONCRETE HOLLOW BLOCK
UBC 1997 EDITION UNIFORM BUILDING CODE
CIVIL OR STRUCTURAL ENGINEER.
TOTAL DESIGN BASE SHEAR NEED NOT EXCEED: COL COLUMN
1.2 GOVERNING STANDARDS: DEFINITION OF PLACING DRAWINGS : PLACING DRAWINGS ARE WORKING DRAWINGS
2.5 Ca I TO PROTECT NEW AND EXISTING CONSTRUCTION. THIS SHALL FOR FABRICATION AND PLACING OF REINFORCING STEEL. THESE DRAWINGS
V = W CONC CONCRETE
ASTM A36 STRUCTURAL STEEL R INCLUDE BUT NOT BE LIMITED TO BRACING AND SHORING FOR MUST COMPRISE THE FOLLOWING: BAR LISTS, SCHEDULES, BENDING DETAILS,
ASTM A53 PIPE, STEEL, BLACK AND HOT-DIPPED, ZINC-COATED WELDED AND SEAMLESS LOADS IMPOSED DURING CONSTRUCTION. PLACING DETAILS, PLACING PLANS AND ELEVATIONS, GRADE, SIZE, SPACING, CONN CONNECTION
ASTM A500 COLD-FORMED WELDED AND SEAMLESS CARBON STEEL TOTAL DESIGN BASE SHEAR SHALL NOT BE LESS THAN: LENGTH OF EACH BAR, SPLICES AND THEIR LOCATIONS AND ANY NECESSARY
ADDITIONAL INFORMATION THAT MUST BE SUPPLIED BY THE CONTRACTOR CONT CONTINUOUS
STRUCTURAL TUBING IN ROUNDS AND SHAPES V = 4. ALL DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALE
0.11Ca I W CONCERNING FIELD CONDITIONS, FIELD MEASUREMENTS , CONSTRUCTION JOINTS, DEG,° DEGREE
ASTM A570 STEEL, SHEET AND STRIP, CARBON, HOT-ROLLED, STRUCTURAL QUALITY SHOWN ON PLANS, SECTIONS AND DETAILS. AND SEQUENCE OF PLACING CONCRETE.
ASTM A611 STEEL, SHEET, CARBON, COLD-ROLLED, STRUCTURAL QUALITY FOR SEISMIC ZONE 4, TOTAL DESIGN BASE SHEAR SHALL ALSO NOT BE LESS THAN: DET DETAIL
ASTM A615/PNS 49 SPECIFICATION FOR STEEL BARS FOR CONCRETE REINFORCEMENT 0.8 ZNv I 5. GENERAL NOTES AND TYPICAL DETAILS APPLY TO ALL
V = W STRUCTURAL STEEL: EF EACH FACE
ASTM C33/PNS 18 STANDARD SPECIFICATION FOR CONCRETE AGGREGATES R DRAWINGS UNLESS OTHERWISE SHOWN OR NOTED.
ASTM C39 STANDARD TEST METHOD FOR COMPRESSIVE STRENGTH OF CYLINDRICAL EGL EXISTING GRADE LINE
1. ALL MATERIALS AND WORKMANSHIP SHALL CONFORM WITH THE
CONCRETE SPECIMENS WHERE: 6. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE NOTED . NINTH EDITION OF THE AMERICAN INSTITUTE OF STEEL CONSTRUCTION ELEV ELEVATION
ASTM C94/PNS 46 STANDARD SPECIFICATION FOR READY-MIXED CONCRETE (AISC) MANUAL UNLESS OTHERWISE SHOWN OR NOTED.
E = THE EARTHQUAKE LOAD ON AN ELEMENT OF THE STRUCTURE RESULTING FROM EQ EQUAL
ASTM C150/PNS 07 STANDARD SPECIFICATION FOR PORTLAND CEMENT 7. ALL BAR DIAMETERS AND SPACINGS ARE IN MILLIMETERS UNLESS
PNS 16 PHILIPPINE NATIONAL STANDARD FOR CONCRETE HOLLOW BLOCKS THE COMBINATION OF THE HORIZONTAL COMPONENT , E , hAND THE VERTICAL
COMPONENT, E v. OTHERWISE NOTED. 2. CONTRACTOR SHALL FURNISH ALL PLATES, CLIP ANGLES, EW EACH WAY
2.0 DESIGN LOADS: E h = THE EARTHQUAKE LOAD DUE TO THE BASE SHEAR, V CONNECTORS, ETC. REQUIRED FOR THE COMPLETION OF THE EXST EXISTING
8. ALL FOUNDATIONS SHALL REST ON 50 THK LEAN CONCRETE. UNLESS
2.1 DEAD LOADS: E v = THE LOAD EFFECT RESULTING FROM THE VERTICAL COMPONENT OF THE OTHERWISE SHOWN OR NOTED. STRUCTURE EVEN IF EVERY SUCH ITEM IS NOT SHOWN ON THE
FFL FINISHED FLOOR LINE
I
EARTHQUAKE GROUND MOTION AND IS EQUAL TO AN ADDITION OF 0.5Ca D CONTRACT DRAWINGS.
2.1.1 ROOF DEAD LOADS (D r ):
TO THE DEAD LOAD EFFECT, D, FOR STRENGTH DESIGN, AND MAY BE TAKEN FGL FINISHED GRADE LINE
AS ZERO FOR ALLOWABLE STRESS DESIGN. CONCRETE & REINFORCING STEEL 3. WELDING SHALL BE IN ACCORDANCE WITH THE AMERICAN WELDING
METAL ROOFING & PURLINS GA GAGE
0.48 kPa ( 10 psf) r = RELIABILITY/REDUNDANCY FACTOR = 1.0 SOCIETY CODE AWS D 1.1 UNLESS INDICATED OTHERWISE,
1. MINIMUM CONCRETE COVER TO ALL REINFORCING BARS SHALL BE HOR HORIZONTAL
STEEL RAFTERS & BRACINGS SELFWEIGHT 7,850 Kg/cum V = TOTAL DESIGN BASE SHEAR WELDING ELECTRODES SHALL BE E70 XX.
AS FOLLOWS:
R = 8.5 (FOR SPECIAL MOMENT -RESISTING FRAME , SMRF) LG LONG
2.1.2 FLOOR DEAD LOADS (D): W = TOTAL SEISMIC DEAD LOAD 4. ALL BOLTS AND THREADED FASTENERS SHALL BE ASTM A 307
A. CONCRETE CAST AGAINST AND PERMANENTLY M,m METER
I = IMPORTANCE FACTOR = 1.0 (FOR SPECIAL OCCUPANCY STRUCTURE) UNLESS OTHERWISE NOTED.
EXPOSED TO EARTH 75m m
150mm THK MASONRY WALL (PLASTERED EACH FACE) 3.45 kPa (72 psf) T = Ct (hn ) 3/4 = ELASTIC FUNDAMENTAL PERIOD OF VIBRATION, IN SECONDS mm MILLIMETER
200mm THK MASONRY WALL (PLASTERED EACH FACE) 4.45 kPa (93 psf)
Ct = 0.0731 (FOR REINFORCED CONCRETE MOMENT-RESISTING FRAMES ) B. FORMED SURFACES EXPOSED TO EARTH 5. ALL ANCHOR BOLTS SHALL BE ASTM A325 UNLESS OTHERWISE MAX,max MAXIMUM
hn = HEIGHT OF STRUCTURE , IN METERS OR WEATHER NOTED.
MIN MINIMUM
Z = SEISMIC ZONE FACTOR = 0.4 Ø 16 BARS OR SMALLER 40m m
Cv = SEISMIC COEFFICIENT = v0.64 N MASONRY: MISC MISCELLANEOUS
OTHER BARS 50m m
Ca = SEISMIC COEFFICIENT = 0.44
a N MPa MEGAPASCAL
2.2 LIVE LOADS : 1. ALL CONCRETE HOLLOW BLOCKS MASONRY WALLS SHALL BE
Nv = NEAR SOURCE FACTOR = 1.6 C. FORMED SURFACES NOT EXPOSED DIRECTLY
2.2.1 ROOF LIVE LOADS (L
r ): LAID IN RUNNING BOND (INTERLOCKING COURSE ) WITH FULL NGL NATURAL GRADE LINE
Na = NEAR SOURCE FACTOR = 1.2 TO WEATHER OR EARTH
MORTAR BEDDING, STACK BOND SHALL BE USED ONLY WHEN OC ON CENTER
SLABS AND WALLS 20m m
TRIBUTARY AREA (TA) LIVE LOAD DESIGN MATERIAL STRESSES: SPECIFIED.
BEAMS AND COLUMNS 40m m OPP OPPOSITE
3.1 CONCRETE ULTIMATE COMPRESSIVE STRENGTH @ 28 DAYS, fc': 20.7 MPa (3,000 psi)
(SQ. M.) (KPa) (psf) 2. ALL CELLS SHALL BE SOLIDLY FILLED WITH CONCRETE GROUT . PEJ PREFORMED EXPANSION JOINT
2. REINFORCING BARS SHALL BE FREE OF RUST,
3.2 REINFORCING STEEL YIELD STRENGTH , fy (BELOW 16mmØ:) 275 MPa (40,000 psi)
TA _< 18.5 0.75 16 GREASE OR OTHER MATERIALS LIKELY TO IMPAIR BOND . PSI POUNDS PER SQUARE INCH
REINFORCING STEEL YIELD STRENGTH , fy (16mmØ AND ABOVE:) 414 MPa (60,000 psi) FOUNDATION:
18.5 < TA <_ 56 0.70 14 RC REINFORCED CONCRETE
TA > 56 0.60 12 3.3 STRUCTURAL STEEL YIELD STRENGTH, Fy 250 MPa (36,000 psi) 3. ALL REINFORCING BARS SHALL BE ACCURATELY AND SECURELY 1. THE STRUCTURAL ENGINEER-OF-RECORD, UPON NOTIFICATION, SHALL
PLACED BEFORE POURING CONCRETE OR APPLYING MORTAR CONDUCT A THOROUGH INSPECTION OF THE FOUNDATION WORKS REINF REINFORCEMENT
3.4 STEEL PIPE YIELD STRENGTH , Fy 241 MPa (35,000 psi) AFTER EXCAVATION FOR FOOTINGS ARE COMPLETE AND ANY
2.2.2 FLOOR LIVE LOADS (L): OR GROUT. SC STIFFENER COLUMN
REQUIRED REINFORCING STEEL IS IN PLACE . FORMWORKS SHALL
3.5 STRUCTURAL TUBING YIELD STRENGTH, Fy 269 MPa (39,000 psi) BE IN PLACE PRIOR TO INSPECTION. CONCRETE POURING OF THE
WAREHOUSE LOADS 4.80 kPa (100 psf) STD STANDARD
4. BAR SPLICES SHALL BE SECURELY WIRED TOGETHER. FOUNDATION SYSTEM SHALL NOT BE ALLOWED WITHOUT FIRST
3.6 COLD-FORMED STEEL YIELD STRENGTH , Fy 230 MPa (33,000 psi) OBTAINING WRITTEN APPROVAL FROM THE STRUCTURAL ENGINEER-
SPLICES IN REINFORCED CONCRETE BEAMS , COLUMNS AND STL STEEL
2.3 WIND LOAD (W): OF-RECORD.
3.7 FORMTILE ULTIMATE COMPRESSIVE STRENGTH @ 28 DAYS, fm': 20.7 MPa (3000psi) WALLS SHALL BE AS SHOWN IN THE DETAILS. FOR NON-
THK THICK
WIND ZONE II 3.8 FORMTILE CONCRETE CORE COMPRESSIVE STRENGTH @ 28 DAYS, fg': STRUCTURAL WALLS, MASONRY WALLS AND SLABS, SPLICES 2. ALL BACKFILL MATERIALS ARE COMPACTED IN LIFTS NOT
SHALL LAP A MINIMUM OF 40 BAR DIAMETERS AND SHALL EXCEEDING 150mm THICK. FILL FOR BACK FILLING SHALL BE TC TOP CHORD
BASIC WIND SPEED = 200 KPH 20.7 MPa (3,000 psi) COMPOSED OF GRANULAR MATERIALS (LESS THAN 7% FINES)
BE STAGGERED WHEREVER POSSIBLE. TYP TYPICAL
COMPACTED TO MINIMUM 95% MDD BASED ON ASTM D-698
EXPOSURE B -URBAN AND SUBURBAN AREAS, WOODED AREAS, OR OTHER TERRAIN 3.9 LEAN CONCRETE ULTIMATE COMPRESSIVE STRENGTH @ 28 DAYS, fc': WITH THE QUALITY OF COMPACTION STRICTLY MONITORED
WITH NUMEROUS CLOSELY SPACED OBSTRUCTIONS HAVING THE SIZE OF SINGLE-FAMILY BY FIELD DENSITY TESTS (ASTM D-1556). VERT,VER VERTICAL
6.9 MPa (1,000 psi) 5. SPLICES REQUIRED IN THE REINFORCEMENT OF BEAMS /GIRDERS
DWELLINGS OR LARGER.
FRAMING INTO COLUMNS SHALL NOT BE LOCATED WITHIN THE W/ WITH
DESIGN WIND PRESSURE , p = qh [(GC Pf) - (GC Pi
)] COLUMN NOR WITHIN A DISTANCE OF TWICE THE BEAM /GIRDER DEPTH
< WITH
FROM THE FACE OF THE COLUMN. AT LEAST TWO CLOSED STIRRUP
VELOCITY PRESSURE , q Z= 47.3x10 -6K KZ VZtI 2 W TIES SHALL BE PROVIDED AT ALL SPLICES (SEE DETAIL 1, SHEET S-1.2). No NUMBER
Kg KILOGRAM
WHERE: 6. LAP SPLICES SHALL BE MADE WITHIN THE CENTER HALF
p = DESIGN WIND PRESSURE, IN kPa OF COLUMN HEIGHT, AND THE SPLICE LENGTH SHALL NOT BE
q h = VELOCITY PRESSURE EVALUATED AT HEIGHT Z=h, IN kPa LESS THAN 1.3 TIMES THE DEVELOPMENT LENGTH, d.
q Z = VELOCITY PRESSURE EVALUATED AT HEIGHT Z ABOVE GROUND , IN kPa
K Z = VELOCITY PRESSURE EXPOSURE COEFFICIENT EVALUATED AT HEIGHT Z 7. SPECIAL TIES/TRANSVERSE HOOP REINFORCEMENT SHALL
(REFER TO TABLE 207-3 OF NSCP)
K Zt = TOPOGRAPHIC FACTOR = 1.0 (REFER TO SECTION 207.5.5 OF NSCP)
BE PROVIDED WITHIN THE BEAM -COLUMN JOINT (SEE TYPICAL COLUMN
I W = IMPORTANCE FACTOR = 1.15 (FOR SPECIAL OCCUPANCY )
DETAIL ON S-1.2).
GC Pf= PRODUCT OF EQUIVALENT EXTERNAL PRESSURE COEFFICIENT AND
GUST EFFECT FACTOR TO BE USED IN THE DETERMINATION OF WIND
LOADS FOR MAIN WIND-FORCE RESISTING SYSTEM OF LOW-RISE
BUILDINGS. (REFER TO FIGURE 207-4 OF NSCP) = ±0.18
GC Pi= PRODUCT OF INTERNAL PRESSURE COEFFICIENT AND GUST EFFECT
FACTOR TO BE USED IN THE DETERMINATION OF WIND LOADS FOR
BUILDINGS. (REFER TO TABLE 207-4 OF NSCP)

PROJECT TITLE: OWNER: SHEET CONTENTS PRINTS DRAWN BY: SHEET NO.

JOSELITO J. CRUZ NO. COPY FURNISH DATE NO. COPY FURNISH DATE EAA
1
PROPOSED ABANILLA RESIDENCE S
CIVIL ENGINEER DATE 01 06 18
PRC NO. 32118 - CHECKED BY:
TIN 111 775 635
- APPROVED BY:
PTR 5567106C 01-05-18 QC LOCATION: DATE

GSPublisherVersion 0.0.100.100
LA LB LB
LA/3 LA/3L OR LB/3 LA/3L OR LB/3 LB/3 OR LC/3 LB/3 OR LC/3 TOP BARSLAP SPLICE LAP SPLICE
(WHICHEVER IS GREATER) (WHICHEVER IS GREATER) ld ld
BEAM SUPPORT
BOTTOM BARS 200 2 ADDITIONAL
STIRRUPS
EXTRA TOP BARS 100

h
CONTINUOUS TOP BARS 100 TOP & BOTTOM
BARS TO RUN

h/3
THROUGH JOINT
50 STIRRUPS- TIES 50 50

h
UNINTERRUPTED

h
BEAM SUPPORT
CONTINUOUS SPAN

h/3
WEB BARS
BOTTOM BARS NOTES:
LA/4 LA/4 LB/4 LB/4 ld 50 2-20mmØ
EXTRA BOTTOM BARS STIRRUPS- 1. SPLICE OF TOP BARS SHALL BE WITHIN MIDDLE HALF OF BEAM SPAN. DIAGONAL SHEER
TIES
TYP BARS
2. SPLICE OF BOTTOM BARS SHALL BE AT SUPPORT.
RC COLUMN SUPPORT (TYP)
NOTES: 50
WHERE BEAM DEPTH
h>600, PROVIDE

(MAX)
150
ADDITIONAL EQUALLY

h
SPACED KEYS AS
REQUIRED, THUS:
LOCATION OF CONSTRUCTION JOINT SHALL
BE WITHIN MIDDLE THIRD SPAN OF BEAM.

1 TYPICAL BEAM REINFORCEMENT DETAIL (CASE 1) 2 TYPICAL BEAM ELEVATION (W/ BEAM SUPPORT)
NOT TO SCALE NOT TO SCALE
S-02 S-02
TYPICAL BEAM
3 CONSTRUCTION JOINT DETAIL
S-02 NOT TO SCALE

EXTEND ldh WHERE HOOKED INTO COLUMN CORE

ld (MIN) 2h 2h
LA LB LB LAP SPLICENO SPLICE
NO SPLICE
LA/3 LA/3L OR LB/3 LA/3L OR LB/3 LB/3 OR LC/3 LB/3 OR LC/3 1.3ld
(WHICHEVER IS GREATER) (WHICHEVER IS GREATER)

d
h
EXTRA TOP BARS

CONTINUOUS TOP BARS BOTTOM BARS


LAP SPLICE
TOP BARS
1.3ld
h
COLUMN
SUPPORT
WEB BARS
EXTRA BOTTOM
BARS STIRRUPS-
LA/7 LA/5 LB/5 TIES LB/5 NOTES:
CONTINUOUS BOTTOM BARS
1. TERMINATE WITH A STANDARD 90 DEGREE HOOK ALL REQUIRED TOP AND BOTTOM
RC COLUMN SUPPORT (TYP) BARS AT THE FAR FACE OF COLUMN CORE.
2. AT LAP SPLICES, SPLICING OF TIES SHALL BE < d/4 BUT NOT GREATER THAN
100mm.
3. LAP SPLICE WITHIN THE BEAM-COLUMN JOINT IS NOT ALLOWED.

5 TYPICAL BEAM REINFORCEMENT DETAIL (CASE 2) 6 TYPICAL BEAM ELEVATION (W/ COLUMN SUPPORT)
S-02 NOT TO SCALE S-02 NOT TO SCALE

DETAILING
ldh ldh DIMENSION
ld CRITICAL CRITICAL
150 (MIN) 150 (MIN) BEAM REINFORCEMENT
300 (MIN) SECTION SECTION

D
50 STIRRUPS
CRITICAL 180° HOOK L BEAM
SECTION 6
1

D
DETAILING
180° HOOK

L
90° HOOK COLUMN REBAR
DIMENSION
MIN DEV'T LENGTH
BASIC JOINT HOOPS (10m m Ø @ 100m m O.C .)
BAR DEVELOPMENT
BASIC DEVELOPMENT DEVELOPMENT LENGTH, ldh SHALL BE AS FOLLOWS: D
ld (mm) BAR COLUMN
DIAMETER

L
LENGTH DIAMETER LENGTH 90° HOOK BAR SIZE
(mm) TOP BARS OTHERS (a) FOR BARS WITH SIDE COVER (NORMAL TO PLANE OF HOOK) NOT LESS D L
lhb (mm) (mm)
10 90 395 300 10
lhb (m m )
150
THAN 65m m , & FOR 90° HOOK, COVER ON BAR EXTENSION BEYOND HOOK
NOT LESS THAN 50m m , USE 0.7 lhb.
10 TYPICAL BEAM TO COLUMN JOINT DETAIL
BAR SIZE D 180° 90° HOOK (mm) (mm) (mm) S-02 NOT TO SCALE
12 130 470 350 12 175
(b) FOR BARS WITH HOOKS ENCLOSED VERTICALLY OR HORIZONTALLY WITHIN HOOK 10 Ø 40 75
16 231 630 465 16 234 EXTRA TOP
TIES OR STIRRUP - TIES SPACED ALONG THE FULL DEVELOPMENT LENGTH ldhl (mm) 12 Ø 48 75 CONTINUOUS
20 361 785 585 20 292 (mm) L(mm) L(mm) BARS
NOT GREATER THAN 3db, USE 0.8 lhb . 10 Ø 60 65 120 TOP BARS
25 565 1185 915 25 365 STIRRUP-TIES
WEB BARS
28 708 1330 1020 28 12 Ø 72 65 145
409 (c) FOR BARS NOT INCLUDED IN (a) & (b), USE 1.0 l hb.
36 925 1520 1170 32 16 Ø 96 65 195
467

h
20 Ø 120 80 240
FOR STIRRUPS
25 Ø 150 100 300
FOR STRAIGHT BARS FOR HOOKED BARS 28 Ø 224 115 340 & TIES 135° BEND 50 50
CONTINUOUS BOTTOM BARS
L
EXTRA BOTTOM BARS
8 REBAR DEVELOPMENT LENTGH 9 STANDARD HOOK DIMENSIONS
S-02 S-02 11 TYPICAL CANTILEVER BEAM DETAIL
S-02 NOT TO SCALE

PROJECT TITLE: OWNER: SHEET CONTENTS PRINTS DRAWN BY: SHEET NO.

JOSELITO J. CRUZ NO. COPY FURNISH DATE NO. COPY FURNISH DATE EAA
2
PROPOSED ABANILLA RESIDENCE S
CIVIL ENGINEER DATE 01 06 18
PRC NO. 32118 - CHECKED BY:
TIN 111 775 635
- APPROVED BY:
PTR 5567106C 01-05-18 QC LOCATION: DATE

GSPublisherVersion 0.0.100.100
1 2 2' 3 4 4' 5 6 6 1 2 2' 3 4 4' 5 6 6
17200 17200

3000 9740 4460 3000 9740 4460


N

N
2000 1000 4500 2147 693 2400 2237 2223 2000 1000 4500 2147 693 2400 2237 2223

PROPERTY LINE PROPERTY LINE

E' E'

LINE

LINE
PROPERTY

PROPERTY
1707
C-2 C-1 C-1
E E
700 1000

700 1000
F-3 F-1 F-1 B-1
C-3

2750
FIREWALL

FIREWALL
779
D' F-3 D'

B-1
B-1
C-2
2510

2510
C-1

860 600
WF-1
1200

F-3
F-2 B-1
5310

5310
D 150mm THK RC GROUND SLAB
D
C-1

B-1
B-1
12mmØ @ 300mm O.C.E.W.
2800

2800
2750

2750
C-3 C-1
F-2
16010

16010

16010

16010
C-3
GS1
F-1 F-2 B-1
F-3 STAIR
C C-1 C
WELL
F-1
S-1

WF-1
continuous continuous
3650

3650

B-1
C-1 C-1
4000

4000
to roof
C-1 to roof

125mm THK RC SLAB

FIREWALL

FIREWALL
F-1 F-1 F-2 12mmØ @ 200mm O.C.E.W.

6450

6450
TOP AND BOTTOM

B continuous
B continuous
B-2
to roof to roof
WF-1

C-1 C-1 C-1


PROPERTY LINE

PROPERTY LINE
F-4 F-4 F-2

A PROPERTY LINE
A PROPERTY LINE

1100 1170 GATE 4075 VEHICULAR CLEARANCE 1100 1170 GATE 4075 VEHICULAR CLEARANCE

2270 1400 4158 5663 2270 1400 4158 5663

1 FOUNDATION PLAN 2 MEZZANINE FRAMING PLAN


S-03 SCALE 1:100 S-03 SCALE 1:100

PROJECT TITLE: OWNER: SHEET CONTENTS PRINTS DRAWN BY: SHEET NO.

JOSELITO J. CRUZ NO. COPY FURNISH DATE NO. COPY FURNISH DATE EAA
3
PROPOSED ABANILLA RESIDENCE S
CIVIL ENGINEER DATE 01 06 18
PRC NO. 32118 - CHECKED BY:
TIN 111 775 635
- APPROVED BY:
PTR 5567106C 01-05-18 QC LOCATION: DATE

GSPublisherVersion 0.0.100.100
LC150X50X20X2.0mm TYPICAL

PURLINS AT 500mm0.C.
E' E' 6

E'

1 2 2' 3 4 4' 5 6 6
17200

C6X13
C6X13
3000 9740 4460
N

2000 1000 4500 2147 693 2400 2237 2223


E'
PROPERTY LINE

E'

C6X13

C6X13
LINE
EB-1

PROPERTY
EB-1 EB-1

2B-3
2B-3
E

2B-3
531
700 1000

2B-3
1 CANOPY ROOF FRAMING 02

FIREWALL
2B-3
EB-1

2B-4 2B-5
D' S-04 SCALE 1:100

4210
2B-4

2B-3
2B-3

S-1 2B-3
2510

2B-3 2B-2 2B-1 2B-3 2B-3


5310

D LC150X50X20X2.0mm TYPICAL
EB-1

125mm THK RC SLAB

2B-3
12mmØ @ 200mm O.C.E.W. PURLINS AT 500mm0.C.
2800

2750
2B-5

2B-3 STAIRWELL
16010

16010
TOP AND BOTTOM E' E' E'
2B-2 2B-3 2B-3 2B-3
C
2B-3
EB-1

E'
2B-3

RB-1

C6X13

C6X13
2B-3
roof-01
2B-3

continuous
3650

4000

to roof
roof-02
2B-3

FIREWALL
OPEN
2400

6450
2B-3
2B-3 2B-3 PC-1 2B-3
B continuous

to roof
1 CANOPY ROOF FRAMING 01
EB-1 S-04 SCALE 1:100
roof-01
RB-1
RB-1

roof-02
PROPERTY LINE

RB-1
A PROPERTY LINE

1100 1170 GATE 4075 VEHICULAR CLEARANCE

2270 1400 4158 5663

1 SECOND FLOOR FRAMING PLAN


S-04 SCALE 1:100

PROJECT TITLE: OWNER: SHEET CONTENTS PRINTS DRAWN BY: SHEET NO.

JOSELITO J. CRUZ NO. COPY FURNISH DATE NO. COPY FURNISH DATE EAA
4
PROPOSED ABANILLA RESIDENCE S
CIVIL ENGINEER DATE 01 06 18
PRC NO. 32118 - CHECKED BY:
TIN 111 775 635
- APPROVED BY:
PTR 5567106C 01-05-18 QC LOCATION: DATE

GSPublisherVersion 0.0.100.100
E' E' E' E' E' E' E'

1030 6000 7000 975


@1000 0.C. @1000 O.C.

1030 6000 1213 TOP CHORD : 2L75X75X6


@1000 0.C. BOTTOM CHORD : 2L50X50X6
WEB MEMBERS : 2L38X38X6

1 2 2' 3 4 4' 5 6 6 1 2 2' 3 4 4' 5 6 6


17200 17200

LC150X50X20X2.0mm TYPIC
3000 9740 4460 3000 9740 4460
N

N
2000 1000 4500 2147 693 2400 2237 2223 2000 1000 4500 2147 693 2400 2237 2223 PURLINS AT 500mm0.C.

PROPERTY LINE PROPERTY LINE

E' E'

LINE

LINE
LC200X65X25X1.8mm TYPICAL ALL FASCIA (FC-1)

PROPERTY

PROPERTY
RB-1 RB-1 RB-1 RB-1 TRUSS-1 TRUSS-1

E E
700 1000

700 1000
RB-1

FIREWALL

FIREWALL
RB-1
TRUSS-1 TRUSS-1

RB-1
D' D'

RB-1

4210

4210
typ fascia
2510

2510
RB-1 RB-1 RB-1 RB-1

typ fascia
RB-1
TRUSS-1 TRUSS-1
5310

5310
D 125mm THK RC SLAB D
12mmØ @ 200mm O.C.E.W.
TOP AND BOTTOM

RB-1
RB-1

RB-1
2800

2800
2750

2750
RB-1
16010

16010

16010

16010
RB-1 TRUSS-1 TRUSS-1
C C
RB-1

RB-1
RB-1

TRUSS-2
RB-1 RB-2 RB-1 3B-2
continuous continuous
3650

3650
4000

4000
to roof to roof

FIREWALL

FIREWALL
3B-1
RB-2

3B-1
3B-1
RB-1

C6X13

C6X13

C6X13

6450

6450
3B-2
B RB-2
continuous
B continuous

to roof
RB-1 to roof
PROPERTY LINE

PROPERTY LINE
A PROPERTY LINE
A PROPERTY LINE

1100 1170 GATE 4075 VEHICULAR CLEARANCE 1100 1170 GATE 4075 VEHICULAR CLEARANCE

2270 1400 4158 5663 2270 1400 4158 5663

1 ROOF BEAM FRAMING PLAN 2 ROOF FRAMING PLAN 01


S-05 SCALE 1:100 S-05 SCALE 1:100

PROJECT TITLE: OWNER: SHEET CONTENTS PRINTS DRAWN BY: SHEET NO.

JOSELITO J. CRUZ NO. COPY FURNISH DATE NO. COPY FURNISH DATE EAA
5
PROPOSED ABANILLA RESIDENCE S
CIVIL ENGINEER DATE 01 06 18
PRC NO. 32118 - CHECKED BY:
TIN 111 775 635
- APPROVED BY:
PTR 5567106C 01-05-18 QC LOCATION: DATE

GSPublisherVersion 0.0.100.100
RAFTER C6X13 16mm KEY BAR

200

FIT

FIT
175
175
6mm SADDLE

16mmØ GR 40
WELDABLE 100
16mmØ GR 40
WELDABLE

1 2 2' 3 4 4' 5 6 6
BEAM
17200

3000 9740 4460


N

2000 1000 4500 2147 693 2400 2237 2223

E'
PROPERTY LINE

2 RAFTER CONNECTION

LINE
S-06 SCALE 1:10

PROPERTY
350

E
700 1000

JEA FASTENER

FIREWALL
D' HAT PURLIN

4210
2510

LC150X50X20X2.0mm TYPICAL
5310

D LC150X50X20X2.0mm TYPICAL
PURLINS AT 500mm0.C.
PURLINS AT 500mm0.C.
2800

C6X13

2750
16010

16010
450

TYP typ fascia L75x50x3


RB-1
C C6X13
typ fascia
12mmØ @1000
RB-1 EXPANSION BOLT
continuous
3650

4000

typ fascia

RB-1
RB-1

typ fascia

to roof
typ fascia

typ fascia
RB-1

C6X13
RB-1

FIREWALL

6450 PURLIN SUPPORT AT FIREWALL


RB-1 3
B continuous C6X13
to roof
S-06 SCALE 1:10
typ fascia RB-1

typ fascia 65 50
PROPERTY LINE

A PROPERTY LINE

1100 1170 GATE 4075 VEHICULAR CLEARANCE

25

20
2270 1400 4158 5663

1.0m m 2.0m m

150
200
1 ROOF FRAMING PLAN 02/03
S-06 SCALE 1:100

4 FASC1A AND PURLIN SECTIONS


S-06 SCALE 1:10

PROJECT TITLE: OWNER: SHEET CONTENTS PRINTS DRAWN BY: SHEET NO.

JOSELITO J. CRUZ NO. COPY FURNISH DATE NO. COPY FURNISH DATE EAA
6
PROPOSED ABANILLA RESIDENCE S
CIVIL ENGINEER DATE 01 06 18
PRC NO. 32118 - CHECKED BY:
TIN 111 775 635
- APPROVED BY:
PTR 5567106C 01-05-18 QC LOCATION: DATE

GSPublisherVersion 0.0.100.100
1000

4-12mmØ "b"

COLUMN LIST
TOP BARS
LONGITUDINAL L1/3 L1/3 OR L2/3 L1/3 OR L2/3 "A "
TOP BARS WEB BARS
GREATER GREATER
STIRRUPS

TOP BARS
bundle if required
MARK C-1
7-16mmØ

"h"
TRANSVERSE WEB BARS B x D 200X400
BOTTOM BARS (IF ANY)
L1/6 BOTTOM BARS L1/6 L2/6
TIES
D
1000
BOTTOM BARS L1 L2
bundle if required

END SPAN CONTINUOUS SPAN


SECTION "A "
FTG TO 2F

B
SECTION
TYPICAL BEAM ELEVATION
7-16mmØ
LONGITUDINAL
BOTTOM BARS

4-12mmØ
TRANSVERSE
P L A N
SCHEDULE OF BEAMS & GIRDERS FY=60,000 PSI for Ø=>16mm MAIN 8-20mmØ

TOP BARS 3- SETS D12


STEEL REINFORCEMENT
1 @ 50, 4 @ 125,
"b" "h" TIES
MARK
(mm) (mm)
EXTERIOR SUPPORT MIDSPAN INTERIOR SUPPORT
WEB
STIRRUPS FROM BOTH ENDS
BARS REST @ 150m m
TOP BOTTOM TOP BOTTOM TOP BOTTOM TYPE SPACING
NAT. GRADE LINE
REBAR fy = 60,000 psi Ø>=16mmØ
B-1 200 400 2- 20Ø 2- 20Ø 2- 20Ø 2- 20Ø 2- 20Ø 2- 20Ø NONE 12Ø 1@50,10@100,REST @ 150 UP TO CL OF BM

B-1 200 400 2- 20Ø 2- 20Ø 2- 20Ø 4- 20Ø 2- 20Ø 2- 20Ø NONE 12Ø 1@50,10@100,REST @ 150 UP TO CL OF BM
MARK C-2
2B - 1 200 600 3- 20Ø 2- 20Ø 2- 20Ø 3- 20Ø 3- 20Ø 2- 20Ø 2- 12Ø 12Ø 1@50,10@100,REST @ 150 UP TO CL OF BM

2B - 2 200 600 4- 20Ø 2- 20Ø 2- 20Ø 4- 20Ø 4- 20Ø 2- 20Ø 2- 12Ø


B x D 200X800
12Ø 1@50,10@100,REST @ 150 UP TO CL OF BM

COLUMN TIES
1500

2B - 3 200 600 2- 20Ø 2- 20Ø 2- 20Ø 2- 20Ø 2- 20Ø 2- 20Ø 2- 12Ø 12Ø
REFER TO DETAIL 1@50,10@100,REST @ 150 UP TO CL OF BM
D
SEE COLUMN DETAILS 2B - 3 200 800 3- 20Ø 3- 20Ø 3- 20Ø 3- 20Ø 6- 20Ø 3- 20Ø 12Ø 1@50,10@100,REST @ 150 UP TO CL OF BM
4- 12Ø
TRANSVERSE BOTTOM BARS TOP BARS
LONGITUDINAL BOTTOM BARS EB-1 200 600 2- 20Ø 2- 20Ø 2- 20Ø 2- 20Ø 2- 20Ø 2- 20Ø 2- 12Ø 12Ø 1@50,10@100,REST @ 150 UP TO CL OF BM

FTG TO 2F
200 400 2- 20Ø 2- 20Ø 2- 20Ø 2- 20Ø 2- 20Ø 2- 20Ø

B
3B - 1 NONE 12Ø 1@50,10@100,REST @ 150 UP TO CL OF BM
SECTION
300

3B - 1 200 400 2- 20Ø 2- 20Ø 2- 20Ø 3- 20Ø 2- 20Ø 2- 20Ø NONE 12Ø 1@50,10@100,REST @ 200 UP TO CL OF BM
BOTTOM OF FOOTING
RB-1 200 400 2- 20Ø 2- 20Ø 2- 20Ø 2- 20Ø 2- 20Ø 2- 20Ø NONE 12Ø 1@50,10@100,REST @ 150 UP TO CL OF BM

RB-2 200 400 2- 20Ø 2- 20Ø 2- 20Ø 3- 20Ø 2- 20Ø 2- 20Ø 12Ø 1@50,10@100,REST @ 150 UP TO CL OF BM
MAIN 14-20mmØ
NONE
SECTION
75mm CLEAR 3- SETS D12
100mm THK. GRAVEL BASE COURSE REBAR fy = 60,000 psi Ø>=16mmØ
WELL COMPACTED 12mmØ TOP BARS 1 @ 50, 4 @ 125,
AT 200mm O.C. O.C.E.W. TIES
COMPACTED TO 95% MDD BASED FROM BOTH ENDS
FLOOR SLAB 12mmØ BOTTOM BARS AT 200mm O.C.EW REST @ 150m m
ON ASTM D-698.

1 FOOTING DETAIL REBAR fy = 60,000 psi Ø>=16mmØ


S-04 SCALE 1:50
150

MARK C-3
SCHEDULE OF FOOTINGS FY=60,000 PSI B x D 200X400
DIMENSIONS (mm) BOTTOM BARS TOP BARS REMARKS
MARK
D
THICKNESS WIDTH LENGTH TRANSVERSE LONGITUDINAL

F-1 400 2000 2000 13-20mmØ 13-20mmØ 6-12mmØ EW qallow=3000psf *


12mmØ TOP BARS
FTG TO 2F

B
F-2 400 1500 1500 10-20mmØ 10-20mmØ 5-12mmØ EW qallow=3000psf * AT 200mm O.C. O.C.E.W.
SECTION
F-3 450 2000 4000 13-20mmØ 26-20mmØ 10-12mmØ EW qallow=3000psf * FLOOR SLAB 12mmØ BOTTOM BARS AT 200mm O.C.EW
F-4 400 1000 1000 7-20mmØ 7-20mmØ 4-12mmØ EW qallow=3000psf *

* must be verified
MAIN 12-20mmØ

150
FY=60,000 PSI
3- SETS D12
1 @ 50, 4 @ 125,
TIES
FROM BOTH ENDS
REST @ 150m m
REBAR fy = 60,000 psi Ø>=16mmØ
EB-1

TYPICAL (S-3) SLAB DETAILS


PROJECT TITLE: OWNER: SHEET CONTENTS PRINTS DRAWN BY: SHEET NO.

JOSELITO J. CRUZ NO. COPY FURNISH DATE NO. COPY FURNISH DATE EAA
7
PROPOSED ABANILLA RESIDENCE S
CIVIL ENGINEER DATE 01 06 18
PRC NO. 32118 - CHECKED BY:
TIN 111 775 635
- APPROVED BY:
PTR 5567106C 01-05-18 QC LOCATION: DATE

GSPublisherVersion 0.0.100.100
MAXIMUM SPACING OF TIES SUPPLEMENTARY
CLASS "C"LAP SPLICES
IN LAP LENGHT
D/4 FOR DIMENSION Bs BUT
CROSS TIES MARK PC-1
ONLY WITHIN CENTER
NOT GREATER THAN 4"
HALF OF CLEAR COLUMN B x D 200X200
(ALTERNATE 90° AND 135° ENDS ON
HEIGHT
JOINT HOOPS MUST BE SPACED AT "2Sh" CONSECUTIVE CROSS TIES) D

FOR THE DEPTH OF THE SHALLOWEST BEAM


WHEN BEAM WITH WIDTH >3/4 TIMES THE Sh=HOOPS AND SUPPLEMENTARY CROSS
WIDTH OF THE COLUMN FRAME INTO THE (4) TIES SPACING NOT TO EXCEED Bs/4 FTG TO 2F

B
FOUR SIDE OF A COLUMN.FOR ALL OTHER OR 100 mm SECTION
CONDITION,USE HOOPS SPACED AT "Sh" ON
St=COLUMN TIE SPACING NOT TO EXCEED
CENTER
16 d OF VERTICALS,48Db OF TIES OR
MAIN 8-20mmØ
Bs
3- SETS D12
135 1 @ 50, 4 @ 125,
TIES
SECTION FROM BOTH ENDS
REST @ 150m m
REBAR fy = 60,000 psi Ø>=16mmØ
=LARGEST COLUMN DIMENSION,BUT NOT

10
JOINT HOOPS

db
LESS THAN 1/6 CLEAR HEIGHT OR
450 mm

ID=4d FOR 10,12,16mmØ


COLUMN
HOOPS

150mm THK. CHB WALL


(PLASTERED BOTHSIDES)
Sh
COLUMN HOOPS 12mmØ VERTICAL BARS
CLEAR HEIGHT OF COLUMN

AT 600mm ON CENTER
COLUMN HOOPS MUST BE PROVIDED IN ALL JOINTS SEALANT SIKAFLEX-1A
OR EQUIVALENT
AND IN THE COLUMNS FOR A DISTANCE ABOVE 12mmØ HORIZONTAL BARS
COLUMN TIES

AND BELOW JOINT SEE VERTICAL ELEVATION 100mm THK. GRAVEL BASE AT EVERY 3 LAYERS OF CHB
TIES REQUIRED TO RESIST SHEAR SHALL BE HOOPS COURSE COMPACTED TO 95%
AND SPACING SHALL NOT EXCEED d/2 MDD BASED ON ASTM D-698
St

FINISH FLR. LINE


NON-EXTRUDING PREMOLDED

100 150
JOINT FILLER
WHEN WELDED SPLICES OR MECHANICAL
OR MECHANICAL CONNECTION ARE USE
COLUMN

12mmØ TRANSVERSE BARS


HOOPS

NOT MORE THAN ALTERNATE BARS MAY AT 300mm ON CENTER

800mm
BE SPLICED AT ANY SECTION WITH VER
Sh

TICAL DISTANCE BETWEEN SPLICES 600


3-12mmØ LONGITUDINAL BARS
MM OR MORE

600
200
d
b

10 100mm THK. GRAVEL BED


WELL COMPACTED TO 95% MDD
BASED ON ASTM D-698

600

TYP. SEISMIC RESISTANT db 90° WF-1 DETAIL


DETAIL OF COLUMNS 135°

PROJECT TITLE: OWNER: SHEET CONTENTS PRINTS DRAWN BY: SHEET NO.

JOSELITO J. CRUZ NO. COPY FURNISH DATE NO. COPY FURNISH DATE EAA
8
PROPOSED ABANILLA RESIDENCE S
CIVIL ENGINEER DATE 01 06 18
PRC NO. 32118 - CHECKED BY:
TIN 111 775 635
- APPROVED BY:
PTR 5567106C 01-05-18 QC LOCATION: DATE

GSPublisherVersion 0.0.100.100
6 6 6 6 6 6 6 6 6

17,200
3,000 14,200
2,000 1,000 9,740 4,460
SETBACK 4,500 2,147 743 2,350 2,237 2,223

F BP1/BP2
20GPM VS 170FT (EACH PUMP)

800
BT MH

O-02
CENTRIFUGAL END SUCTION DUPLEX PUMP

SETBACK
COUPLED APPROXIMATE 1.5HP

2,000
THREE PHASE, 230V, 3500RPM

1,200
3500GALLONS
20mmØCWL CISTERN CAPACITY BT - 19GALS
S WM
F
SHO GV

1,000
GV S
WC

1,700
GV 15mmØCWL
GV 15mmØCWL
HB GV 50mmØCWR GV

700
OVEN
15mmØCWL CABINET
15mmØCWL 20mmØCWL
F KS

COUNTERTOP
20mmØCWL
GV

2,710
RANGE

ISLAND LAV
COUNTER

REF
W WC
F
5,410
15mmØCWL
11,010

2,700
16,010

UP
HB UP
F GV
HB 4
1
2
3
3 4
5
2 6
1
GV
7
HB 8
9
10
3,550
3,900

F
350
SETBACK
3,000

3,000

1
5

3
2
4
F
25mmØRWDF

COLD WATER LINE - GF 1:150


IMPORTANT:
REPUBLIC ACT No.9266 DRAWN BY: KIR PROJECT TITLE DRAWING CONTENTS LAYOUT
MA. LUISA DAYA-GARCIA OWNERSHIP OF PLANS, SPECIFICATIONS AND OTHER CONTRACT
DATE: ABANILLA RESIDENCE COLD WATER LINE - GF
ARCHITECT
DOCUMENTS-DRAWINGS AND SPECIFICATIONS AND OTHER CONTRACT DOCUMENTS
DULY SIGNED, STAMPED OR SEALED, AS AN INSTRUMENT OF SERVICE, ARE THE
INTELLECTUAL PROPERTY AND DOCUMENTS OF THE ARCHITECT, WHETHER THE OBJECT
2/28/2018
ADDRESS: Portofino Phase 8, Molino IV, Cavite
A.19.17
FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY
PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE
DESIGNED BY: MLDDG
REPETITION OF AND FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED
PARTLY OR IN A WHOLE, WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT OR
DATE: 2/28/2018 OWNER SHEET NUMBER
P.T.R. NO.: 6018530 PRC NO.: 10745 REG.DATE: FEB. 20, 1992 AUTHOR OF SAID DOCUMENTS.

28F Tower 2, The Enterprise Center, Ayala Ave., cor.


DATE ISSUED: JANUARY 11, 2017 T.I.N.: 132 441 482 000
-ALL MEASUREMENTS ARE TO BE VERIFIED ON SITE BY CONTRACTOR.
CHECKED BY: MLDDG Mr. Gee & Mrs. Karen Abanilla
Paseo de Roxas, 6766 Makati City, 1226 -ALL DISCREPANCIES ARE TO BE IMMEDIATELY REPORTED TO ARCHITECTS AND PROJECT
MANAGERS. 35 /61
Tel: 885-8437/788 4123 office@ldg-architects.com PLACE ISSUED: MANILA CITY IAPOA NO.: 08810-202957-083117
-CONTRACTORS ARE TO PREPARE AND SUBMIT SHOP DRAWINGS TO ARCHITECTS PRIOR TO
COMMENCEMENT OF WORK. DATE: 2/28/2018 ADDRESS: Portofino Phase 8, Molino IV, Cavite
GSPublisherVersion 0.0.100.100
6 6 6 6 6 6 6 6 6

4,810
2,588 2,222

50mmØCWR
F

W-15
F

F
25mmØRWDF
REJANG 600 BY: "WEIDA" 600LITERS

COLD WATERLINE - MEZZANINE 1:150


IMPORTANT:
REPUBLIC ACT No.9266 DRAWN BY: KIR PROJECT TITLE DRAWING CONTENTS LAYOUT
MA. LUISA DAYA-GARCIA OWNERSHIP OF PLANS, SPECIFICATIONS AND OTHER CONTRACT
DATE: ABANILLA RESIDENCE COLD WATERLINE - MEZZANINE
ARCHITECT
DOCUMENTS-DRAWINGS AND SPECIFICATIONS AND OTHER CONTRACT DOCUMENTS
DULY SIGNED, STAMPED OR SEALED, AS AN INSTRUMENT OF SERVICE, ARE THE
INTELLECTUAL PROPERTY AND DOCUMENTS OF THE ARCHITECT, WHETHER THE OBJECT
2/28/2018
ADDRESS: Portofino Phase 8, Molino IV, Cavite
A.19.18
FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY
PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE
DESIGNED BY: MLDDG
REPETITION OF AND FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED
PARTLY OR IN A WHOLE, WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT OR
DATE: 2/28/2018 OWNER SHEET NUMBER
P.T.R. NO.: 6018530 PRC NO.: 10745 REG.DATE: FEB. 20, 1992 AUTHOR OF SAID DOCUMENTS.

28F Tower 2, The Enterprise Center, Ayala Ave., cor.


DATE ISSUED: JANUARY 11, 2017 T.I.N.: 132 441 482 000
-ALL MEASUREMENTS ARE TO BE VERIFIED ON SITE BY CONTRACTOR.
CHECKED BY: MLDDG Mr. Gee & Mrs. Karen Abanilla
Paseo de Roxas, 6766 Makati City, 1226 -ALL DISCREPANCIES ARE TO BE IMMEDIATELY REPORTED TO ARCHITECTS AND PROJECT
MANAGERS. 36 /61
Tel: 885-8437/788 4123 office@ldg-architects.com PLACE ISSUED: MANILA CITY IAPOA NO.: 08810-202957-083117
-CONTRACTORS ARE TO PREPARE AND SUBMIT SHOP DRAWINGS TO ARCHITECTS PRIOR TO
COMMENCEMENT OF WORK. DATE: 2/28/2018 ADDRESS: Portofino Phase 8, Molino IV, Cavite
GSPublisherVersion 0.0.100.100
6 6 6 6 6 6 6 6 6
17,200
1,600 13,352 2,248
SETBACK 8,090 5,262 825
4,600 1,300 4,747 2,704
1,400 3,200 3,646 1,101

1,600
20mmØHWL

2,000
20mmØCWL 20mmØCWL
50mmØCWR 15mmØHWL
32mmØHWDF GV 15mmØCWL
GV
F

400
SHO BT

1,650
15mmØCWL 15mmØCWL BT 20mmØHWL LAV
15mmØHWL WC
15mmØHWL
WC
LAV

3,410
F GV
LAV
20mmØCWL 20mmØHWL GV

2,160
20mmØCWL 20mmØHWL
UP

GV WC
20mmØCWL

F
2,526
11,010
16,010

ACCENT
DESK

F
2,674
5,074

LINE OF MEZZANINE
1,900

F
2,715
SETBACK
3,000

785

COLD WATERLINE SECOND FLOOR 1:150


IMPORTANT:
REPUBLIC ACT No.9266 DRAWN BY: KIR PROJECT TITLE DRAWING CONTENTS LAYOUT
MA. LUISA DAYA-GARCIA OWNERSHIP OF PLANS, SPECIFICATIONS AND OTHER CONTRACT
DATE: ABANILLA RESIDENCE COLD WATERLINE SECOND FLOOR
ARCHITECT
DOCUMENTS-DRAWINGS AND SPECIFICATIONS AND OTHER CONTRACT DOCUMENTS
DULY SIGNED, STAMPED OR SEALED, AS AN INSTRUMENT OF SERVICE, ARE THE
INTELLECTUAL PROPERTY AND DOCUMENTS OF THE ARCHITECT, WHETHER THE OBJECT
2/28/2018
ADDRESS: Portofino Phase 8, Molino IV, Cavite
A.19.19
FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY
PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE
DESIGNED BY: MLDDG
REPETITION OF AND FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED
PARTLY OR IN A WHOLE, WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT OR
DATE: 2/28/2018 OWNER SHEET NUMBER
P.T.R. NO.: 6018530 PRC NO.: 10745 REG.DATE: FEB. 20, 1992 AUTHOR OF SAID DOCUMENTS.

28F Tower 2, The Enterprise Center, Ayala Ave., cor.


DATE ISSUED: JANUARY 11, 2017 T.I.N.: 132 441 482 000
-ALL MEASUREMENTS ARE TO BE VERIFIED ON SITE BY CONTRACTOR.
CHECKED BY: MLDDG Mr. Gee & Mrs. Karen Abanilla
Paseo de Roxas, 6766 Makati City, 1226 -ALL DISCREPANCIES ARE TO BE IMMEDIATELY REPORTED TO ARCHITECTS AND PROJECT
MANAGERS. 37 /61
Tel: 885-8437/788 4123 office@ldg-architects.com PLACE ISSUED: MANILA CITY IAPOA NO.: 08810-202957-083117
-CONTRACTORS ARE TO PREPARE AND SUBMIT SHOP DRAWINGS TO ARCHITECTS PRIOR TO
COMMENCEMENT OF WORK. DATE: 2/28/2018 ADDRESS: Portofino Phase 8, Molino IV, Cavite
GSPublisherVersion 0.0.100.100

You might also like