APPENDIX-4 TO CONTRACT SPECIFICATION
- for -
COMPREHENSIVE MAINTENANCE OF GAS FACILITIES IN ALL KOC AREAS
Distribution of Personnel for Gas Maintenance Team (NK)
PART-1 PERSONNEL
Shift A Shift B Shift C Leave/Shortage
Item No. Description 07.00 Hrs - 15.00 Hrs - 23.00 Hrs - Total coverage
15.00 Hrs 23.00 Hrs 07.00 Hrs Personnel
Mechanical Crew
1.1.9 Labour 6 2 1 9 0
1.1.19 Labour 3 1 1 5 1
Electrical Crew
1.1.21 Electrical Engineer 3 3 1
1.1.25 Auto-Electrician 2 2 1
1.1.27 Electrician-mate 4 2 2 8 1
1.1.28 Labour 2 1 1 4 1
Workshop Crew
1.1.30 Supervisor -Workshop 1 1 1
1.1.37 Welder 4 4 1
1.1.39 Machinist 1 1 0
1.1.47 Labour 6 6 0
Site-Store Crew
1.1.48 Senior Mechanical Technician ( Store ) 1 1 0
1.1.50 Labour 2 2 0
Note 1- The above distribution is only of guidance purpose, the actual deployment shall be based on the operational requirement of the concerned teams.
Note 2- 50% of the Personnel shall be available on Fridays and remaining 50% Manpower will be working on consecutive Saturdays.
Note 3- 50% of the Personnel shall be available on all Holidays.
Note 4- The personnel working in A, B and C shifts shall be rotated regularly on a monthly basis.
Note 5- Sufficient personnel for leave coverage, emergencies, sick leave shall be available at all times.
Note 6- Company's prior approval of Personnel to cover leave/shortage shall be taken.