Chapter one: Introduction
Quantity surveying works are required to estimate the quantity take off of
material needed to complete the project, and here we can differentiate between
two types of quantity surveying: consultant quantity surveying and contractor
quantity surveying.
Consultant quantity surveying: work for client and called professional quantity
surveyor who check the accuracy of the contractor's applications for payment.
3
Chapter Two: Earth work
2.1 Excavation
Excavation of piles:
We have two types of piles:
Volume of Excavation in pile = Area * length *Number of piles
π
For pile 1 = 4 * D2*L*N
π
= 4 *0.6 2*10*23=65 m3
π
For pile 2 = 4 * D2*L*N
π
= 4 *0.82*10*4=20.096 m3
Excavation of caps:
Volume of excavation of C1 =1*1*0.16*9=1.44 m3
4
Volume of excavation of C1 =1*1*1.1*4=4.04 m3
5
Type of cap Elevation (m) Depth (m) Number of caps Volume (m3 ¿
6
Elevation (m) Length (m) Width (m) Depth (m) Volume (m3 ¿
0.0 69.75 0.2 0.16 2.2
-0.51 70.8 0.2 0.67 9.5
-0.85 6.7 0.2 0.83 1.1
Total Excavation for all tie beams 12.8
7
Chapter Three: Civil Works
3.1 Foundations
Formwork in Caps:
For Example in C1:
[(1*2) + (1*2)]*0.5 * 19= 38 m2
Type of cap Dimensions (cm) Number of caps Formwork (m2)
C1 100*100*50 19 38
C2 120*100*60 4 17.6
C3 340*300*50 1 6.4
Total 62
For Group 2:
Length Spiral stirrups = Parameter * number of stirrups
= (700mm)*𝜋*40= 87964mm = 88m
8
2 2
D 8 ∗¿
Wight of steel for Spiral stirrups = *L = ¿ * 88= 34.76 Kg
162 162
Steel of caps:
For Cap C1 in long direction for Top reinforcement:
Length = (20+80) = 100 cm, Diameter = 14, Number of bars = 6,
Number of caps = 19
2 2
D 12
Total weight = *L = * 1*6*19 = 100.32 Kg
162 162
Cap1
Cap2
10
Direction Length Diameter Number of Number of Total weight
(cm ) (mm) bars caps Kg
Long top 140 14 6 4 40.65
Long bottom 180 14 6 4 52.25
Short top 120 14 7 4 40.65
Short bottom 160 14 7 4 54.20
Total weight 188.00
Cap3
Steel reinforcement:
We have two type for column (P1, P2)
Number of column for P1 = 23
Number of column for P2 = 4
Height of column =0.5m
2
D
Weight of steel for P1 = *L
162
2
14 ∗¿
= ¿ *.5 *10=6 Kg
162
13
2
D
Wight of steel for P2 = *L
162
2
16 ∗¿
= ¿ *.5*10 =7.9 Kg
162
Concrete:
For example in P1:
Volume of concrete = length * width * depth * no. of column
= 0.3 * 0.6 * 0.5 * 19
Type of cap Dimensions (cm) Number of caps Volume (m3)
P1 30*60*50 19 1.71
P2 30*70*50 4 0.42
Total 2.13
Steel reinforcement:
Weight of steel for Tie beams
For example: beam 1 (B1)
14
2
D
Wight of steel for B1 = *L * Number of tie beams
162
2
12 ∗¿
= ¿ *3 *1= 8 Kg
162
Concrete:
For example in Tie beam that level (-0.51):
Length of Tie beam = 70.8, width= 0.2 Depth = 1m
Volume tie beam = 70.8*0.2*1=14.16m3
15
Elevation (m) Length (m) Width (m) Depth (m) Volume (m3 ¿
0.0 69.75 0.2 1 14
-0.51 70.8 0.2 1 14.16
-0.85 6.7 0.2 1 0.22
Total volume of concrete all tie beams 28.38
Steel reinforcement:
Height of shear wall = 28.5 m
Length of shear wall = 5.80 m, spacing between bars = 20 cm
2850
Number of bars in horizontal direction = 20 +1=143+1=144
2
D
Weight of steel for horizontal direction = *L
162
2
8
= *144*2 =660 Kg
162
= 0.66 Ton
580
Number of bars in vertical direction = 20 +1=29+1=30
2
D
Weight of steel for horizontal direction = *L
162
2
12
= *28.5*30*2 =1520Kg
162
= 1.52 Ton
Total Steel Reinforcement = 0.66+1.52 = 2.18 Ton
16
Concrete:
Volume of concrete for shear wall =0.2*5.8*28.5 = 31m3
3.5 Columns
Formwork:
Type of column Dimensions (cm) Height (m)
P1 60*30 3
P2 70*30 3
2
D
Wight of steel for P1 = *L
162
2
14 ∗¿
= ¿ *3 *10=36.2 Kg
162
Total Weight of Main reinforcement steel for P1 For first six floor
= 36.2*23 * 6 =5000Kg = 5 Ton
Total Weight of Main reinforcement steel for P1 For seventh floor (roof)
= 36.2*13 =417.7Kg = 0.4717 Ton
Total Weight of Main reinforcement steel for P1 eighth floor =
= 36.2*8= 290.32Kg = 0.290Ton
2
D
Wight of steel for P2 = *L
162
2
16 ∗¿
= ¿ *3*10 =47.4 Kg
162
Total Weight of Main reinforcement steel for P2 For first six floor
= 47.4*4 * 6 =1128Kg = 1.128 Ton
18
Total Weight of Main reinforcement steel for P2 For seventh floor (roof)
= 47.4*4 =188 = 0.188 Ton
Total Weight of Main reinforcement steel for P2 eighth floor =
= 47.4*4= 188 Kg = 0.188 Ton
Total Weight of Main reinforcement steel for all column in building =7.28 Ton
Length stirrups = Parameter * number of stirrups
We assume the cover = 5cm and length of hock = 7cm
Parameter of P1 = {(60-5)*2 + (30-10)*2} +7*2 = 174 cm
Parameter of P2= {(70-5)*2 + (30-5)*2} +7*2 = 194 cm
2
D
Weight of steel for stirrup P1 = *L
162
2
8
= *1.74 =0.68 Kg
162
Total Weight of steel for stirrup P1 = number of stirrups per meter * length of
column * weight of one stirrup
= 5*3*0.68= 10.31 Kg = 0.01031 Ton
2
D
Wight of steel for stirrup P2= *L
162
2
8
= *1.94 =0.76Kg
162
Total Weight of steel for stirrup P2 = number of stirrups per meter * length of
column8 weight of one stirrup
= 5*3*0.76= 11.49 Kg = 0.01149 Ton
Total Weight of stirrups steel for all column in building =2.07 Ton
Total weight of steel reinforcement = 9.35
Concrete:
Volume of concrete for column
Volume of concrete for column P1 =0.3*0.6*3=0.54 m3
Volume of concrete for column P2 =0.3*0.7*3=0.63m3
3.6 Slabs
3.3.1 Ground to fifth Slab
Formwork:
Area of timber will use in this slab = (perimeter of slab * thickness of slab
+0.05m)
Steel reinforcement:
Shrinkage steel:
Stirrups:
Block:
Number of block in this floor =1730 block (by using AutoCAD)
Concrete:
V. concert =volume of slab - volume of blocks
22
= (172.24* 0.25) – (1730 * 0.0136) = 43 – 23.5 = 19.5 m3
Labor cost
Labor cost = 300* 12 $ =3600 $
Steel reinforcement:
Main steel:
Diameter(mm) Number Length(m) Total Weight(kg)
length(m)
Ø14 6 8.5 51 61.7
Ø16 6 9 54 85.4
Ø14 15 6 90 108.9
Ø16 15 6.5 97.5 154.1
Ø12 6 5.5 33 30
Ø12 3 5.5 16.5 15
Ø12 4 6.5 26 23.11
Ø12 4 11 44 39.11
Total=517.32
23
Total Cost =650 * 0.517 =336 $
Shrinkage steel:
We know that every 1m2 contain 8m Ø8 shrinkage steel.
Stirrups:
6∗5.64 15∗5.6 3.0∗2.7
Number of U stirrups =1 + 0.4
+ 1 + 0.4
+ 1 + 0.4
=318
Block:
Number of block in this floor =750 block (by using AutoCAD)
Concrete:
V. concert =volume of slab - volume of blocks
24
Labor cost
Labor cost =area of slab * labor cost for 1m2 = 147.62 * 12 $ =1771.5 $
Formwork:
Area of timber will use in this slab = perimeter of slab * thickness of slab
+0.05m
Steel reinforcement:
Main steel:
Diameter(mm Number Length(m) Total Weight(kg)
) length(m)
Ø14 10 3 30 36.3
Ø14 10 3.5 35 42.4
Ø14 10 5.5 55 66.6
Ø16 10 5.5 55 87
Ø12 2 15 30 26.7
Shrinkage steel:
25
Stirrups:
10∗4.06 10∗2.4
Number of U stirrups =1 + 0.4
+ 1 + 0.4 =164 U stirrups
Block:
Number of block in this floor =384 block (by using AutoCAD)
Concrete:
V. concert =volume of slab - volume of blocks
Labor cost
In this section we calculated labor cost for slab include beams and timber work.
Labor cost =area of slab * labor cost for 1m2 = 72.5 * 12 $ =870.0 $
26
3.7 Stairs
Formwork:
For example:
Section B-B:
Length of inclined line = No. of stairs*s
As shown in figure:
0.3
0.17
Concrete:
First section:
28
0.3
0.17
Area = 0.0255 ( m )2
Traverse reinforcement:
1 ϕ 12 @15 cm
2
(12 )
W= *13*1.2=13.9 kg
162
1 ϕ 12 @15 cm
# of bars= 5 bars
29
2
(12 )
W= *1.2*5=5.3 kg
162
Top reinforcement: 1 ϕ 10 @ 15 cm
Concrete:
Area of steel:
Traverse reinforcement:
1 ϕ 12 @15 cm
1 ϕ 12 @15 cm
# of bars=11 bars
2
(12 )
W= *1.2*11=11.7 kg
162
31
2
(14 )
W= *5.5*9=60kg
162
Top reinforcement: 1 ϕ 10 @ 15 cm
1-concrete:
Area of steel:
Traverse reinforcement:
1 ϕ 12 @15 cm
1 ϕ 12 @15 cm
# of bars=9bars
2
(12 )
W= *1.2*9=9.6 kg
162
2
(14 )
W= *3.15*9=34.3kg
162
Top reinforcement: 1 ϕ 10 @ 15 cm
33
Total concrete ( m )3 2.558
Total reinforcement (kg) 363.7
34
Section B-B
35
3.8 Walls
Stone:
36
1568.8
Number of blocks = 0.2∗0.4 = 19610 blocks
4.10∗3
Number of block for second wall = 0.08 = 154 blocks
3.4∗3
Number of block for third wall = 0.08 = 128 blocks
3∗3
Number of block for fourth wall = 0.08 = 113 blocks
0.9∗3
Number of block for fifth wall = 0.08 = 34 blocks
37
Total number of blocks for all partitions in building (20) =5530 blocks
Total area of interior partitions for building = 1190 m2
3.9 Beams
Formwork:
In Slabs
Stirrups steel:
39
Steel reinforcement in roof:
Main reinforcement:
Stirrups steel:
41
B3 4.5 2 3 12 24
4.5 2 3 14 32.66667
B4 4.25 2 4 12 30.22222
4.25 2 4 12 30.22222
B5 3.5 1 4 12 12.44444
3.5 1 4 12 12.44444
Sum 745.5926
Stirrups steel:
Diameter Dimensions
Stirrups number Spacing (m) Length (m) (mm) (cm)
B1 126 0.25 31.5 8 45/20
B2 96 0.25 24 8 55/20
B3 38 0.25 9.5 8 15/45
B4 30 0.25 7.5 8 35/20
B5 12 0.25 3 8 35/20
42
Chapter Four: Finishing
4.1 Plastering
For example in level (-0.51):
Length of wall = 11.89, Depth = 3.51m
Area = 11.89*3.51*2(in each face) =41.73m2
In Ground floor:
In floors 1 to 5:
Total length = 124m, Depth = 3, no. of floor=5.
Total Area = 124*3*5 = 1860 m2
In roof:
Total length = 66.62, Depth=3.
Total Area = 66.62*3 = 200 m2
In last floor:
43
Total length = 6, Depth=3.
Total Area = 6*3 = 18 m2
4.2 Tiles
Area = 1148 m2
Volume of base coarse fill = 0.1 * 1148 = 114.8 m3
Cement mortar = 0.03*1148 = 34.44 m3
4.3 Painting
The area same as Plastering
4.4 Doors
For External:
Doors (m2 ¿
Ground floor 34.9
Floors (1-5) 69
Roof floor 6.25
Eighth floor 4.5
Total area 76.2
For interior:
Doors (m2 ¿
Ground floor 12.37
Floors (1-5) 24.75
Roof floor 18.58
Eighth floor 10.66
Total area 66.36
By Type:
Type Area(m2 )
45
Iron 46.65
Wood 17.6
Wood 33
Aluminum 54
iron 15.7
4.5 Windows
46
Details of windows for Roof:
No. Area(m2 )
1 2.625
2 2.625
3 3.5
4 3.5
5 0.8
6 3.5
7 3.5
8 2.625
9 0.8
10 2.625
11 2.625
12 2.625
13 0.8
Total area 32.18
No. Area(m2 )
1 2.625
2 2.625
3 2.625
4 2.625
5 0.55
6 0.55
7 0.55
8 0.55
Total area 12.72
47
Windows (m2 ¿
Ground floor 23.82
Floors (1-5) 218.5
Roof floor 32.18
Eighth floor 12.72
Total area 387.22
براطيش
= width of all windows = 793.3
4.6 Rails
For example:
Section A-A (8 floor):
Length = 1.75+3.85+3.15+ [(3.5+3.5)*6]
=50.75 m
Section B-B:
Length = 4.2 m
48