(GOVERNMENT OF KARNATAKA)

Public Works Department

NAME OF WORK

0.00

DETAILED PROJECT REPORT

ESTIMATED COST :-60.00 LAKHS

Office of the
Executive Engineer
PWD. Division,Kalburgi.
0

INDEX

Sl.
Particulars Pages
No.

1 Face Sheet

2 General Report

3 Soil Investigation Report

4 Certificates

5 Hydrology

6 Structural Designs

7 Recapitulations

8 Sub Estimate for Box Culvert

9 Sub Estimate for Approach Road

10 Sub Estimate for Service Road

11 Rate Analysis

12 Drawings
Face Sheet
0

FACE SHEET

1 Division : PWD Kalaburgi

2 Sub-Division : PWD Kalaburgi

3 Fund Head :

4 Major Head :

5 Minor Head :

6 Service Head :
:
7 Departmental Head :

Estimate is framed in the office of the Executive Engineer, Division, Kalaburgi and the
probable expenditure that will be incurred for,

Proposed Construction of Bridge on MDR Road of Hirapura Village to


PattanaGanagapur at KM 9.40 in Kalaburgi Taluka, Kalaburgi District.

Estimated Cost : ₹ 275.00 Lakhs

8 Estimate Administratively Approved :


under :-
9 EstimatePrepared By

10 Estimate Checked by :

11 Sanction No.,& date :

Assistant Executive Engineer Executive Engineer


General Report
Date :-

TEST RESULTS OF FOUNDATION SOIL


TEST REPORT-I

Name of Work :- #REF!

Name of Clients :- Executive Engineer


Client' Ref No :-
Lab.Ref.No :-

Recommended
Specific Dry Density in Cohesion "C"in Angle of Internal
Sl.No Location Depth in Mts Type of soil
Gravity gm/cc KN/sqm Friction in degrees
SBC of soil in Remarks
T/Sqmts

1 Pit No 1 2.00 Hard rock 2.35 1.68 51.00 7.80 22.00

2 Pit no 2 2.00 Hard rock 2.25 1.75 52.00 7.80 24.00

3 Pit no 3 2.00 Hard rock 2.42 1.65 53.00 7.80 25.00

Relevent IS Codes :
■ Soil Properties : IS 2720 (Relevent Sections)
■ Safe Bearing Capacity: IS:6403-1982
Note: 1) Tests are conducted at FMC and the SBC is against shear failure only.
2) Factor of Safety adopted is 3.00
Certificates
#REF!

CERTIFICATE

Certified that,

1 The required materials are avaible in the sources considered in the estimate.

2 Certified that I have inspected the site of work and is satisfied with the location of the
proposed site of work.
3
This estimate amounting to Rs.104 Lakhs has ben scrutinised in this office in all aspects with
reference to the D.S.R. of PWD Circle,Kalaburgi for 2018-19

Assistant Executive Engineer Executive Engineer


(GOVERNMENT OF KARNATAKA)

Public Works Department

NAME OF WORK

Construction of Bridge at Km 30.00 on Connecting


road to SH150A to SH 127 (Raichur Border) near
Chatnalli Village @ Shahapur Taluk, Yadgir
District.

DESIGN REPORT

Office of the
Executive Engineer
PWD. Division,Yadgir.

Engineering Consultant
"LIFE LINE CONSULTANCY"
Plot No. 85, Sangameshwar Layout,
Near Sai Mandir, Ram Mandir Circle
KALABURGI-585 102 ,PH :- 8762178392,
Hydrology
Location
Near Shahabad
Road MDR

River/ Nala Local Nala

HYDRAULIC DATA:
Catchment Area (M) 2.11 Sq km.
Skew (a) 0 Degrees
Nala Bed Level (NBL) 518.025 m
Raft/Sill level of the Bridge/Barrage 517.725 m
HFL 519.225 m
Ryves Co'efficient ( C) 8.500

SOIL DATA
Type of Soil 2.00

Safe Bearing Capacity of Soil (SBC) (as per Dept.) 15.00 t/m2
Unit Weight of Soil 1.80 t/m3
Depth of Soil 2.00 m
Silt Factor (f) 1

NALA PARTICULARS:
Bed slope of Nala 0.01000
i.e 1 in 100
Manning's Co-efficient (n) 0.030 0.035

DISCHARGE CALCULATIONS:
i) Discharge calculation by Ryves Method:
The flood discahrge is calculated based on
catchment area by Ryve's Method
Discahrge Q= C M 2/3 13.983 Cumecs
Say 14.000 Cumecs

ii) Discharge Calculation by A-V Method At Section 1-1:


The flood discharge is calculated based on Area Velocity Method (A-V Method)
Details of Cross Section of Nala:

Nala Bed Wetted


HFL Depth Avg. Depth Length Area
Sl.N Distance Level Perimeter
o
(m) (m) (m) (m) (m2) (m)

1 0.000 521.525 519.225 0.000 0.000 - 0 -


2 3.000 521.515 519.225 0.000 0.000 - 0 -
3 6.000 520.343 519.225 0.000 0.000 - 0 -
4 9.000 519.817 519.225 0.000 0.000 - 0 -
5 12.000 519.292 519.225 0.000 0.000 - 0 -
6 15.000 518.505 519.225 0.720 0.360 3.00 1.08 3.085
7 18.000 518.085 519.225 1.140 0.930 3.00 2.79 3.029
8 21.000 518.025 519.225 1.200 1.170 3.00 3.51 3.001
9 24.000 518.095 519.225 1.130 1.165 3.00 3.495 3.001
10 27.000 518.305 519.225 0.920 1.025 3.00 3.075 3.007
11 30.000 518.605 519.225 0.620 0.770 3.00 2.31 3.015
12 33.000 518.905 519.225 0.320 0.470 3.00 1.41 3.015
13 36.000 519.205 519.225 0.020 0.170 3.00 0.51 3.015
14 39.000 519.705 519.225 0.000 0.010 - 0 -
15 42.000 520.895 519.225 0.000 0.000 - 0 -
16 45.000 521.327 519.225 0.000 0.000 - 0 -
17 48.000 521.336 519.225 0.000 0.000 - 0 -
18 51.000 521.345 519.225 0.000 0.000 - 0 -
19 54.000 521.354 519.225 0.000 0.000 - 0 -
20 57.000 521.363 519.225 0.000 0.000 - 0 -
21 60.000 521.372 519.225 0.000 0.000 - 0 -
22 63.000 521.468 519.225 0.000 0.000 - 0 -
23 66.000 521.563 519.225 0.000 0.000 - 0 -
24 69.000 521.658 519.225 0.000 0.000 - 0 -
25 72.000 521.754 519.225 0.000 0.000 - 0 -
26 75.000 521.849 519.225 0.000 0.000 - 0 -
24.00 18.18 24.17

Area (A) 18.18 m2


Wetted Perimeter (P) 24.17 m
Hydraulic Mean Depth ( R )= A/P 0.75 m
Velocity (v) based on Manning's formula 1/n x R 2/3 x S 1/2
2.363 m/sec.
Discaharge (Q) = AV 42.963 Cumecs
Say 42.50 Cumecs

HYDRAULIC DATA FOR DESIGN:


As per IRC:SP:13-2004, the recommended rule to estimate the Design discharge is " the
highest of these values is adopted.

By Ryve's Method 14.00 Cumecs


By A-V Method 42.50 Cumecs
Max Discharge 42.50 Cumecs

Recommended Design Discharge 42.50 Cumecs


HFL 519.225 m
Sill Level 517.725 m

HYDRAULIC DATA FOR DESIGN:


Design Discharge adopted 42.50 Cumecs
HFL 519.225 m
Sill Level 517.725 m

BOX DETAILS:
No. of Cells provided (Nc) 1 Nos.
Size of the Vent provided ( a x b ) 3.00 3.00
Earth Cushion ( Ec) 0.00 m
No. of cells considered in group 1 Nos.
No. of such groups provided 1 0
Depth of the Top Slab (d) 0.45 0.45
Depth of the Bottom Slab (e) 0.50 0.50
Depth of the Outer Vertical Slab (f) 0.45 0.45
Depth of the Inner Vertical Slab (g) 0.40 0.40
Depth of Flow 1.200 m
Therefore, designed water way (L) 3.00 m
Total length of the Bridge 3.90 m
Discharge / m width Q/L 14.17 m3/sec/m
VENT WAY:
Regime width as per Lacey's Formula (W) C x (Q) 1/2
where C= 4.80
Regime width (W) 31.29 m.

SCOUR DEPTH CALCULATIONS:


Regime width > Linear Water Way
The Linear water way (L) provided is less than Regime width of the stream (W)
(As per Cl. 703 of IRC:78-2000 given in IRC:SP:13-2004, Page No. 27)

Normal Scour depth 'dsm' 1.34 x ( Qm 2/ f)1/3


Where Qm = Discharge in m3/sec per mtr. width 14.17 Cumecs
f = Lacey's Silt Factor 1.0
Normal Scour depth 'dsm' 7.85 m 511.380
Depth of protection curtain wall 1.33 x d sm 10.43 m
508.791 m
Depth of Curtain wall at base of Box culvert 9.00 m
Minimum Depth of Curtain wall at base of Box culvert 3.00 m
Adopted Depth of Curtain wall at base of Box culvert 9.00 m
The bottom slab top level of Box is kept 0.30 m below the Lowest Nala Bed Level

The Bottom Slab Top Level NBL-0.30 m 517.725 m

APRON DETAILS:
As per IRC:SP:13-2004
Length of D/s Apron = 2 times of Normal Scour Depth = 15.69 m
Say 16.00 m

Length of U/s Apron = 1.50 times of Normal Scour Depth = 11.77 m


Say 12.00 m

REVISED DISCHARGE FOR MODIFIED WATER WAY

Sl.N Distance Avg.


Nala Bed Depth Length Area Wetted
o Bridge/Road HFL/ FRL Depth
Level Level Perimeter

1 0.000 521.525 521.525 519.225 0.000


2 3.000 521.515 521.515 519.225 0.000
3 6.000 520.343 520.343 519.225 0.000
4 9.000 519.817 519.817 519.225 0.000
5 12.000 519.292 519.292 519.225 0.000
6 15.000 518.505 518.505 519.225 0.720
7 18.000 518.085 518.085 519.225 1.140
8 21.000 518.025 518.025 519.225 1.200
9 24.000 518.095 518.095 519.225 1.130
10 27.000 518.305 518.305 519.225 0.920
11 30.000 518.605 518.605 519.225 0.620
12 33.000 518.905 518.905 519.225 0.320
13 36.000 519.205 519.205 519.225 0.020
14 39.000 519.705 519.705 519.225 0.000
15 42.000 520.895 520.895 519.225 0.000
16 45.000 521.327 521.327 519.225 0.000
17 48.000 521.336 521.336 519.225 0.000 1.200 3.000 3.600 5.400
18 51.000 521.345 521.345 519.225 0.000
19 54.000 521.354 521.354 519.225 0.000
20 57.000 521.363 521.363 519.225 0.000
21 60.000 521.372 521.372 519.225 0.000
22 63.000 521.468 521.468 519.225 0.000
23 66.000 521.563 521.563 519.225 0.000
24 69.000 521.658 521.658 519.225 0.000
25 72.000 521.754 521.754 519.225 0.000
26 75.000 521.849 521.849 519.225 0.000

Total = 3.00 3.6 5.40

Area (A) 3.60 m


Wetted Perimeter (P) 5.40 m
Hydraulic Mean Depth ( R )= A/P 0.67 m pertaining to revised nala
Velocity (v) based on Manning's formul 1/n x R 2/3 x S 1/2
2.544 m/sec.

Discharge (Q) = AV 9.158 Cumecs

Revised discharge is less


Height of water needs to be raised

Revise Vent Area


AFFLUX CALCULATIONS:

(As per Moles Worth formula)


[V2/17.88 +1/65.60] x[{A/a}2-1]
Where V= Velocity 2.363 m/sec
A= Clear water way (refer Area-Perimeter Table-1) 18.18 m2
a= Unabstructed water way (refer Area-Perimeter Table-2) 3.60 m2
Afflux 0.000 m
Adopt afflux 0.00 m
AHFL 519.225 m
AHFL = 519.225 m
Required Vertical clearance 0.90 m
Bottom level of the Top Slab = 520.725 m
Vertical Height available = 1.50 m
Road Top Level 521.250 m

Revise Vent Area

Hence the design of bridge with the vent way proposed is acceptable.
PARAGRAPH 130 (A) OF THE KARNATAKA PUBLIC WORKS
DEPARTMENTAL CODE
ESTIMATE.

FACE SHEET

Division. PWD.Dept. Belagavi Division Belagavi

Sub - Division. PWD.Dept.Sub- Dn.Belagavi

Fund Head.

Major Head.
Service Head.
Department Head.

Estimated Cost Rs :- Lakhs

Administratively sanctioned under No. Date.

Techanically sanctioned under No. Date.

Estimate prepared by

Estimate Checked by
(Call of Authority)

General Description

Separate sheet enclosed


Assistant Executive Engineer, Executive Engineer,
PWD,Dept.Sub-Dn.,Ramadurga PWD.Dept. Belagavi Dn Belagavi
Structural Designs
DESIGN OF BOX CULVERT (3.0x 3.0 , 3 VENT WITHOUT EARTH CUSHION)

DESIGN DATA
1.Dimensions
Number of Cells 1
Number of cells considerd in group 1
Number of such group provided 1 0
Clear span= 3.00 m
Clear height= 3.00 m
Top Slab Thickness= 0.450 m
Bottom Slab thickness= 0.500 m
Side outer wall thickness= 0.450 m
Side inner wall thickness= 0.400 m
Height of fill (for live load dispersion)= 0m
Height of fill (for SIDL, Earth pressure
calculation)= 0m
Top and Bottom haunch= 150 by 150
Width of carriage way= 6m
Total width= 3.50 m
Total Height= 3.95 m
C/C width= 3.45 m
C/C height= 3.475 m
Extra Offset width for Bottom Slab= 0.00 m
2.Material
CONCRETE
Grade of concrete = M25
Characteristic Strength, fck= 25 N/mm2
Modulus of Elasticity = 28500 N/mm2
Poissons ratio= 0.2
Co-efficient of Thermal Expansion= 1.20E-05 /oC
Weight Density= 25 kN/m3
STEEL
Grade of steel= Fe550
Characteristic strength, fy= 500 N/mm2
Modulus of Elasticity= 2.00E+08 kN/m2
SOIL
SBC= 150.00 kN/m2
Angle of internal friciton= 30
Unit weight of soil fill material= 20 kN/m3
WEARING COAT
Thickness ofThickness of wearing coat=
road crust(conservatively 75 mm
totaol fill ht considered) 0m
Wearing coat thickness(future 0.1 m
overlaying)=
Weight Density= 22 kN/m3
Modelling of structure

0.45

0.45 3 3.475
3 0.40 3

0.5

3.45

Property calculations
Width considered for the model (1m strip)= 1m
a. Base slab
Area of cross section= 0.5 m2
Moment of Inertia, Izz= 0.0104 m4
Moment of Inertia, Iyy= 0.0416666667 m4

b. Top slab
Area of cross section= 0.45 m2
Moment of Inertia, Izz= 0.0076 m4
Moment of Inertia, Iyy= 0.03750 m4

c. Wall
Area of cross section= 0.45 m2
Moment of Inertia, Izz= 0.00759375 m4
Moment of Inertia, Iyy= 0.0375 m4

d. Haunch
Area of cross section= 0.01125 m2

e. Concrete Crash Barrier/Railing


Area of cross section= 0.365 m2

Load Calculation
The design loading for the bridge has been considered in accordance with
IRC:6-2016 (Load and Stresses) so as to sustain the most critical comnination of
various loads, forces and Stresses

A. Dead Load(DL)
Self weight of the Top slab= 11.25 kN/m
Self wt. of the bottom slab= 12.5 kN/m
Self weight of the side slab= 11.25 kN/m
Self weight of hunches= 0.01125 kN/m
B. SIDL
Conservatively total fill height is considered as road crust including wearing
coat.
Density of wearing coat considered for
road crust= 22 kN/m3
Load due to WC = 1.65 kN/m
Weight of Crash Barrier/railing= 9.125 kN/m

C. Earth pressure (EP)


Since the side walls are effectively restrained against movement, At rest earth
pressure is considered for design. Co-effecident of earth pressure at rest (k o) is
calculated as per below formula (Jaky's equation)

0.175 m
2.25 kN/m2 1.500 kN/m2

3.650 m

36.5 kN/m2 24.33 kN/m2

Co-efficient of Earth pressure at rest, k o= (1-sinφ)= 0.500


Co-efficient of active earth pressure, ka= (1-sinφ)/(1+sinφ)= 0.333

a. Lateral Earth Pressure at Rest


Earth Pressure at top= 2.25 kN/m2
Earth Pressure at bottom= 36.5 kN/m2

b. Lateral Earth pressure Active earth pressure condition


Earth Pressure @ top= 1.500 kN/m2
Earth Pressure @ bottom= 24.33 kN/m2

D. Live Load Surcharge (LS)


Live load surcharge of 1.2m ht fill considered as per Cl 214.1 of IRC 6-2017.
Surcharge Live Load for EP leading = 1.2 m
Surcharge Live Load(1.2m earth filling) = 12 kN/m2
Surcharge Live Load for LL leading = 1.2
Surcharge Live Load(1.2m earth filling) = 8.0 kN/m2
E. Live Loads
Calculation of effective width of loading
Live Load dispersion has been considered for design as per ANNEX B-3 of IRC
112-2011.
The following Live Load are considered for design
CASE 1: IRC CLASS 70R -Track Load 70T
CASE 2: IRC CLASS 70R -WHEELED VEHICLE -BOGIE LOAD (40T)
IRC CLASS 70R -WHEELED VEHICLE -BOGIE LOAD (40T) (At
CASE 2a:
support)
CASE 3: IRC CLASS 70R- WHEEELED VEHICLE
CASE 4: IRC CLASS A Vechicle - Single Lane
CASE 5: IRC CLASS A Vechicle - Two Lane
The dispersion of loads through fills and wearing coat shall be assumed at 45
degree both along transverse and longitudinal direction.

Note: IRC CLASS A- Three lane and IRC CLASS A+ IRC 70R are not governing the
design, hence not presented in design note.

Case 1: IRC CLASS 70R- Track Laod 70T

Assumption: Dispersion of loads through fill is taken as 1:1


Height of soil fill+wearing coat thicknes= 0.075 m
Dispersed width of wheel 1 in the direction transverse of
traffic direction= 0.99 m
Dispersed width of wheel 2 in the direction transverse of
traffic direction = 0.99 m

Direction of Traffic
W=350kN W=350kN
2.06
KERB

1 2
C= 1.2
KERB

4.57 3.45
2.12
0.84 0.84

0.5
2.9
Width of carriage way= 6m

Calculation of effective width of loading(beff)


Effective width of the load is computed using the formula
As per IRC: 112-2011, Annexure B-3,b eff = a * α * (1-a/l0) + b1
b= 6m
lo= 3.45 m
for (b/l0) = 1.74
for continuous type, α= 2.24
As per IRC: 112-2011, Annexure B-3
a=(0.5*lo)= 1.725 m
b1 = 0.99 m
beff = 2.92 m

If 0.5*beff > 0.5*C/C Distance between wheels there will be Overlap


OVERLAPPING WILL OCCUR
Length of overlap = 0.43 m
If 0.5*beff > 0.5*(C+Kerb width) then there will be
THERE IS NO OVER-HANGING -1.862
Length of overhanging = 0m

So, the actual dispersed width (B) = 4.982 m


Dispersed length in the direction parallel of traffic
direction (L)= 5.62 m
Actual area of dispersion=L*B= 28.00 m2

2.06 2.12

1.03 1.03 1.06 1.06

1.461 1.461 1.461 1.461

2.92 2.92
B= 4.982

4.57

0.075
0.25
L= 5.620

As per IRC-6-2016, cl:208.6 if fill ht is more than 0.6m, impact factor


percentage shall be taken half of the value what specified in cl 208.2
and 208.3 of IRC 06-2016

Impact factor = 25 %
Total Load = 700 kN
Load intensity = (Total load/Actaul area of dispersion)= 25.00 kN/m2
Load intensity after impact = 31.25 kN/m2

Case 2: IRC CLASS 70R - WHEELED VEHICLE - BOGIE LOAD(40T)

Assumption: Dispersion of loads through fill is taken as 1:1


Height of soil fill+wearing coat thicknes= 0.075 m
Dispersed width of wheel 1 in the direction transverse of
traffic direction= 1.01 m
Dispersed width of wheel 2 in the direction transverse of
traffic direction = 1.01 m
Direction of Traffic
W=200kN W=200kN
1.93

1 2
C= 1.2

KERB
KERB

1.22 1.115
0.263 2.13 3.45
3 4

0.86 0.86
0.5
2.79
Width of carriage way= 6m

Calculation of effective width of loading(beff)


Effective width of the load is computed using the formula
As per IRC: 112-2011, Annexure B-3,b eff = a * α * (1-a/l0) + b1
b= 1.01 m
lo= 3.45 m
for (b/l0) = 1.74
for continuous type, α= 2.24
As per IRC: 112-2011, Annexure B-3
a= 1.115 m
b1 = 1.01 m
beff = 2.70 m
If 0.5*beff > 0.5*C/C Distance between wheels there will be Overlap
OVERLAPPING WILL OCCUR 0.3852023
Length of overlap = 0.3852023 m
If 0.5*beff > (C+Kerb width) then there will be Over hanging portion
THERE IS NO OVER-HANGING 0.2852023
Length of overhanging = 0.2852023 m

Actual Dispersed width,B = 4.35 m


Dispersed length of wheel 3,4 in the direction parallel of
traffic direction,L
L=Length of wheel +2*(Wc+Top Slab thickness)= 1.313 m
Dispersed length of wheel 1,2 in the direction parallel of
traffic direction,L =
1.313 m
If 0.5*beff > 0.5*C/C Distance between wheels there will be Overlap
OVERLAPPING WILL OCCUR 0.0465
Length of overlap = 0.0465 m

Actual Dispersed length of wheel parallel to the traffic


direction,L= 2.533 m
Actual area of dispersion=B*Lmax= 11.01 m2
1.93 2.13

0.965 0.965 1.065 1.065

1.35 1.35 1.35 1.35


2.70 2.70

B= 4.35

0.263

0.053
0.25
L= 2.533 m
As per IRC-6-2010, cl:208.6 if fill ht is more than 0.6m, impact factor
percentage shall be taken half of the value what specified in cl 208.2
and 208.3 of IRC 06-2010
Impact factor = 25 %
Total Load = 400 kN
Load intensity = (Total load/Actaul area of dispersion)= 36.34 kN/m2
Load intensity after impact = 45.43 kN/m2

Case 2 a: IRC CLASS 70R - WHEELED VEHICLE - BOGIE LOAD(40T) (At support)

Assumption: Dispersion of loads through fill is taken as 1:1


Height of soil fill+wearing coat thicknes= 0.075 m
Dispersed width of wheel 1 in the direction transverse of
traffic direction= 1.01 m
Dispersed width of wheel 2 in the direction transverse of
traffic direction = 1.01 m

Direction of Traffic
W=200kN W=200kN
1.93

0.43 C= 1.2
KERB

KERB

1 2

1.22 2.13 1.115


3.45
3 0.263 4

0.15
0.86 0.86 0.5

2.79
Width of carriage way= 6m

Calculation of effective width of loading(beff)


Effective width pf the load is computed using the formula
As per IRC: 112-2011, Annexure B-3,b eff = a * α * (1-a/l0) + b1
b= 6.00
lo= 3.45
for (b/l0) = 1.74 m
for continuous type, α= 2.24
As per IRC: 112-2011, Annexure B-3
Since the load W1 and W2 placed unsymmetry about the span, the
distance of the load from the nearest support X1 and X2 is calculated
separately for W1 and W2

For W1,
a= 0.43 m
b1 = 1.01 m
beff1 = 1.85 m

If 0.5*beff > 0.5*C/C Distance between wheels there will be Overlap


THERE IS NO OVERLAPPING
Length of overlap = 0m -0.038
If 0.5*beff > (C+Kerb width) then there will be Over hanging portion
THERE IS NO OVER-HANGING
Length of overhanging = 0m -0.138426

For W2,
a= 0.1455 m
b1 = 1.01 m
beff2= 1.32 m
therefore,
beff= min of beff1 & beff2
beff= 1.32 m
If 0.5*beff > 0.5*C/C Distance between wheels there will be Overlap
THERE IS NO OVERLAPPING -0.304
Length of overlap = 0m
If 0.5*beff > (C+Kerb width) then there will be Over hanging portion
THERE IS NO OVER-HANGING -0.403913
Length of overhanging = 0m
Actual dispersed width (B) = 2.644 m

Dispersed width of wheel 1,3 in the direction parallel of


traffic direction.
i.e.Length of wheel +2*(Wc+Top Slab thickness)= 1.313 m
Dispersed width of wheel 2,4 in the direction parallel of
traffic direction = 1.313 m

If 0.5*beff > 0.5*C/C Distance between wheels there will be Overlap


OVERLAPPING WILL OCCUR 0.047
Length of overlap = 0.0465 m

Actual dispersed length,L = 2.533 m


therefore
Actual area of dispersion=B*L 6.70 m2
1.93 2.13

0.965 0.965 1.065 1.065

0.66 0.66 0.66 0.66


1.32 1.32

B= 2.64

0.263

0.053
0.25
L= 2.533 m
As per IRC-6-2010, cl:208.6 if fill ht is more than 0.6m, impact factor
percentage shall be taken half of the value what specified in cl 208.2
and 208.3 of IRC 06-2010
Impact factor = 25 %
Total Load = 400 kN
Load intensity = (Total load/Actaul area of dispersion)= 59.72 kN/m2
Load intensity after impact = 74.65 kN/m2

Case 3: IRC CLASS 70R - WHEELED VEHICLE

Assumption: Dispersion of loads through fill is taken as 1:1


Height of soil fill+wearing coat thicknes= 0.075 m
Dispersed width of wheel 1 in the direction transverse of
traffic direction= 1.01 m
Dispersed width of wheel 2 in the direction transverse of
traffic direction = 1.01 m

Direction of Traffic
W=170kN W=170kN
1.93

1 2
C= 1.2
KERB

1.37 1.04
0.263 2.13 3.45
3 4
KERB

0.86 0.86
0.5
2.79
Width of carriage way= 6m

Calculation of effective width of loading(beff)


Effective width of the load is computed using the formula
As per IRC: 112-2011, Annexure B-3,b eff = a * α * (1-a/l0) + b1
b= 6.00 m
lo= 3.45 m
for (b/l0) = 1.74
for continuous type, α= 2.24
As per IRC: 112-2011, Annexure B-3
a= 1.04 m
b1 = 1.01 m
beff = 2.64 m
If 0.5*beff > 0.5*C/C Distance between wheels there will be Overlap
OVERLAPPING WILL OCCUR 0.3536719
Length of overlap = 0.3536719 m
If 0.5*beff > (C+Kerb width) then there will be Over hanging portion
THERE IS NO OVER-HANGING 0.25
Length of overhanging = 0.2536719 m

Actual Dispersed width,B = 4.31 m


Dispersed length of wheel 3,4 in the direction parallel of
traffic direction,L
L=Length of wheel +2*(Wc+Top Slab thickness)= 1.313 m
Dispersed length of wheel 1,2 in the direction parallel of
traffic direction,L = 1.313 m
If 0.5*beff > 0.5*C/C Distance between wheels there will be Overlap
OVERLAPPING WILL OCCUR -0.0285
Length of overlap = 0m

Actual Dispersed length of wheel parallel to the traffic


direction,L= 2.626 m
Actual area of dispersion=B*Lmax= 11.33 m2

1.93 2.13

0.965 0.965 1.065 1.065

1.32 1.32 1.32 1.32


2.64 2.64

B= 4.31

0.263

0.053
0.25
L= 2.626 m
As per IRC-6-2010, cl:208.6 if fill ht is more than 0.6m, impact factor
percentage shall be taken half of the value what specified in cl 208.2
and 208.3 of IRC 06-2010
Impact factor = 25 %
Total Load = 340 kN
Load intensity = (Total load/Actaul area of dispersion)= 30.01 kN/m2
Load intensity after impact = 37.52 kN/m2

Case 4: IRC CLASS A VEHICLE-SINGLE LANE

Assumption: Dispersion of loads through fill is taken as 1:1


Height of soil fill+wearing coat thicknes= 0.075 m
Dispersed width of wheel 1 in the direction transverse of
traffic direction= 0.65 m
Dispersed width of wheel 2 in the direction transverse of
traffic direction = 0.65 m

Direction of Traffic
W=114kN W=114kN
1.8

1 2
C= 0.15
KERB

1.2 1.125
0.9 3.45
3 0.25 4

KERB
0.5 0.5
0.5
Width of carriage way= 6m

Calculation of effective width of loading(beff)


Effective width of the load is computed using the formula
As per IRC: 112-2011, Annexure B-3,b eff = a * α * (1-a/l0) + b1
b= 6.00 m
lo= 3.45 m
for (b/l0) = 1.74
for continuous type, α= 2.24
As per IRC: 112-2011, Annexure B-3
a= 1.125 m
b1 = 0.65 m
beff = 2.35 m
If 0.5*beff > 0.5*C/C Distance between wheels there will be Overlap
OVERLAPPING WILL OCCUR 0.2741304
Length of overlap = 0.2741304 m
If 0.5*beff > (C+Kerb width) then there will be Over hanging portion
THERE IS OVER-HANGING 0.27
Length of overhanging = 0.2741304 m

Actual Dispersed width,B = 3.87 m


Dispersed length of wheel 3,4 in the direction parallel of
traffic direction,L
L=Length of wheel +2*(Wc+Top Slab thickness)= 1.3 m
Dispersed length of wheel 1,2 in the direction parallel of
traffic direction,L = 1.3 m
If 0.5*beff > 0.5*C/C Distance between wheels there will be Overlap
OVERLAPPING WILL OCCUR 0.05
Length of overlap = 0.5 * (0.869-1.22) 0.05 m
Actual Dispersed length of wheel parallel to the traffic
direction,L= 2.5 m
Actual area of dispersion=B*L= 9.69 m2
1.8 0.9

0.9 0.9 0.45 0.45

1.17 1.17 1.17 1.17


2.35 2.35

B= 3.87

0.25

0.053
0.25
L= 2.5 m
As per IRC-6-2010, cl:208.6 if fill ht is more than 0.6m, impact factor
percentage shall be taken half of the value what specified in cl 208.2
and 208.3
As per of IRC
cl:208 06-2010
of IRC 6, Impact factor for Class A load=
Impact factor for RCC bridge=(4.5/(6+L))
IF= 47.62 %
Total Load = 228 kN
Load intensity = (Total load/Actual area of dispersion)= 23.54 kN/m2
Load intensity after impact = 34.75 kN/m2

Case 5: IRC CLASS A VEHICLE - TWO LANE

Assumption: Dispersion of loads through fill is taken as 1:1


Height of soil fill+wearing coat thicknes= 0.075 m
Dispersed width of wheel 3,7 in the direction transverse
of traffic direction= 0.65 m
Dispersed width of wheel 4,8 in the direction transverse
of traffic direction = 1.20 m

Direction of Traffic
W=228KN W=228KN
3.5

1.8 1.2 1.8 0.15


KERB

KERB

1 2 3 4
a=
1.2 1.125

5 6 0.25 7 8
3.5 0.9
0.5 0.5
x= 2.7

0.5
Calculation of effective width of loading(beff)
Effective width of the load is computed using the formula
As per IRC: 112-2011, Annexure B-3,b eff = a * α * (1-a/l0) + b1
b= 6.00 m
lo= 3.45 m
for (b/l0) = 1.74
for continuous type, α= 2.24
As per IRC: 112-2011, Annexure B-3
a= 1.125 m
b1 = 0.65 m
beff = 2.35 m
If 0.5*beff > 0.5*C/C Distance between wheels there will be Overlap
OVERLAPPING WILL OCCUR
Length of overlap = 0.2741304348 m 0.27413
NOTE: Since wheels 1,2,5,6 are in the interior portion there is no
need to check for overhanging length
Dispersed width of wheels 1,2,5,6 in direction transverse
to traffic direction= 0.65 m
Actual width of dispersion,b= 4.1482609 m
1.8

0.9 0.9

1 `2

1.17 1.17 1.17 1.17


2.35 2.35

B= 4.15

Check for overlappig lane 1 and lane 2 vehicle


If 0.5*b > 0.5*C/C Distance between 2 vehicles there will be Overlap
OVERLAPPING WILL OCCUR -0.57587
Length of overlap = 0m

If 0.5*b >x then there will be Over hanging portion


THERE IS NO OVER-HANGING -0.63
Length of overhanging = 0m

Actual dispersed width for two lanes combined, (B)= 8.30 m

Dispersed width of wheels 3,4 in direction parallel to


traffic direction,l= 1.3 m
Dispersed width of wheels 1,2 in direction parallel to
traffic direction,l= 1.3 m
If 0.5*l > 0.5*C/C Distance between wheels there will be Overlap
OVERLAPPING WILL OCCUR 0.05
Length of overlap = 0.05 m
Actual dispersed length for two lanes combined, (L)= 2.5 m
Actual area of dispersion,A=B*L= 20.74 m2
As per cl:208 of IRC 6, Impact factor for Class A load=
Impact factor for RCC bridge=(4.5/(6+L))
IF= 47.62 %
Total Load = 456 kN
Load intensity = (Total load/Actual area of dispersion)= 21.99 kN/m2
Load intensity after impact = 32.45 kN/m2

1 Critical Live load case-with live load surcharge


IRC CLASS 70R-WHEELED VEHICLE-BOGIE LOAD(40T)
Live load intensity considered without impact factor= 36.34 kN/m2
Impact factor considered for Governing case= 25 %

2 Critical Live load case-with live load surcharge


IRC CLASS 70R-WHEELED VEHICLE-BOGIE LOAD(40T) (At Support)
Live load intensity considered without impact factor= 59.72 kN/m2
Impact factor considered for Governing case= 25 %

Braking force
Braking force is considered as per Cl.211.2 of IRC 6-2010
Note:The effect of Braking force is full for zero earth cushion and it is
considered zero for earth cushion of 3, hence for earth cushin 0.6m
effect of braking force is interpoated.
Note:The effect of Braking force is full for zero earth cushion and it is
considered zero for earth cushion of 3, hence for earth cushin 0.6m
effect of braking force is interpoated.

Loads
Class 70R -Tracked vehicle(70T) = 17.3 kN
Class 70R -BOGIE LOAD(40T)= 18.42 kN
Class 70R -Wheeled vehicle = 15.77 kN
Class A load (1 lane)= 11.78 kN
Class A load (2 lane)= 11 kN
udl force on top slab due to Braking
Class 70R -Tracked vehicle(70T) = 3.48 kN/m
Class 70R -BOGIE LOAD(40T)= 4.24 kN/m
Class 70R -Wheeled vehicle = 3.66 kN/m
Class A load (1 lane)= 3.05 kN/m
Class A load (2 lane)= 2.66 kN/m

Temprature Loads
Temperature Rise Forces
1 17.8 °
0.135
10.9 °
0.135 4

0.45
0
0.045
0
1.05 °
0.135
2.1

fck = M25 Mpa


EC = 30000.00 Mpa
Coefficient of thermal expansion of concrete = 0.000012 /°C

Area t αt Eαt Force (kN) x M (kNm)


0.135 10.9 1.3E-04 3.9E+00 529.74 0.18 95.35
0.135 2 2.4E-05 7.2E-01 97.20 0.045 4.37
0.045 0 0.0E+00 0.0E+00 0.00 0.0225 0.00
0.135 1.05 1.3E-05 3.8E-01 51.03 0.09 -4.59
Total 677.97 95.13

3.3.5 Temperature Fall Forces


1 10.6 °
0.09 5.65 °
0.7 °
0.1125 0.35 °

0.45 0.045 0°

0.1125 0.4 °
0.8 °
0.09 3.7 °
6.6 °
Area t αt Eαt Force (kN) x M (kNm)
0.09 5.65 6.8E-05 2.0E+00 183.06 0.188 34.42
0.1125 0.35 4.2E-06 1.3E-01 14.18 0.083 1.18
0.1125 0.4 4.8E-06 1.4E-01 16.20 0.083 1.34
0.09 3.7 4.4E-05 1.3E+00 119.88 0.188 -22.54
Total 333.32 14.40

Check for base pressure


Total base area= 3.9 m2
Pressure on bottom slab due to DL = 160.125 kN/m
Pressure on bottom slab due to SIDL = 10.78 kN/m
Pressure on base due to LL (IRC Class 70R-Wheeled Vehicle-B)= 59.72 kN/m
Total Pressure on base slab = 59.13 kN/m2/m

Allowable bearing capacity = 150 kN/m2


SAFE
Load Combination
Load Combination for limit state shall be as per annex B of IRC 6-2016. The following
Limit statea are considered below.
1) Ultimate limit state - ULS
2) Serviceability limit state - SLS
Ultimate Limit State Combination :- (ULS) (Verification
A) of Structural Strength)
1 Basic Combination
Comb-1 = DL +WC +SIDL+EP+LLS One Side + Temp Rise
Comb-2 = DL +WC +SIDL+EP+LLS One Side+ Temp Fall
Comb-3 = DL +WC +SIDL+EP+LLS Both Side + Temp Rise
Comb-4 = DL +WC +SIDL+EP+LLS Both Side + Temp Fall
Comb-5 = DL +WC+SIDL +EP+LLS One Side+ WP + Temp Rise
Comb-6 = DL +WC+SIDL +EP+LLS One Side +WP + Temp Fall
Comb-7 = DL +WC +SIDL+EP+LLS Both Side +WP + Temp Rise
Comb-8 = DL +WC+SIDL +EP+LLS Both Side +WP + Temp Fall

As per IRC6:2017, the load factors for varies load combinarion are as under

Ultimate limit state load combination shall be calculated as per table 3.2 of IRC 6-2017.
SL. No Combination DL SIDL WC LL WITH IF BF

G1(live load
1 leading) 1.35 1.35 1.75 1.5 1.15

SL. No Combination EP LS Temp Rise Temp fall


G1(live load
1 leading) 1.5 1.2 1 1

ULS Load Combinations

LL WITH IF
SL. No Combination DL (KN/M) SIDL(KN/M) WC (KN/M) BF (KN/M)
(KN/M)

G1(live load
1 62.5 12.32 2.89 111.98 4.88
leading)
Active EP
EP (KN/M) at EP (KN/M) at rest Active EP (KN/M)
SL. No Combination (KN/M) @ LS (kn/m)
rest top bottom @ top
bottom
G1(live load
1 leading) 3.375 54.75 2.25 36.5 14.4

SL. No Combination Temp Rise Temp Fall

G1(live load
1 leading) 27.58 4.18

Maximum intensity on each members with factors


Top slab (udl on top slab) 174.900 Kn/m

side outer walls at top 17.775 Kn/m

side outer walls at Bottom 69.15 Kn/m

Bottom slab 189.69 Kn/m

Maximum intensity on each members without factors


Top slab (udl on top slab) 124.31 Kn/m

side walls at top 14.25 Kn/m

side walls at Bottom 48.5 Kn/m

Bottom slab 131.73 Kn/m


MOMENT CALCULATIONS
Relative stiffness of member are
KAD = 1 KAE = KDF = 0.5
Distribution factors are
DAD = DDA = 0.67
DAB = DDC = 0.33

Fixed end moments are


FMAB = - wl2/12 = -173.48 Kn-m
FMDC = wl2/12 = 188.15 Kn-m
FMAD = (Pl2/12)+(wl/15) = 17.89 Kn-m
FMDA = - (Pl2/12)-(wl/10) = -59.64 Kn-m

Moment distribution table


Joint member D A
DC DA AD AB
DF 0.33 0.67 0.67 0.33
FEM 188.15 -59.64 17.89 -173.48
128.51 -155.59
Balance -42.84 -85.67 103.73 51.86
Carry over 51.86 -42.84
Balance -17.29 -34.58 28.56 14.28
Carry over 14.28 -17.29
Balance -4.76 -9.52 11.53 5.76
Carry over 5.76 -4.76
Balance -1.92 -3.84 3.17 1.59
Carry over 1.59 -1.92
Balance -0.53 -1.06 1.28 0.64
Carry over 120.82 -120.82 99.35 -99.35
174.9 174.90
Kn/m 17.775 Kn/m Kn/m 17.775 Kn/m
A E1 B

3.425 3.425

3.45

D F1 C

Kn/m 69.15 189.69 189.69 69.15 Kn/m


Kn/m Kn/m

For horizontal slab AB, carrying udl @ 174.90 Kn/m


The vertical reactions @ A & B are 301.70 kn

Similarly,
For bottom slab DC carrying udl @ 189.69 Kn/m
The vertical reactions @ D & C are 327.22 kn

For vertical member AD the horizontal reaction h A @ A is found by taking moments about D

Thus,

hA = 64.54 kn
For vertical member E1F1 the horizontal reaction hE1 @ E is found by taking moments about F1

Thus,

hE1 = 127.66925 kn

Therefore, the horizontal reaction @ the other end D is


hD = 120.148 kn

From B.M @ mid point E = 260.22 Kn-m

Net B.M @ E = 160.87 Kn-m


For the critical condition Net B.M @ E = 260.22 Kn-m
For the design Net B.M @ E = 160.87 Kn-m

From B.M @ F= 282.22 Kn-m

Net bending moment @ F = 161.41 Kn-m

For vertical member AD, S.S B.M @ mid span is = 26.45 Kn-m

Net B.M = 110.08 Kn-m

Top slab Design


B.M @ centre B.M @ ends Shear Force
160.87 Kn-m 99.35 Kn-m 64.54 kn

Bottom slab Design


B.M @ centre B.M @ ends Shear Force
161.41 Kn-m 120.82 Kn-m 120.15 kn

Outer Side walls


B.M @ centre B.M @ ends Shear Force
26.45 Kn-m 110.08 Kn-m 92.34 kn
Inner Side walls
B.M @ centre B.M @ ends Shear Force
26.45 Kn-m 72.01 Kn-m 127.67 kn
UNFACTORED MOMENT CALCULATIONS
Relative stiffness of member are
KAD = 1 KAE = KDF = 0.5
Distribution factors are
DAD = DDA = 0.67
DAB = DDC = 0.33

Fixed end moments are


FMAB = - wl2/12 = -123.3 Kn-m
FMDC = wl2/12 = 130.66 Kn-m
FMAD = (Pl2/12)+(wl/15) = 14.34 Kn-m
FMDA = - (Pl2/12)-(wl/10) = -43.63 Kn-m

Moment distribution table


Joint member D A
DC DA AD AB
DF 0.33 0.67 0.67 0.33
FEM 130.66 -43.63 14.34 -123.30
87.03 -108.96
Balance -29.01 -58.02 72.64 36.32
Carry over 36.32 -29.01
Balance -12.11 -24.21 19.34 9.67
Carry over 9.67 -12.11
Balance -3.22 -6.45 8.07 4.04
Carry over 4.04 -3.22
Balance -1.35 -2.69 2.15 1.07
Carry over 1.07 -1.35
Balance -0.36 -0.72 0.90 0.45
Carry over 84.62 -84.62 71.75 -71.75
124.31 124.31
Kn/m 14.25 Kn/m Kn/m 14.25 Kn/m
A E1 B
3.425 3.425

3.45

D F1 C

Kn/m 48.50 131.73 131.73 48.50 Kn/m


Kn/m Kn/m

For horizontal slab AB, carrying udl @ 124.31 Kn/m


The vertical reactions @ A & B are 214.43 kn

Similarly,
For bottom slab DC carrying udl @ 131.73 Kn/m
The vertical reactions @ D & C are 227.23 kn

For vertical member AD the horizontal reaction h A @ A is found by taking moments about D

Thus,

hA = 67.01 kn
For vertical member E1F1 the horizontal reaction hE1 @ E is found by taking moments about F1

Thus,

hE1 = 77.07925 kn

Therefore, the horizontal reaction @ the other end D is


hD = 120.148 kn

From B.M @ mid point E = 184.95 Kn-m

Net B.M @ E = 77.32 Kn-m


For the critical condition Net B.M @ E = 184.95 Kn-m
For the design Net B.M @ E = 77.32 Kn-m
From B.M @ F= 195.99 Kn-m

Net bending moment @ F = 111.37 Kn-m

For vertical member AD, S.S B.M @ mid span is = 26.45 Kn-m

Net B.M = 51.74 Kn-m

Top slab Design


B.M @ centre B.M @ ends Shear Force
77.32 Kn-m 71.75 Kn-m 67.01 kn

Bottom slab Design


B.M @ centre B.M @ ends Shear Force
111.37 Kn-m 84.62 Kn-m 120.15 kn

Side walls
B.M @ centre B.M @ ends Shear Force
26.45 Kn-m 51.74 Kn-m 93.58 kn
Inner Side walls
B.M @ centre B.M @ ends Shear Force
26.45 Kn-m 56.74 Kn-m 77.08 kn
REINFORCEMENT FOR TOP SLAB
DESIGN PARAMETERS
Grade of concrete fck= M25
Grade of steel fyk= Fe 500
Tensile strength of concrete fctm= 2.2 MPa
Partial safty factor for concrete for basic & seismic comb. ym= 1.5
Partial safty factor for reinforcement ys= 1.15
Design compressive strength of concrete fcd= α*fck/ym
Factor CI 6.4.2.8 of IRC 112-2011 α= 0.67
Design compressive strength of steel fcd= 11.17 MPa
Design compressive strength of concrete fyd= 434.79 MPa
Secant modulus elasticity of concrete Ecm= 30 GPa
Elastic modulus of steel Es= 200 GPa
Ultimate compressive strain in concrete Table 6.5 of IRC 112-2011 εcu3= 0.0035
Ultimate tensile strain in steel εst= 0.00217
Factor CI A2.9 of IRC 112-2011 λ= 0.8
Factor CI A2.9 of IRC 112-2011 η= 1
limiting neutral axia to depth ratio = Xu, max = εcu3
d εcu3+εst

Xu, max = 0.62


d
Limiting Moment Of Resistence Ru= 3.33 N/mm2

DESIGN OF TOP SLAB

Clear cover to main reinforcement = 40 mm


Overall depth provided at mid span = 450 mm
Overall depth provided at support = 450 mm
Effective depth provided at mid span = 402 mm
Effective depth provided at support = 402 mm
Grade of concrete= M 25
Grade of steel= 500 N/mm2

Max support bending moment = 99.348 kN-m


Effective depth required = 172.73 mm
Effective depth available = 402 mm

Max midspan bending moment = 160.87 kN-m


Effective depth required = 219.79 mm
Effective depth available = 402 mm
Design of reinforcement
Support section (horizontal reinforcement @slab both perdendicular to wall)
Bending moment at support section = 99.348 kN-m
Area of steel required = 467.97 mm2
Check for min. reinforcement
Clause 16.5.1.1 of IRC 112-2011
Min area of reinf 0.26*(fctm/fyk)*bt*d>0.0013btd = 459.89 mm2
Max area of reinf 0.025Ac = 11250.00 mm2
Distribution of steel
EXTR ST
Dia of Bar 16 mm 16 mm
Spacing of Bar 150 mm 150 mm
Area of Steel Provided 1341.01 mm2 1341.01 mm2
Total Area of Steel Provided= 2682.03 mm2

Provide 16 mm bars at 150 mm c/c For Top extra at support


Provide 16 mm bars at 150 mm c/c for Top full length

Distribution Reinforcement
20% of Main Reinforcement, IRC: 112-2011, clause 16.6.1.1 = 536.41 mm2
Diameter of Secondary Reinforcement = 10
Area of reinforcement = 78.58 mm2
Maximum spacing of distribution reinforcement = 400 mm
Spacing of reinforcement provided = 150 mm
Area of steel reinforcement provided = 523.866666667 mm2
Provide 10 mm bars at 150 mm c/c at perpendicular to main reinforcement

Midspan section (Horizontal reinforcement @slab both perdendicular to wall)


Bending moment at Center section = = 160.870 kN-m
Area of steel required = = 772.41 mm2
Check for min. reinforcement
Clause 16.5.1.1 of IRC 112-2011
Min area of reinf 0.26*(fctm/fyk)*bt*d>0.0013btd = 459.89 mm2
Max area of reinf 0.025Ac = 11250.00 mm2

Distribution of steel
ST CURT
Dia of Bar 16 mm 0 mm
Spacing of Bar 150 mm 150 mm
Area of Steel Provided 1341.01 mm2 0.00 mm2
Total Area of Steel Provided= 1341.01 mm2

Provide 16 mm bars at 150 mm c/c For Bottom full length


Provide 0 mm bars at 150 mm c/c for Bottom extra at mid span

Distribution Reinforcement
20% of Main Reinforcement, IRC: 112-2011, clause 16.6.1.1 = 268.21 mm2
Diameter of Secondary Reinforcement = 10
Area of reinforcement = 78.58 mm2
Maximum spacing of distribution reinforcement = 400 mm
Spacing of reinforcement provided = 150 mm
Area of steel reinforcement provided = 523.87 mm2
Provide 10 mm bars at 150 mm c/c at perpendicular to main reinforcement

Check For Shear:


Max. ultimate Shear force = 64.54 KN
bw= 1000.00 mm
ρ= 0.00334
K= 1.71
C/s area Ac = 402000.00 mm2
Concrete comp fcd= 11.17 Mpa
ϭ cp= 2.23 Mpa
VRD,C= 288.56 Kn
VRD,C MIN= 240.93 Kn
So VRD,C= 240.93 Kn
V= 0.55
VED = 64.54 Kn

Shear Reinforcement Not Required

Check For Deflection:


Load intensity on top slab= w= 174.90 Kn/m
Effective span= l= 3450.00 mm
Effective depth of slab= d= 402.00 mm
Moment of Inertia= I= 33500000000 mm4
Elastic modulus of steel E= 200.00 GPa
Actual Deflection= 5wl4/384EI = 0.0482 mm

Alloweble Deflection= span/1000 = 3.45 mm


Satisfies deflection Criterion

Check for Stress Limitation

Stress limitation shall be checked for Rare combination as per CI 12.2 of IRC 112-2011

Allowable compressive stress in concrete under Rare = 0.48fck


combination=
= 12.00 Mpa

Allowable compressive stress in concrete under quai permanent = 0.36fck


loads =
= 9.00 Mpa

= 0.8fyk
Allowable tensile stress in reinforcement=
= 400.00 Mpa
Check for Stress at maximum sagging moment
Stress calculation for short term effect
Notinal size= = 348.88 mm
Creep coefficient at 28 days= RH80% = 1.6298
Depth of Neutral axis= = 225 mm
Second moment of area= = 7593750000 mm4
Secant modulus elasticity of concrete = 30 GPa
Elastic modulus of steel = 200 GPa
As= = 1864.88 mm2
Effective depth available = 402.00 mm
Unfactored Sagging Moment = 77.32 Kn-m
The depth of concrete in compression is= = 113.19 mm
The cracked second moment of area in steel units is= = 228061287.419 mm4

The concrete stress at the top of the section is = 4.76 Mpa

The concrete Stress is within the limit, Hence OK.

The reinforcement stress at the top of the section is = 97.92 Mpa

The reinforcement Stress is within the limit, Hence OK.

Stress calculation for long term effect


Depth of Neutral axis= = 225
Second moment of area= = 7593750000
Mqp= = 0.225
Mst= = 0.775
long term modulus elasticity of concrete= = 21.951
Elastic modulus of steel = 200 GPa
As= = 1864.88 mm2
Effective depth available = 402.00 mm
Unfactored Sagging Moment = 77.32 Kn-m
The depth of concrete in compression is= = 135.11 mm
The cracked second moment of area in steel units is= = 223067311.337 mm4

The concrete stress at the top of the section is = 5.15 Mpa

The concrete Stress is within the limit, Hence OK.

The reinforcement stress at the top of the section is = 92.52 Mpa

The reinforcement Stress is within the limit, Hence OK.

Check for Stress at maximum hogging moment


Stress calculation for short term effect
Notinal size= = 348.88 mm
Creep coefficient at 28 days= RH80% = 1.6469
Depth of Neutral axis= = 225 mm
Second moment of area= = 7593750000 mm4
Secant modulus elasticity of concrete = 30 GPa
Elastic modulus of steel = 200 GPa
As= = 3205.89 mm2
Effective depth available = 402.00 mm
Unfactored Hogging Moment = 71.75 Kn-m
The depth of concrete in compression is= = 154.19 mm
The cracked second moment of area in steel units is= = 380163196.171 mm4
=
The concrete stress at the top of the section is = = 4.37 Mpa

The concrete Stress is within the limit, Hence OK.

The reinforcement stress at the top of the section is = 46.78 Mpa

The reinforcement Stress is within the limit, Hence OK.

Stress calculation for long term effect


Depth of Neutral axis= = 225
Second moment of area= = 7593750000
Mqp= = 0.225
Mst= = 0.775
long term modulus elasticity of concrete= = 21.89
Elastic modulus of steel = 200 GPa
As= = 3205.89 mm2
Effective depth available = 402.00 mm
Unfactored Hogging Moment = 71.75 Kn-m
The depth of concrete in compression is= = 185.53 mm
The cracked second moment of area in steel units is= = 383204784.114 mm4

The concrete stress at the top of the section is = 3.81 Mpa

The concrete Stress is within the limit, Hence OK.

The reinforcement stress at the top of the section is = 40.54 Mpa

The reinforcement Stress is within the limit, Hence OK.

Check for Crack width

Maximum permissible value of crack width for moderate exposure= 0.3 mm

Check for crackwidth at maximun sagging moment


Tensile strength of concrete= fct,eff 2.2 MPa
Depth of neutral axis= X 185.53 mm
Effective heigth of concrete in tension= hceff 88.16 mm
Area of concrete effective in tension= Aceff 88160 mm2/m
Modular ratio= αe 6.67
Factor dependent on duration of load= kt 0.5

Coefficient which takes account of bond properties of bonded reinforcement


k1 0.8
Coefficient which takes account of distribution of strain k2 0.5

As 1864.88 mm2
factor = 0.03

maximum crack spacing= S r,max 226.67 mm

minimum value of reinfocement stress 0.6σs/Es 0.00012162

εsm-εcm = -1.731833E-05

Maximum Crack width,wk= 0.03 mm


< 0.3 mm
Crack width is within the permissible limit.

Check for crackwidth at maximun Hogging moment

Tensile strength of concrete= fct,eff 2.2 MPa


Depth of neutral axis= X 185.53 mm
Effective heigth of concrete in tension= hceff 88.16 mm
Area of concrete effective in tension= Aceff 88160 mm2/m
Modular ratio= αe 6.67
Factor dependent on duration of load= kt 0.5

Coefficient which takes account of bond properties of bonded reinforcement


k1 0.8
Coefficient which takes account of distribution of strain k2 0.5

As 3205.89 mm2
factor = 0.04

maximum crack spacing= S r,max 204.00 mm

minimum value of reinfocement stress 0.6σs/Es 0.00012162


εsm-εcm = 0.000028515

Maximum Crack width,wk= 0.03 mm


< 0.3 mm
Crack width is within the permissible limit.
REINFORCEMENT FOR BOTTOM SLAB
DESIGN PARAMETERS
Grade of concrete fck= M25
Grade of steel fyk= Fe 500
Tensile strength of concrete fctm= 2.2 MPa
Partial safty factor for concrete for basic & seismic comb. ym= 1.5
Partial safty factor for reinforcement ys= 1.15
Design compressive strength of concrete fcd= α*fck/ym
Factor CI 6.4.2.8 of IRC 112-2011 α= 0.67
Design compressive strength of steel fcd= 11.17 MPa
Design compressive strength of concrete fyd= 434.79 MPa
Secant modulus elasticity of concrete Ecm= 30 GPa
Elastic modulus of steel Es= 200 GPa
Ultimate compressive strain in concrete Table 6.5 of IRC 112-2011 εcu3= 0.0035
Ultimate tensile strain in steel εst= 0.00217
Factor CI A2.9 of IRC 112-2011 λ= 0.8
Factor CI A2.9 of IRC 112-2011 η= 1
limiting neutral axia to depth ratio = Xu, max = εcu3
d εcu3+εst

Xu, max = 0.62


d
Limiting Moment Of Resistence Ru= 3.33 N/mm2

DESIGN OF BOTTOM SLAB

Clear cover to main reinforcement = 40 mm


Overall depth provided at mid span = 500 mm
Overall depth provided at support = 500 mm
Effective depth provided at mid span = 452 mm
Effective depth provided at support = 452 mm
Grade of concrete= M 25
Grade of steel= 500 N/mm2

Max support bending moment = 120.816 kN-m


Effective depth required = 190.48 mm
Effective depth available = 452 mm

Max midspan bending moment = 161.41 kN-m


Effective depth required = 220.16 mm
Effective depth available = 452 mm
Design of reinforcement
Support section (horizontal reinforcement @slab both perdendicular to wall)
Bending moment at support section = 120.816 kN-m
Area of steel required = 505.57 mm2
Check for min. reinforcement
Clause 16.5.1.1 of IRC 112-2011
Min area of reinf 0.26*(fctm/fyk)*bt*d>0.0013btd = 517.09 mm2
Max area of reinf 0.025Ac = 12500.00 mm2
Distribution of steel
CURT ST
Dia of Bar 16 mm 16 mm
Spacing of Bar 150 mm 150 mm
Area of Steel Provided 1341.01 mm2 1341.01 mm2
Total Area of Steel Provided= 2682.03 mm2

Provide 16 mm bars at 150 mm c/c For Bottom extra at support


Provide 16 mm bars at 150 mm c/c for bottom full length

Distribution Reinforcement
20% of Main Reinforcement, IRC: 112-2011, clause 16.6.1.1 = 536.41 mm2
Diameter of Secondary Reinforcement = 12
Area of reinforcement = 113.15 mm2
Maximum spacing of distribution reinforcement = 400 mm
Spacing of reinforcement provided = 150 mm
Area of steel reinforcement provided = 754.33333333 mm2
Provide 12 mm bars at 150 mm c/c at perpendicular to main reinforcement

Midspan section (Horizontal reinforcement @slab both perdendicular to wall)


Bending moment at Center section = = 161.40693913 kN-m
Area of steel required = = 682.08 mm2
Check for min. reinforcement
Clause 16.5.1.1 of IRC 112-2011
Min area of reinf 0.26*(fctm/fyk)*bt*d>0.0013btd = 517.09 mm2
Max area of reinf 0.025Ac = 12500.00 mm2

Distribution of steel
CURT ST
Dia of Bar 0 mm 16 mm
Spacing of Bar 200 mm 150 mm
Area of Steel Provided 0.00 mm2 1341.01 mm2
Total Area of Steel Provided= 1341.01 mm2

Provide 16 mm bars at 150 mm c/c For Top full length


Provide 0 mm bars at 200 mm c/c for Top extra at mid span

Distribution Reinforcement
20% of Main Reinforcement, IRC: 112-2011, clause 16.6.1.1 = 268.21 mm2
Diameter of Secondary Reinforcement = 12
Area of reinforcement = 113.15 mm2
Maximum spacing of distribution reinforcement = 400 mm
Spacing of reinforcement provided = 150 mm
Area of steel reinforcement provided = 754.33 mm2
Provide 12 mm bars at 150 mm c/c at perpendicular to main reinforcement

Check For Shear:


Max. ultimate Shear force = 120.15 Kn
bw= 1000.00 mm
ρ= 0.00297
K= 1.6652
C/s area Ac = 452000.00 mm2
Concrete comp fcd= 11.17 Mpa
ϭ cp= 2.23 Mpa
VRD,C= 313.97 Kn
VRD,C MIN= 268.08 Kn
So VRD,C= 268.08 Kn
V= 0.55
VED = 120.15 Kn

Shear Reinforcement Not Required

Check For Deflection:


Load intensity on top slab= w= 189.69 Kn/m
Effective span= l= 3450.00 mm
Effective depth of slab= d= 452.00 mm
Moment of Inertia= I= 37666666666.67 mm4
Elastic modulus of steel E= 200.00 GPa
Actual Deflection= 5wl4/384EI = 0.0465 mm

Alloweble Deflection= span/1000 = 3.45 mm


Satisfies deflection Criterion
Check for Stress Limitation

Stress limitation shall be checked for Rare combination as per CI 12.2 of IRC 112-2011

Allowable compressive stress in concrete under Rare combination= 0.48fck


12 Mpa

Allowable compressive stress in concrete under quai permanent loads = 0.36fck


9 Mpa

Allowable tensile stress in reinforcement= 0.8fyk


400 Mpa
Check for Stress at maximum sagging moment
Stress calculation for short term effect
Notinal size= = 348.88 mm
Creep coefficient at 28 days= RH80% = 1.6428
Depth of Neutral axis= = 250 mm
Second moment of area= = 10416666667 mm4
Secant modulus elasticity of concrete = 30 GPa
Elastic modulus of steel = 200 GPa
As= = 2095.35 mm2
Effective depth available = 452.00 mm
Unfactored Sagging Moment = 111.37 Kn-m
The depth of concrete in compression is= = 127.21 mm
The cracked second moment of area in steel units is= = 323963123.32 mm4

The concrete stress at the top of the section is = 0.56 Mpa

The concrete Stress is within the limit, Hence OK.

The reinforcement stress at the top of the section is = 111.66 Mpa

The reinforcement Stress is within the limit, Hence OK.

Stress calculation for long term effect


Depth of Neutral axis= = 250
Second moment of area= = 10416666667
Mqp= = 0.225
Mst= = 0.775
long term modulus elasticity of concrete= = 21.903725824
Elastic modulus of steel = 200 GPa
As= = 2095.35 mm2
Effective depth available = 452.00 mm
Unfactored Sagging Moment = 111.37 Kn-m
The depth of concrete in compression is= = 152.03 mm
The cracked second moment of area in steel units is= = 316822209.48 mm4

The concrete stress at the top of the section is = -0.14 Mpa

The concrete Stress is within the limit, Hence OK.

The reinforcement stress at the top of the section is = 105.45 Mpa

The reinforcement Stress is within the limit, Hence OK.

Check for Stress at maximum hogging moment


Stress calculation for short term effect
Notinal size= = 348.88 mm
Creep coefficient at 28 days= RH80% = 1.6298
Depth of Neutral axis= = 250 mm
Second moment of area= = 10416666667 mm4
Secant modulus elasticity of concrete = 30 GPa
Elastic modulus of steel = 200 GPa
As= = 3436.36 mm2
Effective depth available = 452.00 mm
Unfactored Hogging Moment = 84.62 Kn-m
The depth of concrete in compression is= = 168.64 mm
The cracked second moment of area in steel units is= = 515716713.13 mm4
=
The concrete stress at the top of the section is = = 4.16 Mpa

The concrete Stress is within the limit, Hence OK.

The reinforcement stress at the top of the section is = 46.5 Mpa

The reinforcement Stress is within the limit, Hence OK.

Stress calculation for long term effect


Depth of Neutral axis= = 250
Second moment of area= = 10416666667
Mqp= = 0.225
Mst= = 0.775
long term modulus elasticity of concrete= = 21.950603825
Elastic modulus of steel = 200 GPa
As= = 3436.36 mm2
Effective depth available = 452.00 mm
Unfactored Hogging Moment = 84.62 Kn-m
The depth of concrete in compression is= = 202.44 mm
The cracked second moment of area in steel units is= = 517534995 mm4

The concrete stress at the top of the section is = 3.64 Mpa

The concrete Stress is within the limit, Hence OK.

The reinforcement stress at the top of the section is = 40.81 Mpa

The reinforcement Stress is within the limit, Hence OK.

Check for Crack width

Maximum permissible value of crack width for moderate exposure= 0.3 mm

Check for crackwidth at maximun sagging moment


Tensile strength of concrete= fct,eff 2.2 MPa
Depth of neutral axis= X 202.44 mm
Effective heigth of concrete in tension= hceff 99.19 mm
Area of concrete effective in tension= Aceff 99190 mm2/m
Modular ratio= αe 6.67
Factor dependent on duration of load= kt 0.5

Coefficient which takes account of bond properties of bonded reinforcement


k1 0.8
Coefficient which takes account of distribution of strain k2 0.5

As 2095.35 mm2
factor = 0.03

maximum crack spacing= S r,max 226.66666667 mm

minimum value of reinfocement stress 0.6σs/Es 0.00012243

εsm-εcm = -1.59683E-05

Maximum Crack width,wk= 0.03 mm


< 0.3 mm
Crack width is within the permissible limit.

Check for crackwidth at maximun Hogging moment

Tensile strength of concrete= fct,eff 2.2 MPa


Depth of neutral axis= X 202.44 mm
Effective heigth of concrete in tension= hceff 99.19 mm
Area of concrete effective in tension= Aceff 99190 mm2/m
Modular ratio= αe 6.67
Factor dependent on duration of load= kt 0.5

Coefficient which takes account of bond properties of bonded reinforcement


k1 0.8
Coefficient which takes account of distribution of strain k2 0.5

As 3436.36 mm2
factor = 0.04

maximum crack spacing= S r,max 204 mm

minimum value of reinfocement stress 0.6σs/Es 0.00012243


εsm-εcm = 0.000029865

Maximum Crack width,wk= 0.03 mm


< 0.3 mm
Crack width is within the permissible limit.
REINFORCEMENT FOR OUTER SIDE WALLS
DESIGN PARAMETERS
Grade of concrete fck= M25

Grade of steel fyk= Fe 500


Tensile strength of concrete fctm= 2.2 MPa
Partial safty factor for concrete for basic & seismic comb. ym= 1.5
Partial safty factor for reinforcement ys= 1.15
Design compressive strength of concrete fcd= α*fck/ym
Factor CI 6.4.2.8 of IRC 112-2011 α= 0.67
Design compressive strength of steel fcd= 11.17 MPa
Design compressive strength of concrete fyd= 434.79 MPa
Secant modulus elasticity of concrete Ecm= 30 GPa
Elastic modulus of steel Es= 200 GPa
Ultimate compressive strain in concrete Table 6.5 of IRC 112-2011 εcu3= 0.0035
Ultimate tensile strain in steel εst= 0.00217
Factor CI A2.9 of IRC 112-2011 λ= 0.8
Factor CI A2.9 of IRC 112-2011 η= 1
limiting neutral axia to depth ratio = Xu, max = εcu3
d εcu3+εst

Xu, max = 0.62


d
Limiting Moment Of Resistence Ru= 3.33 N/mm2

DESIGN OF SIDE WALLS

Clear cover to main reinforcement = 75 mm


Overall depth provided at mid span = 450 mm
Overall depth provided at support = 450 mm
Effective depth provided at mid span = 367 mm
Effective depth provided at support = 367 mm
Grade of concrete= M 25
Grade of steel= 500 N/mm2

Max support bending moment = 110.082 kN-m


Effective depth required = 230.80 mm
Effective depth available = 367 mm

Max midspan bending moment = 26.45 kN-m


Effective depth required = 89.12 mm
Effective depth available = 367 mm
Design of reinforcement
Support section (horizontal reinforcement @slab both perdendicular to wall)
Bending moment at support section = 110.082 kN-m
Area of steel required = 573.72 mm2
Check for min. reinforcement
Clause 16.5.1.1 of IRC 112-2011
Min area of reinf 0.26*(fctm/fyk)*bt*d>0.0013btd = 419.85 mm2
Max area of reinf 0.025Ac = 11250.00 mm2
Distribution of steel
ST CURT
Dia of Bar 16 mm 16 mm
Spacing of Bar 150 mm 150 mm
Area of Steel Provided 1341.01 mm2 1341.01 mm2
Total Area of Steel Provided= 2682.03 mm2

Provide 16 mm bars at 150 mm c/c For extra at support


Provide 16 mm bars at 150 mm c/c for Outer side full length

Distribution Reinforcement
20% of Main Reinforcement, IRC: 112-2011, clause 16.6.1.1 = 536.41 mm2
Diameter of Secondary Reinforcement = 12
Area of reinforcement = 113.15 mm2
Maximum spacing of distribution reinforcement = 400 mm
Spacing of reinforcement provided = 150 mm
Area of steel reinforcement provided = 754.3333333 mm2
Provide 12 mm bars at 150 mm c/c at perpendicular to main reinforcement

Midspan section (Horizontal reinforcement @slab both perdendicular to wall)


Bending moment at Center section = = 26.44586719 kN-m
Area of steel required = = 133.77 mm2
Check for min. reinforcement
Clause 16.5.1.1 of IRC 112-2011
Min area of reinf 0.26*(fctm/fyk)*bt*d>0.0013btd = 419.85 mm2
Max area of reinf 0.025Ac = 11250.00 mm2

Distribution of steel
ST
Dia of Bar 16 mm 0 mm
Spacing of Bar 150 mm 250 mm
Area of Steel Provided 1341.01 mm2 0.00 mm2
Total Area of Steel Provided= 1341.01 mm2

Provide 16 mm bars at 150 mm c/c For outer side wall full length

Distribution Reinforcement
20% of Main Reinforcement, IRC: 112-2011, clause 16.6.1.1 = 268.21 mm2
Diameter of Secondary Reinforcement = 12
Area of reinforcement = 113.15 mm2
Maximum spacing of distribution reinforcement = 400 mm
Spacing of reinforcement provided = 150 mm
Area of steel reinforcement provided = 754.33 mm2
Provide 12 mm bars at 150 mm c/c at perpendicular to main reinforcement

Check For Shear:


Max. ultimate Shear force = 92.34 Kn
bw= 1000.00 mm
ρ= 0.00365
K= 1.7382
C/s area Ac = 367000.00 mm2
Concrete comp fcd= 11.17 Mpa
ϭ cp= 2.23 Mpa
VRD,C= 270.52 Kn
VRD,C MIN= 221.82 Kn
So VRD,C= 221.82 Kn
V= 0.55
VED = 92.34 Kn

Shear Reinforcement Not Required

Check for Stress Limitation

Stress limitation shall be checked for Rare combination as per CI 12.2 of IRC 112-2011

Allowable compressive stress in concrete under Rare combination= 0.48fck


12 Mpa

Allowable compressive stress in concrete under quai permanent loads = 0.36fck


9 Mpa

Allowable tensile stress in reinforcement= 0.8fyk


400 Mpa

Check for Stress at maximum sagging moment


Stress calculation for short term effect
Notinal size= = 348.88 mm
Creep coefficient at 28 days= RH80% = 1.696
Depth of Neutral axis= = 225 mm
Second moment of area= = 7593750000 mm4
Secant modulus elasticity of concrete = 30 GPa
Elastic modulus of steel = 200 GPa
As= = 2095.35 mm2
Effective depth available = 367.00 mm
Unfactored Sagging Moment = 26.45 Kn-m
The depth of concrete in compression is= = 116.19 mm
The cracked second moment of area in steel units is= = 210238081 mm4

The concrete stress at the top of the section is = 2.2 Mpa

The concrete Stress is within the limit, Hence OK.

The reinforcement stress at the top of the section is = 31.55 Mpa


The reinforcement Stress is within the limit, Hence OK.

Stress calculation for long term effect


Depth of Neutral axis= = 225
Second moment of area= = 7593750000
Mqp= = 0.225
Mst= = 0.775
long term modulus elasticity of concrete= = 21.71395483
Elastic modulus of steel = 200 GPa
As= = 2095.35 mm2
Effective depth available = 367.00 mm
Unfactored Sagging Moment = 26.45 Kn-m
The depth of concrete in compression is= = 139.88 mm
The cracked second moment of area in steel units is= = 207135319 mm4

The concrete stress at the top of the section is = 1.94 Mpa

The concrete Stress is within the limit, Hence OK.

The reinforcement stress at the top of the section is = 29 Mpa

The reinforcement Stress is within the limit, Hence OK.

Check for Stress at maximum hogging moment


Stress calculation for short term effect
Notinal size= = 348.88 mm
Creep coefficient at 28 days= RH80% = 1.6298
Depth of Neutral axis= = 225 mm
Second moment of area= = 7593750000 mm4
Secant modulus elasticity of concrete = 30 GPa
Elastic modulus of steel = 200 GPa
As= = 3436.36 mm2
Effective depth available = 367.00 mm
Unfactored Hogging Moment = 51.74 Kn-m
The depth of concrete in compression is= = 154.6 mm
The cracked second moment of area in steel units is= = 339783087 mm4
=
The concrete stress at the top of the section is = = 3.54 Mpa

The concrete Stress is within the limit, Hence OK.

The reinforcement stress at the top of the section is = 32.35 Mpa

The reinforcement Stress is within the limit, Hence OK.

Stress calculation for long term effect


Depth of Neutral axis= = 225
Second moment of area= = 7593750000
Mqp= = 0.225
Mst= = 0.775
long term modulus elasticity of concrete= = 21.95060382
Elastic modulus of steel = 200 GPa
As= = 3436.36 mm2
Effective depth available = 367.00 mm
Unfactored Hogging Moment = 51.74 Kn-m
The depth of concrete in compression is= = 186.11 mm
The cracked second moment of area in steel units is= = 348274672 mm4

The concrete stress at the top of the section is = 3.04 Mpa

The concrete Stress is within the limit, Hence OK.

The reinforcement stress at the top of the section is = 26.88 Mpa

The reinforcement Stress is within the limit, Hence OK.

Check for Crack width

Maximum permissible value of crack width for moderate exposure= 0.3 mm

Check for crackwidth at maximun sagging moment

Tensile strength of concrete= fct,eff 2.2 MPa


Depth of neutral axis= X 186.11 mm
Effective heigth of concrete in tension= hceff 87.97 mm
Area of concrete effective in tension= Aceff 87970 mm2/m
Modular ratio= αe 6.67
Factor dependent on duration of load= kt 0.5

Coefficient which takes account of bond properties of bonded reinforcement


k1 0.8
Coefficient which takes account of distribution of strain k2 0.5

As 2095.35 mm2
factor = 0.03

maximum crack spacing= S r,max 345.6666667 mm

minimum value of reinfocement stress 0.6σs/Es 0.00008064


εsm-εcm = -8.5618E-05

Maximum Crack width,wk= 0.03 mm


< 0.3 mm
Crack width is within the permissible limit.

Check for crackwidth at maximun Hogging moment

Tensile strength of concrete= fct,eff 2.2 MPa


Depth of neutral axis= X 186.11 mm
Effective heigth of concrete in tension= hceff 87.97 mm
Area of concrete effective in tension= Aceff 87970 mm2/m
Modular ratio= αe 6.67
Factor dependent on duration of load= kt 0.5

Coefficient which takes account of bond properties of bonded reinforcement


k1 0.8
Coefficient which takes account of distribution of strain k2 0.5

As 3436.36 mm2
factor = 0.04

maximum crack spacing= S r,max 323 mm

minimum value of reinfocement stress 0.6σs/Es 0.00008064

εsm-εcm = -3.9785E-05

Maximum Crack width,wk= 0.03 mm


< 0.3 mm
Crack width is within the permissible limit.
Inner Face of Side wall

Bending Moment on Inner face is not present, hence minimum Reinforcement


Provided
On inner face of side wall
Clause 16.5.1.1 of IRC 112-2011
Clear cover to Reinforcement on inner face = 200 GPa
Effective Depth = 367 mm
Minimum area of Reinforcement 0.26*(fctm/fyk)*bt*d > 0.0013btd = 419.848 mm2
Diameter of reinforcement = 16 mm
Area of reinforcement = 201.152 mm2
Spacing of reinforcement = 150 mm
Area of reinforcement provided = 1341.02 mm2

Provide 16 mm bars at 150 mm c/c at Inner face of Vertical Wall


REINFORCEMENT FOR INNER WALLS
DESIGN PARAMETERS
Grade of concrete fck= M25

Grade of steel fyk= Fe 500


Tensile strength of concrete fctm= 2.2 MPa
Partial safty factor for concrete for basic & seismic comb. ym= 1.5
Partial safty factor for reinforcement ys= 1.15
Design compressive strength of concrete fcd= α*fck/ym
Factor CI 6.4.2.8 of IRC 112-2011 α= 0.67
Design compressive strength of steel fcd= 11.17 MPa
Design compressive strength of concrete fyd= 434.79 MPa
Secant modulus elasticity of concrete Ecm= 30 GPa
Elastic modulus of steel Es= 200 GPa
Ultimate compressive strain in concrete Table 6.5 of IRC 112-2011 εcu3= 0.0035
Ultimate tensile strain in steel εst= 0.00217
Factor CI A2.9 of IRC 112-2011 λ= 0.8
Factor CI A2.9 of IRC 112-2011 η= 1
limiting neutral axia to depth ratio = Xu, max = εcu3
d εcu3+εst

Xu, max = 0.62


d
Limiting Moment Of Resistence Ru= 3.33 N/mm2

DESIGN OF INNER WALLS

Clear cover to main reinforcement = 75 mm


Overall depth provided at mid span = 400 mm
Overall depth provided at support = 400 mm
Effective depth provided at mid span = 317 mm
Effective depth provided at support = 317 mm
Grade of concrete= M 25
Grade of steel= 500 N/mm2

Max support bending moment = 72.006 kN-m


Effective depth required = 177.10 mm
Effective depth available = 317 mm

Max midspan bending moment = 26.45 kN-m


Effective depth required = 89.12 mm
Effective depth available = 317 mm
Design of reinforcement
Support section (horizontal reinforcement @slab both perdendicular to wall)
Bending moment at support section = 72.006 kN-m
Area of steel required = 432.29 mm2
Check for min. reinforcement
Clause 16.5.1.1 of IRC 112-2011
Min area of reinf 0.26*(fctm/fyk)*bt*d>0.0013btd = 362.65 mm2
Max area of reinf 0.025Ac = 10000.00 mm2
Distribution of steel
ST 0
Dia of Bar 16 mm 0 mm
Spacing of Bar 150 mm 150 mm
Area of Steel Provided 1341.01 mm2 0.00 mm2
Total Area of Steel Provided= 1341.01 mm2

Provide 0 mm bars at 150 mm c/c For extra at support


Provide 16 mm bars at 150 mm c/c for full length

Distribution Reinforcement
20% of Main Reinforcement, IRC: 112-2011, clause 16.6.1.1 = 268.21 mm2
Diameter of Secondary Reinforcement = 10
Area of reinforcement = 78.58 mm2
Maximum spacing of distribution reinforcement = 400 mm
Spacing of reinforcement provided = 150 mm
Area of steel reinforcement provided = 523.8666667 mm2
Provide 10 mm bars at 150 mm c/c at perpendicular to main reinforcement

Midspan section (Horizontal reinforcement @slab both perdendicular to wall)


Bending moment at Center section = = 26.44586719 kN-m
Area of steel required = = 155.35 mm2
Check for min. reinforcement
Clause 16.5.1.1 of IRC 112-2011
Min area of reinf 0.26*(fctm/fyk)*bt*d>0.0013btd = 362.65 mm2
Max area of reinf 0.025Ac = 10000.00 mm2

Distribution of steel
Outer side 2
Dia of Bar 20 mm 0 mm
Spacing of Bar 150 mm 250 mm
Area of Steel Provided 2095.33 mm2 0.00 mm2
Total Area of Steel Provided= 2095.33 mm2

Provide 20 mm bars at 150 mm c/c For outer side extra

Distribution Reinforcement
20% of Main Reinforcement, IRC: 112-2011, clause 16.6.1.1 = 419.07 mm2
Diameter of Secondary Reinforcement = 10
Area of reinforcement = 78.58 mm2
Maximum spacing of distribution reinforcement = 400 mm
Spacing of reinforcement provided = 150 mm
Area of steel reinforcement provided = 523.87 mm2
Provide 10 mm bars at 150 mm c/c at perpendicular to main reinforcement

Check For Shear:


Max. ultimate Shear force = 127.67 Kn
bw= 1000.00 mm
ρ= 0.00661
K= 1.7943
C/s area Ac = 317000.00 mm2
Concrete comp fcd= 11.17 Mpa
ϭ cp= 2.23 Mpa
VRD,C= 266.20 Kn
VRD,C MIN= 194.36 Kn
So VRD,C= 194.36 Kn
V= 0.55
VED = 127.67 Kn

Shear Reinforcement Not Required

Check for Stress Limitation

Stress limitation shall be checked for Rare combination as per CI 12.2 of IRC 112-2011

Allowable compressive stress in concrete under Rare combination= 0.48fck


12 Mpa

Allowable compressive stress in concrete under quai permanent loads = 0.36fck


9 Mpa

Allowable tensile stress in reinforcement= 0.8fyk


400 Mpa

Check for Stress at maximum sagging moment


Stress calculation for short term effect
Notinal size= = 348.88 mm
Creep coefficient at 28 days= RH80% = 1.696
Depth of Neutral axis= = 200 mm
Second moment of area= = 5333333333 mm4
Secant modulus elasticity of concrete = 30 GPa
Elastic modulus of steel = 200 GPa
As= = 2619.20 mm2
Effective depth available = 317.00 mm
Unfactored Sagging Moment = 26.45 Kn-m
The depth of concrete in compression is= = 124.12 mm
The cracked second moment of area in steel units is= = 193049533 mm4

The concrete stress at the top of the section is = 2.56 Mpa

The concrete Stress is within the limit, Hence OK.

The reinforcement stress at the top of the section is = 26.43 Mpa


The reinforcement Stress is within the limit, Hence OK.

Stress calculation for long term effect


Depth of Neutral axis= = 200
Second moment of area= = 5333333333
Mqp= = 0.225
Mst= = 0.775
long term modulus elasticity of concrete= = 21.71395483
Elastic modulus of steel = 200 GPa
As= = 2619.20 mm2
Effective depth available = 317.00 mm
Unfactored Sagging Moment = 26.45 Kn-m
The depth of concrete in compression is= = 150.13 mm
The cracked second moment of area in steel units is= = 195392025 mm4

The concrete stress at the top of the section is = 2.21 Mpa

The concrete Stress is within the limit, Hence OK.

The reinforcement stress at the top of the section is = 22.59 Mpa

The reinforcement Stress is within the limit, Hence OK.

Check for Stress at maximum hogging moment


Stress calculation for short term effect
Notinal size= = 348.88 mm
Creep coefficient at 28 days= RH80% = 1.6298
Depth of Neutral axis= = 200 mm
Second moment of area= = 5333333333 mm4
Secant modulus elasticity of concrete = 30 GPa
Elastic modulus of steel = 200 GPa
As= = 1864.88 mm2
Effective depth available = 317.00 mm
Unfactored Hogging Moment = 56.74 Kn-m
The depth of concrete in compression is= = 102.09 mm
The cracked second moment of area in steel units is= = 139332900 mm4
=
The concrete stress at the top of the section is = = 2.24 Mpa

The concrete Stress is within the limit, Hence OK.

The reinforcement stress at the top of the section is = 87.51 Mpa

The reinforcement Stress is within the limit, Hence OK.

Stress calculation for long term effect


Depth of Neutral axis= = 200
Second moment of area= = 5333333333
Mqp= = 0.225
Mst= = 0.775
long term modulus elasticity of concrete= = 21.95060382
Elastic modulus of steel = 200 GPa
As= = 1864.88 mm2
Effective depth available = 317.00 mm
Unfactored Hogging Moment = 56.74 Kn-m
The depth of concrete in compression is= = 122.17 mm
The cracked second moment of area in steel units is= = 137498167 mm4

The concrete stress at the top of the section is = 3.54 Mpa

The concrete Stress is within the limit, Hence OK.

The reinforcement stress at the top of the section is = 80.4 Mpa

The reinforcement Stress is within the limit, Hence OK.

Check for Crack width

Maximum permissible value of crack width for moderate exposure= 0.3 mm

Check for crackwidth at maximun sagging moment

Tensile strength of concrete= fct,eff 2.2 MPa


Depth of neutral axis= X 122.17 mm
Effective heigth of concrete in tension= hceff 92.61 mm
Area of concrete effective in tension= Aceff 92610 mm2/m
Modular ratio= αe 6.67
Factor dependent on duration of load= kt 0.5

Coefficient which takes account of bond properties of bonded reinforcement


k1 0.8
Coefficient which takes account of distribution of strain k2 0.5

Diameter of reinforcement bar 1 ø1 20


Number of bar 1 per m width n1 6.666666667
Diameter of reinforcement bar 2 ø2
Number of bar 2 per m width n2
Equivalent diameter of reinforcement ø
As 2619.20 mm2
factor = 0.03

maximum crack spacing= S r,max 368.3333333 mm

minimum value of reinfocement stress 0.6σs/Es 0.0002412


εsm-εcm = 0.000181982

Maximum Crack width,wk= 0.09 mm


< 0.3 mm
Crack width is within the permissible limit.

Check for crackwidth at maximun Hogging moment

Tensile strength of concrete= fct,eff 2.2 MPa


Depth of neutral axis= X 122.17 mm
Effective heigth of concrete in tension= hceff 92.61 mm
Area of concrete effective in tension= Aceff 92610 mm2/m
Modular ratio= αe 6.67
Factor dependent on duration of load= kt 0.5

Coefficient which takes account of bond properties of bonded reinforcement


k1 0.8
Coefficient which takes account of distribution of strain k2 0.5

As 1864.88 mm2
factor = 0.03

maximum crack spacing= S r,max 345.6666667 mm

minimum value of reinfocement stress 0.6σs/Es 0.0002412

εsm-εcm = 0.000181982

Maximum Crack width,wk= 0.09 mm


< 0.3 mm
Crack width is within the permissible limit.
DESIGN OF BOX CULVERT (3.0x 3.0 , 3 VENT WITHOUT EARTH CUSHION)

BAR BENDING SCHEDULE

Total UNIT WT
Nos Shape Of Bars Bar dia, mm Spacing M1, mm M2, mm Length, mm No of Bars Wieght, Kgs
Length, m (KG)

1 16 150 1350 10600 13300 41 546.0 1.58 862.68

2 16 150 1300 3850 6450 84 542.0 1.58 856.36

3 0 200 2100 2100 31 66.0 0 0.00

4 16 150 580 3800 4960 41 204.0 1.58 322.32

5 16 150 3850 400 4650 82 382.0 1.58 603.56

6 16 150 320 10600 11240 41 461.0 1.58 728.38

7 0 150 2100 2100 41 87.0 0 0.00

8 16 150 1300 10600 13200 41 542.0 1.58 856.36

9 10 200 200 1781 2181 62 136.0 0.62 84.32

10 10 200 200 1922 2322 62 144.0 0.62 89.28

11 10 150 340 5900 6580 38 251.0 0.62 155.62

12 12 150 340 5900 6580 38 251.0 0.89 223.39

13 12 150 350 5900 6600 39 258.0 0.89 229.62

14 8 128 5900 6156 12 74.0 0.39 28.86

15 12 150 340 5900 6580 4 27.0 0.89 24.03

16 12 5900 5900 10 59.0 0.89 52.51

17 12 200 1006 1268 2274 62 141.0 0.89 125.49

18 10 160 5900 6220 4 25.0 0.62 15.50

19 10 160 5900 6220 8 50.0 0.62 31.00

20 10 150 1100 1556 4156 54 225.0 0.62 139.50

21 10 160 4600 4920 20 99.0 0.62 61.38

22 12 150 350 5900 6600 39 258.0 0.89 229.62

Total steel, Kgs 5719.8


Total steel for single group, Tonne 5.72
No of group 2
Total Steel for 2 groups,Tonne 11.44
RETAINING WALL
0 HEIGHT OF WALL 4.450 m

T2

H
EARTH FACE

GL

B2 T1 B1

D
B
HEEL TOE

DATA
BACK FILL Angle of slope of bank Ф(deg) to horizontal, (max Ф=θ) 0
Angle of repose θ (deg) = 30
Density of back fill (kN/m3) = 18
Density of saturated back fill (kN/m3) = 20.8
Surcharge Uniform Surcharge load (kN/m2) = 21.6
Base Soil Safe Bearing Capacity of Soil (kN/m 2) = 140
Coefficient of base friction between soil and concrete 0.6

Wall Height of Wall, H (m) 4.450


Profile Depth of Water Table below GL, H1 (m) 5.450
Depth of soil above toe slab, H2 (m) 1.000
Wall thickness at top of base slab, T1 (m) 0.500
Wall thickness at top, T2 (m) 0.300
Base slab width, B (m) 3.250
Base slab toe dimension, B1 (m) 1.300
Base slab thickness, D1 (m) 0.500
Base Heel slab dimension, B2 (m) 1.450
Base Heel slab thickness, D2 (m) 0.500
Shear key depth, D3 (m) 0.000
Shear key thickness, T3 (m) 0.000
Material Concrete Grade, fck M 25
Data Steel Reinforcement Grade, fy (N/mm2) = 500
Concrete In base slab (mm) = 50
Cover In earth face of wall (mm) = 50
In front face of wall (mm) = 50
Active Coefficient of earth pressure 0.33
Passive Coefficient of earth pressure 3.00
Concrete density kN/m3 25
Water density kN/m3 10

Horizontal Pressures, Moments and Shears on Wall (Service Load Condn.)

Bending
Shear on(-
Depth of wall Horizontal Pressure on wall (kN/m 2) Bending Moment Shear on Moment(-
surcharge)
Surcharge)

on wall
from top (m) Soil Pressu Grd Water Pr Surcharge Pr. on wall (kNm/m) wall (kN/m) wall (kN/m)
(kNm/m)
0.0 0.00 0 7.200 0.00 0.00 0.00 0.00
0.89 5.34 0 7.200 3.56 8.78 0.70 2.38
1.78 10.68 0 7.200 17.05 22.32 5.64 9.51
2.67 16.02 0 7.200 44.70 40.61 19.03 21.39
3.56 21.36 0 7.200 90.74 63.65 45.12 38.02
4.45 26.70 0 7.200 159.41 91.45 88.12 59.41
4.95 29.70 0 7.200 209.50 109.15 121.29 73.51

Value at max
depth neglecting
4.5 209.50 109.15 121.29 73.51
surcharge
pressure =
Passive Resistance Considered
Passive pressure at top, (kN/m2) = 54.00
Passive pressure at bottom, (kN/m2) = 81.00
Depth of passive resistance (m) = 0.50
Passive Force (kN/m) = 33.75
Passive Moment about Toe (kNm/m) = -5.49

Vertical Loads per metre length (Service Load condition)


Load case Vertical load (kN) Lever arm to Toe (m) B.M. (kNm)
Wall (Rectangle) 33.375 1.650 55.069
Wall (Triangle) 11.125 1.433 15.946
Base Slab 40.625 1.625 66.016
Shear Key 0.000 1.800 0.000
Soil load over Toe Slab 18.000 0.650 11.700
Soil +sub-soil water(if any) over Heel Slab 116.145 2.525 293.266
Surcharge load 7.200 2.525 18.180
Maximum Total = 226.470 - 460.176
Total neglecting surcharge load = 219.270 - 441.996
Total for 0.9 x (wall+base+soil over toe) & no surcharge = 219.270 - 441.996
C.G. of vertical loads from Toe: Case: Total load = 460.176 /226.47 2.032 m
Case: Total neglecting surcharge load = 441.996 /219.27 2.016 m
Eccentricity= 0.407 < B/6 0.54 Hence OK
Moment on C.L. of Base:
Case: Total load = = 209.496+ (-5.493)+226.47 x ( 1.625 -2.032) 111.83 kNm
Case: Total neglecting surcharge load = = 121.287375+ (-5.493)+219.27 x ( 1.625 -2.016) 30.06 kNm

Soil Pressure under Base Slab (Service Load Condition)


Safe Bearing capacity of soil= 140.00 kN/m2
Case: Total load including soil load over toe slab
Pressure at Toe = (226.47/ (3.25))+(111.83 x 6/ ( 3.25^2)) 133.21 kN/m2
Pressure at Heel = (226.47/ (3.25)) - (111.83 x 6/ ( 3.25^2)) 6.16 kN/m2
Case: Total including soil load over toe slab, but neglecting surcharge load: Err:508
Pressure at Toe = (219.27/ (3.25))+(30.06 x 6/ ( 3.25^2)) 84.54 kN/m2
Pressure at Heel = (219.27/ (3.25)) - (30.06 x 6/ ( 3.25^2)) 50.39 kN/m2
Err:508
SBC of soil is more than the design pressures, hence base width is O.K

Stability Calculations (Service Load Condition)

Case: Total load including soil load over toe slab & Surchrage
Over Turning Moment about Toe = 209.50 kNm
Resisting Moment = 460.176 kNm
Factor of safety against over turning = 2.20 > 1.5, Section O.K.

Horizontal Sliding Force = 109.15 kN


Resisting Force = 219.27 x 0.6 +33.75 165.312 kN

Factor of safety against sliding = 1.51 > 1.5, Section O.K.

Total for 0.9 x (wall+base+soil over toe) & no surcharge:


Over Turning Moment about Toe = 121.29 kNm
Resisting Moment = 441.996 kNm
Factor of safety against over turning = 3.644 > 1.5, Section O.K.

Horizontal Sliding Force = 73.51


Resisting Force = 219.27 x 0.6 +33.75 165.312
Factor of safety against sliding = 2.25 > 1.5 Section O.K.

Design of Wall by Limit State Method (Partial Safety Factor, γ f = 1.5)

Ult. Eff. Depth (mm)


Depth of wall Sqrt(Mu*1000/3.33) Bar ф (mm) Ast (mm2) Vertical Reinf't Horizontal Reinf't
Moment

from top (m) Mu, kNm Reqd. Provided Vertl. Horzl. Reqd. Provided Main Reinf't Distr Reinf't
(0.5
Adopted
Ru= 3.33 fck/fy)*(1-sqrt(1-(4.6*Mu/fck*bd* Max c/c Dia/Spacing Max c/c Adopted c/c Dia/Spacing
d))bd c/c
12 dia
0 0.0 0 244.00 12 8 0 565 310 200 at200c/c
210 200 8 dia at200c/c
12 dia
0.89 5.3 40 227.60 12 8 65.272 565 310 200 at200c/c
210 200 8 dia at200c/c
12 dia
1.78 25.6 88 267.20 12 8 269.69 565 310 200 at200c/c
210 200 8 dia at200c/c
16 dia
2.67 67.0 142 304.80 16 8 631.259 1005 310 200 at200c/c
210 200 8 dia at200c/c
16 dia
3.56 136.1 202 442.00 16 8 882.616 1005 228 200 at200c/c
210 200 8 dia at200c/c
16 dia
4.5 239.1 268 442.00 16 8 1594.611 2011 126 100 at100c/c
210 200 8 dia at200c/c
Check for Shear in Wall by Limit State Method (Partial Safety Factor, γf = 1.5)

Depth of wall Ult. Shear Shear Stress 100 Ast Perm. Shear Stress Design Status

from top (m) Vu, kN τv, N/mm2 bd τc, N/mm2 of Wall


Beta τc, N/mm2
IF((0.8*25/(6.89*
0.85*Sqrt(0.8*25)*(Sqrt(1+5*B
%st))<0,1,
eta)-1)/(6*Beta)
(0.85*25/(6.89*%st)))

0.00 0.000 0.000 0.232 13.308 0.344 Section is OK


0.89 13.176 0.058 0.248 12.413 0.354 Section is OK
1.78 33.482 0.125 0.212 14.573 0.330 Section is OK
2.67 60.916 0.200 0.330 9.351 0.400 Section is OK
3.56 95.479 0.216 0.227 13.560 0.341 Section is OK
4.45 137.171 0.310 0.455 6.780 0.459 Section is OK

Design of Base Slab

Case: Total load including soil load over toe slab


Soil Pressure at P = 133.21 kN/m2
Soil Pressure at Q = 82.39 kN/m2
Soil Pressure at R = 62.84 kN/m2
Soil Pressure at S = 6.16 kN/m2

Designing the base slab by limit-state method, Partial load factor, γf = 1.5
Moment at Q = 1.5 x(82.39x 1.3^2/2 +50.818x1.3^2/3 -(18+1.3x0.5x25) x0.65 113.977 kNm
Moment at R = 1.5 x(6.158x 1.45^2/2 +56.682x1.45^2/6 -(116.145+7.2+1.45x0.5x25) x0.725 -114.345 kNm

Case: Total including soil load over toe slab, but neglecting surcharge load:

Soil Pressure at P = 84.543 kN/m2


Soil Pressure at Q = 70.88 kN/m2
Soil Pressure at R = 65.63 kN/m2
Soil Pressure at S = 50.392 kN/m2
Designing the base slab by limit-state method, Partial load factor, γf = 1.5
Moment at Q = 1.5 x(70.88x 1.3^2/2 +13.663x1.3^2/3 -(18+1.3x0.5x25) x0.65 67.992
Moment at R = 1.5 x(50.392x 1.45^2/2 +15.238x1.45^2/6 -(116.145+0+1.45x0.5x25) x0.725 -58.547

Areas of Reinforcement in Base Slab


Mu Eff. Depth(mm) Bar Ф (mm) Ast (mm2) Main steel Distribn.Steel
Location
(kNm) Reqd. Provided Main Distbn. Reqd. Provided Ф - Crs (mm) Ф - Crs (mm)
Spacing
Sqrt(Mu*1000/3.33) (0.5 fck/fy)*(1-sqrt(1-(4.6*Mu/fck*bd*d))bd Adopted c/c Dia/Spacing Reqd Adopted c/c Dia/Spacing
(0.12%)
Steel
Q 3.33 Steel req Req spacing, C/C
Provided
16 dia
Toe Slab 113.98 185.01 442 16 8 734.85 274 1005.31 200 210 200 8 dia at200c/c
at200c/c
16 dia
Heel Slab 114.34 185.31 442 16 8 737.29 273 1005.31 200 210 200 8 dia at200c/c
at200c/c

Check for Shear in Base Slab

Case: Total load including soil load over toe slab


Soil Pressure at P = 133.21 kN/m2
Soil Pressure at Q = 82.39 kN/m2
Soil Pressure at R = 62.84 kN/m2
Soil Pressure at S = 6.16 kN/m2
Ultimate Shear (Partial lad factor, γf = 1.5:
Shear at Q(@d/2) = 1.5 x (82.39x1.05+(133.208- 82.39 ) x 0.5 x 1.05-(1x 18x1.3+1.05 x 0.5x 25) 115.00 kN
Shear at R(@d/2) = 1.5 x (6.158x1.2+(62.84- 6.158 ) x 0.5 x 1.2-(4.45x 18x1.2+1.2 x 0.5x 25) 104.58 kN

Case: Total including soil load over toe slab, but neglecting surcharge load:
Soil Pressure at P = 84.54 kN/m2
Soil Pressure at Q = 70.88 kN/m2
Soil Pressure at R = 65.63 kN/m2
Soil Pressure at S = 50.39 kN/m2
Ultimate Shear (Partial lad factor, γf = 1.5:
Shear at Q = 1.5 x (70.88x1.05+(84.543- 70.88 ) x 0.5 x 1.05-(1x 18x1.05+1.05 x 0.5x 25) 74.36 kN
Shear at R = 1.5 x (50.392x1.2+(65.63- 50.392 ) x 0.5 x 1.2-(4.45x 18x1.2+1.2 x 0.5x 25) 62.26 kN

Check for Shear in Base Slab by Limit State Method (Partial Safety Factor, γf = 1.5)

Ult. Shear Shear Stress 100 Ast Perm. Shear Stress Design Status
Location
Vu-max, kN τv, N/mm2 bd τc, N/mm2 of Base
Toe Slab 114.996 0.260 0.455 0.459 Section is OK
Heel Slab 104.582 0.237 0.455 0.459 Section is OK
DESIGN OF BOX CULVERT (5.0x 3.5 , 4 VENT WITHOUT EARTH CUSHION)

BAR BENDING SCHEDULE

Total UNIT WT
Nos Shape Of Bars Bar dia, mm Spacing M1, mm M2, mm Length, mm No of Bars Wieght, Kgs
Length, m (KG)

1 16 150 1350 14000 16700 51 852.0 1.58 1346.16

2 16 150 2100 2100 102 215.0 1.58 339.70

3 16 150 1300 3850 6450 104 671.0 1.58 1060.18

4 16 150 400 14000 14800 51 755.0 1.58 1192.90

5 16 150 260 3850 4370 104 455.0 1.58 718.90

6 16 150 320 3850 4490 204 916.0 1.58 1447.28

7 16 150 1300 14000 16600 51 847.0 1.58 1338.26

8 16 150 320 14000 14640 51 747.0 1.58 1180.26

9 16 150 2100 2100 102 215.0 1.58 339.70

10 10 200 200 1173 1573 231 364.0 0.62 225.68

11 10 200 200 1173 1573 231 364.0 0.62 225.68

12 10 200 200 1173 1573 77 122.0 0.62 75.64

13 10 200 200 1173 1573 77 122.0 0.62 75.64

14 10 150 250 7400 7900 186 1470.0 0.62 911.40

15 12 150 250 7400 7900 39 309.0 0.89 275.01

16 12 150 250 7400 7900 186 1470.0 0.89 1308.30

17 10 150 250 7400 7900 118 933.0 0.62 578.46

18 12 200 7400 7800 32 250.0 0.89 222.50

19 12 7400 7400 10 74.0 0.89 65.86

20 12 200 1006 1268 2274 77 176.0 0.89 156.64

21 10 160 7400 7720 4 31.0 0.62 19.22

22 10 160 7400 7720 4 31.0 0.62 19.22

23 12 200 1100 1556 4156 144 599.0 0.89 533.11

24 12 192 14000 14384 20 288.0 0.89 256.32

25 12 150 235 7400 7870 42 331.0 0.89 294.59

Total steel, Kgs 16337.6


Total steel for single group, Tonne 16.34
No of group 1
Total Steel for 1 groups,Tonne 16.34
DESIGN OF BOX CULVERT (4.0x 4.0 , 2 VENT WITHOUT EARTH CUSHION)

BAR BENDING SCHEDULE

Total UNIT WT
Nos Shape Of Bars Bar dia, mm Spacing M1, mm M2, mm Length, mm No of Bars Wieght, Kgs
Length, m (KG)

1 16 150 1350 7200 9900 81 802.0 1.58 1267.16

2 16 150 2100 2100 81 171.0 1.58 270.18

3 16 150 1300 3850 6450 164 1058.0 1.58 1671.64

4 16 150 400 7200 8000 81 648.0 1.58 1023.84

5 16 150 260 3850 4370 164 717.0 1.58 1132.86

6 16 150 320 3850 4490 162 728.0 1.58 1150.24

7 16 150 1300 7200 9800 81 794.0 1.58 1254.52

8 16 150 320 7200 7840 81 636.0 1.58 1004.88

9 16 150 2100 2100 81 171.0 1.58 270.18

10 10 200 200 1173 1573 122 192.0 0.62 119.04

11 10 200 200 1173 1573 122 192.0 0.62 119.04

12 10 200 200 1173 1573 122 192.0 0.62 119.04

13 10 200 200 1173 1573 122 192.0 0.62 119.04

14 10 150 250 11900 12400 96 1191.0 0.62 738.42

15 12 150 250 11900 12400 39 484.0 0.89 430.76

16 12 150 250 11900 12400 96 1191.0 0.89 1059.99

17 10 150 250 11900 12400 38 472.0 0.62 292.64

18 12 200 11900 12300 32 394.0 0.89 350.66

19 12 11900 11900 10 119.0 0.89 105.91

20 12 200 1006 1268 2274 122 278.0 0.89 247.42

21 10 160 11900 12220 4 49.0 0.62 30.38

22 10 160 11900 12220 4 49.0 0.62 30.38

23 12 200 1100 1556 4156 76 316.0 0.89 281.24

24 12 192 7200 7584 20 152.0 0.89 135.28

25 12 150 235 11900 12370 42 520.0 0.89 462.80

Total steel, Kgs 15056.3


Total steel for single group, Tonne 15.06
No of group 1
Total Steel for 1 groups,Tonne 15.06
0

STEEL QUANTITY
MAIN DIST Total WT
Quantit No of LENGT
Sl.no Type Nos L B D DIA C/C NO UNIT WT WT DIA C/C LENGTH NO UNIT WT WT
y sides H
RETAINING WALL
1 Returns Footing 4 3 3.25 0.65 25.35 8 16 0.20 4.50 16.00 1.58 910.08 10 0.20 2.95 17.00 0.62 248.74
2 Returns Wall 4 3 0.48 4.45 25.37 8 16 0.20 3.25 16.00 1.58 164.32 8 0.20 2.95 23.00 0.39 211.69
12 0.20 3.55 16.00 0.89 101.10

1734.10

Total 254.86 1175.504 460.436 1734.096

Total Quantity of Steel

Box Culvert 16338 Kg

Retaining Wall & Curtain Wall 1734.1 Kg

Total Quantity of Steel 18072 Kg


RETAINING WALL
0 HEIGHT OF WALL 2.000 m

T2

H
EARTH FACE

GL

B2 T1 B1

D
B
HEEL TOE

DATA
BACK FILL Angle of slope of bank Ф(deg) to horizontal, (max Ф=θ) 0
Angle of repose θ (deg) = 30
Density of back fill (kN/m3) = 18
Density of saturated back fill (kN/m3) = 20.8
Surcharge Uniform Surcharge load (kN/m2) = 10.8
Base Soil Safe Bearing Capacity of Soil (kN/m 2) = 100
Coefficient of base friction between soil and concrete 0.6

Wall Height of Wall, H (m) 2.000


Profile Depth of Water Table below GL, H1 (m) 3.000
Depth of soil above toe slab, H2 (m) 1.000
Wall thickness at top of base slab, T1 (m) 0.300
Wall thickness at top, T2 (m) 0.230
Base slab width, B (m) 1.500
Base slab toe dimension, B1 (m) 0.600
Base slab thickness, D1 (m) 0.300
Base Heel slab dimension, B2 (m) 0.600
Base Heel slab thickness, D2 (m) 0.300
Shear key depth, D3 (m) 0.000
Shear key thickness, T3 (m) 0.000
Material Concrete Grade, fck M 25
Data Steel Reinforcement Grade, fy (N/mm2) = 500
Concrete In base slab (mm) = 50
Cover In earth face of wall (mm) = 50
In front face of wall (mm) = 50
Active Coefficient of earth pressure 0.33
Passive Coefficient of earth pressure 3.00
Concrete density kN/m3 25
Water density kN/m3 10

Horizontal Pressures, Moments and Shears on Wall (Service Load Condn.)

Bending
Shear on(-
Depth of wall Horizontal Pressure on wall (kN/m 2) Bending Moment Shear on Moment(-
surcharge)
Surcharge)

on wall
from top (m) Soil Pressu Grd Water Pr Surcharge Pr. on wall (kNm/m) wall (kN/m) wall (kN/m)
(kNm/m)
0.0 0.00 0 3.600 0.00 0.00 0.00 0.00
0.40 2.40 0 3.600 0.35 1.92 0.06 0.48
0.80 4.80 0 3.600 1.66 4.80 0.51 1.92
1.20 7.20 0 3.600 4.32 8.64 1.73 4.32
1.60 9.60 0 3.600 8.70 13.44 4.10 7.68
2.00 12.00 0 3.600 15.20 19.20 8.00 12.00
2.30 13.80 0 3.600 21.69 24.15 12.17 15.87

Value at max
depth neglecting
2.0 21.69 24.15 15.87 15.87
surcharge
pressure =
Passive Resistance Considered
Passive pressure at top, (kN/m2) = 54.00
Passive pressure at bottom, (kN/m2) = 70.20
Depth of passive resistance (m) = 0.30
Passive Force (kN/m) = 18.63
Passive Moment about Toe (kNm/m) = -1.82

Vertical Loads per metre length (Service Load condition)


Load case Vertical load (kN) Lever arm to Toe (m) B.M. (kNm)
Wall (Rectangle) 11.500 0.785 9.028
Wall (Triangle) 1.750 0.647 1.132
Base Slab 11.250 0.750 8.437
Shear Key 0.000 0.900 0.000
Soil load over Toe Slab 18.000 0.300 5.400
Soil +sub-soil water(if any) over Heel Slab 21.600 1.200 25.920
Surcharge load 3.600 1.200 4.320
Maximum Total = 67.700 - 54.237
Total neglecting surcharge load = 64.100 - 49.917
Total for 0.9 x (wall+base+soil over toe) & no surcharge = 64.100 - 49.917
C.G. of vertical loads from Toe: Case: Total load = 54.237 /67.7 0.801 m
Case: Total neglecting surcharge load = 49.917 /64.1 0.779 m
Eccentricity= 0.051 < B/6 0.25 Hence OK
Moment on C.L. of Base:
Case: Total load = = 21.689+ (-1.819)+67.7 x ( 0.75 -0.801) 16.417 kNm
Case: Total neglecting surcharge load = = 15.87+ (-1.819)+64.1 x ( 0.75 -0.779) 12.19 kNm

Soil Pressure under Base Slab (Service Load Condition)


Safe Bearing capacity of soil= 100.00 kN/m2
Case: Total load including soil load over toe slab
Pressure at Toe = (67.7/ (1.5))+(16.417 x 6/ ( 1.5^2)) 88.91 kN/m2
Pressure at Heel = (67.7/ (1.5)) - (16.417 x 6/ ( 1.5^2)) 1.35 kN/m2
Case: Total including soil load over toe slab, but neglecting surcharge load: Err:508
Pressure at Toe = (64.1/ (1.5))+(12.192 x 6/ ( 1.5^2)) 75.25 kN/m2
Pressure at Heel = (64.1/ (1.5)) - (12.192 x 6/ ( 1.5^2)) 10.22 kN/m2
Err:508
SBC of soil is more than the design pressures, hence base width is O.K

Stability Calculations (Service Load Condition)

Case: Total load including soil load over toe slab & Surchrage
Over Turning Moment about Toe = 21.69 kNm
Resisting Moment = 54.237 kNm
Factor of safety against over turning = 2.50 > 1.5, Section O.K.

Horizontal Sliding Force = 24.15 kN


Resisting Force = 64.1 x 0.6 +18.63 57.09 kN

Factor of safety against sliding = 2.36 > 1.5, Section O.K.

Total for 0.9 x (wall+base+soil over toe) & no surcharge:


Over Turning Moment about Toe = 15.87 kNm
Resisting Moment = 49.917 kNm
Factor of safety against over turning = 3.145 > 1.5, Section O.K.

Horizontal Sliding Force = 15.87


Resisting Force = 64.1 x 0.6 +18.63 57.09
Factor of safety against sliding = 3.60 > 1.5 Section O.K.

Design of Wall by Limit State Method (Partial Safety Factor, γ f = 1.5)

Ult. Eff. Depth (mm)


Depth of wall Sqrt(Mu*1000/3.33) Bar ф (mm) Ast (mm2) Vertical Reinf't Horizontal Reinf't
Moment

from top (m) Mu, kNm Reqd. Provided Vertl. Horzl. Reqd. Provided Main Reinf't Distr Reinf't
(0.5
Adopted
Ru= 3.33 fck/fy)*(1-sqrt(1-(4.6*Mu/fck*bd* Max c/c Dia/Spacing Max c/c Adopted c/c Dia/Spacing
d))bd c/c
12 dia
0 0.0 0 174.00 12 8 0 565 310 200 at200c/c
210 200 8 dia at200c/c
12 dia
0.4 0.5 13 132.00 12 8 11.1 565 310 200 at200c/c
210 200 8 dia at200c/c
12 dia
0.8 2.5 27 146.00 12 8 47.632 565 310 200 at200c/c
210 200 8 dia at200c/c
12 dia
1.2 6.5 44 160.00 12 8 113.567 565 310 200 at200c/c
210 200 8 dia at200c/c
12 dia
1.6 13.1 63 244.00 12 8 149.802 565 310 200 at200c/c
210 200 8 dia at200c/c
12 dia
2.0 22.8 83 244.00 12 8 263.667 565 310 200 at200c/c
210 200 8 dia at200c/c
Check for Shear in Wall by Limit State Method (Partial Safety Factor, γf = 1.5)

Depth of wall Ult. Shear Shear Stress 100 Ast Perm. Shear Stress Design Status

from top (m) Vu, kN τv, N/mm2 bd τc, N/mm2 of Wall


Beta τc, N/mm2
IF((0.8*25/(6.89*
0.85*Sqrt(0.8*25)*(Sqrt(1+5*B
%st))<0,1,
eta)-1)/(6*Beta)
(0.85*25/(6.89*%st)))

0.00 0.000 0.000 0.325 9.490 0.398 Section is OK


0.40 2.880 0.022 0.428 7.199 0.447 Section is OK
0.80 7.200 0.049 0.387 7.963 0.429 Section is OK
1.20 12.960 0.081 0.353 8.726 0.412 Section is OK
1.60 20.160 0.083 0.232 13.308 0.344 Section is OK
2.00 28.800 0.118 0.232 13.308 0.344 Section is OK

Design of Base Slab

Case: Total load including soil load over toe slab


Soil Pressure at P = 88.91 kN/m2
Soil Pressure at Q = 53.89 kN/m2
Soil Pressure at R = 36.38 kN/m2
Soil Pressure at S = 1.36 kN/m2

Designing the base slab by limit-state method, Partial load factor, γf = 1.5
Moment at Q = 1.5 x(53.89x 0.6^2/2 +35.022x0.6^2/3 -(18+0.6x0.3x25) x0.3 10.729 kNm
Moment at R = 1.5 x(1.355x 0.6^2/2 +35.025x0.6^2/6 -(21.6+3.6+0.6x0.3x25) x0.3 -9.847 kNm

Case: Total including soil load over toe slab, but neglecting surcharge load:

Soil Pressure at P = 75.245 kN/m2


Soil Pressure at Q = 49.24 kN/m2
Soil Pressure at R = 36.23 kN/m2
Soil Pressure at S = 10.221 kN/m2
Designing the base slab by limit-state method, Partial load factor, γf = 1.5
Moment at Q = 1.5 x(49.24x 0.6^2/2 +26.005x0.6^2/3 -(18+0.6x0.3x25) x0.3 7.851
Moment at R = 1.5 x(10.221x 0.6^2/2 +26.009x0.6^2/6 -(21.6+0+0.6x0.3x25) x0.3 -6.645

Areas of Reinforcement in Base Slab


Mu Eff. Depth(mm) Bar Ф (mm) Ast (mm2) Main steel Distribn.Steel
Location
(kNm) Reqd. Provided Main Distbn. Reqd. Provided Ф - Crs (mm) Ф - Crs (mm)
Spacing
Sqrt(Mu*1000/3.33) (0.5 fck/fy)*(1-sqrt(1-(4.6*Mu/fck*bd*d))bd Adopted c/c Dia/Spacing Reqd Adopted c/c Dia/Spacing
(0.12%)
Steel
Q 3.33 Steel req Req spacing, C/C
Provided
12 dia
Toe Slab 10.73 56.76 244 12 8 122.88 920 565.49 200 210 200 8 dia at200c/c
at200c/c
12 dia
Heel Slab 9.85 54.38 244 12 8 112.69 1004 565.49 200 210 200 8 dia at200c/c
at200c/c

Check for Shear in Base Slab

Case: Total load including soil load over toe slab


Soil Pressure at P = 88.91 kN/m2
Soil Pressure at Q = 53.89 kN/m2
Soil Pressure at R = 36.38 kN/m2
Soil Pressure at S = 1.36 kN/m2
Ultimate Shear (Partial lad factor, γf = 1.5:
Shear at Q(@d/2) = 1.5 x (53.89x0.45+(88.912- 53.89 ) x 0.5 x 0.45-(1x 18x0.6+0.45 x 0.3x 25) 26.93 kN
Shear at R(@d/2) = 1.5 x (1.355x0.45+(36.38- 1.355 ) x 0.5 x 0.45-(2x 18x0.45+0.45 x 0.3x 25) 16.63 kN

Case: Total including soil load over toe slab, but neglecting surcharge load:
Soil Pressure at P = 75.25 kN/m2
Soil Pressure at Q = 49.24 kN/m2
Soil Pressure at R = 36.23 kN/m2
Soil Pressure at S = 10.22 kN/m2
Ultimate Shear (Partial lad factor, γf = 1.5:
Shear at Q = 1.5 x (49.24x0.45+(75.245- 49.24 ) x 0.5 x 0.45-(1x 18x0.45+0.45 x 0.3x 25) 24.80 kN
Shear at R = 1.5 x (10.221x0.45+(36.23- 10.221 ) x 0.5 x 0.45-(2x 18x0.45+0.45 x 0.3x 25) 13.69 kN

Check for Shear in Base Slab by Limit State Method (Partial Safety Factor, γf = 1.5)

Ult. Shear Shear Stress 100 Ast Perm. Shear Stress Design Status
Location
Vu-max, kN τv, N/mm2 bd τc, N/mm2 of Base
Toe Slab 26.933 0.110 0.464 0.462 Section is OK
Heel Slab 16.627 0.068 0.464 0.462 Section is OK
STABILITY ANALYSIS OF PROTECTON WALL

Road Top Level (RTL) 100.000 m


Top level of Wall 100.000 m
Surcharge No
Top width of wall (b) 0.30 m
Ground Level ( Typ.) 99.200 m
Height of Vertical Face of wall (h1) 0.00 m
Depth of Foundation provided for wall 0.80 m
Top level of levelling course 98.400 m
Height of wall (h) (from top level of wall to fdn. Level ) 1.60 m
Slope of wall at Back side 0.85 :1
Slope of wall at Front Side 0.50 :1
Tring. width of wall at Back side (b1) 0.68 m
Tring. width of wall at Front side side (b2) 0.40 m
Total bottom width of wall (B) 1.38 m
Unit weight of Concrete (Wc) 2.40 t/m3
Unit Weight of Soil 1.80 t/m3
S.B.C. of Strata 25.00 t/m2
Angle of repose (b) 30 0 0.52 radians
Traffic (Indicate "Yes" or "No") Yes
Slope of Embankment 2.00 :1
Height of surcharge (x)= 0.60 m
Angle of Surcharge (a)= 0.00 0 0.00 radians
Super imposed Load due to Traffic 0.60 t/m2
The equivalent additional height of soil corresponding to 0.33 m
super-imposed load

0.33
0.00 100.000

0.00
100.000 0.30 0.60 Pressure diagram due
a Super imposed load (traffic)

0.00
100.000

0.85
1
4

0.80
1 2.20
1.60 Outside Earth side (inside) P
1.60 0.150
GL 99.200

0.50 0.80
1 2

3
RL. 98.400
0.15 1.52
0.40 PCC 1:2:4/ M15 Cp wh
0.30 0.68

1.38

0.18
6.12
The Earth Pressure per unit run (P) = Cp wh2 1.93 t-m
2
where, Cp = Co-efficient of earth pressure

cos a - ( cos2a-cos2b)1/2
= cos a 0.334
cos a + ( cos2a-cos2b)1/2

The Hzl. Earth Pr. per unit run (Ph) = Cp wh2 cos a 1.93 t-m
2

The Vtl. Earth Pr. per unit run (Pv) = Cp wh2 sin a 0.00 t-m
2
Sl. Particulars Vertical Hzl. Lever Moment Moment
No. Force(V) Force(H) arm (M+) (M-)
(tonne) (tonne) (m) (t-m) (t-m)

1 Wall
Tringular - Inside 0.653 0.927 0.605
Rectangular - Inside 1.306 1.040 1.358
Tringular - Out side 0.384 0.267 0.102
Rectangular - Center 1.152 0.550 0.634

2 Soil
Tringular-1 0.490 1.153 0.565
Rectangular-2 0.000 1.040 0.000
Tringular-3 0.367 1.153 0.424

3 Hzl. Earth Pressure (Active) 1.93 0.84 1.627

4 Vtl. Earth Pressure (Active) 0.000 1.38 0.000

Total = 4.351 1.927 3.687 1.627

Net Moment 2.06 t-m


Resultant Load X = M/ V 0.47 m
Eccentricity e B/2 - X 0.22 m
B/6 0.23 m
e is less than B/6, hence O.K.

Max.Pressure Pmax V/ B ( 1+ 6 e /B) 6.12 t / m2


Min.Pressure Pmin V/ B ( 1- 6 e /B) 0.18 t / m2
Hence O.K.

No negative pressure develops

FACTOR OF SAFETY :
Factor of Safety against Sliding Cf V/H
where Cf Co-efficient of friction between the material above 0.65
and below the horizontal generally varies from 0.65 to 0.75
generally varies from 0.65 to 0.75 1.47 > 1.50
Hence Not Safe

Factor of Safety against Overturning +M/-M


2.27 > 2.00
Hence Safe

STEEL DETAILS :
10 mm Dia. Bars @ 175 Cm C/c ( Both ways and both faces)

Weep Holes 100 mm Dia pipe @ 1.50 m. C/c staggered


0

RECAPITULATION

1 Estimate of Box Culvert: 1 V, (3 m x 3 m) Rs. 4,768,316.00

2 APPROACH ROAD ESTIMATE Rs. 4,362,265.00

Total Rs. 9,130,581.00

3 Add GST- 12% 1,095,669.72

4 Consultancy Charges (1.00% +18%) Rs. 107,740.86

5 Rounding off Rs. 66,008.42

Grand Total Rs. Rs. 10,400,000.00

IN LAKHS Rs. 104.00

Assistant Executive Engineer, Executive Engineer,


PWD,Dept.Sub-Dn.,Belagavi PWD.Dept. Belagavi Dn Belagavi
RECAPITULATION SHEET

Sl.No Description Amount in Rs:


A CIVIL WORK
1 Construction of Ground floor 1785494.41
Total Rs :- 1785494.41
G.S.T 12% :- 214259.33
7 Contigencies, change in SR, Miscelleneous & 0.00
rounding off
Grand Total 1999753.74

Asst. Executive Engineer, Executive Engineer,


0

MEASUREMENT SHEET FOR SUPPORTING STRUCTURE

It.N Description of items. Qty. Unit


o. No. L. B. D
1 2 3 4

1 KSRRB M200-12.3. Dismantling of existing structures like culverts, bridges, retaining walls and
other structure comprising of masonry, cement concrete, wood work, steel work, including T&P
and scaffolding wherever necessary, sorting the dismantled material, disposal of
unserviceable material and stacking the serviceable material with all lifts complete as per
specifications. -do- C. Prestressed I Reinforced cement concrete grade M-20 above.MORTH
Specification No. 202

Existing Bridge 1 20.00 2.10 2.00 = 84.00


84.00 Cum

2 "KSRRB M2100-3.2. Earth work excavation in all kinds of ordinary rock I soft rock not requiring
blasting for foundation of bridges and allied works as per drawing and technical specifications,
including setting out, providing shoring and bracing, removal of stumps and other deleterious
matter, dressing of sides and bottom and filling back with approved material including cost of all
materials, labour, HOM complete as per specifications. -do- (v) 3 m to 6 m depth by Mechanical
means (S.R.2018-19 Page No. 220, I.No. 27.7.5)
MORTH Specification No. 304

For Footing & Curtain Wall 2 3.85 3.85 3.50 = 103.76


103.76 Cum

3 KSRB 2.8 : Providing and Filling in foundation with granite I trap broken metal 1OOmm. and
down size & with approved sand including hand packing, ramming, watering, including cost
of all materials and labour with all lead and lift. complete as per specifications. specification.
No. KBS 2.10.2 (S.R.2018-19 Page No. 7, I.No. 2.15)

For Footing 2 2.60 2.60 0.45 = 6.08


For Curtain Wall Foundation 2 4.70 1.60 0.15 = 2.26
2 1.50 1.60 0.15 = 0.72
9.06 Cum

4 KSRRB M2100-10. Providing and laying Plain cement concrete of mix 1:3:6 with OPC @
220kgs, with crushed 40mm and down size graded granite metal coarse aggregates @0.89cum
and fine aggregates @ 0.46cum, in foundation mechanically mixed, placed in foundation and
compacted by vibration including curing for 14 days including cost of all materials, labour, HOM
curing, form works, scaffolding and centering complete as per specifications. (S.R.2018-19
Page No. 222, I.No. 27.18)
MORTH Specification No. 2100

For Footing 2 2.30 2.60 0.15 = 1.79


For Curtain Wall Foundation 2 4.40 1.60 0.15 = 2.11
It.N Description of items. Qty. Unit
o. No. L. B. D
1 2 3 4
2 1.50 1.60 0.15 = 0.72
4.63 Cum

5 K8RRB M2200-5.9. Providing and laying Design mix M20 with OPC @ 320kgs, with 20mm
and down size graded granite metal coarse aggregates @0.69cum and fine aggregates @
0.46cum, with superplastisiser @31ts confirming to 189103-1999 Reaffirmed-2008 including
cost of materials, labour, HOM curing, form works, scaffolding and centering complete as per
specifications.
- i) Upto 5m height
Footing
2 2.00 2.00 0.45 = 3.60
Curtain Wall Foundation 2 4.10 1.30 0.30 = 3.20
2 1.50 1.30 0.30 = 1.17
3.60 Cum
Column
Column up to Ground Level 2 1.00 1.00 1.55 = 3.10
Column Above Ground Level 2 1.00 1.00 2.00 = 4.00
7.10 Cum
Curtain Wall
Curtain Wall up to Ground Level 2 3.00 0.20 3.05 = 3.66
2 2.60 0.20 3.05 = 3.17
4 0.70 0.20 3.05 = 1.71
8.54 Cum

Total upto Date Quantity :- = 19.24 Cum

6 KSRRB M2200-6 : Supplying, fitting and placing TMT bar reinforcement in sub structure
complete as per drawing and technical specification complete as per specifications. MORTH
Specification No. 1600 & 2200. (S.R.2018-19 Page No. 229, I.No. 28.8.2)

Footing 3.60 60.00 Kgs Per Cum = 0.00


Column 7.10 200.00 Kgs Per Cum = 0.00
Curtain Wall 8.54 150.00 Kgs Per Cum = 0.00
0.00 Kgs

Separate sheet attached = 3.44 Tone

7 KSRRB M2200-8.1. Back filling behind abutment, wing wall and return wall complete as per
drawing and Technical Specification including cost of materials, labour, HOM of machineries,
complete as per specifications. A. Granular material MORTH Specification No. 2204 & 304
(S.R.2018-19 Page No. 229, I.No. 28.11)

Quantity Vide as Per Item No 1 = 103.76


103.76 Cum
Deductions
Broken metal Filling Quantity = 9.06
PCC Bed Concrete Quantity = 4.63
RCC Bottom Slab/Raft Quantity = 3.60
17.29 Cum

Total up to date Quantity after Ded :- = 86.47 Cum


It.N Description of items. Qty. Unit
o. No. L. B. D
1 2 3 4

8 Fabricating, supplying & erecting M.S. Angular Truss for all spans as per approved designs and
drawing. The entire truss is anchored suitably by using 4 Nos. of M.S. anchor bolts at each
support, with base plate and shoe plate. The work includes cutting, straightening, placing in
position of M.S angle and welding wherever necessary, and applying one coat of red oxide
primer coat to all the members including cost of all materials, labour charges, & hire charges of
machineries for cutting, welding, grinding & erection equipments, etc., complete as per
specification (P.no.43, I.no.7.30)

1 25.00 1.00 = 0.00


0.00 Sqm

Separate sheet attached = 8630.50 Kgs

9 KSRRB M2500-4.1. Providing and laying Pitching stones of size 0.3x0.3x0.3 m on slopes laid
over prepared filter media including boulder apron laid dry in front of toe of embankment
complete as per drawing and Technical specifications including cost of materials, labour, HOM
complete as per specifications. A. Stone I Boulder
MORTH Specification No. 2504

2 2.60 2.60 0.30 = 4.06


4.06 Cum
Deduction
Column 2 1.20 1.20 0.30 = 0.86
0.86 Cum

Total Quantity after Deduction :- = 3.19 Cum

Assistant Executive Engineer, Executive Engineer,


PWD,Dept.Sub-Dn.,Belagavi PWD.Dept. Belagavi Dn Belagavi
0

ABSTRACT

It.No. Description of items. Unit Qty Rate Amount


1 2 3 4 5 6
1 KSRRB M200-12.3. Dismantling of existing Cum 84.00 1684.34 141484.56
structures like culverts, bridges, retaining walls and
other structure comprising of masonry, cement
concrete, wood work, steel work, including T&P
2 "KSRRB M2100-3.2. Earth work excavation in all Cum 103.76 73.14 7588.82
and scaffolding wherever necessary, sorting the
kinds of ordinary rock I soft rock not requiring
dismantled material, disposal of unserviceable
blasting for foundation of bridges and allied works
material and stacking the serviceable material with
as per drawing and technical specifications,
3 KSRB
all lifts 2.8complete
: Providing and specifications.
as per Filling in foundation
-do- C. Cum 9.06 2265.22 20522.89
including setting out, providing shoring and
with granite I Itrap
Prestressed broken metal
Reinforced cement 1OOmm. and grade
concrete down
bracing, removal of stumps and other deleterious
size
M-20&above.MORTH
with approved Specification
sand includingNo. hand
202packing,
matter, dressing of sides and bottom and filling
ramming, watering, including cost of all materials
4 KSRRB
back withM2100-10.
approved Providing and laying
material including costPlain
of all Cum 4.63 5605.49 25931.01
and labour with all lead and lift. complete as per
cement
materials, concrete
labour, of HOM mix 1:3:6
complete with OPCas per @
specifications. specification. No. KBS 2.10.2
220kgs, with crushed
specifications. -do- (v)40mm 3 m andtodown 6 msize graded
depth by
(S.R.2018-19 Page No. 7, I.No. 2.15)
granite
Mechanical metalmeans
coarse(S.R.2018-19
aggregates @0.89cum Page No. and
220,
5 K8RRB M2200-5.9. Providing and laying Design Cum 19.24 5703.01 109725.95
fine
I.No. aggregates @ 0.46cum, in foundation
27.7.5)
mix M20 with OPC @ 320kgs, with 20mm and
mechanically
MORTH mixed, No.
Specification placed
304 in foundation and
down size graded granite metal coarse aggregates
compacted by vibration including curing for 14 days
@0.69cum and fine aggregates @ 0.46cum, with
6 KSRRB
includingM2200-6
cost of all: materials,
Supplying,labour,fitting HOM
and placing
curing, Tonne 3.44 65893.68 226344.79
superplastisiser @31ts confirming to 189103-1999
TMT bar reinforcement
form works, scaffolding and in sub structure
centering complete
complete as
Reaffirmed-2008 including cost of materials,
as
per per drawing (S.R.2018-19
specifications. and technicalPage specification
No. 222,
labour, HOM curing, form works, scaffolding and
complete
I.No. 27.18) as per specifications. MORTH
7 KSRRB
centeringM2200-8.1.
complete asBack filling behind abutment,
per specifications. Cum 86.47 895.70 77452.52
Specification
MORTH No. 1600No.
Specification & 2200.
2100 (S.R.2018-19 Page
wing wall5m
- i) Upto and return wall complete
height as per drawing
No. 229, I.No. 28.8.2)
and Technical Specification including cost of
materials, labour, HOM of machineries, complete
8 Fabricating, supplying & erecting M.S. Angular Kgs 8630.50 135.68 1170986.24
as per specifications. A. Granular material MORTH
Truss for all spans as per approved designs and
Specification No. 2204 & 304 (S.R.2018-19 Page
drawing. The entire truss is anchored suitably by
No. 229, I.No. 28.11)
using 4 Nos. of M.S. anchor bolts at each support,
9 KSRRB M2500-4.1. Providing and laying Pitching Cum 3.19 1709.78 5457.62
with base plate and shoe plate. The work includes
stones of size 0.3x0.3x0.3 m on slopes laid over
cutting, straightening, placing in position of M.S
prepared filter media including boulder apron laid
angle and welding wherever necessary, and
dry in front of toe of embankment complete as per
applying one coat of red oxide primer coat to all the 1785494.41
drawing and Technical specifications including
members including cost of all materials, labour
cost of materials, labour, HOM complete as per
charges, & hire charges of machineries for cutting,
specifications. A. Stone I Boulder
welding, grinding & erection equipments, etc.,
MORTH Specification No. 2504
complete Assistant
as per specification
Executive(P.no.43,
Engineer, I.no.7.30) Executive Engineer,
PWD,Dept.Sub-Dn.,Belagavi PWD.Dept. Belagavi Dn Belagavi
0

RATE ANALYSIS

Diffrence in cost
Cement/
Steel
Qtl
Store issue rate 470.00 45645.00
C.S.R rates 516.00 40522.00
Diffrence 46.00 -5123.00

It.No. Description of items. Unit Page Item No Basic Rate Diffrence in cost Total - 1 Area Total - 2
No S.R 2018- Const Rate Amount Weightag 10 + 11
19 e6%
1 2 3 4 5 6 7 8 9 10 11 12

1 KSRRB M200-12.3. Dismantling of Cum 139 18.19 1589.00 1589.00 95.34 1684.34
existing structures like culverts,
bridges, retaining walls and other
structure comprising of masonry,
2 "KSRRB M2100-3.2. Earth work Cum 220 27.7.5 69.00 69.00 4.14 73.14
cement concrete, wood work, steel
excavation in all kinds of ordinary
work, including T&P and
rock I soft rock not requiring
scaffolding wherever necessary,
blasting for foundation of bridges
3 KSRB
sorting 2.8the : Providing
dismantled andmaterial,
Filling Cum 7 2.15 2137.00 2137.00 128.22 2265.22
and allied works as per drawing
in foundation
disposal with granitematerial
of unserviceable I trap
and technical specifications,
broken
and stacking metal 1OOmm. and down
the serviceable
including setting out, providing
size
material & with with approved
all lifts complete sandas
4 KSRRB and
shoring M2100-10. bracing, Providing
removaland of Cum 222 27.18 5187.00 2.20 46.00 101.20 5288.20 317.29 5605.49
including
per hand packing, -do-
specifications. ramming, C.
laying Plain
stumps andcement other concrete
deleterious of
watering,
Prestressed including
I Reinforced costcement
of all
mix
matter,1:3:6 dressing
with OPC @ of 220kgs,
sides with and
materials
concrete and labourgrade with all M-20 lead
crushed
bottom 40mmfilling
and and back
down size with
5 K8RRB
and
above.MORTH lift.M2200-5.9.
complete Providing
Specification as No. per Cum 227 28.7.9 5233.00 3.20 46.00 147.20 5380.20 322.81 5703.01
graded
approved granite including
metal coarse
and layingmaterial
specifications.
202 Design mix M20 cost
specification.
of
with
No.
aggregates
all materials, @0.89cum labour, and HOM fine
OPC
KBS @2.10.2 320kgs, with 20mmPage
(S.R.2018-19 and
aggregates
complete @specifications.
0.46cum, -do- in
down
No. sizeas2.15)
7, I.No.
per
graded granite metal
6 KSRRB
foundation
(v) 3 m aggregates
to 6 M2200-6
mmechanically : Mechanical
depth@0.69cum
by Supplying,
mixed, Tonn 229 28.8.2 67543.00 1.050 -5123.00 -5379.15 62163.85 3729.83 65893.68
coarse and
fitting
placed
means and in placing
(S.R.2018-19 foundation TMT and
Page bar
No. e
fine aggregates @ 0.46cum, with
reinforcement
compacted
220, I.No. 27.7.5) in sub structure
by vibration including
superplastisiser @31ts confirming
complete
curing
MORTH as daysper including
forSpecification
14 drawing
No. 304 cost and
of
7 KSRRB
to 189103-1999 M2200-8.1. Back
Reaffirmed-2008 filling Cum 229 28.11 845.00 845.00 50.70 895.70
technical
all materials,specification
labour,wing complete
HOM curing, as
behind
includingabutment,
cost of materials, wall and
labour,
per
form specifications.
works, scaffolding MORTH and
return
HOM wall
curing,complete form asworks, per
Specification
centering No. 1600 as
complete & 2200. per
drawing
scaffolding and and
centering Technical
complete
8 Fabricating, supplying
(S.R.2018-19
specifications. Page No. &229,
(S.R.2018-19 erecting
I.No.
Page Kgs 43 7.29 128.00 128.00 7.68 135.68
Specification
as perAngular
specifications.including cost of
M.S.
28.8.2)
No. 222, I.No.labour, Truss for all spans
27.18)
materials,
-asi) Upto 5m height designs HOM of
MORTH per approved
Specification No. 2100 and
machineries, complete as per
drawing. The entire truss is
9 KSRRB M2500-4.1.
specifications. Providing
A. Granular and
material Cum 241 30.5 1613.00 1613.00 96.78 1709.78
anchored suitably by using 4 Nos.
laying
MORTH Pitching
Specificationstones of size
No. 2204 &
of M.S. anchor bolts at each
0.3x0.3x0.3
304 (S.R.2018-19 m on slopesPage No. laid 229,
over
support, with base plate and shoe
prepared
I.No. 28.11)filter media including
plate. The work includes cutting,
boulder apron laid dry in front of
straightening, placing in position of
toe of embankment complete as
M.S angle and welding wherever
per drawing and Technical
necessary, and applying one coat
specifications including cost of
of red oxide primer coat to all the
materials, labour, HOM complete
members including cost of all
as per specifications. A. Stone I
materials, labour charges, & hire
Boulder
charges of machineries for cutting,
MORTH Specification No. 2504
welding, grinding & erection
equipments, etc., complete as per
It.No. Description of items. Unit Page Item No Basic Rate Diffrence in cost Total - 1 Area Total - 2
No S.R 2018- Const Rate Amount Weightag 10 + 11
19 e6%

Assistant Executive Engineer, Executive Engineer,


PWD,Dept.Sub-Dn.,Belagavi PWD.Dept. Belagavi Dn Belagavi
0

Estimate of Box Culvert: 1 V, (3 m x 3 m)

Nos 1

SN Description of Work Unit Box No L B D Qty Rate Amount


1 KSRRB M200-13.1 Dismantling of existing
structure like culverts, bridges, retaining walls and
other structures comprising of masonry, cement
concrete, wood work, steel work, including T & P
and scaffolding wherever necessary, sorting the
dismantled material, disposable of unserciable
material and stacking stacking the serviceable
materials with all lifts and lead of 1000 mtrs.,
complete as per specificatiions. MORTH
Specification 202.

PWD Belagavi CIRCLE 2018-19 Item


No:18.21Page No:139
MCPC 1 1 15.00 7.50 3.50 393.75
Deduction for Vents (3M Dia) 4 7.50 3.54 -106.08
CUM 287.67 783.34 225,343.42

2 KSRRB M2100-2.1. Earth work in excavation for


foundation of structures as per drawing and
technical specifications, including setting out,
construction of shoring and bracing, removal of
stumps and other deleterious matter, dressing of
sides and bottom and backfilling with approved
material complete as per specifications - (i)
Depth upto 3m By Mechanical means

PWD Belagavi CIRCLE 2018-19 Item


No:27.4Page No:220
BOX CULVERT: 1 V, (3 m x 3 m) 1 6.00 6.90 1.25 51.75
Retaining wall 4 3.00 3.25 2.10 81.90
133.65
CUM 1 133.65 53.00 7,083.45

3 KSRB 2.8 : Providing and Filling in foundation


with granite I trap broken metal 1OOmm. and
down size & with approved sand including hand
packing, ramming, watering, including cost of
all materials and labour with all lead and lift.
complete as per specifications. specification. No.
KBS 2.10.2

PWD Belagavi CIRCLE 2018-19 Item


No:2.15Page No:52
Below box 1 6.90 6.00 0.50 20.70
Retaining wall 4 3.00 3.85 0.45 20.79
41.49
CUM 1 41.49 2265.22 93,983.98
4 KSRRB M2100-13. Providing and laying Plain/
Reinforced cement concrete of mix 1:2:4 with
OPC cement @ 240kgs, with crushed 40mm and
down size graded granite metal coarse
aggregates @0.84cum and fine aggregates @
0.56cum, in open foundation including cost of all
materials, labour, HOM curing, form works,
scaffolding and centering complete as per
specifications
PWD Belagavicomplete as per
CIRCLE Drawings Item
2018-19 and
No:27.24Page No:222
BOX CULVERT: 1 V, (3 m x 3 m) 1 6.00 6.30 0.15 5.67
Retaining wall 4 3.00 3.55 0.15 6.39

Curtain Wall Type-1 1 6.30 1.85 0.15 1.75


1 6.30 1.65 0.55 5.72
1 6.30 0.75 0.75 3.54
1 6.30 0.45 0.75 2.13
1 6.30 0.20 0.45 0.57
Curtain Wall Type-2 1 6.30 1.50 0.15 1.42
1 6.30 1.30 0.80 6.55
1 6.30 0.45 0.75 2.13
1 6.30 0.20 0.45 0.57
SN Description of Work Unit Box No L B D Qty Rate Amount
36.44
Cum 1 36.44 5751.77 209,594.57

5 KSRRB M2100-17.12.Providing and laying Plain/


Reinforced cement concrete of mix M25 with OPC
cement @ 340kgs, with 20mm and down size
graded granite metal coarse aggregates
@0.7cum and fine aggregates @ 0.47cum, with
superplastisiser @3lts confirming to IS9103-1999
Reaffirmed-2008open foundation including cost of
all materials, labour, HOM curing, form works,
scaffolding and centering complete as per
specifications complete as per Drawings and
Technical specifications. MORTH Specification
No.1500,1700 & 2100

PWD Belagavi CIRCLE 2018-19 Item


No:27.31Page No:223
BOX CULVERT: 1 V, (3 m x 3 m)
Bottom (slab) 1 6.0 6.00 0.50 18.00
Retaining wall Raft 4 3.0 3.25 0.50 19.50
37.50
Cum 1 37.50 5704.07 213,902.70

6 KSRRB M2200-5.12.Providing and laying Plain/


Reinforced cement concrete of mix M25 with OPC
cement @ 340kgs, with 20mm and down size
graded granite metal coarse aggregates
@0.7cum and fine aggregates @ 0.47cum, with
superplastisiser @3lts confirming to IS9103-1999
Reaffirmed-2008- i) Up to 5m height

PWD Belagavi CIRCLE 2018-19 Item


No:28.7.12Page No:227
BOX CULVERT: 1 V, (3 m x 3 m)
Sides 4 6.0 3.00 0.45 32.40
Middle Sides 3 6.0 3.00 0.40 21.60
Haunch Portion (0.50x0.15x0.15) 1 4.0 0.01125 6.00 0.27
Brackets 2 6.0 0.30 0.30 1.08
2 6.0 (0.3*0.3*1/2) 0.54
Key Slab 1 6.0 0.30 0.30 0.54
1 6.0 (0.3*0.3*1/2) 0.27
Retaining wall 4 3.0 4.45000 0.40 21.36

78.06
Cum 1 78.06 6052.81 472,482.50

7 KSRRB M2000-3.1.Providing and laying Plain


Reinforced/Prestressed cement concrete in super
structure as per drawing and technical
Specification Complete as per specification. B.
RCC WITH OPC design mix M25 @ 340kgs, with
20mm and down size graded granite metal coarse
aggregates @0.7cum and fine aggregates @
0.47cum, with superplastisiser @3lts confirming to
IS9103-1999 Reaffirmed-2008- including cost of
materials, labour, HOM, curing, form
waorks,scaffolding and centering complete as per
specifications. MORTH Specification No.
1500,1600,1700 & 2300 is 456 Height Up to 5m

PWD Belagavi CIRCLE 2018-19 Item


No:29.5.1Page No:233
BOX CULVERT: 1 V, (3 m x 3 m)
Slab 1 6.0 6.00 0.45 16.20
16.20
Cum 1 16.20 7220.93 116,979.10
SN Description of Work Unit Box No L B D Qty Rate Amount
8 KSRRB M2200-6 :Providing T.M.T steel
reinforcement for R.C.C work including
straightening, cutting, bending, hooking, placing in
position, lapping and/or welding wherevr required,
tying with binding wire and anchoring to the
adjoning members wherever necessary complete
as per design (laps, hooks and wastage shall not
be measured and paid) cost of materials, labour,
HOM complete as per specification. MORTH
Specification No. 1600 & 2200 TMT Bars Fe 500

PWD Belagavi CIRCLE 2018-19 Item


No:29.29.2Page No:239
AS PER CALCULATION SHEET 33.13
tonne 1 33.13 80847.10 2,678,795.64

9 KSRRB M 2700-6. PCC M15 Grade levelling


course below approach Slab complete as per
drawing and technical specification. MORTH
Specification No. 2700

PWD Belagavi CIRCLE 2018-19 Item


No:32.6Page No:247
Below Approach Slab Cum 2 3.50 6.00 0.150 6.30
1 6.30 6105.81 38,466.62
10 KSRRB M2700-7. Reinforced cement concrete
M30 approach slab including reinforcement @
70kg/cum and formwork complete as per drawing
and Technical specification including cost of
materials, labour, HOM complete as per
specifications. MORTH Specification No.
1500,1600 1700 & 2704.
PWD Belagavi CIRCLE 2018-19 Item
No:32.7Page No:247
For Approach slab 2 3.50 6.00 0.30 12.60
Cum 1 12.60 10928.39 137,697.69

11 KSRRB M2300-16. Providing and laying Cement


concrete wearing coat with OPC cement design
mix M30 @ 360kgs, with 20mm and down size
graded granite metal coarse aggregates
@0.69cum and fine aggregtes @ 0.46cum, with
superplastisiser @3lts confirming to IS9103-1999
Reaffirmed-2008 including reinforcement
complete as per drawing and Technical
Specifications including cost of materials, labour,
HOM complete as per specifications MORTH
Specification No. 2702
PWD Belagavi CIRCLE 2018-19 Item
No:32.8Page No:247
For Slab 1 6.00 6.00 0.075 2.70
For Approach slab 2 3.50 6.00 0.075 3.15
5.85
Cum 1 5.85 11291.97 66,058.01
SN Description of Work Unit Box No L B D Qty Rate Amount
12 KSRRB 2200-8.1 : Back Filling behind abutment,
wing wall and return wall complete as per drawing
and Technical Specifications including cost of
materials, labour, HOM of machineries, complete
as per specifications. A. Granular materialc
MORTH Specification No. 2204 & 304

PWD Belagavi CIRCLE 2018-19 Item


No:28.11Page No:229
Retaining wall and abutmrnt back side 2 6.00 3 4.450 160.20
Deduct for Filter media 56.88
103.32
Cum 1 103.32 895.70 92,543.72

13 KSRRB M2200-9: Providing and filling filter media


with granular material /stone crushed aggregate
satisfying the requirement laid down in Clause
2500.4.2.2. of MORTH specification to a
thickness of not less than 600 mm with smaller
size towards the soil and bigger size towards the
the wall and provided over the entire surface
behind abutments, wing walls and return walls to
a full height compacted to a firm condition
complete as per drawing and technical
specifications including cost of materials, labour,
HOM complete as per specifications MORTH
Specification No. 2504.2.

PWD Belagavi CIRCLE 2018-19 Item


No:28.13Page No:229
Behind walls 2 6.00 0.60 3.45 24.84
Behind Retaining wall 4 3.00 0.60 4.45 32.04
56.88
Cum 1 56.88 2216.46 126,072.24

14 KSRRB M2200-8 : Providing weep holes in brick


masonrt/ plain/ Reinforced concrete abutment/
wing wall / return wall with 100 mm dia. A.C.
Pipe, extending through the full width of the
structure with slope of 1V:20 H towards drawing
force. complete as per drawing and technical
specification including cost of materials, labour,
HOM complete as per specification MORTH
Specification No. 2706 and 2200

PWD Belagavi CIRCLE 2018-19 Item


No:28.1Page No:229
Mtr.
Behind end walls 2 2.00 4.00 16.00
Behind retaining wall 4 2.00 2.00 16.00

1 32.00 155.82 4,986.24


15 KSRRB 2700-3: Construction of RCC Railings of
M30 grade in situ with 20 mm nominal size
aggregate, true to line and grade, tolerance of
vertical RCC post not to exceed 1 in 500, center
to center spacing between vertical post not to
exceed 2000 mm, leaving adequate space
between vertical post for expansion, complete as
per approved drawings and technical
specifications including cost of materials, labour,
HOM complete as per specification. MORTH
Specification No.2703,1500,1600and 1700.

PWD Belagavi CIRCLE 2018-19 Item


No:32.8Page No:247
Mtr. 2 13.00 26.00
1 26.00 1852.88 48,174.88
SN Description of Work Unit Box No L B D Qty Rate Amount
16 KSRRB M400 Construction of granular sub-base
Grading -V as sub base and drainage layer by
providing coarse graded crushed stone
aggregates of granite/trap/basalt material, mixing
in a mechanical mix plant at OMC, Carriage of
mixed material to work site, spreading in uniform
layers with motor grader on prepared surface and
compacting with vibratory power roller to achieve
the 98% proctor density, complete as per
specifications. Clause 401 of MORTH V Revision.

PWD Belagavi CIRCLE 2018-19 Item


No:20.4Page No:153
Flexible Apron D/S 1 4.00 6.00 0.75 18.00
Flexible Apron U/S 1 3.00 6.00 0.75 13.50
31.50
Cum 1 31.50 1995.98 62,873.37
17 KSRRB 2500-1.1:Providing and laying of apron
with cement concrete blocks of size 0.5x0.5x0.5m
cast -in- situ and made with nominal mix of M-15
grade cement concrete with a minimum cement
content of 240 kg/cum including cost of materials,
labour, HOM complete as per specification as per
IRC:21-2000 Complete as per specification
MORTH Specification No.2503.

PWD Belagavi CIRCLE 2018-19 Item


No:30.3Page No:241
Floor Apron D/S 1 6.00 6.00 0.45 16.20
Floor Apron U/S 1 5.00 6.00 0.45 13.50
29.70
Cum 1 29.70 5834.24 173,276.93

Total 4,768,316.00
0.00

APPROACH ROAD ESTIMATE

ABSTRACT AND MEASUREMENTS

SN Description of Work Unit No L B D Quantity Rate Amount


1 KSRRB M200-11.1. Clearing and grubbing road land including uprooting rank vegetation, grass, bushes,
shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of
unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000
metres including removal and disposal of top organic soil not exceeding 150 mm in thickness complete as
per specifications.
II. By Mechanical Means:A. In area of light jungle.
PWD Belagavi CIRCLE 2018-19 Item No:18.15Page No:139
APPROACH ROAD
1 186 5.50 1023
Total 1023
Deduction for voids 40% 40% -409
Ha 614
0.06 19637.6 1,206.00
2 KSRRB 300-50. Scarifying bituminous course 50mm to 75mm thick along with premix carpet / surface
dressing by road roller attached with scarifier without disturbing the base and stacking the debris including
cost of all labour charges, HOM of machineries complete as per specifications. MORTH / Chapter 3.
PWD Belagavi CIRCLE 2018-19 Item No:19.56Page No:146

1 186 5.50 1023


Total 1023
Sqm 1023
1023.00 41.3 42,291.00
3 KSRRB M300-53. Construction of embankment with approved material Gravel/Murrum with all lifts and
leads, transporting to site, spreading, grading to required slope and compacting to meet requirement Table
300-2 complete as per specifications.(which includes cost of gravel / murrum, watering charges & compaction
by vibratory roller) MORTH Specification No. 305

PWD Belagavi CIRCLE 2018-19 Item No:19.6Page No:147


Embankment
Towards Savalagi Village 1 93.00 13.50 1.25 1569.38

Towards Savalagi RS 1 93.00 13.50 1.25 1569.38

Cum 3138.75 482.30 1,513,819.13


4 KSRRB M300-55. Construction of Subgrade and Earthen Shoulders with approved material Gravel/Murrum
with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet
requirement of Table No. 300-2 complete as per specifications (including cost of earth, watering charges &
compaction by vibratory roller).
PWD Belagavi CIRCLE 2018-19 Item No:19.62Page No:147
APPROACH ROAD
SUBGRADE FULL WIDTH
(13.575+15.075)/2 1 93.00 12.000 0.300 334.80
1 93.00 12.000 0.300 334.80
FOR EARTHEN SHOULDER
FOR BM+SDBC 2 93.00 2.50 0.08 34.88
2 93.00 2.50 0.08 34.88
FOR WMM 2 93.00 2.35 0.25 109.28
2 93.00 2.35 0.25 109.28
SN Description of Work Unit No L B D Quantity Rate Amount
FOR GSB 2 93.00 2.20 0.10
40.92
2 93.00 2.20 0.10
40.92
Total Cum 1039.74 507.74 527,917.59
5 KSRRB M400 Construction of granular sub-base Grading -V as sub base and drainage layer by providing
coarse graded crushed stone aggregates of granite/trap/basalt material, mixing in a mechanical mix plant at
OMC, Carriage of mixed material to work site, spreading in uniform layers with motor grader on prepared
surface and compacting with vibratory power roller to achieve the 98% proctor density, complete as per
specifications. Clause 401 of MORTH V Revision.
PWD Belagavi CIRCLE 2018-19 Item No:20.4Page No:153
APPROACH ROAD
Towards Savalagi Village 1 93.00 12.00 0.100 111.60
1 93.00 7.50 0.100 69.75
Towards Savalagi RS 1 93.00 12.00 0.100 111.60
1 93.00 7.50 0.100 69.75
Total Cum 362.70 1995.98 723,941.95
6 KSRRB M400-17. Providing, laying, spreading and compacting graded stones aggregate to wet mix
macadam specifications including pre mixing the material with water at OMC in mechanical mix plant carriage
of mixed method of tipper to site, laying in uniforms layers with paver in sub-base/base course on well
prepared surface and compacting with vibratory roller to achieve the desired density complete as per
specifications.
PWD Belagavi CIRCLE 2018-19 Item No:20.18Page No:155

1 93.00 7.50 0.250


174.38
1 93.00 7.50 0.250
174.38
Total Cum 348.76 1935.56 675,045.91
7 KSRRB M500-6. Providing and applying primer coat with S.S.bitumen emulsion on prepared surface of
granular base such as WBM, WMM including clearing of road surface and spraying primer at the rate of 0.60
kg / sqm using mechanical means complete as per specifications.
PWD Belagavi CIRCLE 2018-19 Item No:21.6Page No:158

Sqm 1 186.00 7.50 1395 37.51 52,325.28

8 KSRRB M500-10. Tack Coat:- Providing and applying tack coat using 80/100 grade bitumem(VG 10) in
boiler fitted with spray set distributer at the rate of 0.25 kg/sqm on primed surfaces cleaned with mechanical
broom, complete as per specifications.
PWD Belagavi CIRCLE 2018-19 Item No:21.1Page No:159
Qty of 11 sqm 1 186.00 7.50 1395.00 13.33 18,598.35
9 KSRRB 500-11. Providing and laying bituminous macadam on prepared surface with crushed coarse
aggregates as per design mix formula for base / binding course including loading of aggregates with F.E.
loader, hot mixing of stone aggregates and bitumen in hot mix plant, transporting the mixd material in tipper
to paver and laying mixed materials with paver finisher to the required level and grade, rolling by power roller
to achieve the desired density, but excluding cost of primer / tack coat including lead, lift and cost of all
materials, labour, HOM of machineries complete as per specifications. MORTH /Chapter 5 - using 40/60 TPH
capacity H.M.P. with Mechanical paver Gr-II (50 mm to 75 mm) with 3.3 % VG-30 Bitumen
PWD Belagavi CIRCLE 2018-19 Item No:21.11.6Page No:159
Grade-2
1 93.00 7.50 0.050 34.88
1 93.00 7.50 0.050 34.88
Total Cum 69.75 6358.86 443,530.16
SN Description of Work Unit No L B D Quantity Rate Amount
10 KSRRB M500-18. Providing and laying semi dense bituminous concrete using crushed aggregates of
specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site, laying with
a paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem
rollers to achieve the desired compaction as per MORTH specification clause No. 508 complete in all
respects complete as per specifications. - using40/60 TPH capacity H.M.P. with Mechanical Paver Gr-II (25
mm to 30 mm) with 5 % VG-30 Bitumen
PWD Belagavi CIRCLE 2018-19 Item No:21.20.6Page No:160
1 93.00 7.50 0.025 17.44
1 93.00 7.50 0.025 17.44
Cum 34.88 8415.50 293,532.61
11 KSRRB M800-4. Direction and Place Identification Signs with size more than 0.9 sqm Size Board: Providing
and erecting direction and place identification retro-reflectorised sign as per IRC 67 made of high intensity
grade sheeting vide clause 800.1.3, fixed over aluminium sheeting 2 mm thick with area exceeding 0.9 sqm
supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm, 2 Nos, firmly fixed to the ground by means
of properly designed foundation with M-15 grade cement concrete 45cm x 45 cm x 60 cm 60 cm below
ground level as per approved drawing complete as per specifications.
Using Type IV sheeting.
PWD Belagavi CIRCLE 2018-19 Item No:24.4Page No:180
2 Legged junctions 2 1.50 1.20 3.60
Sqm 3.60 7574.76 27,269.14
SN Description of Work Unit No L B D Quantity Rate Amount
12 KSSRB M800-2- Retro-Reflectorised Traffic Signs: Providing and fixing of retro-reflectorised cautionary
mandatory, and informatory sign as per IRC 67 made of high intensity grade sheeting vide clause 800.1.3,
fixed over Aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75mm x 6
mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45
cm x 45 cm x 60 cm 60 cm below ground level as per approved drawing complete as per specifications.
MORTH Specification No. 801.

PWD Belagavi CIRCLE 2018-19 Item No:24.2.3Page No:180


600 mm circle Each 1 1 3256.32 3,256.32
13 KSRRB M800-13.Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads
on Bituminous Surface:- Providing and laying of hot applied thermoplastic compound 2.5 mm thick including
reflectorising glass beads at 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass
beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes complete as
per specifications.

PWD Belagavi CIRCLE 2018-19 Item No:24.15Page No:182

Shoulder Edge Marking 2 93.00 0.10 18.60


2 93.00 0.10 18.60
CENTER 1 65.59 0.1 6.56
Sqm 43.76 454.74 19,899.43
14 KSSRB-M-800-15.Road Delineators: Supplying and installation of delineators (road way indicators, hazard
markers, object markers), 80-100cm high above ground level, painted black and white in 15cm wide strips,
fitted with 80x100mm rectangular or 75mm dia circluar reflectorised panels at the top, buried or pressed into
the ground and conforming to IRC: 79 and the drawings complete as per specifications.
MORTH Specification No 805

PWD Belagavi CIRCLE 2018-19 Item No:24.19Page No:182


10 1 10
Nos 10 1963.12 19,631.20
Total 4,362,264.07
Grand Total 4,362,265.00
Sub Estimate for Service
Road
Sub Estimate for Service
Road
0.00

ESTIMATE FOR DIVERSION WORK


ABSTRACT AND MEASUREMENTS

SN Description of Work Unit No L B D Quantity Rate Amount


1 KSRRB M200-11.1. Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs,
saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials
and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and
disposal of top organic soil not exceeding 150 mm in thickness complete as per specifications.
II. By Mechanical Means:A. In area of light jungle.
PWD Belagavi CIRCLE 2018-19 Item No:18.15Page No:139
1 75 10.00 750
Total 750
Deduction for voids 40% 40% -300
Sqm 1200
Ha 0.12 19637.6 2,356.51
2 KSRRB M300-53. Construction of embankment with approved material Gravel/Murrum with all lifts and leads,
transporting to site, spreading, grading to required slope and compacting to meet requirement Table 300-2 complete
as per specifications.(which includes cost of gravel / murrum, watering charges & compaction by vibratory roller)
MORTH Specification No. 305
PWD Belagavi CIRCLE 2018-19 Item No:19.6Page No:147
1 75.00 10.00 1.20 900.00

Total Cum 900.00 482.30 434,070.00


3 KSRRB M300-55. Construction of Subgrade and Earthen Shoulders with approved material Gravel/Murrum with all
lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table
No. 300-2 complete as per specifications (including cost of earth, watering charges & compaction by vibratory roller).

PWD Belagavi CIRCLE 2018-19 Item No:19.62Page No:147


Service Road
1 75.00 8.500 0.300 191.25

Total Cum 191.25 507.74 97,105.28


4 Providing and laying reinforced cement concrete pipe NP3 for culverts including pointing ends, and fixing collars
with cement mortar 1:2 including cost of all materials, labour, curing complete as per specifications. Specifications.
No. KSRB 1000, 2300 MOST Specification No.1000 / 2300

PWD Belagavi CIRCLE 2018-19 Item No:34.6.3Page No:254


Rmtr 4 10.00 80.00 3381.40 270,512.00
Total 0.00
Grand Total 0.00
0

Esimate of Protection Wall

Nos 1

SN Description of Work Unit Box No L B D Qty Rate Amount


1 KSRRB M2100-2.1. Earth work in excavation for
foundation of structures as per drawing and
technical specifications, including setting out,
construction of shoring and bracing, removal of
stumps and other deleterious matter, dressing of
sides and bottom and backfilling with approved
material complete as per specifications - (i)
Depth upto 3m By Mechanical means

PWD Belagavi CIRCLE 2018-19 Item


No:27.4Page No:220
Protection Wall 2 278.00 1.80 1.15 1150.92
1150.92
CUM 1 1150.92 53.00 60,998.76

2 KSRB 2.8 : Providing and Filling in foundation


with granite I trap broken metal 1OOmm. and
down size & with approved sand including hand
packing, ramming, watering, including cost of
all materials and labour with all lead and lift.
complete as per specifications. specification. No.
KBS 2.10.2

PWD Belagavi CIRCLE 2018-19 Item


No:2.15Page No:52
Protection Wall 2 278.00 2.10 0.35 408.66
408.66
CUM 1 408.66 2265.22 925,704.81
3 KSRRB M2100-13. Providing and laying Plain/
Reinforced cement concrete of mix 1:2:4 with
OPC cement @ 240kgs, with crushed 40mm and
down size graded granite metal coarse
aggregates @0.84cum and fine aggregates @
0.56cum, in open foundation including cost of all
materials, labour, HOM curing, form works,
scaffolding and centering complete as per
specifications
PWD Belagavicomplete as per
CIRCLE Drawings Item
2018-19 and
No:27.24Page No:222
Protection Wall 2 278.00 1.80 0.15 150.12
Side Slop Protection 2 278.00 2.00 0.075 83.40
233.52
Cum 1 233.52 5751.77 1,343,153.80

4 KSRRB M2100-17.12.Providing and laying Plain/


Reinforced cement concrete of mix M25 with OPC
cement @ 340kgs, with 20mm and down size
graded granite metal coarse aggregates
@0.7cum and fine aggregates @ 0.47cum, with
superplastisiser @3lts confirming to IS9103-1999
Reaffirmed-2008open foundation including cost of
all materials, labour, HOM curing, form works,
scaffolding and centering complete as per
specifications complete as per Drawings and
Technical specifications. MORTH Specification
No.1500,1700 & 2100

PWD Belagavi CIRCLE 2018-19 Item


No:27.31Page No:223
Protection Wall 2 278.0 1.50 0.30 250.20
250.20
Cum 1 250.20 5704.07 1,427,158.81
SN Description of Work Unit Box No L B D Qty Rate Amount

5 KSRRB M2200-5.12.Providing and laying Plain/


Reinforced cement concrete of mix M25 with OPC
cement @ 340kgs, with 20mm and down size
graded granite metal coarse aggregates
@0.7cum and fine aggregates @ 0.47cum, with
superplastisiser @3lts confirming to IS9103-1999
Reaffirmed-2008- i) Up to 5m height

PWD Belagavi CIRCLE 2018-19 Item


No:28.7.12Page No:227
Protection Wall 2 278.0 2.00 0.27 294.68

294.68
Cum 1 294.68 6052.81 1,783,642.64

6 KSRRB M2200-6 :Providing T.M.T steel


reinforcement for R.C.C work including
straightening, cutting, bending, hooking, placing in
position, lapping and/or welding wherevr required,
tying with binding wire and anchoring to the
adjoning members wherever necessary complete
as per design (laps, hooks and wastage shall not
be measured and paid) cost of materials, labour,
HOM complete as per specification. MORTH
Specification No. 1600 & 2200 TMT Bars Fe 500

PWD Belagavi CIRCLE 2018-19 Item


No:28.8.2Page No:229
Protection Wall AS PER CALCULATION SHEET #NAME?
tonne 1 #NAME? 79182.90 #NAME?

7 KSRRB M2200-9: Providing and filling filter media


with granular material /stone crushed aggregate
satisfying the requirement laid down in Clause
2500.4.2.2. of MORTH specification to a
thickness of not less than 600 mm with smaller
size towards the soil and bigger size towards the
the wall and provided over the entire surface
behind abutments, wing walls and return walls to
a full height compacted to a firm condition
complete as per drawing and technical
specifications including cost of materials, labour,
HOM complete as per specifications MORTH
Specification No. 2504.2.

PWD Belagavi CIRCLE 2018-19 Item


No:28.13Page No:229

Behind Protection Wall 2 278.00 0.60 2.00 667.20

667.20
Cum 1 667.20 2216.46 1,478,822.11

8 KSRRB M2200-8 : Providing weep holes in brick


masonrt/ plain/ Reinforced concrete abutment/
wing wall / return wall with 100 mm dia. A.C.
Pipe, extending through the full width of the
structure with slope of 1V:20 H towards drawing
force. complete as per drawing and technical
specification including cost of materials, labour,
HOM complete as per specification MORTH
Specification No. 2706 and 2200

PWD Belagavi CIRCLE 2018-19 Item


No:28.1Page No:229
Mtr.
Behind Protection Wall 2 185.33 0.27 98.23

1 98.23 155.82 15,306.20


SN Description of Work Unit Box No L B D Qty Rate Amount
9 KSRRB 2700-3: Construction of RCC Railings of
M30 grade in situ with 20 mm nominal size
aggregate, true to line and grade, tolerance of
vertical RCC post not to exceed 1 in 500, center
to center spacing between vertical post not to
exceed 2000 mm, leaving adequate space
between vertical post for expansion, complete as
per approved drawings and technical
specifications including cost of materials, labour,
HOM complete as per specification. MORTH
Specification No.2703,1500,1600and 1700.
PWD Belagavi CIRCLE 2018-19 Item
No:32.8Page No:247
Mtr. 0 10.90 0.00
1 0.00 1852.88 0.00

10 KSRRB M400 Construction of granular sub-base


Grading -V as sub base and drainage layer by
providing coarse graded crushed stone
aggregates of granite/trap/basalt material, mixing
in a mechanical mix plant at OMC, Carriage of
mixed material to work site, spreading in uniform
layers with motor grader on prepared surface and
compacting with vibratory power roller to achieve
the 98% proctor density, complete as per
specifications. Clause 401 of MORTH V Revision.

PWD Belagavi CIRCLE 2018-19 Item


No:20.4Page No:153
Side Slop Protection 2 278.00 2.00 0.075 83.40

83.40
Cum 1 83.40 1995.98 166,464.73
Total #NAME?

Executive Engineer,
Assistant Executive Engineer,
PWD.Dept. Belagavi Dn
PWD,Dept.Sub-Dn.,Belagavi
Belagavi
0

RATE ANALYSIS FOR BRIDGE


PWD Belagavi CIRCLE 2018-19

Area Weightage 6 % Per Bag Per Kg


Material As per SR Market Diff Diff
Cement Rate per Bag 235 284 49 0.98
Steel 45645 52462 6817 6817

SL. Difference in Cost Total Area G. Total


Basic Rate
No Description of Work Per Cement of Steel Weightage ( Rate ( Rs.)
Rate (Rs.) Rs.)
(Rs.) (Rs.) ( Rs.)
1 2 3 4 5 6 7 8 9
1 KSRRB M200-13.1 Dismantling of existing structure like
culverts, bridges, retaining walls and other structures comprising
of masonry, cement concrete, wood work, steel work, including T &
P and scaffolding wherever necessary, sorting the dismantled
material, disposable of unserciable material and stacking stacking
the serviceable materials with all lifts and lead of 1000 mtrs.,
complete as per specificatiions. MORTH Specification 202.

II. By Mechanical means


A. Cement Concrete Grade M-15 & M-20
PWD Belagavi CIRCLE 2018-19 Item No:18.21Page No:139 739.00 CUM 0.00 0.00 739.00 44.34 783.34
2 KSRRB M2100-2.1. Earth work in excavation for foundation of
structures as per drawing and technical specifications, including
setting out, construction of shoring and bracing, removal of stumps
and other deleterious matter, dressing of sides and bottom and
backfilling with approved material complete as per specifications -
(i) Depth upto 3m By Mechanical means

PWD Belagavi CIRCLE 2018-19 Item No:27.4Page No:220 50.00 CUM 0.00 0.00 50.00 3.00 53.00
3 KSRB 2.8 : Providing and Filling in foundation with granite I trap
broken metal 1OOmm. and down size & with approved sand
including hand packing, ramming, watering, including cost of all
materials and labour with all lead and lift. complete as per
specifications. specification. No. KBS 2.10.2
PWD Belagavi CIRCLE 2018-19 Item No:2.15Page No:52 2137.00 CUM 0.00 0.00 2137.00 128.22 2265.22
4 KSRRB M2100-13. Providing and laying Plain/ Reinforced cement
concrete of mix 1:2:4 with OPC cement @ 240kgs, with crushed
40mm and down size graded granite metal coarse aggregates
@0.84cum and fine aggregates @ 0.56cum, in open foundation
including cost of all materials, labour, HOM curing, form works,
scaffolding and centering complete as per specifications complete
as per Drawings and Technical specifications. MORTH
Specification No.1500,1700 & 2100

PWD Belagavi CIRCLE 2018-19 Item No:27.24Page No:222 5191.00 Cum 235.20 0.00 5426.20 325.57 5751.77
5 KSRRB M2100-17.12.Providing and laying Plain/ Reinforced
cement concrete of mix M25 with OPC cement @ 340kgs, with
20mm and down size graded granite metal coarse aggregates
@0.7cum and fine aggregates @ 0.47cum, with superplastisiser
@3lts confirming to IS9103-1999 Reaffirmed-2008open foundation
including cost of all materials, labour, HOM curing, form works,
scaffolding and centering complete as per specifications complete
as per Drawings and Technical specifications. MORTH
Specification No.1500,1700 & 2100

PWD Belagavi CIRCLE 2018-19 Item No:27.31Page No:223 5048.00 Cum 333.20 0.00 5381.20 322.87 5704.07
6 KSRRB M2200-5.12.Providing and laying Plain/ Reinforced
cement concrete of mix M25 with OPC cement @ 340kgs, with
20mm and down size graded granite metal coarse aggregates
@0.7cum and fine aggregates @ 0.47cum, with superplastisiser
@3lts confirming to IS9103-1999 Reaffirmed-2008- i) Up to 5m
height

PWD Belagavi CIRCLE 2018-19 Item No:28.7.12Page No:227 5377.00 Cum 333.20 0.00 5710.20 342.61 6052.81
7 KSRRB M2000-3.1.Providing and laying Plain
Reinforced/Prestressed cement concrete in super structure as per
drawing and technical Specification Complete as per specification.
B. RCC WITH OPC design mix M25 @ 340kgs, with 20mm and
down size graded granite metal coarse aggregates @0.7cum and
fine aggregates @ 0.47cum, with superplastisiser @3lts confirming
to IS9103-1999 Reaffirmed-2008- including cost of materials,
labour, HOM, curing, form waorks,scaffolding and centering
complete as per specifications. MORTH Specification No.
1500,1600,1700 & 2300 is 456 Height Up to 5m

PWD Belagavi CIRCLE 2018-19 Item No:29.5.1Page No:233 6479.00 Cum 333.20 0.00 6812.20 408.73 7220.93
SL. Difference in Cost Total Area G. Total
No Basic Rate Weightage ( Rate ( Rs.)
Description of Work Per Cement of Steel
Rate (Rs.) Rs.)
(Rs.) (Rs.) ( Rs.)
1 2 3 4 5 6 7 8 9
8 KSRRB M2200-6 :Providing T.M.T steel reinforcement for R.C.C
work including straightening, cutting, bending, hooking, placing in
position, lapping and/or welding wherevr required, tying with
binding wire and anchoring to the adjoning members wherever
necessary complete as per design (laps, hooks and wastage shall
not be measured and paid) cost of materials, labour, HOM
complete as per specification. MORTH Specification No. 1600 &
2200 TMT Bars Fe 500

PWD Belagavi CIRCLE 2018-19 Item No:28.8.2Page No:229 67543.00 tonne 0.00 7157.85 74700.85 4482.05 79182.90
9 KSRRB M2200-6 :Providing T.M.T steel reinforcement for R.C.C
work including straightening, cutting, bending, hooking, placing in
position, lapping and/or welding wherevr required, tying with
binding wire and anchoring to the adjoning members wherever
necessary complete as per design (laps, hooks and wastage shall
not be measured and paid) cost of materials, labour, HOM
complete as per specification. MORTH Specification No. 1600 &
2200 TMT Bars Fe 500

tonne
PWD Belagavi CIRCLE 2018-19 Item No:29.29.2Page No:239 69113.00 0.00 7157.85 76270.85 4576.25 80847.10
10 KSRRB M 2700-6. PCC M15 Grade levelling course below
approach Slab complete as per drawing and technical
specification. MORTH Specification No. 2700
PWD Belagavi CIRCLE 2018-19 Item No:32.6Page No:247 5525.00 Cum 235.20 0.00 5760.20 345.61 6105.81
11 KSRRB M2700-7. Reinforced cement concrete M30 approach
slab including reinforcement @ 70kg/cum and formwork complete
as per drawing and Technical specification including cost of
materials, labour, HOM complete as per specifications. MORTH
Specification No. 1500,1600 1700 & 2704.

PWD Belagavi CIRCLE 2018-19 Item No:32.7Page No:247 9957.00 Cum 352.80 0.00 10309.80 618.59 10928.39
12 KSRRB M2300-16. Providing and laying Cement concrete wearing
coat with OPC cement design mix M30 @ 360kgs, with 20mm and
down size graded granite metal coarse aggregates @0.69cum and
fine aggregtes @ 0.46cum, with superplastisiser @3lts confirming
to IS9103-1999 Reaffirmed-2008 including reinforcement complete
as per drawing and Technical Specifications including cost of
materials, labour, HOM complete as per specifications MORTH
Specification No. 2702

PWD Belagavi CIRCLE 2018-19 Item No:32.8Page No:247 10300.00 Cum 352.80 0.00 10652.80 639.17 11291.97
13 KSRRB 2200-8.1 : Back Filling behind abutment, wing wall and
return wall complete as per drawing and Technical Specifications
including cost of materials, labour, HOM of machineries, complete
as per specifications. A. Granular materialc MORTH Specification
No. 2204 & 304
PWD Belagavi CIRCLE 2018-19 Item No:28.11Page No:229 845.00 Cum 0.00 0.00 845.00 50.70 895.70
14 KSRRB M2200-9: Providing and filling filter media with granular
material /stone crushed aggregate satisfying the requirement laid
down in Clause 2500.4.2.2. of MORTH specification to a
thickness of not less than 600 mm with smaller size towards the
soil and bigger size towards the the wall and provided over the
entire surface behind abutments, wing walls and return walls to a
full height compacted to a firm condition complete as per drawing
and technical specifications including cost of materials, labour,
HOM complete as per specifications MORTH Specification No.
2504.2.

PWD Belagavi CIRCLE 2018-19 Item No:28.13Page No:229 2091.00 Cum 0.00 0.00 2091.00 125.46 2216.46
15 KSRRB M2200-8 : Providing weep holes in brick masonrt/ plain/
Reinforced concrete abutment/ wing wall / return wall with 100 mm
dia. A.C. Pipe, extending through the full width of the structure with
slope of 1V:20 H towards drawing force. complete as per drawing
and technical specification including cost of materials, labour, HOM
complete as per specification MORTH Specification No. 2706
and 2200
PWD Belagavi CIRCLE 2018-19 Item No:28.1Page No:229 147.00 Mtr. 0.00 0.00 147.00 8.82 155.82
16 KSRRB 2700-3: Construction of RCC Railings of M30 grade in situ
with 20 mm nominal size aggregate, true to line and grade,
tolerance of vertical RCC post not to exceed 1 in 500, center to
center spacing between vertical post not to exceed 2000 mm,
leaving adequate space between vertical post for expansion,
complete as per approved drawings and technical specifications
including cost of materials, labour, HOM complete as per
specification. MORTH Specification No.2703,1500,1600and 1700.

PWD Belagavi CIRCLE 2018-19 Item No:32.3Page No:247 1748.00 Mtr. 0.00 1748.00 104.88 1852.88
17 KSRRB M400 Construction of granular sub-base Grading -V as
sub base and drainage layer by providing coarse graded crushed
stone aggregates of granite/trap/basalt material, mixing in a
mechanical mix plant at OMC, Carriage of mixed material to work
site, spreading in uniform layers with motor grader on prepared
surface and compacting with vibratory power roller to achieve the
98% proctor density, complete as per specifications. Clause 401 of
MORTH V Revision.

PWD Belagavi CIRCLE 2018-19 Item No:20.4Page No:153 1883.00 Cum 0.00 0.00 1883.00 112.98 1995.98
SL. Difference in Cost Total Area G. Total
No Basic Rate Weightage ( Rate ( Rs.)
Description of Work Per Cement of Steel
Rate (Rs.) Rs.)
(Rs.) (Rs.) ( Rs.)
1 2 3 4 5 6 7 8 9

Assistant Executive Engineer, Executive Engineer,


PWD,Dept.Sub-Dn.,Belagavi PWD.Dept. Belagavi Dn Belagavi
0.00

RATE ANALYSIS FOR APPROACH ROAD

Area Weightage 6%

Material As per SR Market Diff Diff

VG10 80/100 BULK 38118 40428 2310 2310

VG10 80/100 PACKED 41318 41468 150 150

VG30 60/70 BULK 38918 39528 610 610

VG30 60/70 PACKED 42118 40918 -1200 -1200


Area
Sl. Material Cost difference Sub Total weighata
Discrition of Items Unit Basic Rate ge % Gross Rate
No
Bitumen/Cement 6%
1 2 3 4 5 6 7 5 6
Sub-Estimate No -1 (For Road Work)
1 KSRRB M200-11.1. Clearing and grubbing road land including uprooting
rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300
mm, removal of stumps of trees cut earlier and disposal of unserviceable
materials and stacking of serviceable material to be used or auctioned, up
to a lead of 1000 metres including removal and disposal of top organic soil Ha 18526.00 1111.56 19637.56
not exceeding 150 mm in thickness complete as per specifications.
II. By Mechanical Means:A. In area of light jungle.

PWD Belagavi CIRCLE 2018-19 Item No:18.15Page No:139


2 KSRRB 300-50. Scarifying bituminous course 50mm to 75mm thick along
with premix carpet / surface dressing by road roller attached with scarifier
without disturbing the base and stacking the debris including cost of all Sqm 39.00 2.34 41.34
labour charges, HOM of machineries complete as per specifications.
MORTH / Chapter 3.

PWD Belagavi CIRCLE 2018-19 Item No:19.56Page No:146


3 KSRRB M300-53. Construction of embankment with approved material
Gravel/Murrum with all lifts and leads, transporting to site, spreading,
grading to required slope and compacting to meet requirement Table 300-2
complete as per specifications.(which includes cost of gravel / murrum, Cum 455.00 27.30 482.30
watering charges & compaction by vibratory roller) MORTH Specification
No. 305

PWD Belagavi CIRCLE 2018-19 Item No:19.6Page No:147


4 KSRRB M300-55. Construction of Subgrade and Earthen Shoulders with
approved material Gravel/Murrum with all lifts & leads, transporting to site,
spreading, grading to required slope and compacted to meet requirement
of Table No. 300-2 complete as per specifications (including cost of earth, Cum 479.00 28.74 507.74
watering charges & compaction by vibratory roller).

PWD Belagavi CIRCLE 2018-19 Item No:19.62Page No:147


5 KSRRB M400 Construction of granular sub-base Grading -V as sub base
and drainage layer by providing coarse graded crushed stone aggregates
of granite/trap/basalt material, mixing in a mechanical mix plant at OMC,
Carriage of mixed material to work site, spreading in uniform layers with
motor grader on prepared surface and compacting with vibratory power Cum 1883.00 112.98 1995.98
roller to achieve the 98% proctor density, complete as per specifications.
Clause 401 of MORTH V Revision.

PWD Belagavi CIRCLE 2018-19 Item No:20.4Page No:153


6 KSRRB M400-17. Providing, laying, spreading and compacting graded
stones aggregate to wet mix macadam specifications including pre mixing
the material with water at OMC in mechanical mix plant carriage of mixed
method of tipper to site, laying in uniforms layers with paver in
Cum 1826.00 109.56 1935.56
sub-base/base course on well prepared surface and compacting with
vibratory roller to achieve the desired density complete as per
specifications.

PWD Belagavi CIRCLE 2018-19 Item No:20.18Page No:155


7 KSRRB M500-6. Providing and applying primer coat with S.S.bitumen
emulsion on prepared surface of granular base such as WBM, WMM
including clearing of road surface and spraying primer at the rate of 0.60 kg Sqm 34.00 0.0006 2,310 1.39 35.39 2.12 37.51
/ sqm using mechanical means complete as per specifications.

PWD Belagavi CIRCLE 2018-19 Item No:21.6Page No:158


8 KSRRB M500-10. Tack Coat:- Providing and applying tack coat using
80/100 grade bitumem(VG 10) in boiler fitted with spray set distributer at
the rate of 0.25 kg/sqm on primed surfaces cleaned with mechanical Sqm 12.00 0.0003 2,310 0.58 12.58 0.75 13.33
broom, complete as per specifications.

PWD Belagavi CIRCLE 2018-19 Item No:21.1Page No:159


Area
Sl. Material Cost difference Sub Total weighata
Discrition of Items Unit Basic Rate ge % Gross Rate
No
Bitumen/Cement 6%
9 KSRRB 500-11. Providing and laying bituminous macadam on prepared
surface with crushed coarse aggregates as per design mix formula for
base / binding course including loading of aggregates with F.E. loader, hot
mixing of stone aggregates and bitumen in hot mix plant, transporting the
mixd material in tipper to paver and laying mixed materials with paver
finisher to the required level and grade, rolling by power roller to achieve
Cum 5955.00 0.07200 610 43.92 5,998.92 359.94 6358.86
the desired density, but excluding cost of primer / tack coat including lead,
lift and cost of all materials, labour, HOM of machineries complete as per
specifications. MORTH /Chapter 5 - using 40/60 TPH capacity H.M.P. with
Mechanical paver Gr-II (50 mm to 75 mm) with 3.3 % VG-30 Bitumen

PWD Belagavi CIRCLE 2018-19 Item No:21.11.6Page No:159


10 KSRRB M500-18. Providing and laying semi dense bituminous concrete
using crushed aggregates of specified grading, premixed with bituminous
binder and filler, transporting the hot mix to work site, laying with a paver
finisher to the required grade, level and alignment, rolling with smooth
wheeled, vibratory and tandem rollers to achieve the desired compaction
as per MORTH specification clause No. 508 complete in all respects Cum 7869.00 0.12 610.00 70.15 7,939.15 476.35 8415.50
complete as per specifications. - using40/60 TPH capacity H.M.P. with
Mechanical Paver Gr-II (25 mm to 30 mm) with 5 % VG-30 Bitumen

PWD Belagavi CIRCLE 2018-19 Item No:21.20.6Page No:160


11 KSRRB M800-4. Direction and Place Identification Signs with size more
than 0.9 sqm Size Board: Providing and erecting direction and place
identification retro-reflectorised sign as per IRC 67 made of high intensity
grade sheeting vide clause 800.1.3, fixed over aluminium sheeting 2 mm
thick with area exceeding 0.9 sqm supported on a mild steel angle iron Sqm 7146.00 428.76 7574.76
post 75 mm x 75 mm x 6 mm, 2 Nos, firmly fixed to the ground by means
of properly designed foundation with M-15 grade cement concrete 45cm x
45 cm x 60 cm 60 cm below ground level as per approved drawing
complete as per specifications.
Using Type IV sheeting.
PWD Belagavi CIRCLE 2018-19 Item No:24.4Page No:180
12 KSSRB M800-2- Retro-Reflectorised Traffic Signs: Providing and fixing of
retro-reflectorised cautionary mandatory, and informatory sign as per IRC
67 made of high intensity grade sheeting vide clause 800.1.3, fixed over
Aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post
75 mm x 75mm x 6 mm firmly fixed to the ground by means of properly
designed foundation with M15 grade cement concrete 45 cm x 45 cm x 60
cm 60 cm below ground level as per approved drawing complete as per
specifications. MORTH Specification No. 801.

For 60 cm circular No 3072.00 184.32 3256.32

PWD Belagavi CIRCLE 2018-19 Item No:24.2.3Page No:180


13 KSRRB M800-13.Road Marking with Hot Applied Thermoplastic
Compound with Reflectorising Glass Beads on Bituminous Surface:-
Providing and laying of hot applied thermoplastic compound 2.5 mm thick
including reflectorising glass beads at 250 gms per sqm area, thickness of
Sqm 429.00 25.74 454.74
2.5 mm is exclusive of surface applied glass beads as per IRC:35. The
finished surface to be level, uniform and free from streaks and holes
complete as per specifications.

PWD Belagavi CIRCLE 2018-19 Item No:24.15Page No:182


14 Providing and Fixing RCC precast guard stones of size 0.23x0.23x1.5
casted in cc 1:1.5:3 with 20mm down size aggregates using 10mm dia
vertical 4 TMT steel rods and 8mm dia stirrps at 20cm c/c fixed 0.90m
above ground level using steel moulding, curing, transportation to work
spot inluding excavation in hard soil fixing in plain cement concrete 1:2:4
using 20mm down size aggregate including aligning to plumb and line
providing enamel painting to exposed faces in alternate black and white No 2487.00 149.22 2636.22
strips and painting to exposed faces in alternate black and white strips and
painting with reflective paint on top of guard stone with a width of 10 cm
including cost of all materials, labour, hire charges of machineries
complete. (as per drawings)

PWD Belagavi CIRCLE 2018-19 Item No:24.52Page No:188


15 KSSRB-M-800-15.Road Delineators: Supplying and installation of
delineators (road way indicators, hazard markers, object markers), 80-
100cm high above ground level, painted black and white in 15cm wide
strips, fitted with 80x100mm rectangular or 75mm dia circluar reflectorised
panels at the top, buried or pressed into the ground and conforming to IRC: No 1852.00 111.12 1963.12
79 and the drawings complete as per specifications.
MORTH Specification No 805

PWD Belagavi CIRCLE 2018-19 Item No:24.19Page No:182


16 Providing and laying reinforced cement concrete pipe NP3 for culverts
including pointing ends, and fixing collars with cement mortar 1:2
including cost of all materials, labour, curing complete as per m 3190.00 191.40 3381.40
specifications. Specifications. No. KSRB 1000, 2300 MOST Specification
No.1000 / 2300

PWD Belagavi CIRCLE 2018-19 Item No:34.6.3Page No:254