NAME OF WORK
0.00
Office of the
Executive Engineer
PWD. Division,Kalburgi.
0
INDEX
Sl.
Particulars Pages
No.
1 Face Sheet
2 General Report
4 Certificates
5 Hydrology
6 Structural Designs
7 Recapitulations
11 Rate Analysis
12 Drawings
Face Sheet
0
FACE SHEET
3 Fund Head :
4 Major Head :
5 Minor Head :
6 Service Head :
:
7 Departmental Head :
Estimate is framed in the office of the Executive Engineer, Division, Kalaburgi and the
probable expenditure that will be incurred for,
10 Estimate Checked by :
Recommended
Specific Dry Density in Cohesion "C"in Angle of Internal
Sl.No Location Depth in Mts Type of soil
Gravity gm/cc KN/sqm Friction in degrees
SBC of soil in Remarks
T/Sqmts
Relevent IS Codes :
■ Soil Properties : IS 2720 (Relevent Sections)
■ Safe Bearing Capacity: IS:6403-1982
Note: 1) Tests are conducted at FMC and the SBC is against shear failure only.
2) Factor of Safety adopted is 3.00
Certificates
#REF!
CERTIFICATE
Certified that,
1 The required materials are avaible in the sources considered in the estimate.
2 Certified that I have inspected the site of work and is satisfied with the location of the
proposed site of work.
3
This estimate amounting to Rs.104 Lakhs has ben scrutinised in this office in all aspects with
reference to the D.S.R. of PWD Circle,Kalaburgi for 2018-19
NAME OF WORK
DESIGN REPORT
Office of the
Executive Engineer
PWD. Division,Yadgir.
Engineering Consultant
"LIFE LINE CONSULTANCY"
Plot No. 85, Sangameshwar Layout,
Near Sai Mandir, Ram Mandir Circle
KALABURGI-585 102 ,PH :- 8762178392,
Hydrology
Location
Near Shahabad
Road MDR
HYDRAULIC DATA:
Catchment Area (M) 2.11 Sq km.
Skew (a) 0 Degrees
Nala Bed Level (NBL) 518.025 m
Raft/Sill level of the Bridge/Barrage 517.725 m
HFL 519.225 m
Ryves Co'efficient ( C) 8.500
SOIL DATA
Type of Soil 2.00
Safe Bearing Capacity of Soil (SBC) (as per Dept.) 15.00 t/m2
Unit Weight of Soil 1.80 t/m3
Depth of Soil 2.00 m
Silt Factor (f) 1
NALA PARTICULARS:
Bed slope of Nala 0.01000
i.e 1 in 100
Manning's Co-efficient (n) 0.030 0.035
DISCHARGE CALCULATIONS:
i) Discharge calculation by Ryves Method:
The flood discahrge is calculated based on
catchment area by Ryve's Method
Discahrge Q= C M 2/3 13.983 Cumecs
Say 14.000 Cumecs
BOX DETAILS:
No. of Cells provided (Nc) 1 Nos.
Size of the Vent provided ( a x b ) 3.00 3.00
Earth Cushion ( Ec) 0.00 m
No. of cells considered in group 1 Nos.
No. of such groups provided 1 0
Depth of the Top Slab (d) 0.45 0.45
Depth of the Bottom Slab (e) 0.50 0.50
Depth of the Outer Vertical Slab (f) 0.45 0.45
Depth of the Inner Vertical Slab (g) 0.40 0.40
Depth of Flow 1.200 m
Therefore, designed water way (L) 3.00 m
Total length of the Bridge 3.90 m
Discharge / m width Q/L 14.17 m3/sec/m
VENT WAY:
Regime width as per Lacey's Formula (W) C x (Q) 1/2
where C= 4.80
Regime width (W) 31.29 m.
APRON DETAILS:
As per IRC:SP:13-2004
Length of D/s Apron = 2 times of Normal Scour Depth = 15.69 m
Say 16.00 m
Hence the design of bridge with the vent way proposed is acceptable.
PARAGRAPH 130 (A) OF THE KARNATAKA PUBLIC WORKS
DEPARTMENTAL CODE
ESTIMATE.
FACE SHEET
Fund Head.
Major Head.
Service Head.
Department Head.
Estimate prepared by
Estimate Checked by
(Call of Authority)
General Description
DESIGN DATA
1.Dimensions
Number of Cells 1
Number of cells considerd in group 1
Number of such group provided 1 0
Clear span= 3.00 m
Clear height= 3.00 m
Top Slab Thickness= 0.450 m
Bottom Slab thickness= 0.500 m
Side outer wall thickness= 0.450 m
Side inner wall thickness= 0.400 m
Height of fill (for live load dispersion)= 0m
Height of fill (for SIDL, Earth pressure
calculation)= 0m
Top and Bottom haunch= 150 by 150
Width of carriage way= 6m
Total width= 3.50 m
Total Height= 3.95 m
C/C width= 3.45 m
C/C height= 3.475 m
Extra Offset width for Bottom Slab= 0.00 m
2.Material
CONCRETE
Grade of concrete = M25
Characteristic Strength, fck= 25 N/mm2
Modulus of Elasticity = 28500 N/mm2
Poissons ratio= 0.2
Co-efficient of Thermal Expansion= 1.20E-05 /oC
Weight Density= 25 kN/m3
STEEL
Grade of steel= Fe550
Characteristic strength, fy= 500 N/mm2
Modulus of Elasticity= 2.00E+08 kN/m2
SOIL
SBC= 150.00 kN/m2
Angle of internal friciton= 30
Unit weight of soil fill material= 20 kN/m3
WEARING COAT
Thickness ofThickness of wearing coat=
road crust(conservatively 75 mm
totaol fill ht considered) 0m
Wearing coat thickness(future 0.1 m
overlaying)=
Weight Density= 22 kN/m3
Modelling of structure
0.45
0.45 3 3.475
3 0.40 3
0.5
3.45
Property calculations
Width considered for the model (1m strip)= 1m
a. Base slab
Area of cross section= 0.5 m2
Moment of Inertia, Izz= 0.0104 m4
Moment of Inertia, Iyy= 0.0416666667 m4
b. Top slab
Area of cross section= 0.45 m2
Moment of Inertia, Izz= 0.0076 m4
Moment of Inertia, Iyy= 0.03750 m4
c. Wall
Area of cross section= 0.45 m2
Moment of Inertia, Izz= 0.00759375 m4
Moment of Inertia, Iyy= 0.0375 m4
d. Haunch
Area of cross section= 0.01125 m2
Load Calculation
The design loading for the bridge has been considered in accordance with
IRC:6-2016 (Load and Stresses) so as to sustain the most critical comnination of
various loads, forces and Stresses
A. Dead Load(DL)
Self weight of the Top slab= 11.25 kN/m
Self wt. of the bottom slab= 12.5 kN/m
Self weight of the side slab= 11.25 kN/m
Self weight of hunches= 0.01125 kN/m
B. SIDL
Conservatively total fill height is considered as road crust including wearing
coat.
Density of wearing coat considered for
road crust= 22 kN/m3
Load due to WC = 1.65 kN/m
Weight of Crash Barrier/railing= 9.125 kN/m
0.175 m
2.25 kN/m2 1.500 kN/m2
3.650 m
Note: IRC CLASS A- Three lane and IRC CLASS A+ IRC 70R are not governing the
design, hence not presented in design note.
Direction of Traffic
W=350kN W=350kN
2.06
KERB
1 2
C= 1.2
KERB
4.57 3.45
2.12
0.84 0.84
0.5
2.9
Width of carriage way= 6m
2.06 2.12
2.92 2.92
B= 4.982
4.57
0.075
0.25
L= 5.620
Impact factor = 25 %
Total Load = 700 kN
Load intensity = (Total load/Actaul area of dispersion)= 25.00 kN/m2
Load intensity after impact = 31.25 kN/m2
1 2
C= 1.2
KERB
KERB
1.22 1.115
0.263 2.13 3.45
3 4
0.86 0.86
0.5
2.79
Width of carriage way= 6m
B= 4.35
0.263
0.053
0.25
L= 2.533 m
As per IRC-6-2010, cl:208.6 if fill ht is more than 0.6m, impact factor
percentage shall be taken half of the value what specified in cl 208.2
and 208.3 of IRC 06-2010
Impact factor = 25 %
Total Load = 400 kN
Load intensity = (Total load/Actaul area of dispersion)= 36.34 kN/m2
Load intensity after impact = 45.43 kN/m2
Case 2 a: IRC CLASS 70R - WHEELED VEHICLE - BOGIE LOAD(40T) (At support)
Direction of Traffic
W=200kN W=200kN
1.93
0.43 C= 1.2
KERB
KERB
1 2
0.15
0.86 0.86 0.5
2.79
Width of carriage way= 6m
For W1,
a= 0.43 m
b1 = 1.01 m
beff1 = 1.85 m
For W2,
a= 0.1455 m
b1 = 1.01 m
beff2= 1.32 m
therefore,
beff= min of beff1 & beff2
beff= 1.32 m
If 0.5*beff > 0.5*C/C Distance between wheels there will be Overlap
THERE IS NO OVERLAPPING -0.304
Length of overlap = 0m
If 0.5*beff > (C+Kerb width) then there will be Over hanging portion
THERE IS NO OVER-HANGING -0.403913
Length of overhanging = 0m
Actual dispersed width (B) = 2.644 m
B= 2.64
0.263
0.053
0.25
L= 2.533 m
As per IRC-6-2010, cl:208.6 if fill ht is more than 0.6m, impact factor
percentage shall be taken half of the value what specified in cl 208.2
and 208.3 of IRC 06-2010
Impact factor = 25 %
Total Load = 400 kN
Load intensity = (Total load/Actaul area of dispersion)= 59.72 kN/m2
Load intensity after impact = 74.65 kN/m2
Direction of Traffic
W=170kN W=170kN
1.93
1 2
C= 1.2
KERB
1.37 1.04
0.263 2.13 3.45
3 4
KERB
0.86 0.86
0.5
2.79
Width of carriage way= 6m
1.93 2.13
B= 4.31
0.263
0.053
0.25
L= 2.626 m
As per IRC-6-2010, cl:208.6 if fill ht is more than 0.6m, impact factor
percentage shall be taken half of the value what specified in cl 208.2
and 208.3 of IRC 06-2010
Impact factor = 25 %
Total Load = 340 kN
Load intensity = (Total load/Actaul area of dispersion)= 30.01 kN/m2
Load intensity after impact = 37.52 kN/m2
Direction of Traffic
W=114kN W=114kN
1.8
1 2
C= 0.15
KERB
1.2 1.125
0.9 3.45
3 0.25 4
KERB
0.5 0.5
0.5
Width of carriage way= 6m
B= 3.87
0.25
0.053
0.25
L= 2.5 m
As per IRC-6-2010, cl:208.6 if fill ht is more than 0.6m, impact factor
percentage shall be taken half of the value what specified in cl 208.2
and 208.3
As per of IRC
cl:208 06-2010
of IRC 6, Impact factor for Class A load=
Impact factor for RCC bridge=(4.5/(6+L))
IF= 47.62 %
Total Load = 228 kN
Load intensity = (Total load/Actual area of dispersion)= 23.54 kN/m2
Load intensity after impact = 34.75 kN/m2
Direction of Traffic
W=228KN W=228KN
3.5
KERB
1 2 3 4
a=
1.2 1.125
5 6 0.25 7 8
3.5 0.9
0.5 0.5
x= 2.7
0.5
Calculation of effective width of loading(beff)
Effective width of the load is computed using the formula
As per IRC: 112-2011, Annexure B-3,b eff = a * α * (1-a/l0) + b1
b= 6.00 m
lo= 3.45 m
for (b/l0) = 1.74
for continuous type, α= 2.24
As per IRC: 112-2011, Annexure B-3
a= 1.125 m
b1 = 0.65 m
beff = 2.35 m
If 0.5*beff > 0.5*C/C Distance between wheels there will be Overlap
OVERLAPPING WILL OCCUR
Length of overlap = 0.2741304348 m 0.27413
NOTE: Since wheels 1,2,5,6 are in the interior portion there is no
need to check for overhanging length
Dispersed width of wheels 1,2,5,6 in direction transverse
to traffic direction= 0.65 m
Actual width of dispersion,b= 4.1482609 m
1.8
0.9 0.9
1 `2
B= 4.15
Braking force
Braking force is considered as per Cl.211.2 of IRC 6-2010
Note:The effect of Braking force is full for zero earth cushion and it is
considered zero for earth cushion of 3, hence for earth cushin 0.6m
effect of braking force is interpoated.
Note:The effect of Braking force is full for zero earth cushion and it is
considered zero for earth cushion of 3, hence for earth cushin 0.6m
effect of braking force is interpoated.
Loads
Class 70R -Tracked vehicle(70T) = 17.3 kN
Class 70R -BOGIE LOAD(40T)= 18.42 kN
Class 70R -Wheeled vehicle = 15.77 kN
Class A load (1 lane)= 11.78 kN
Class A load (2 lane)= 11 kN
udl force on top slab due to Braking
Class 70R -Tracked vehicle(70T) = 3.48 kN/m
Class 70R -BOGIE LOAD(40T)= 4.24 kN/m
Class 70R -Wheeled vehicle = 3.66 kN/m
Class A load (1 lane)= 3.05 kN/m
Class A load (2 lane)= 2.66 kN/m
Temprature Loads
Temperature Rise Forces
1 17.8 °
0.135
10.9 °
0.135 4
2°
0.45
0
0.045
0
1.05 °
0.135
2.1
0.45 0.045 0°
0°
0.1125 0.4 °
0.8 °
0.09 3.7 °
6.6 °
Area t αt Eαt Force (kN) x M (kNm)
0.09 5.65 6.8E-05 2.0E+00 183.06 0.188 34.42
0.1125 0.35 4.2E-06 1.3E-01 14.18 0.083 1.18
0.1125 0.4 4.8E-06 1.4E-01 16.20 0.083 1.34
0.09 3.7 4.4E-05 1.3E+00 119.88 0.188 -22.54
Total 333.32 14.40
As per IRC6:2017, the load factors for varies load combinarion are as under
Ultimate limit state load combination shall be calculated as per table 3.2 of IRC 6-2017.
SL. No Combination DL SIDL WC LL WITH IF BF
G1(live load
1 leading) 1.35 1.35 1.75 1.5 1.15
LL WITH IF
SL. No Combination DL (KN/M) SIDL(KN/M) WC (KN/M) BF (KN/M)
(KN/M)
G1(live load
1 62.5 12.32 2.89 111.98 4.88
leading)
Active EP
EP (KN/M) at EP (KN/M) at rest Active EP (KN/M)
SL. No Combination (KN/M) @ LS (kn/m)
rest top bottom @ top
bottom
G1(live load
1 leading) 3.375 54.75 2.25 36.5 14.4
G1(live load
1 leading) 27.58 4.18
3.425 3.425
3.45
D F1 C
Similarly,
For bottom slab DC carrying udl @ 189.69 Kn/m
The vertical reactions @ D & C are 327.22 kn
For vertical member AD the horizontal reaction h A @ A is found by taking moments about D
Thus,
hA = 64.54 kn
For vertical member E1F1 the horizontal reaction hE1 @ E is found by taking moments about F1
Thus,
hE1 = 127.66925 kn
For vertical member AD, S.S B.M @ mid span is = 26.45 Kn-m
3.45
D F1 C
Similarly,
For bottom slab DC carrying udl @ 131.73 Kn/m
The vertical reactions @ D & C are 227.23 kn
For vertical member AD the horizontal reaction h A @ A is found by taking moments about D
Thus,
hA = 67.01 kn
For vertical member E1F1 the horizontal reaction hE1 @ E is found by taking moments about F1
Thus,
hE1 = 77.07925 kn
For vertical member AD, S.S B.M @ mid span is = 26.45 Kn-m
Side walls
B.M @ centre B.M @ ends Shear Force
26.45 Kn-m 51.74 Kn-m 93.58 kn
Inner Side walls
B.M @ centre B.M @ ends Shear Force
26.45 Kn-m 56.74 Kn-m 77.08 kn
REINFORCEMENT FOR TOP SLAB
DESIGN PARAMETERS
Grade of concrete fck= M25
Grade of steel fyk= Fe 500
Tensile strength of concrete fctm= 2.2 MPa
Partial safty factor for concrete for basic & seismic comb. ym= 1.5
Partial safty factor for reinforcement ys= 1.15
Design compressive strength of concrete fcd= α*fck/ym
Factor CI 6.4.2.8 of IRC 112-2011 α= 0.67
Design compressive strength of steel fcd= 11.17 MPa
Design compressive strength of concrete fyd= 434.79 MPa
Secant modulus elasticity of concrete Ecm= 30 GPa
Elastic modulus of steel Es= 200 GPa
Ultimate compressive strain in concrete Table 6.5 of IRC 112-2011 εcu3= 0.0035
Ultimate tensile strain in steel εst= 0.00217
Factor CI A2.9 of IRC 112-2011 λ= 0.8
Factor CI A2.9 of IRC 112-2011 η= 1
limiting neutral axia to depth ratio = Xu, max = εcu3
d εcu3+εst
Distribution Reinforcement
20% of Main Reinforcement, IRC: 112-2011, clause 16.6.1.1 = 536.41 mm2
Diameter of Secondary Reinforcement = 10
Area of reinforcement = 78.58 mm2
Maximum spacing of distribution reinforcement = 400 mm
Spacing of reinforcement provided = 150 mm
Area of steel reinforcement provided = 523.866666667 mm2
Provide 10 mm bars at 150 mm c/c at perpendicular to main reinforcement
Distribution of steel
ST CURT
Dia of Bar 16 mm 0 mm
Spacing of Bar 150 mm 150 mm
Area of Steel Provided 1341.01 mm2 0.00 mm2
Total Area of Steel Provided= 1341.01 mm2
Distribution Reinforcement
20% of Main Reinforcement, IRC: 112-2011, clause 16.6.1.1 = 268.21 mm2
Diameter of Secondary Reinforcement = 10
Area of reinforcement = 78.58 mm2
Maximum spacing of distribution reinforcement = 400 mm
Spacing of reinforcement provided = 150 mm
Area of steel reinforcement provided = 523.87 mm2
Provide 10 mm bars at 150 mm c/c at perpendicular to main reinforcement
Stress limitation shall be checked for Rare combination as per CI 12.2 of IRC 112-2011
= 0.8fyk
Allowable tensile stress in reinforcement=
= 400.00 Mpa
Check for Stress at maximum sagging moment
Stress calculation for short term effect
Notinal size= = 348.88 mm
Creep coefficient at 28 days= RH80% = 1.6298
Depth of Neutral axis= = 225 mm
Second moment of area= = 7593750000 mm4
Secant modulus elasticity of concrete = 30 GPa
Elastic modulus of steel = 200 GPa
As= = 1864.88 mm2
Effective depth available = 402.00 mm
Unfactored Sagging Moment = 77.32 Kn-m
The depth of concrete in compression is= = 113.19 mm
The cracked second moment of area in steel units is= = 228061287.419 mm4
As 1864.88 mm2
factor = 0.03
εsm-εcm = -1.731833E-05
As 3205.89 mm2
factor = 0.04
Distribution Reinforcement
20% of Main Reinforcement, IRC: 112-2011, clause 16.6.1.1 = 536.41 mm2
Diameter of Secondary Reinforcement = 12
Area of reinforcement = 113.15 mm2
Maximum spacing of distribution reinforcement = 400 mm
Spacing of reinforcement provided = 150 mm
Area of steel reinforcement provided = 754.33333333 mm2
Provide 12 mm bars at 150 mm c/c at perpendicular to main reinforcement
Distribution of steel
CURT ST
Dia of Bar 0 mm 16 mm
Spacing of Bar 200 mm 150 mm
Area of Steel Provided 0.00 mm2 1341.01 mm2
Total Area of Steel Provided= 1341.01 mm2
Distribution Reinforcement
20% of Main Reinforcement, IRC: 112-2011, clause 16.6.1.1 = 268.21 mm2
Diameter of Secondary Reinforcement = 12
Area of reinforcement = 113.15 mm2
Maximum spacing of distribution reinforcement = 400 mm
Spacing of reinforcement provided = 150 mm
Area of steel reinforcement provided = 754.33 mm2
Provide 12 mm bars at 150 mm c/c at perpendicular to main reinforcement
Stress limitation shall be checked for Rare combination as per CI 12.2 of IRC 112-2011
As 2095.35 mm2
factor = 0.03
εsm-εcm = -1.59683E-05
As 3436.36 mm2
factor = 0.04
Distribution Reinforcement
20% of Main Reinforcement, IRC: 112-2011, clause 16.6.1.1 = 536.41 mm2
Diameter of Secondary Reinforcement = 12
Area of reinforcement = 113.15 mm2
Maximum spacing of distribution reinforcement = 400 mm
Spacing of reinforcement provided = 150 mm
Area of steel reinforcement provided = 754.3333333 mm2
Provide 12 mm bars at 150 mm c/c at perpendicular to main reinforcement
Distribution of steel
ST
Dia of Bar 16 mm 0 mm
Spacing of Bar 150 mm 250 mm
Area of Steel Provided 1341.01 mm2 0.00 mm2
Total Area of Steel Provided= 1341.01 mm2
Provide 16 mm bars at 150 mm c/c For outer side wall full length
Distribution Reinforcement
20% of Main Reinforcement, IRC: 112-2011, clause 16.6.1.1 = 268.21 mm2
Diameter of Secondary Reinforcement = 12
Area of reinforcement = 113.15 mm2
Maximum spacing of distribution reinforcement = 400 mm
Spacing of reinforcement provided = 150 mm
Area of steel reinforcement provided = 754.33 mm2
Provide 12 mm bars at 150 mm c/c at perpendicular to main reinforcement
Stress limitation shall be checked for Rare combination as per CI 12.2 of IRC 112-2011
As 2095.35 mm2
factor = 0.03
As 3436.36 mm2
factor = 0.04
εsm-εcm = -3.9785E-05
Distribution Reinforcement
20% of Main Reinforcement, IRC: 112-2011, clause 16.6.1.1 = 268.21 mm2
Diameter of Secondary Reinforcement = 10
Area of reinforcement = 78.58 mm2
Maximum spacing of distribution reinforcement = 400 mm
Spacing of reinforcement provided = 150 mm
Area of steel reinforcement provided = 523.8666667 mm2
Provide 10 mm bars at 150 mm c/c at perpendicular to main reinforcement
Distribution of steel
Outer side 2
Dia of Bar 20 mm 0 mm
Spacing of Bar 150 mm 250 mm
Area of Steel Provided 2095.33 mm2 0.00 mm2
Total Area of Steel Provided= 2095.33 mm2
Distribution Reinforcement
20% of Main Reinforcement, IRC: 112-2011, clause 16.6.1.1 = 419.07 mm2
Diameter of Secondary Reinforcement = 10
Area of reinforcement = 78.58 mm2
Maximum spacing of distribution reinforcement = 400 mm
Spacing of reinforcement provided = 150 mm
Area of steel reinforcement provided = 523.87 mm2
Provide 10 mm bars at 150 mm c/c at perpendicular to main reinforcement
Stress limitation shall be checked for Rare combination as per CI 12.2 of IRC 112-2011
As 1864.88 mm2
factor = 0.03
εsm-εcm = 0.000181982
Total UNIT WT
Nos Shape Of Bars Bar dia, mm Spacing M1, mm M2, mm Length, mm No of Bars Wieght, Kgs
Length, m (KG)
T2
H
EARTH FACE
GL
B2 T1 B1
D
B
HEEL TOE
DATA
BACK FILL Angle of slope of bank Ф(deg) to horizontal, (max Ф=θ) 0
Angle of repose θ (deg) = 30
Density of back fill (kN/m3) = 18
Density of saturated back fill (kN/m3) = 20.8
Surcharge Uniform Surcharge load (kN/m2) = 21.6
Base Soil Safe Bearing Capacity of Soil (kN/m 2) = 140
Coefficient of base friction between soil and concrete 0.6
Bending
Shear on(-
Depth of wall Horizontal Pressure on wall (kN/m 2) Bending Moment Shear on Moment(-
surcharge)
Surcharge)
on wall
from top (m) Soil Pressu Grd Water Pr Surcharge Pr. on wall (kNm/m) wall (kN/m) wall (kN/m)
(kNm/m)
0.0 0.00 0 7.200 0.00 0.00 0.00 0.00
0.89 5.34 0 7.200 3.56 8.78 0.70 2.38
1.78 10.68 0 7.200 17.05 22.32 5.64 9.51
2.67 16.02 0 7.200 44.70 40.61 19.03 21.39
3.56 21.36 0 7.200 90.74 63.65 45.12 38.02
4.45 26.70 0 7.200 159.41 91.45 88.12 59.41
4.95 29.70 0 7.200 209.50 109.15 121.29 73.51
Value at max
depth neglecting
4.5 209.50 109.15 121.29 73.51
surcharge
pressure =
Passive Resistance Considered
Passive pressure at top, (kN/m2) = 54.00
Passive pressure at bottom, (kN/m2) = 81.00
Depth of passive resistance (m) = 0.50
Passive Force (kN/m) = 33.75
Passive Moment about Toe (kNm/m) = -5.49
Case: Total load including soil load over toe slab & Surchrage
Over Turning Moment about Toe = 209.50 kNm
Resisting Moment = 460.176 kNm
Factor of safety against over turning = 2.20 > 1.5, Section O.K.
from top (m) Mu, kNm Reqd. Provided Vertl. Horzl. Reqd. Provided Main Reinf't Distr Reinf't
(0.5
Adopted
Ru= 3.33 fck/fy)*(1-sqrt(1-(4.6*Mu/fck*bd* Max c/c Dia/Spacing Max c/c Adopted c/c Dia/Spacing
d))bd c/c
12 dia
0 0.0 0 244.00 12 8 0 565 310 200 at200c/c
210 200 8 dia at200c/c
12 dia
0.89 5.3 40 227.60 12 8 65.272 565 310 200 at200c/c
210 200 8 dia at200c/c
12 dia
1.78 25.6 88 267.20 12 8 269.69 565 310 200 at200c/c
210 200 8 dia at200c/c
16 dia
2.67 67.0 142 304.80 16 8 631.259 1005 310 200 at200c/c
210 200 8 dia at200c/c
16 dia
3.56 136.1 202 442.00 16 8 882.616 1005 228 200 at200c/c
210 200 8 dia at200c/c
16 dia
4.5 239.1 268 442.00 16 8 1594.611 2011 126 100 at100c/c
210 200 8 dia at200c/c
Check for Shear in Wall by Limit State Method (Partial Safety Factor, γf = 1.5)
Depth of wall Ult. Shear Shear Stress 100 Ast Perm. Shear Stress Design Status
Designing the base slab by limit-state method, Partial load factor, γf = 1.5
Moment at Q = 1.5 x(82.39x 1.3^2/2 +50.818x1.3^2/3 -(18+1.3x0.5x25) x0.65 113.977 kNm
Moment at R = 1.5 x(6.158x 1.45^2/2 +56.682x1.45^2/6 -(116.145+7.2+1.45x0.5x25) x0.725 -114.345 kNm
Case: Total including soil load over toe slab, but neglecting surcharge load:
Case: Total including soil load over toe slab, but neglecting surcharge load:
Soil Pressure at P = 84.54 kN/m2
Soil Pressure at Q = 70.88 kN/m2
Soil Pressure at R = 65.63 kN/m2
Soil Pressure at S = 50.39 kN/m2
Ultimate Shear (Partial lad factor, γf = 1.5:
Shear at Q = 1.5 x (70.88x1.05+(84.543- 70.88 ) x 0.5 x 1.05-(1x 18x1.05+1.05 x 0.5x 25) 74.36 kN
Shear at R = 1.5 x (50.392x1.2+(65.63- 50.392 ) x 0.5 x 1.2-(4.45x 18x1.2+1.2 x 0.5x 25) 62.26 kN
Check for Shear in Base Slab by Limit State Method (Partial Safety Factor, γf = 1.5)
Ult. Shear Shear Stress 100 Ast Perm. Shear Stress Design Status
Location
Vu-max, kN τv, N/mm2 bd τc, N/mm2 of Base
Toe Slab 114.996 0.260 0.455 0.459 Section is OK
Heel Slab 104.582 0.237 0.455 0.459 Section is OK
DESIGN OF BOX CULVERT (5.0x 3.5 , 4 VENT WITHOUT EARTH CUSHION)
Total UNIT WT
Nos Shape Of Bars Bar dia, mm Spacing M1, mm M2, mm Length, mm No of Bars Wieght, Kgs
Length, m (KG)
Total UNIT WT
Nos Shape Of Bars Bar dia, mm Spacing M1, mm M2, mm Length, mm No of Bars Wieght, Kgs
Length, m (KG)
STEEL QUANTITY
MAIN DIST Total WT
Quantit No of LENGT
Sl.no Type Nos L B D DIA C/C NO UNIT WT WT DIA C/C LENGTH NO UNIT WT WT
y sides H
RETAINING WALL
1 Returns Footing 4 3 3.25 0.65 25.35 8 16 0.20 4.50 16.00 1.58 910.08 10 0.20 2.95 17.00 0.62 248.74
2 Returns Wall 4 3 0.48 4.45 25.37 8 16 0.20 3.25 16.00 1.58 164.32 8 0.20 2.95 23.00 0.39 211.69
12 0.20 3.55 16.00 0.89 101.10
1734.10
T2
H
EARTH FACE
GL
B2 T1 B1
D
B
HEEL TOE
DATA
BACK FILL Angle of slope of bank Ф(deg) to horizontal, (max Ф=θ) 0
Angle of repose θ (deg) = 30
Density of back fill (kN/m3) = 18
Density of saturated back fill (kN/m3) = 20.8
Surcharge Uniform Surcharge load (kN/m2) = 10.8
Base Soil Safe Bearing Capacity of Soil (kN/m 2) = 100
Coefficient of base friction between soil and concrete 0.6
Bending
Shear on(-
Depth of wall Horizontal Pressure on wall (kN/m 2) Bending Moment Shear on Moment(-
surcharge)
Surcharge)
on wall
from top (m) Soil Pressu Grd Water Pr Surcharge Pr. on wall (kNm/m) wall (kN/m) wall (kN/m)
(kNm/m)
0.0 0.00 0 3.600 0.00 0.00 0.00 0.00
0.40 2.40 0 3.600 0.35 1.92 0.06 0.48
0.80 4.80 0 3.600 1.66 4.80 0.51 1.92
1.20 7.20 0 3.600 4.32 8.64 1.73 4.32
1.60 9.60 0 3.600 8.70 13.44 4.10 7.68
2.00 12.00 0 3.600 15.20 19.20 8.00 12.00
2.30 13.80 0 3.600 21.69 24.15 12.17 15.87
Value at max
depth neglecting
2.0 21.69 24.15 15.87 15.87
surcharge
pressure =
Passive Resistance Considered
Passive pressure at top, (kN/m2) = 54.00
Passive pressure at bottom, (kN/m2) = 70.20
Depth of passive resistance (m) = 0.30
Passive Force (kN/m) = 18.63
Passive Moment about Toe (kNm/m) = -1.82
Case: Total load including soil load over toe slab & Surchrage
Over Turning Moment about Toe = 21.69 kNm
Resisting Moment = 54.237 kNm
Factor of safety against over turning = 2.50 > 1.5, Section O.K.
from top (m) Mu, kNm Reqd. Provided Vertl. Horzl. Reqd. Provided Main Reinf't Distr Reinf't
(0.5
Adopted
Ru= 3.33 fck/fy)*(1-sqrt(1-(4.6*Mu/fck*bd* Max c/c Dia/Spacing Max c/c Adopted c/c Dia/Spacing
d))bd c/c
12 dia
0 0.0 0 174.00 12 8 0 565 310 200 at200c/c
210 200 8 dia at200c/c
12 dia
0.4 0.5 13 132.00 12 8 11.1 565 310 200 at200c/c
210 200 8 dia at200c/c
12 dia
0.8 2.5 27 146.00 12 8 47.632 565 310 200 at200c/c
210 200 8 dia at200c/c
12 dia
1.2 6.5 44 160.00 12 8 113.567 565 310 200 at200c/c
210 200 8 dia at200c/c
12 dia
1.6 13.1 63 244.00 12 8 149.802 565 310 200 at200c/c
210 200 8 dia at200c/c
12 dia
2.0 22.8 83 244.00 12 8 263.667 565 310 200 at200c/c
210 200 8 dia at200c/c
Check for Shear in Wall by Limit State Method (Partial Safety Factor, γf = 1.5)
Depth of wall Ult. Shear Shear Stress 100 Ast Perm. Shear Stress Design Status
Designing the base slab by limit-state method, Partial load factor, γf = 1.5
Moment at Q = 1.5 x(53.89x 0.6^2/2 +35.022x0.6^2/3 -(18+0.6x0.3x25) x0.3 10.729 kNm
Moment at R = 1.5 x(1.355x 0.6^2/2 +35.025x0.6^2/6 -(21.6+3.6+0.6x0.3x25) x0.3 -9.847 kNm
Case: Total including soil load over toe slab, but neglecting surcharge load:
Case: Total including soil load over toe slab, but neglecting surcharge load:
Soil Pressure at P = 75.25 kN/m2
Soil Pressure at Q = 49.24 kN/m2
Soil Pressure at R = 36.23 kN/m2
Soil Pressure at S = 10.22 kN/m2
Ultimate Shear (Partial lad factor, γf = 1.5:
Shear at Q = 1.5 x (49.24x0.45+(75.245- 49.24 ) x 0.5 x 0.45-(1x 18x0.45+0.45 x 0.3x 25) 24.80 kN
Shear at R = 1.5 x (10.221x0.45+(36.23- 10.221 ) x 0.5 x 0.45-(2x 18x0.45+0.45 x 0.3x 25) 13.69 kN
Check for Shear in Base Slab by Limit State Method (Partial Safety Factor, γf = 1.5)
Ult. Shear Shear Stress 100 Ast Perm. Shear Stress Design Status
Location
Vu-max, kN τv, N/mm2 bd τc, N/mm2 of Base
Toe Slab 26.933 0.110 0.464 0.462 Section is OK
Heel Slab 16.627 0.068 0.464 0.462 Section is OK
STABILITY ANALYSIS OF PROTECTON WALL
0.33
0.00 100.000
0.00
100.000 0.30 0.60 Pressure diagram due
a Super imposed load (traffic)
0.00
100.000
0.85
1
4
0.80
1 2.20
1.60 Outside Earth side (inside) P
1.60 0.150
GL 99.200
0.50 0.80
1 2
3
RL. 98.400
0.15 1.52
0.40 PCC 1:2:4/ M15 Cp wh
0.30 0.68
1.38
0.18
6.12
The Earth Pressure per unit run (P) = Cp wh2 1.93 t-m
2
where, Cp = Co-efficient of earth pressure
cos a - ( cos2a-cos2b)1/2
= cos a 0.334
cos a + ( cos2a-cos2b)1/2
The Hzl. Earth Pr. per unit run (Ph) = Cp wh2 cos a 1.93 t-m
2
The Vtl. Earth Pr. per unit run (Pv) = Cp wh2 sin a 0.00 t-m
2
Sl. Particulars Vertical Hzl. Lever Moment Moment
No. Force(V) Force(H) arm (M+) (M-)
(tonne) (tonne) (m) (t-m) (t-m)
1 Wall
Tringular - Inside 0.653 0.927 0.605
Rectangular - Inside 1.306 1.040 1.358
Tringular - Out side 0.384 0.267 0.102
Rectangular - Center 1.152 0.550 0.634
2 Soil
Tringular-1 0.490 1.153 0.565
Rectangular-2 0.000 1.040 0.000
Tringular-3 0.367 1.153 0.424
FACTOR OF SAFETY :
Factor of Safety against Sliding Cf V/H
where Cf Co-efficient of friction between the material above 0.65
and below the horizontal generally varies from 0.65 to 0.75
generally varies from 0.65 to 0.75 1.47 > 1.50
Hence Not Safe
STEEL DETAILS :
10 mm Dia. Bars @ 175 Cm C/c ( Both ways and both faces)
RECAPITULATION
1 KSRRB M200-12.3. Dismantling of existing structures like culverts, bridges, retaining walls and
other structure comprising of masonry, cement concrete, wood work, steel work, including T&P
and scaffolding wherever necessary, sorting the dismantled material, disposal of
unserviceable material and stacking the serviceable material with all lifts complete as per
specifications. -do- C. Prestressed I Reinforced cement concrete grade M-20 above.MORTH
Specification No. 202
2 "KSRRB M2100-3.2. Earth work excavation in all kinds of ordinary rock I soft rock not requiring
blasting for foundation of bridges and allied works as per drawing and technical specifications,
including setting out, providing shoring and bracing, removal of stumps and other deleterious
matter, dressing of sides and bottom and filling back with approved material including cost of all
materials, labour, HOM complete as per specifications. -do- (v) 3 m to 6 m depth by Mechanical
means (S.R.2018-19 Page No. 220, I.No. 27.7.5)
MORTH Specification No. 304
3 KSRB 2.8 : Providing and Filling in foundation with granite I trap broken metal 1OOmm. and
down size & with approved sand including hand packing, ramming, watering, including cost
of all materials and labour with all lead and lift. complete as per specifications. specification.
No. KBS 2.10.2 (S.R.2018-19 Page No. 7, I.No. 2.15)
4 KSRRB M2100-10. Providing and laying Plain cement concrete of mix 1:3:6 with OPC @
220kgs, with crushed 40mm and down size graded granite metal coarse aggregates @0.89cum
and fine aggregates @ 0.46cum, in foundation mechanically mixed, placed in foundation and
compacted by vibration including curing for 14 days including cost of all materials, labour, HOM
curing, form works, scaffolding and centering complete as per specifications. (S.R.2018-19
Page No. 222, I.No. 27.18)
MORTH Specification No. 2100
5 K8RRB M2200-5.9. Providing and laying Design mix M20 with OPC @ 320kgs, with 20mm
and down size graded granite metal coarse aggregates @0.69cum and fine aggregates @
0.46cum, with superplastisiser @31ts confirming to 189103-1999 Reaffirmed-2008 including
cost of materials, labour, HOM curing, form works, scaffolding and centering complete as per
specifications.
- i) Upto 5m height
Footing
2 2.00 2.00 0.45 = 3.60
Curtain Wall Foundation 2 4.10 1.30 0.30 = 3.20
2 1.50 1.30 0.30 = 1.17
3.60 Cum
Column
Column up to Ground Level 2 1.00 1.00 1.55 = 3.10
Column Above Ground Level 2 1.00 1.00 2.00 = 4.00
7.10 Cum
Curtain Wall
Curtain Wall up to Ground Level 2 3.00 0.20 3.05 = 3.66
2 2.60 0.20 3.05 = 3.17
4 0.70 0.20 3.05 = 1.71
8.54 Cum
6 KSRRB M2200-6 : Supplying, fitting and placing TMT bar reinforcement in sub structure
complete as per drawing and technical specification complete as per specifications. MORTH
Specification No. 1600 & 2200. (S.R.2018-19 Page No. 229, I.No. 28.8.2)
7 KSRRB M2200-8.1. Back filling behind abutment, wing wall and return wall complete as per
drawing and Technical Specification including cost of materials, labour, HOM of machineries,
complete as per specifications. A. Granular material MORTH Specification No. 2204 & 304
(S.R.2018-19 Page No. 229, I.No. 28.11)
8 Fabricating, supplying & erecting M.S. Angular Truss for all spans as per approved designs and
drawing. The entire truss is anchored suitably by using 4 Nos. of M.S. anchor bolts at each
support, with base plate and shoe plate. The work includes cutting, straightening, placing in
position of M.S angle and welding wherever necessary, and applying one coat of red oxide
primer coat to all the members including cost of all materials, labour charges, & hire charges of
machineries for cutting, welding, grinding & erection equipments, etc., complete as per
specification (P.no.43, I.no.7.30)
9 KSRRB M2500-4.1. Providing and laying Pitching stones of size 0.3x0.3x0.3 m on slopes laid
over prepared filter media including boulder apron laid dry in front of toe of embankment
complete as per drawing and Technical specifications including cost of materials, labour, HOM
complete as per specifications. A. Stone I Boulder
MORTH Specification No. 2504
ABSTRACT
RATE ANALYSIS
Diffrence in cost
Cement/
Steel
Qtl
Store issue rate 470.00 45645.00
C.S.R rates 516.00 40522.00
Diffrence 46.00 -5123.00
It.No. Description of items. Unit Page Item No Basic Rate Diffrence in cost Total - 1 Area Total - 2
No S.R 2018- Const Rate Amount Weightag 10 + 11
19 e6%
1 2 3 4 5 6 7 8 9 10 11 12
1 KSRRB M200-12.3. Dismantling of Cum 139 18.19 1589.00 1589.00 95.34 1684.34
existing structures like culverts,
bridges, retaining walls and other
structure comprising of masonry,
2 "KSRRB M2100-3.2. Earth work Cum 220 27.7.5 69.00 69.00 4.14 73.14
cement concrete, wood work, steel
excavation in all kinds of ordinary
work, including T&P and
rock I soft rock not requiring
scaffolding wherever necessary,
blasting for foundation of bridges
3 KSRB
sorting 2.8the : Providing
dismantled andmaterial,
Filling Cum 7 2.15 2137.00 2137.00 128.22 2265.22
and allied works as per drawing
in foundation
disposal with granitematerial
of unserviceable I trap
and technical specifications,
broken
and stacking metal 1OOmm. and down
the serviceable
including setting out, providing
size
material & with with approved
all lifts complete sandas
4 KSRRB and
shoring M2100-10. bracing, Providing
removaland of Cum 222 27.18 5187.00 2.20 46.00 101.20 5288.20 317.29 5605.49
including
per hand packing, -do-
specifications. ramming, C.
laying Plain
stumps andcement other concrete
deleterious of
watering,
Prestressed including
I Reinforced costcement
of all
mix
matter,1:3:6 dressing
with OPC @ of 220kgs,
sides with and
materials
concrete and labourgrade with all M-20 lead
crushed
bottom 40mmfilling
and and back
down size with
5 K8RRB
and
above.MORTH lift.M2200-5.9.
complete Providing
Specification as No. per Cum 227 28.7.9 5233.00 3.20 46.00 147.20 5380.20 322.81 5703.01
graded
approved granite including
metal coarse
and layingmaterial
specifications.
202 Design mix M20 cost
specification.
of
with
No.
aggregates
all materials, @0.89cum labour, and HOM fine
OPC
KBS @2.10.2 320kgs, with 20mmPage
(S.R.2018-19 and
aggregates
complete @specifications.
0.46cum, -do- in
down
No. sizeas2.15)
7, I.No.
per
graded granite metal
6 KSRRB
foundation
(v) 3 m aggregates
to 6 M2200-6
mmechanically : Mechanical
depth@0.69cum
by Supplying,
mixed, Tonn 229 28.8.2 67543.00 1.050 -5123.00 -5379.15 62163.85 3729.83 65893.68
coarse and
fitting
placed
means and in placing
(S.R.2018-19 foundation TMT and
Page bar
No. e
fine aggregates @ 0.46cum, with
reinforcement
compacted
220, I.No. 27.7.5) in sub structure
by vibration including
superplastisiser @31ts confirming
complete
curing
MORTH as daysper including
forSpecification
14 drawing
No. 304 cost and
of
7 KSRRB
to 189103-1999 M2200-8.1. Back
Reaffirmed-2008 filling Cum 229 28.11 845.00 845.00 50.70 895.70
technical
all materials,specification
labour,wing complete
HOM curing, as
behind
includingabutment,
cost of materials, wall and
labour,
per
form specifications.
works, scaffolding MORTH and
return
HOM wall
curing,complete form asworks, per
Specification
centering No. 1600 as
complete & 2200. per
drawing
scaffolding and and
centering Technical
complete
8 Fabricating, supplying
(S.R.2018-19
specifications. Page No. &229,
(S.R.2018-19 erecting
I.No.
Page Kgs 43 7.29 128.00 128.00 7.68 135.68
Specification
as perAngular
specifications.including cost of
M.S.
28.8.2)
No. 222, I.No.labour, Truss for all spans
27.18)
materials,
-asi) Upto 5m height designs HOM of
MORTH per approved
Specification No. 2100 and
machineries, complete as per
drawing. The entire truss is
9 KSRRB M2500-4.1.
specifications. Providing
A. Granular and
material Cum 241 30.5 1613.00 1613.00 96.78 1709.78
anchored suitably by using 4 Nos.
laying
MORTH Pitching
Specificationstones of size
No. 2204 &
of M.S. anchor bolts at each
0.3x0.3x0.3
304 (S.R.2018-19 m on slopesPage No. laid 229,
over
support, with base plate and shoe
prepared
I.No. 28.11)filter media including
plate. The work includes cutting,
boulder apron laid dry in front of
straightening, placing in position of
toe of embankment complete as
M.S angle and welding wherever
per drawing and Technical
necessary, and applying one coat
specifications including cost of
of red oxide primer coat to all the
materials, labour, HOM complete
members including cost of all
as per specifications. A. Stone I
materials, labour charges, & hire
Boulder
charges of machineries for cutting,
MORTH Specification No. 2504
welding, grinding & erection
equipments, etc., complete as per
It.No. Description of items. Unit Page Item No Basic Rate Diffrence in cost Total - 1 Area Total - 2
No S.R 2018- Const Rate Amount Weightag 10 + 11
19 e6%
Nos 1
78.06
Cum 1 78.06 6052.81 472,482.50
Total 4,768,316.00
0.00
8 KSRRB M500-10. Tack Coat:- Providing and applying tack coat using 80/100 grade bitumem(VG 10) in
boiler fitted with spray set distributer at the rate of 0.25 kg/sqm on primed surfaces cleaned with mechanical
broom, complete as per specifications.
PWD Belagavi CIRCLE 2018-19 Item No:21.1Page No:159
Qty of 11 sqm 1 186.00 7.50 1395.00 13.33 18,598.35
9 KSRRB 500-11. Providing and laying bituminous macadam on prepared surface with crushed coarse
aggregates as per design mix formula for base / binding course including loading of aggregates with F.E.
loader, hot mixing of stone aggregates and bitumen in hot mix plant, transporting the mixd material in tipper
to paver and laying mixed materials with paver finisher to the required level and grade, rolling by power roller
to achieve the desired density, but excluding cost of primer / tack coat including lead, lift and cost of all
materials, labour, HOM of machineries complete as per specifications. MORTH /Chapter 5 - using 40/60 TPH
capacity H.M.P. with Mechanical paver Gr-II (50 mm to 75 mm) with 3.3 % VG-30 Bitumen
PWD Belagavi CIRCLE 2018-19 Item No:21.11.6Page No:159
Grade-2
1 93.00 7.50 0.050 34.88
1 93.00 7.50 0.050 34.88
Total Cum 69.75 6358.86 443,530.16
SN Description of Work Unit No L B D Quantity Rate Amount
10 KSRRB M500-18. Providing and laying semi dense bituminous concrete using crushed aggregates of
specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site, laying with
a paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem
rollers to achieve the desired compaction as per MORTH specification clause No. 508 complete in all
respects complete as per specifications. - using40/60 TPH capacity H.M.P. with Mechanical Paver Gr-II (25
mm to 30 mm) with 5 % VG-30 Bitumen
PWD Belagavi CIRCLE 2018-19 Item No:21.20.6Page No:160
1 93.00 7.50 0.025 17.44
1 93.00 7.50 0.025 17.44
Cum 34.88 8415.50 293,532.61
11 KSRRB M800-4. Direction and Place Identification Signs with size more than 0.9 sqm Size Board: Providing
and erecting direction and place identification retro-reflectorised sign as per IRC 67 made of high intensity
grade sheeting vide clause 800.1.3, fixed over aluminium sheeting 2 mm thick with area exceeding 0.9 sqm
supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm, 2 Nos, firmly fixed to the ground by means
of properly designed foundation with M-15 grade cement concrete 45cm x 45 cm x 60 cm 60 cm below
ground level as per approved drawing complete as per specifications.
Using Type IV sheeting.
PWD Belagavi CIRCLE 2018-19 Item No:24.4Page No:180
2 Legged junctions 2 1.50 1.20 3.60
Sqm 3.60 7574.76 27,269.14
SN Description of Work Unit No L B D Quantity Rate Amount
12 KSSRB M800-2- Retro-Reflectorised Traffic Signs: Providing and fixing of retro-reflectorised cautionary
mandatory, and informatory sign as per IRC 67 made of high intensity grade sheeting vide clause 800.1.3,
fixed over Aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75mm x 6
mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45
cm x 45 cm x 60 cm 60 cm below ground level as per approved drawing complete as per specifications.
MORTH Specification No. 801.
Nos 1
294.68
Cum 1 294.68 6052.81 1,783,642.64
667.20
Cum 1 667.20 2216.46 1,478,822.11
83.40
Cum 1 83.40 1995.98 166,464.73
Total #NAME?
Executive Engineer,
Assistant Executive Engineer,
PWD.Dept. Belagavi Dn
PWD,Dept.Sub-Dn.,Belagavi
Belagavi
0
PWD Belagavi CIRCLE 2018-19 Item No:27.4Page No:220 50.00 CUM 0.00 0.00 50.00 3.00 53.00
3 KSRB 2.8 : Providing and Filling in foundation with granite I trap
broken metal 1OOmm. and down size & with approved sand
including hand packing, ramming, watering, including cost of all
materials and labour with all lead and lift. complete as per
specifications. specification. No. KBS 2.10.2
PWD Belagavi CIRCLE 2018-19 Item No:2.15Page No:52 2137.00 CUM 0.00 0.00 2137.00 128.22 2265.22
4 KSRRB M2100-13. Providing and laying Plain/ Reinforced cement
concrete of mix 1:2:4 with OPC cement @ 240kgs, with crushed
40mm and down size graded granite metal coarse aggregates
@0.84cum and fine aggregates @ 0.56cum, in open foundation
including cost of all materials, labour, HOM curing, form works,
scaffolding and centering complete as per specifications complete
as per Drawings and Technical specifications. MORTH
Specification No.1500,1700 & 2100
PWD Belagavi CIRCLE 2018-19 Item No:27.24Page No:222 5191.00 Cum 235.20 0.00 5426.20 325.57 5751.77
5 KSRRB M2100-17.12.Providing and laying Plain/ Reinforced
cement concrete of mix M25 with OPC cement @ 340kgs, with
20mm and down size graded granite metal coarse aggregates
@0.7cum and fine aggregates @ 0.47cum, with superplastisiser
@3lts confirming to IS9103-1999 Reaffirmed-2008open foundation
including cost of all materials, labour, HOM curing, form works,
scaffolding and centering complete as per specifications complete
as per Drawings and Technical specifications. MORTH
Specification No.1500,1700 & 2100
PWD Belagavi CIRCLE 2018-19 Item No:27.31Page No:223 5048.00 Cum 333.20 0.00 5381.20 322.87 5704.07
6 KSRRB M2200-5.12.Providing and laying Plain/ Reinforced
cement concrete of mix M25 with OPC cement @ 340kgs, with
20mm and down size graded granite metal coarse aggregates
@0.7cum and fine aggregates @ 0.47cum, with superplastisiser
@3lts confirming to IS9103-1999 Reaffirmed-2008- i) Up to 5m
height
PWD Belagavi CIRCLE 2018-19 Item No:28.7.12Page No:227 5377.00 Cum 333.20 0.00 5710.20 342.61 6052.81
7 KSRRB M2000-3.1.Providing and laying Plain
Reinforced/Prestressed cement concrete in super structure as per
drawing and technical Specification Complete as per specification.
B. RCC WITH OPC design mix M25 @ 340kgs, with 20mm and
down size graded granite metal coarse aggregates @0.7cum and
fine aggregates @ 0.47cum, with superplastisiser @3lts confirming
to IS9103-1999 Reaffirmed-2008- including cost of materials,
labour, HOM, curing, form waorks,scaffolding and centering
complete as per specifications. MORTH Specification No.
1500,1600,1700 & 2300 is 456 Height Up to 5m
PWD Belagavi CIRCLE 2018-19 Item No:29.5.1Page No:233 6479.00 Cum 333.20 0.00 6812.20 408.73 7220.93
SL. Difference in Cost Total Area G. Total
No Basic Rate Weightage ( Rate ( Rs.)
Description of Work Per Cement of Steel
Rate (Rs.) Rs.)
(Rs.) (Rs.) ( Rs.)
1 2 3 4 5 6 7 8 9
8 KSRRB M2200-6 :Providing T.M.T steel reinforcement for R.C.C
work including straightening, cutting, bending, hooking, placing in
position, lapping and/or welding wherevr required, tying with
binding wire and anchoring to the adjoning members wherever
necessary complete as per design (laps, hooks and wastage shall
not be measured and paid) cost of materials, labour, HOM
complete as per specification. MORTH Specification No. 1600 &
2200 TMT Bars Fe 500
PWD Belagavi CIRCLE 2018-19 Item No:28.8.2Page No:229 67543.00 tonne 0.00 7157.85 74700.85 4482.05 79182.90
9 KSRRB M2200-6 :Providing T.M.T steel reinforcement for R.C.C
work including straightening, cutting, bending, hooking, placing in
position, lapping and/or welding wherevr required, tying with
binding wire and anchoring to the adjoning members wherever
necessary complete as per design (laps, hooks and wastage shall
not be measured and paid) cost of materials, labour, HOM
complete as per specification. MORTH Specification No. 1600 &
2200 TMT Bars Fe 500
tonne
PWD Belagavi CIRCLE 2018-19 Item No:29.29.2Page No:239 69113.00 0.00 7157.85 76270.85 4576.25 80847.10
10 KSRRB M 2700-6. PCC M15 Grade levelling course below
approach Slab complete as per drawing and technical
specification. MORTH Specification No. 2700
PWD Belagavi CIRCLE 2018-19 Item No:32.6Page No:247 5525.00 Cum 235.20 0.00 5760.20 345.61 6105.81
11 KSRRB M2700-7. Reinforced cement concrete M30 approach
slab including reinforcement @ 70kg/cum and formwork complete
as per drawing and Technical specification including cost of
materials, labour, HOM complete as per specifications. MORTH
Specification No. 1500,1600 1700 & 2704.
PWD Belagavi CIRCLE 2018-19 Item No:32.7Page No:247 9957.00 Cum 352.80 0.00 10309.80 618.59 10928.39
12 KSRRB M2300-16. Providing and laying Cement concrete wearing
coat with OPC cement design mix M30 @ 360kgs, with 20mm and
down size graded granite metal coarse aggregates @0.69cum and
fine aggregtes @ 0.46cum, with superplastisiser @3lts confirming
to IS9103-1999 Reaffirmed-2008 including reinforcement complete
as per drawing and Technical Specifications including cost of
materials, labour, HOM complete as per specifications MORTH
Specification No. 2702
PWD Belagavi CIRCLE 2018-19 Item No:32.8Page No:247 10300.00 Cum 352.80 0.00 10652.80 639.17 11291.97
13 KSRRB 2200-8.1 : Back Filling behind abutment, wing wall and
return wall complete as per drawing and Technical Specifications
including cost of materials, labour, HOM of machineries, complete
as per specifications. A. Granular materialc MORTH Specification
No. 2204 & 304
PWD Belagavi CIRCLE 2018-19 Item No:28.11Page No:229 845.00 Cum 0.00 0.00 845.00 50.70 895.70
14 KSRRB M2200-9: Providing and filling filter media with granular
material /stone crushed aggregate satisfying the requirement laid
down in Clause 2500.4.2.2. of MORTH specification to a
thickness of not less than 600 mm with smaller size towards the
soil and bigger size towards the the wall and provided over the
entire surface behind abutments, wing walls and return walls to a
full height compacted to a firm condition complete as per drawing
and technical specifications including cost of materials, labour,
HOM complete as per specifications MORTH Specification No.
2504.2.
PWD Belagavi CIRCLE 2018-19 Item No:28.13Page No:229 2091.00 Cum 0.00 0.00 2091.00 125.46 2216.46
15 KSRRB M2200-8 : Providing weep holes in brick masonrt/ plain/
Reinforced concrete abutment/ wing wall / return wall with 100 mm
dia. A.C. Pipe, extending through the full width of the structure with
slope of 1V:20 H towards drawing force. complete as per drawing
and technical specification including cost of materials, labour, HOM
complete as per specification MORTH Specification No. 2706
and 2200
PWD Belagavi CIRCLE 2018-19 Item No:28.1Page No:229 147.00 Mtr. 0.00 0.00 147.00 8.82 155.82
16 KSRRB 2700-3: Construction of RCC Railings of M30 grade in situ
with 20 mm nominal size aggregate, true to line and grade,
tolerance of vertical RCC post not to exceed 1 in 500, center to
center spacing between vertical post not to exceed 2000 mm,
leaving adequate space between vertical post for expansion,
complete as per approved drawings and technical specifications
including cost of materials, labour, HOM complete as per
specification. MORTH Specification No.2703,1500,1600and 1700.
PWD Belagavi CIRCLE 2018-19 Item No:32.3Page No:247 1748.00 Mtr. 0.00 1748.00 104.88 1852.88
17 KSRRB M400 Construction of granular sub-base Grading -V as
sub base and drainage layer by providing coarse graded crushed
stone aggregates of granite/trap/basalt material, mixing in a
mechanical mix plant at OMC, Carriage of mixed material to work
site, spreading in uniform layers with motor grader on prepared
surface and compacting with vibratory power roller to achieve the
98% proctor density, complete as per specifications. Clause 401 of
MORTH V Revision.
PWD Belagavi CIRCLE 2018-19 Item No:20.4Page No:153 1883.00 Cum 0.00 0.00 1883.00 112.98 1995.98
SL. Difference in Cost Total Area G. Total
No Basic Rate Weightage ( Rate ( Rs.)
Description of Work Per Cement of Steel
Rate (Rs.) Rs.)
(Rs.) (Rs.) ( Rs.)
1 2 3 4 5 6 7 8 9
Area Weightage 6%