Professional Documents
Culture Documents
Top View: Notes
Top View: Notes
B BREEZE AIR
COOLER
B
A A
1 Top view
PROJECT TITLE:
A
OWNER:
Scale: 1:50 MTS
OWNER CONTACT NUMBER: DRAWING TITLE:
C SHEET NO:
+966 505134176 01
AIR COOLER DUCT MR. ALI KHALIFA PROJECT ADDRESS: AIR COOLER DUCT
AL RASS ,AL QUASSIM, SAUDI ARABIA A
CONTACT / WATSAPP NO: LOCATION: CAD & DESIGNED BY: APPROVED BY: DATE STARTED: DATE FINISHED:
SCALE
+966 55 333 2277 AL RASS,AL QUASSIM, SAUDI ARABIA ENGR. YASSER SHEHATA -TOE SEPTEMBER 28,2023 SEPTEMBER 28,2023
MR. BADER FAHAD AL MAZYAD
EMAIL ADDRESS: OFFICE FAX NO: CHECKED & REVIEWED BY:
CENTRAL DUCT INDUSTRIES CEO-OWNER PURPOSE OF ISSUE: REVISION NO: 1:50
PO BOX NO 1400-AL RASS 51921 ENGR. JOBERT L. BANGGUIYAO -RME FOR APPROVAL 00
NOTES:
BREEZE AIR
1 Section A-A
B Scale: 1:50 MTS
PROJECT TITLE: OWNER: OWNER CONTACT NUMBER: DRAWING TITLE: SHEET NO:
+966 505134176 01
AIR COOLER DUCT MR. ALI KHALIFA PROJECT ADDRESS: AIR COOLER DUCT
AL RASS ,AL QUASSIM, SAUDI ARABIA B
CONTACT / WATSAPP NO: LOCATION: CAD & DESIGNED BY: APPROVED BY: DATE STARTED: DATE FINISHED:
SCALE
+966 55 333 2277 AL RASS,AL QUASSIM, SAUDI ARABIA ENGR. YASSER SHEHATA -TOE SEPTEMBER 28,2023 SEPTEMBER 28,2023
MR. BADER FAHAD AL MAZYAD
EMAIL ADDRESS: OFFICE FAX NO: CHECKED & REVIEWED BY:
CENTRAL DUCT INDUSTRIES CEO-OWNER PURPOSE OF ISSUE: REVISION NO: 1:50
PO BOX NO 1400-AL RASS 51921 ENGR. JOBERT L. BANGGUIYAO -RME FOR APPROVAL 00
NOTES:
1 Section B-B
C Scale: 1:40 MTS
PROJECT TITLE: OWNER: OWNER CONTACT NUMBER: DRAWING TITLE: SHEET NO:
+966 505134176
MR. ALI KHALIFA AIR COOLER DUCT 01
AIR COOLER DUCT PROJECT ADDRESS:
AL RASS ,AL QUASSIM, SAUDI ARABIA C
CONTACT / WATSAPP NO: LOCATION: CAD & DESIGNED BY: APPROVED BY: DATE STARTED: DATE FINISHED:
SCALE
+966 55 333 2277 AL RASS,AL QUASSIM, SAUDI ARABIA ENGR. YASSER SHEHATA -TOE SEPTEMBER 28,2023
MR. BADER FAHAD AL MAZYAD SEPTEMBER 28,2023
EMAIL ADDRESS: OFFICE FAX NO: CHECKED & REVIEWED BY:
CENTRAL DUCT INDUSTRIES CEO-OWNER PURPOSE OF ISSUE: REVISION NO: 1:40
PO BOX NO 1400-AL RASS 51921 ENGR. JOBERT L. BANGGUIYAO -RME FOR APPROVAL 00
NOTES:
BREEZE AIR
BREEZE AIR
1 Section C-C
D Scale: 1:30 MTS
PROJECT TITLE: OWNER: OWNER CONTACT NUMBER: DRAWING TITLE: SHEET NO:
+966 505134176 01
AIR COOLER DUCT MR. ALI KHALIFA PROJECT ADDRESS: AIR COOLER DUCT
AL RASS ,AL QUASSIM, SAUDI ARABIA D
CONTACT / WATSAPP NO: LOCATION: CAD & DESIGNED BY: APPROVED BY: DATE STARTED: DATE FINISHED:
SCALE
+966 55 333 2277 AL RASS,AL QUASSIM, SAUDI ARABIA ENGR. YASSER SHEHATA -TOE SEPTEMBER 28,2023 SEPTEMBER 28,2023
MR. BADER FAHAD AL MAZYAD
EMAIL ADDRESS: OFFICE FAX NO: CHECKED & REVIEWED BY:
CENTRAL DUCT INDUSTRIES CEO-OWNER PURPOSE OF ISSUE: REVISION NO: 1:30
PO BOX NO 1400-AL RASS 51921 ENGR. JOBERT L. BANGGUIYAO -RME FOR APPROVAL 00
PROJECT NAME : AIR COOLER DUCT
LOCATION : AL RASS, AL QASSIM
OWNER : MR.ALI KHALIFA
BILL OF QUANTITES
ITEM MATERIALS DESCRIPTION UNIT UNIT
QTY
PRICE
AMOUNT
AC & VENTILATION DUCT SYSTEM
A. GALVANIZED STEEL SHEETS FOR DUCT
A.1 G.I Sheet Ga# 24 (0.70mm) , 1mx 2m 22.00 Sheets 56.35 1,239.70
A.2 1" thick x 1.2m x 20m @ 16 Kg/mᶾ 2.00 Rolls 241.5 483.00
Cladding Cloth (Gumas) 3.00 Rolls 28.75 86.25
XCHEM (ENICOAT 30-36 LAG CONTING) (25 KG) 6.00 ple 92 552.00
AFICO Duct Liner board (1.2mx1mx25mm)
A.3 LxWxThck. @24 kg/mᶾ density 3.00 L.M. 14.4 43.20
B MISCELLANEOUS MATERIALS
Primer paint,Canvass cloths cladding, flexible connectors,sealants, blind
B.1 rivets, self tapping screw, hex lag screws, flat washers,duct pin, bolts, 1.00 LOT 150 150.00
welding rods. etc. to complete the works.
FABRICATION(Cutting of Duct Fittings & Assembling of Duct Worcks (INSULATIONS,DUCT LINERS & etc:
INSTALLATION WORKS:
TOTAL LABOR
1,317.60 DIFFERENCE
COST =
VS
(474.55)