Sl. No. NAME OF EQUIPMENT PAGE NO.
FROM TO
CBRN EQUIPMENT
1. TELETECTOR 1 1
2. GM SURVEY METER 2 2
3. CONTAMINATION MONITOR (BETA & GAMA) 3 3
4. MINI RAD METER 4 4
5. PORTABLE ALPHA CONTAMINATION MONITOR 5 5
6. NBC PERMEABLE SUIT MK-V 6 32
7. ELECTRONIC DOSIMETER 33 33
8. BETA GAMA COUNTING SYSTEM 34 35
9. ALPHA COUNTING SYSTEM 36 36
10. BATTERY OPERATED AIR SAMPLER WITH FILTER 37 37
PAPER
11. MICRO RADIATION SURVEY METER 38 38
12. BREATHING APPARATUS SET WITH SPARE 39 41
CYLINDERS
13. NBC FIRST AID KIT TYPE-A 42 42
14. NBC FIRST AID KIT TYPE-B 43 43
15. PORTABLE DECONTAMINATION APPARATUS 44 45
16. A LEVEL SUIT 46 47
17. NBC SUIT ( IMPERMEABLE) DECONTAMINATION 48 48
18. PORTABLE GAMA SPECTROMETER 49 49
19. PLASTIC SUIT WITH COMFY RESPIRATOR 50 50
20. INTEGRATED HOOD MASK 51 51
21. RESPIRATOR ( GAS MASK) WITH 2 CANISTERS 52 52
22. BUTYL RUBBER GLOVES ( INNER AND OUTER) 53 53
23. NBC OVER BOOTS 54 54
24. RESUSCITATOR 55 55
25. WATER POISON DETECTION KIT ( WPDK) 56 57
26. RESIDUAL VAPOR DETECTION KIT 58 58
27. C W SAMPLING KIT 59 59
28. CASUALTY BAG ( FULL) 60 60
29. CASUALTY BAG ( HALF) 61 61
30. DECONTAMINATION KIT (SET) 62 62
CSSR EQUIPMENT FOR DETECTION
31. LIFE DETECTOR TYPE-I & TYPE-II 63 66
32. VICTIM LOCATION UNIT WITH BREACHING 67 68
SYSTEM
33. HAND HELD GAS DETECTOR 69 70
34. THERMAL IMAGING CAMERA 71 74
35. SKID STEER LOADER MACHINE WITH 75 78
ACCESSORIES
36. MULTI GAS DETECTORS 79 80
37. ANGLE CUTTER ( ELECTRIC-14”) 81 81
38. CIRCULAR SAW ( ELECTRIC-16”) 82 82
39. CIRCULAR SAW CARBIDE TIPPED BLADE ( 235 MM) 82 82
40. AIR LIFTING BAG WITH AIR CYLINDERS 83 84
41. COM ALONG 1.5 TONS 85 85
42. COMBINATION CUTTER 86 87
43. MULTI CABLE WINCH 88 88
44. BULLET CHAIN SAW 89 89
45. DIAMOND CHAIN SAW 90 90
46. REPLACEMENT 16” DIA DIAMOND TIPPED BLADE 90 90
47. OXY GASOLINE CUTTING TORCH ( PETROGEN GAS 91 92
CUTTER)
48. ROTARY RESCUE SAW 93 94
49. RAMSET WITH MATCHING FOOT PUMP 95 95
50. HYDRAULIC JACK 10/20 TONS ( WEDGE JACK TOE 96 96
JACK)
51. AIR PLASMA CUTTING MACHINE 97 100
52. CHAIN SAW ( 36”) 101 102
53. CHAIN SAW ( 50”) 103 104
54. ROTARY DRILL BIT ( DIA-200 MM, 10” LONG) 105 105
55. KEYHOLE SAW WITH SET OF FOUR SAWS 106 106
56. RECIPROCATING SAW (BLADE METAL L-150MM,24 107 107
TPI)
57. RECIPROCATING SAW (BLADE WOOD L-240 MM,5 107 107
TPI)
58. DIAMOND TIPPED BLADE ( DIA-300 MM) FOR 107 107
ANGLE CUTTER
59. COMPOSITE BLADE METAL FOR ANGLE CUTTER ( 107 107
DIA-300 MM)
60. WOODEN PLANKS 5MX100MMX100MM 108 108
61. GALVANIZED METAL TUBES 109 109
CSSR POWER TOOLS
62. CHIPPING HAMMER MEDIUM WEIGHT ( 08-12 KGS) 110 111
63. BREATHING APPARATUS SET WITH SPARE 112 113
CYLINDER
64. LEAK TESTER FOR TESTING RESPIRATORY 114 115
EQUIPMENT
65. DISTRESS SIGNAL UNIT 116 116
66. FIRE PROXIMITY SUIT 117 120
67. ROTARY HAMMER DRILL 620 W, 4850 IMP/MTR, 870 121 121
RPM
68. RECIPROCATING SAW 600W, 2600 ST/MTE, L-28 MM 112 123
69. CORDLESS HAMMER DRILL 124 124
70. HAZMAT VEHICLE 125 151
71. POWER PACK WITH UNIT TOOL 152 152
72. DISASTER MANAGEMENT KIT 153 154
73. PVC SUITS 155 155
74. HEAD LIGHT 156 156
75. REFLECTIVE JACKET 157 157
76. VENTILATOR & AIR TUBE 7 MTRS LONG 158 158
77. FLOATING PUMP 159 159
78. FIRE ENTRY SUIT 160 160
LIGHTING & POWER EQUIPMENT
79. INFLATABLE LIGHTING TOWER 161 161
80. PORTABLE GENERATORS ( 10.5 KVA) 162 162
81. PORTABLE GENERATORS ( 2.5 KVA & 5 KVA) 163
163
1. TELETECTOR
Picture of Equipment
3. CONTAMINATION MONITOR ( BETA & GAMMA )
SPECIFICATION
Picture of Equipment
4. MINI RAD METER
SPECIFICATION
5
6. NBC PERMEABLE SUIT MK-V
Joint Service Specification (JSS) of NBC Permeable Suit MK-V is not received so far from Ministry
of Defence. However, the specification of NBC Suit Permeable (MK-V) is available with NDRF.
SPECIFICATIONS
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
7. ELECTRONIC DOSIMETER
SPECIFICATION
33
8. BETA GAMA COUNTING SYSTEM :
34
DIMENSONS
External 200 mm dia x 370 mm height (approx)
Internal 120 mm dia x 300 mm height
Weight 100 kg
TECCHNICAL SPECIFICATION OF G.M. TUBE.
a) halogen quenched b) End window
c) Type PhilipsZP1430 or 72314 of Lnd or d)Mica window 1.5 mm thickness
equivalent
e) 446 ss Wall if 1.5 mm thickness f) Effective length : 36 mm (approx)
g) Diameter : 30 mm h) Operating voltage: 500 V
I) Plateau slope : 5% for 100 V j)Minimum dead time : 200 micro sec
k) Operating range : 450 -750 V l) Maximum background : 15 cpm with 5 cm lead
shield and 3 mm Al.
35
9. ALPHA COUNTING SYSTEM
36
10. BATTERY OPERATED AIR SAMPLER WITH FILTER PAPER
37
11. MICRO RADIATION SURVEY METER
_
1. Hand held, portable, light weight and analog dose rate meter.
2. Radiation detected : Gamma and X-rays
3. Energy range : 40 KeV to 1.3 MeV
4. Range : Five linear range from 0 to 200 m R/h
5. Detector - : Internal tissue equivalent, organic scintillator
6. Accuracy : with in 10% of reading for Cs-137 between 20% and
100% of full scale of any range.
7. Temperature : Operational from -20 to + 40 degree centigrade
8. Battery compliment : Two 9 volt, NM 1604 or equal
9. Weight : approx 3.0 pound
38
12. BREATHING APPARATUS SET WITH SPARE CYLINDERS.
1. GENERAL:
The self contained, Positive pressure and open circuit air breathing apparatus shall be certified for use
by the fire fighters for use by the fire fighters for 45 minutes total working duration.
2. TECHNICAL SPECIFICATION:
a) Back Plate and Body Harness: This shall be made of non - metallic, antistatic, impact, chemical &
fire resistant material and orthopaedic ally designed and manufactured in conformity to EN/ DIN/
US/BIS 10245 PART II standards and certified for use by the fire fighters, It shall facilitate mounting
of air cylinder through cam lock. The body harness shall be wearer friendly and safe for carrying load
while all buckles shall be quick release type.
b)Pressure reducer: This shall be so designed so as to meet the air demand for two users
simultaneously at a stable pressure on the outlet with inlet pressure varying from 300 bars to 20 bars
and shall confirm to provisions in pr EN 137-2002 class II.
c) Face Mask: The shall be reverted edge seal type and made of flame resistant material confirming
to EN 136. The reflex seal on the outer mask shall be so designed so as to facemask to reduce dead
space, speech transmitter for clear voice reproduction and a wide angle panoramic vision visor made
of Polycarbonate material and shall e self - de- misting type. The head straps shall be easy to tighten
and quick to release.
d) Demand valve: The lung operated demand valve design shall either be titling diaphragm type or
piston type. This shall be provided on the facemask and connected o the pressure reducer with the
help of rubber hose through quick connector. The demand valve shall be rated for minimum 500 Lpm
airflow and shall activate with the first breath.
e) Pressure gauge: This shall be bourdon pressure gauge with luminescent dial with reassure making
in bar and encased in fire resistant rubber cover. The gauge shall be connected to pressure reducer
through non-metallic rubber hose.
f) Hoses: The low pressure hoses shall be flexible and non-kinking type and suitably reinforced to
with stand 30 bar air pressure while the high - Pressure hoses shall either be flexible or rigid metallic
tube suitably secured to the back plate so as not to obstruct the movement of the wearer.
39
g) Warning Whistle: This shall be fitted either on the back plate or provided along with the pressure
gauge assembly and shall be automatic in operation giving audible alarm of minimum 90 dB
40
intensity at 1 meter distance of low cylinder pressure in the range of 50+ 5 Bar.
h) 'Y' manifold for additional connections: This set shall have provision through suitably placed '
Y' manifold to facilitate receiving air from a different source and supplying air for additional
facemask.
i) Air Cylinder: This shall be corrosion and impact resistant and made of light alloy fully wrapped.
The size of the cylinder shall be such that it can hold sufficient quantity of air [Not less than 1800
litres] for providing 45 minutes total working duration when charged at 300 bars pressure. The
cylinder shall be provided with cross flow valve and EN 144+2 compliant. The cylinder shall be duly
approved by the Chief Controller Explosive Nagpur and shall be capable of with standing a minimum
hydraulic testing pressure of 450 bars.
j) Weight "The weight of the ready to use set shall not be more than 12.5 kgs.
3. APPROVAL: The complete set shall have relevant EN or equivalent approval approval and
certificate to this effect shall be furnished along with the offer.
TECHNICAL EVALUATION:-
The technical evaluation of the SCBA shall be subjected to the following:-
41
13. NBC FIRST AID KIT TYPE-A
JOINT SERVICE SPECIFICATION
(JSS NO. 6545-02: 2017)
42
14. NBC FIRST AID KIT TYPE-B
43
15. PORTABLE DECONTAMINATION APPARATUS
DESCRIPTION
The apparatus shall be made of stainless steel with provision for pressuring the vessel by a pump
for vehicle built into the system. A lanve eith a scrubber, a brush, a scraper and an adjustable
nozzle shall be provided for working at a safe distance from the contaminated surface. There
shall be a pressure gauge for indicating the pressure inside the apparatus. The shoulder strap shll
be provided for manual handling and brackets for fixing it on a vehicles.
SPECIFICATION DETAILS
1 Capacity 14±0.4 liter total
2 Weight 12±0.4 liter charged
3 Weight complete assay 10.5± 0.5 kg
but without mounting
bracket
4 Weight of mounting 5.2±0.1 kg
bracket
5 Operating pressure 5.5±0.1 kg
6 No. of strokes to attain Not more than 35 strokes the operating pressure by
7 Ruddedness Shall withstand normal vibrations and shocks during
handling and transportation
8 Working conditions The apparatus shall be capable of working in a
temperature range of 30 to +50 degree C and upto RH
100%
9 Shelf life Minimum 5 years for all non metallic components when
tested and 10 years for metallic components.
10 Discharge time at 4 Not more than 5 min
gk/CM2
11 Jet Range at 4 Not less than 5 meters
KG/CM2
12 Leakage Not more than 1kg/cm2 in 48 hrs
13 Corrosion resistance Not trace corrosion shall be permitted when tested.
14 Hydraulic pressure test The equipment shall not fair or show any sign of leakage
when pressured at 2.5 times the opeaning pressure i.e.
13.75 kg/cm2
15 Brust pressure Not less than 22kg /cm2
16 Pressure gauge Size 40+/-2 mm range 0-10 +/- 1 kg/cm2 conforming to
IS 2624:66. The dial shall be marked range and red for
maximum permissible range.
17 Workmanship and Standard workmanship shall be of high quality and
finish reliability. Finish of parts and overall finish shallbe
specified in design documents
18 Painting The external surface of the DAP shall be pretreated and
painted with acid and alkali proof paint as per IS 5660 and
5660 shade for external paint shall be as per IS 345
shade No 5 (Olive green)
19 Marking Name of article : Portable
Decontamination apparatus
Batch number and Sr. No.
Date of manufacture (M&Y)
Capacity (L)
Developed by DRDE Gwalior
Manufactured or Decon unit should be of any
Internationally approved defense forces.
20 Guarantee Manufactures have 44 to stand guarantee for five years from
the date of manufacture of DAP when stored, in factory
packing in store houses for all non metallic parts and 10
years for all metallic parts.
21 Warranty The stores supplied against the contract shall be deemed to
bear warranty for all the contractor against defective
design, material workmanship and performance for a
period of 1 year from the date of receipt of each
consignment of DAP of the consignee end during the
period, if any of the stores supplied is found defective, the
same shall be replaced by the contractor free of cost at
consignee end and as soon as possible in any case not laer
than six months from the date of intimation received
by him.
22 Technical literature The following technical literatures shall be suppled free
of cost as per defence format available from the AHSP
according to quantity covered in the supply order:-
a) User hand book (UHB)
b) Part identification list (PIL)
c) List of spares for two years maintenance
23 Spares The following spare part shall be provided with the
apparatus
i) One set of O line shall be provided with each DAP.
ii) Clamps -2 Nos to hold delivery connections
iii) Funnel – one number
iv) Vehicle mounting bracket
v) Measuring scale one number
vi) Spanner for pump assembly one number
vii) Braided PVC hose with air filling value at one end and
connector to suit vehicles on the other end, length 7meter-
one set
viii) 5ltr PVC can – obne No.
ix) Key for air filling valvo tightening – one No.
x) Screw driver taparia 150 mm one No.
xi) dust caps for nozzle and sockets – one No.
45
16. A- LEVEL SUIT
01 Suit should be gas tight, to provide protection against Gasses, Vapours, Aerosol and liquid
(CWAs and TICs) hazardous chemicals and Biological warfare Agents.
02 The suit should be one piece fully ENCAPSULATION TYPE 1a / Level”A” gas tight suit
covering both the wearer and the breathing apparatus. It should be overall suit, designed to
enclose the wearer’s completer body and SCBA.
03 Head area should be large enough to accommodate a SCBA face piece and to be able to allow
user to wear a hard cap or firemen’s helmet, with a provision to attach communication set.
4. Suit must be provided with an intrinsically safe, fireproof, hands-free Radio set/Walky-Talky (
VHF/UHF) inside the suit for communication during operation.
05 The suit should contain a SCBA with a lightweight carbon steel/Aluminum cylinder with capacity
to allow continuous work for not less than 45 minutes. It should be able to give out alarm 15
minutes prior to exhaustion of air in the cylinder.
a. It should have minimum 15 years’ service life and 3 to 5 years hydrostatic testing cycle.
b. Light weight
6. The suit should have extra connection for supplementary air through line supply, Suit should
have Integrated ventilation system through one way valve.
7. The suit to be made up to polyamide Fabric Tychem TK or equivalent. The material will be high
visibility fluorescent orange color.
8. A long gas tight zipper should be fitted to the suit which enables easy donning and doffing. The
Zipper should be shrouded by two outer flaps which must be fastened together by means of a
velcro strip when suit is in use.
9. All seems to be double sealed hermetically both from inside and outside.
10. The gloves to be lined ( outer gloves with inner lining compatible with the suit material, with
outer layer of Neoprene for extra protection. The gloves to be fitted by means of locking cuff
mechanism, 2 Spare Pairs of Gloves shall be supplied with each suit.
11. The boots to be permanently sealed to the suit. The boot to be highly chemically resistant providing
a degree of protection against mechanical hazard.. Safety boots with steel toe cap and mid sole.
The main features of boots to include.
a. Should have a BTT for chemicals/gasses/ acrosols not less than that of the suit
b. Not less than 200 joule steel toe cap.
c. Cleated slip resistant sole.
d. Injection molded seamless construction.
e. Non-absorbent polyester lining.
f. Kick off lug for easy removal.
g. Stainless steel midsole.
h. Cleated, oil resistant Rubber ousole for superior grip.
i. Exothermic insole for maximum wearer comfort.
j. Antistatic.
12. The visor to be double glazed permitting clear undistorted vision that will withstand chemical
permeation for the substances listed in the European standard EN464: 1994 for more than 480
minutes : the mechanical strength of the visor should conform to EN146:1991. The visor to be
impact resistant. The visor to provide a wide view of vision.
13. The suit to be supplied with adjustable internal support belt to enable wearers of varying sixe for
comfortable use.
14. The suits to be available in S/M/L/XL sixe depending on the order.
15. The suit to be light in weight & comfortable to wear.
16. Each suit to be supplied in a suitable rigid box/case to store it when not in use and should have
shelf life of minimum five years.
46
17. The suit should comply with EN464:1994 for protective clothing suit should conform to EN943-1
for ( gastight type 1a/Level A), en943-2 FOR ( Emergency teams), EN 1073-2 for radioactive
particles, EN 14126 for infective agents and EN 1149-5 for electrostatic properties .
18. The suit should have more than 8hrs (480 minutes) breakthrough time against the given
chemicals as per Appx. – “A”.
19. Operation/Maintenance manual to be supplied with each suit with indicative BTT for different
chemical environment.
PICTURE OF EQUIPMENT
47
17. NBC SUITS (IMPERMEBLE) DECONTAMINATION
48
18. PORTABLE GAMMA SPECTROMETER
SPECIFICATION
Picuture of Equipment
Specifications:
A) Material : PVC Plastic
B) Thickness : 0.2 mm
C) Size : 66 inch
COMFO RESPIRATORNOSE CUP
1. Type :- Half Mask, fitting under the chin, having
rolled in periphery.
2. Cavity Volume : 200 ml Weight : 90 Gms.
3. Length : 121 mmWidth : 87 mm
4.Material : Natural rubber with high density
polyethylene
EXHALATION VALVE
1. Type : Three piece valve, consisting of valve,
valve seat and valve guard.
2.Leakage : <0.1 % of normal breathing rate at 75
mm of W.G.
50
20. INTERGRATED HOOD MASK
51
21. RESPIRATOR (GAS MASK) WITH 2 CONISTERS
52
22. BUTYL RUBBER GLOVES ( INNER AND OUTER)
53
23. NBC OVER BOOTS
54
24. RESUSCITATOR
55
25. WATER POISION DETECTION KIT
Picture of Equipment
DESCRIPTION
The water poison detection kit shall be housed in an aluminium container having regent bottles
and impregnated filter papers strips essential glassware and miscellaneous items properly
cushioned to withstand transport hazards.
SPECTIFICATION DETAILS
56
MARKING Following marking shall be provided on each kit
a) Name of the kit
b) Batch No. & S.No
c) Date of manufacture (M&Y)
d) date of expiry of reagents
e) Developed by DRDE Gwalior
f) manufacturers name
57
PACKING Each kit shall be wrapped in a polythene blister bag thickness
accompanied with 50gm silica get pouch and packed in corrugated
PVC packing. Bulk packing shall be of 10 pieces per box in a
corrugated PVC packing.
GUARANTEE Manufacures have to stand guarantee for five years from the date of
manufacture of WPDK except for consumable for which guarantee
shall be two years, while storing in factory packages at store house.
WARRANTY The store supplied against the contract shall be deemed to bear
warranty for all the contractor against defective design, material
workmanship and performance for a period of 1 year from the date of
receipt of each consignment of DAP of the consignee end and during
the period, if any of the stores supplied is found defective, the same
shall be replaced by the contractor free of cost at consignees end and
as soon as possible, in any case not later than six months from the date
of intimation received by him.
TECHNICAL The following technical literatures shall be supplied free of cost as per
LITERATURE defence format available from the AHSP according to quantity
covered in the supply order:-
a) User Hand Book (UHB)
b) Part identification list (PIL)
c) List of spares for two years maintenance
58
26. RESIDUAL VAPOUR DETECTION KIT
59
27. C W SAMPLING KIT
SPECIFICATION
Containers ( 415x355x165mm) 01 Aluminium
NOTE :- All surfaces of the kit to be applied
1 with one coat of each primer then two coats
of Zinc chromate primer as per IS
1874,finally two coats of olive green paints.
2 Micro Pipette 01 Make qualipett,200 to 1000 micro
liter
3 Syringe ( 20 & 50 ml) 01 Each ,make Disproven
4 Hand sealing machine 01 Chrome plated
5 Suction Pumps 01 Plastic, Make Pip lip
6 Surgical Gloves (6.5”) 01 Latex
7 Scissor ( 6.5”) 01 Chrome plated
8 Teflon tube ( dia 2 mm) 03 m Teflon
9 Measuring Cylinder ( 10 ml) 01 Glass
10 PDK- I 04 Chemical Pouch as per DRDE Spec
DRDE/0287/NBCD/98/08.
11 PDK – II 01 Chemical Bottle as per DRDE
Spec DRDE/0287/NBCD/98/08.
12 Three colour detector 02 As per DRDE Spec
DRDE/0287/NBCD/98/03
13 Spatula ( 6”) 01 Stainless steel
14 Forceps (6”) 01 Stainless Steel
15 Droppers ( 6”) 10 Glass with back rubber teat
16 Label Sticker 100 Paper with back side gummed
17 Plastic containers ( 100 gm) 06 Plastic, make pearl pet
18 Plastic Containers ( 100 gm) 05 Plastic with Cover
19 Sample collection bottle ( 50 ml) 05 Glass
20 Sample collection bottle ( 20 ml) 05 Glass
21 Note Pad ( slap pad No.002) 01
22 Gel pen 01
23 Cello Tape ( 1”x5 mtr) 01 Roll
24 Packing Tape ( 1” x 10mtr) 01 Roll
25 Adhesive Tape ( 5 cm x 5 m) 01 Make john sons
26 Plastic box ( 5.5 x 4.5 cm) 01 Colour less Plastic
27 Plastic Box ( 5 cm x 6.5 cm) 01 Color less Plastic
28 Aluminium caps 10 Aluminium
29 Tissue paper 01 Roll
30 Buds pack 01 Make john sons
31 Polythene bags with gip ( !2” x 12) 20
32 Polythene bags with gip ( !8”x 18 “) 20
33 Safety cover 01 Corrugated PVC box to house
sampling kit.
60
28. CASUALTY BAG (FULL)
61
29. CASUALTY BAG (HALF)
62
30. DECONTAMINATION KIT ( SET )
63
DETECTION & LOCATION (57 ITEMS) CSSR EQUIPMENT
The human Life Detection System will be used by Rescue Workers to determine, without risking
lives by entering; whether anyone is trapped inside a burning or collapsed building. It should help
to locate trapped or marooned victims in a disaster area, Reducing both search times and danger to
rescuers and to find lost or injured people faster in hostile terrain, bad weather, collapsed trenches,
even underwater. The system should have the discrimination capability for detecting only living
human beings and not decease humans or living animals. The principle of working is based on the
equipment's capability of detecting living human beings by detecting the distinctive electro-
magnetic field created by their heartbeat. This is achieved by use of the special hand held
equipment.
Required Capabilities and specifications
The instrument should be in full compliance with following specifications:-
It should be capable of passively detecting the presence of living humans behind thick barriers such
as concrete walls, steel gates, trees, and 500 meters in the open air. It should be capable of
passively detecting the non-uniform electric fields of living humans. It should not detect animal
life.
Field of view:
Horizontal plane: at least -2 to + 2 degreesVertically plane:
At least - 60 to + 60 degrees in open air.
At least - 40 to + 40 degrees in composite structure .
- 20 to + 20 degrees on and all-metal grounded platform.
Detection range: It will come with two range adjustment devices (RADs) as follows:
All metal RAD up to 500 meters
Composite RAD up to 20 meters
* Target tracking - in detection mode, once the Life detector has fixed on target, even if it is
moving, the life detector will continue tracking the target.
D) It will have a built - in Red laser (used to show direction in dark areas) and will be eyesafe,
the laser Environmental parameters for optimum performance will be:-
Operating temperature: -10 to + 45 degrees Celsius
Storage temperature : -40 to + 85 degrees Celsius
* Instrument will be water resistant.
(E) Power: (Internal)- rechargeable 8.4 V DC battery for the laser. Operating time: 3 hours in
continuous operation.
Charging time : 14 to 16 hours-charge should be provided.
64
* Weight: < 1kg
* Hard carrying case or bag for accommodating the instrument will be provided.
(F) Instrument environmental parameters for optimum performance.
1. Operating temperature : - 40 to +85 degrees Celsius.
2. Storage temperature : - 40 to +85 degrees Celsius.
(G) The supplier will provide full training on the set to the user for a minimum of three days. This
training will include on day in house classroom training on theoretical aspects including
troubleshooting and maintenance and tow days of field training and techniques to ease
detection.
GENERAL:
Life detector a seismic/acoustic listening device, light weight and easy to carry, designed specially
to detect and locate trapped, live victims in collapsed structures caused by earthquakes, explosion,
landslides, construction cave-ins or mine disasters and should include the control unit, sensors,
sensors spikes, connecting cables and spools, Magnetic Clamps, Headphones, intercom probe, AC
power supply battery pack and carry bag (for control unit) with all required accessories.
The Life Detector should be provided with not less than 6 sensors. 4/6 sensors.
TECHNICAL SPECIFICATIONS
(F) MAIN UNIT
INPUT OF SENSOR/INTERCOM/PROBE
Seismic sensor input impedance : > 6K Ohms
Intercom probe input impedance: > 3 K Ohms
HEADSET OUTPUT
For headphones : 1/4" stereo jack
Output power, variable : 0.13 W/60 Ohms
FREQUENCY RANGE
1 Hz to 3000 Hz
FILTERS (FIXED SWITCH ABLE)
SIGNAL DISPLAY
LED Bar graph any 2 channels or sum of all channel, range 60 db.
65
(I) SESMIC/ ACCOUSTIC SENSOR (POSITION INSENSITIVE)
Frequency Range : 1 Hz to 300 Hz
Shock resistant : > 1000 g
(J) © POWER SUPPLY
Battery operated, low battery alert: Lithium ion rechargeable battery type”. Appropriate
perating time at approx. 20 deg.C:>20 hrs
66
32. VICTIM LOCATION UNIT WITH BREACHING SYSTEM
VICTIM LOCATING CAMERA
Specification
Purpose
Victim location systems to be acquired are designed for location and rescue of victims trapped
under debris during natural calamities or in mine collapses or confined space disasters. They
enable insertion below the debris of a telescopic probe which mounts, at its head, a sensitive
articulable video camera, supported by appropriate illumination, whose images can be viewed by
the operator and other rescue personnel on remote display monitors. The system also integrates a
two – way audio system which can pick up life sounds from the victim and also permits the
passage of spoken instructions or assurances to him from the rescue team. Since a rigid telescopic
probe has limitations on how far it can be inserted, the camera, light and sound system can also
be mounted on one end of a cable which can be used to reach greater depths.
The required Breaching System is a heavy duty drill used for making an entry hole for the probe
of the victim location system through debris at the disaster site, or other overlaying material
required to be breached to enable the search camera to access underlying void spaces. It should
allow rescue teams to breach most common construction materials with only one system. It coring
bits, carbide tipped diamond studded should be able to bore through wood, nails, sheet metal and
roofing materials and reinforced concrete. The system Should have a collar for attachment of
coring bits as well as for cooling water tobe delivered to the spinning carbide tipped diamond
studded bits when used.
68
33. SPECIFICATION OF HAND HELD GAS DETECTOR
PURPOSE The Hand Held Gas Detector (HHGDs) is meant for use by the First Responder in
making quick assessment of availability of flammable/ combustible gases and oxygen
concentrations and life threatening concentrations of the poisonous/ irritant/ toxic vapors/ gases
in the operational area and shall be designed to facilitate display of data on LCD screen along
with simple button operation.
TECHNICAL SPECIFICATIONS
1. The Hand Held Gas Detectors (HHGDs) shall have following technical parameters:-
Size: - Single hand operation, small and compact. Case material used for case should be
impact- resistant, rugged, non-corrosive composite material so as to prevent sparkgeneration
with built in concussion proof boot.
Sampling Device: - Inbuilt facility to collect samples from a minimum distance of 06 m.
Communication Port:- Removable memory card or USB using direct contact for
downloading data on a personal computer.
Audible Alarm Intensity: Shall not be less than 90 dB at a distance of 1 meter. The
detector shall have Visual Alarm Bar, so that alarm lights are visible from all angles and
shall also be equipped with an Internal Vibrator Alarm for high noise areas. The alarmsshould
be LOW, TWA, HIGH, STEL as applicable for the gases.
Display Screen:- LCD Display with backlight and gas readings minimum 5 mm high font
size.
No of Gases detected simultaneously: 5 gases including Oxygen, combustibles, hydrogen
sulphide, carbon monoxide & chlorine with range as under
Specifications Std measuring resolution Tolerance limit for Inlet
gases Range concentration of gas
Oxygen 0-25% 0.1% + 10.0%
Combustible 0-100% LEL 1.0% + 10.0%
gases LEL
Hydrogen 0-100 ppm 1.0 ppm + 10.0%
sulphide
Carbon 0-900ppm 1.0 ppm + 10.0%
monoxide
Chlorine(cl2) 0-20ppm 0.1 ppm + 10.0%
Weight:- Upto 600 gms.
Power sources- Re-chargeable battery pack for min 08 hrs operation (with sampling pump)along
with charger unit
ACCESSORIES: Each detector should be supplied rechargeable batteries with spare
batteries (one set ) so that the user can use the detector for a longer duration (i.e. when the rechargeable
battery is exhausted) and can also be able to use this additional battery pack for minimumm 8 hrs. The
user should be able to change the battery pack in hazardous conditions. The other accessories should
include sufficient length of flexible sampling hose with water and dust filters and Set of Spare Sensor
Filters. All accessories for the data downloading on to a Personal Computer with software and
hardware should be provided.
WARRANTY/CALIBRATION: The set shall carry warranty for not less than 2 years
including sensors. The supplier has to provide ON- SITE calibration of the detector once
every 6 months |(i.e. total 4 calibrations- at the end of 6 months, 12 months, 18 months and24
months respectively). The charges for this shall be mentioned in the price bid.
APPROVALS: The Hand Held Gas Detector shall carry certification for use in the Class-I
Hazardous area , ATEX class-I and should also be certified intrinsically safe or certified byChief
controller of Explosive, Nagpur (CCOE).
69
TECHNICAL EVALUATION: The evaluation of the Hand Held Gas Detector shall:-
Design in conformity to EN/DIN/US/UL standards and certificate be submitted along with
the offer, and.
70
34. THERMAL IMAGING CAMERA
As per certificate issued by IRDE, Dehradun vide letter No. 78700/TIC dated 22/02/2012 that Helmet
Mounted Thermal Imaging Camera (HMTIC) with the following specification has been designed and developed
by Instruments Research & Development Establishment, Defence Research & Development Organization,
Ministry of Defence, Dehradun.
1 Detector 384 x 288 VOx Microbolometer FPA (NETD), 50mK: 25µm pitch)
2 Spectral Range 8-12 µm
3 Field of view 50° x 37.5°
4 Focus Control Nil ( 3m to infinity)
5 Recognition Range 50m for human target
6 Display OLED with 6X Magnifier
7 Power 4W typical
8 Input Voltage 12 VDC
9 Battery Rechargeable Li-ion Battery with 2Hrs (min) continuous operation
10 Ext. Video O/P CCIR format
11 Weight 2.2 Kg (including battery & helmet )
12 Environmental Applicable clauses of JSS55555 and MIL STD 461- C & EMI/EMC
The product has gone through extensive testing at laboratory and can be extremely helpful for end user
requirements in rescue operations during disaster
including fire accidents.
Note : (i) The confirmation that the stores is meeting the specification should be supported by
cuments/literature etc.
71
(b) Thermal Imaging Camera
Qualitative Requirements Picture of Equipment
PHYSICAL CONFIGURATION:-
The thermal image camera should be a hand held design with battery,
viewing optics , side straps, neck strap lanyard and the optional choice of
grips.
Weight of camera should not exceed 2 kgs.
(The camera should be supplied in a storage case )
TURN ON TIME :-
The camera should provide an image within nominally five (5) seconds of
power being applied.
TECHNOLOGY:-
The imaging technology should be amorphous silicon 320 x 240 or better
micro bolometer free of export restrictions into India. The heat sensitivity
of the detector should be the minimum of 0.05 degree Celsius for
temperature definition. The imager should exhibit an abilityto avoid with
out or blooming conditions when subjected direct to flame or sun. Clarity
of the image must not deteriorate by either type of exposure during normal
operation. The imager should have Minimum three colour to aid clear
identification of the burning matter. The unit should have a Direct
Temperature Measurement facility with a digital read-out. Temperature
measurement to be from 0-500 (Minimum) Degree Centigrade.
VIEW OPTICS :
By high resolution not less than 90 mm (3. inch) colour Liquid Crystal
Display LCD.
LENS:
72
The unit should have a lens fabricated of germanium with a diagonal
field of view of not less than 50 degree.
The lens focus range should be 1.0m to infinity.
VISUAL INDICATORS :
All thermal imaging unit shall be equipped with the following on
screen displays:
Battery level indicator
Digital temperature read out.
All indicators shall be visible on the viewing screen.
SWITCHES:
(A single ON/OFF switch)
SIDE STRAPS/LANYARD:
The die straps and lanyard should be of sturdy fire retardant construction
and be field replaceable. Side straps should be on both sides of the unit
enabling it to be used by both left and right handed operators. The
Lanyard should be attached to the unit by a “D” ring. An optional
removable pistol grip handle or action grip should be available.
POWER SUPPLY:
Each unit should be supplied with two rechargeable dry batteries each
having a continuous operating time of 3 hours. Each unit should be
supplied complete with a battery charger capable of operating on both
mains 220/240 AC or 12V DC. The unit shall have automatic variable
dynamic range control management.
VIDEO OUTPUT:
The thermal image camera should have a video output or BNC
connector.
TRAINING :
Product familiarization should be available through the manufactures
distributor. Each unit shall be shipped with a user manual. Authority
letter from OEM should be attached with the bid.
NOTE TO TENDERER
(a) The tenderer shall indicate the make/model in their offer.
(b) The tenderer shall furnish the clause by clause compliance statement. In case there is any deviation the same
should be clearly brought out in the offer.
(c) They shall mention the relevant BIS/EN/DIN/UL certification of the product offered.
(d)Technical manual comprising of servicing details shall be supplied with system.
(e) Relevant Test certificate shall be provided from a Govt approved Laboratory or from the manufacturer along
with their office.
73
35. SKID STEER LOADER MACHINE WITH ACCESSORIES (AUTH IN
CSSR) BY MHA IN PLACE OF VEHICLE
SN SPECIFICATION
1. General :
It should be employable for the following tasks with the use of suitable attachments:-
a) Rock Breaking
b) Limited Dozing work (Back hoe Loader)
c) Snow clearance
2 CHARACTERISTICS
a) Essential
i) Small enough to be used in confined places for constructions of class 3/3.5 track/mule
track up to 5 ft width in high altitude mountainous terrain and should be able to
function up to temp(-)15 degree C.
ii) Self-propelled machine with capability to travel with a speed of 8 to 9 kmph X-
country and high on site mobility.
iii) Maintenance–free positive gear meshed transmission /hydraulic transmission.
iv) It should have an excavator or a loader or excavator cum loader attachment with
single/dual-cylinder loader arm, fixed to the machine at any one time with capability to
fit other attachments.
v) Weight with operating weight (weight with standard dirt bucket, full fuel standard
tyres and an 80 kg operator) not exceeding 3600 Kg.
vi) Should be possible to operate the machine in High Altitude Areas up to 18000 ft above
MSL and in slushy /water logged areas for track construction tasks.
vii)Changing of attachments should be user friendly and should not exceed 10 minutes in
field conditions.
b) Desirable
i) Should be able to clear landslides consisting of boulders up to 30 to 40 cm disaster
(upto 300 kgs weight).
ii) Should have a cabin to provide weather protection to operator.
3. Excavation performance
Excavator should be capable of excavating speedily in soft soil and to limited capability in
rocky areas. However, it should be able to break rocks and clear the rocky outcrops/burden
as desired. It should be able to work on slopes of mountains.
4. Dozing Performance
Should be capable of carrying out limited dozing of soft soil/loose rocks /loose earth
5. Performance of the equipment
The performance of the skid steer should be:-
a) Dump Ht-Min 2000mm
b) Rated OP Capacity – Min 600 kg ±10 kg.
c) Tipping Load-1100 to 1300 Kg.
74
6. Attachments
It should have capability of fitting and working with following attachments:-
a) Excavator buckets of capacities 300 mm,450mm, 600mm
b) Riper Tooth with 5 teeth
c) Ditch cleaning bucket Size-550 mm-700 mm
d) Rock Breaker, Hydraulic vibrating type
e) Stump grinder/tree cuter, operating height 24 inches, wheel diameter 20 inches
f) Earth Auger, Auger bit size 300 mm
g) Snow blower-Chain driving with rotating protrusion
h) Back hoe loader, Cutting depth 2.5 m, minimum horizontal reach 3.36m.
i) Track Rubber tracks as attachments should preferably be easily mountable over
wheels in field conditions.
7. Mobility
The machine should be self-propelled with high on-site mobility and cross country
performance.
8. Night aids
Luminous markers should be provided on the machine and attachment to enable the
operator to gauge the depth of the trench and location of arm and bucket at night.
9. Transportability
Should be capable of being transported over a long distance:-
a) By road in 5/7.5 ton class vehicle.
b) By Air in IL-76 aircraft.
c) On Board /under sluing in MI-26 helicopter in full or semi knocked down state. If
transported in semi Knocked down state, it should be possible to reassemble the
machine in field with ease.
10. The Skid steer shall be simple to operate and simple to store and maintain .
11. A user handbook giving complete operation and maintenance instructions shall be provided
with the equipment. The skid steer also be provided with tool kit and fast running spares.
12. The firm should be able to provide Skid Steer Loader (one number) for trial and evaluation
on “No cost No commitment basis” at HQ NDRF, New Delhi immediately if required by a
technical committee to be detailed by DG, NDRF.
TECHNICAL SPECIFICATIONS:
SN Parameters Specifications
1 Engine assembly Four cylinders, Liquid cooled /Power-min 60 hp deliverable at altitude
4500 mtr or above specifics of power to be certified by OEM.
Capacity : min 2.60 Ltr
2 Transmission Hydrostatic 4x4 independent drive
3 Tyre 04 Nos, Pneumatic Tubeless 10x16.5 Standard duty
4 Power train Through positive gear boxes, slip free drive through forged
gears/hydraulic systems.
5 Axle and Rigidly fixed, integrated into chassis
suspension
6 Brakes Hydraulically activated and released multiple fade free brakes forming
integral part of the drive motor.
7 Electric system 12/24V 150 AH-maintenance free automobile battery.
8 Cooling system Liquid cooled one pump one loop system. Coolant is Ethylene Glycol/
water mixed (1.1)
9 Steel tracks Manganese enriched steel with solid blocks.
75
10 Back hoe Cutting depth 2.5 m, Horizontal reach–minimum 3.36 m, Swing
capacity 90 degrees either side, cutting force 16.3 KMS
11 Rock Breaker Hydraulic, vibrating type rock breaker
12 Snow blower Chain driven with rotating protrusions
13 Gross Vehicle Not exceeding 3600 Kg
Weight
14 Fitments Each skid steer loader should be fitted with cold starting
/provision/aids and lift hooks.
WARRANTY CLAUSE
SN SUBJECT
1. The seller warrants that the goods supplied under this contract conform the technical
specifications prescribed and shall perform according to the said Technical specifications
2. The Seller warrants for a period of 24 months from the date of acceptance of stores by Joint
Receipt Inspection Team or date of installation and commissioning whichever is later, that
the goods/stores supplied under the contract and each component used in the manufacturer
there of shall be free from all types of defects /failures.
3. If within the period of warranty, the goods are reported by the Buyer to have failed to
perform as per the specifications. The seller shall either replace or rectify the same free of
charge, maximum within 45 days of notification or such defect received by the Seller,
provided that the goods are used and maintained by the Buyer as per instructions contained
in the Operating Manual. Warranty of the equipment would be extended by such duration
record of the down time would be maintained by user in log book. Spares required for
warranty repairs shall be provided by seller at the time of deliveries. The seller also
undertakes to diagnose, test, adjust, calibrate and repair/replace the goods/equipment arising
due to accidents by neglect or misuse by the operator or damage due to transportation of the
goods during the warranty period, at the cost mutually agreed to between the Buyer and the
Seller.
4. Seller hereby warrants that necessary service and repair back up during the warranty period
of the equipment shall be provided by the seller and he will ensure that the downtime is
within 5% of the warranty period.
5. If particular equipment /goods fails frequently and/or, the cumulative down time exceeds
20% of the warranty period, the complete equipment shall be replaced free of cost by the
Seller within a stipulated period of 4 days of receipt of the notification from the Buyer.
Warranty of the replaced equipment would start from the date of acceptance by the buyer
/date of installation and commissioning.
6. In case the complete delivery of Engineering Support Package is delayed beyond the period
stipulated in this contract, then the seller undertakes that the warranty period for the goods
/stores shall be extended to that extent.
Service Life:- Service life of the equipment/Skid loader should be minimum 10 years. Firm
should agree to ensure the supply of spares during the service life of the equipment /skid
steer loader.
76
REPAIR AND MAINTENANCE
SN Brief Parameters
Firm should have proven capability to repair and maintain the equipment in-site in high
altitude areas and have preferably supplied to Army, BRO or CPMFS earlier for high
attitude operations. The supplier is required to provide the following.
a) Technical literature
(i) Users hand book /operators manual
(ii) Design Specification
(iii) Technical manual
(iv) Manufacturer recommended list of spares
(v) Illustrated spare parts list
(vi) Technical manual on Spl test equipment with drawing reference
(vii) Complete equipment schedule
(viii) Table of tools and equipment (TOTE) and carried Spares.
b) One set of gauges
c) One set of special maintenance tools
d) One set of special test equipment
e) Presence of technical representative of the OEM during evaluation
f) Servicing schedule
g) Condemnation limit
h) Permissive repair schedule
i) Packing specifications/instructions
j) Any addl. information suggested by the OEM
Sufficiency clause in terms of installation material and spares should also be included
by the supplier.
77
36. MULTI GAS DETECTORS
QUALITATIVE REQUIREMENTS/SPECIFICATIONS OF MULTIGAS
DETECTOR (CHEMICAL AGENT MONITOR)
1. Hand held chemical agent monitor must be IMS (Ion Mobility Spectrometry)
principle based with minimum interferences. The chemical agent monitor should
have an additional Toxic industrial chemical detector suitable to enlarge the range of
detectable hazardous compounds.
2. Detector should be able to indicate and display name of compounds detected.
3. Principle firm manufactures must have IPR on complete instrument.
4. Instrument must be hand held and capable of sensing:-
a) All nerve agents including V agents.
b) Blister agents including Lewisites.
c) Blood and choking agents.
d) Important Toxic Industrial Chemicals like:-
i) Formaldehyde
ii) Phosphorus Richloride
iii) Hydrogen Chloride
iv) Chlorine
v) Arsine
vi) Boron Trichloride
vii) Boron Trifluoride
viii) Sulphur Dioxide
ix) Cyanide
5. Detection Sensitivities
a) Nerve Agents & VX : 0.05 mg/m³(GA, GB, GD, GF, VX)
b) Blister Agents : 0.5 mg/m³ *HD& Lewisite)
6. Response time must be < 60 at the above stated concentration.
7. Recovery time must be < 03 Minutes at the above stated concentration.
8. It must sense vapour samples from agents present in the atmosphere in the form of
vapours liquid or aerosol.
9. Time to be ready : < 05 minutes after switch on.
10. Must be capable of providing visual alarms for agent class (Nerve, Blister,
Blood, Chocking and TIC)
11. Must be capable to provide audio and visual alarm with LCD/LED indications for
increasing concentrations.
12. The chemical detector shall be capable of having workable memory and networking
with comprehensive communication links, such as RS -232/- RS – 422/Ethernet/
Fiber optic or RF options.
13. The chemical agent detector must be compatible with communication capable to
transferring the real time data.
14. The chemical agent detector must be compatible to store the data.
15. Instrument must not give false alarm in continuous operation of minimum 06 hrs in
normal Indian environment
16. Interferences:-Instrument must not give alarm to the interferons, such as screening
smokes, smoke of wood, paper plastic, PVC, Incendiary gases from explosive, engine
exhaust and fuel. At the same time it should be able to detect CW agents in
the presence of above stated interferons.
17. Operating Temperature
a) Lower temperature range : - 30° to – 25° C
78
b) Higher Temperature range : + 45° to 55° C
18. It must be possible to decontaminate the instrument easily in the field.
19. Temperature and environmental test must meet JSS55555/ MIL-46IE/810F or other
equivalent standards for the instrument in semi protected conditions.
20. Input power must be 6 to 12 V DC battery rechargeable / 230 VAC operated. (with
battery eliminator)
21. Instrument must able to run for minimum 06 hrs continuously with a single battery
unit.
22. The weight of instrument must< 02 Kgs without battery & case.
23. Maintenance must be modular, with fitment of consumable form outside, without
opening complete instrument enclosure.
24. Shelf life minimum 10 years.
25. Maintenance must be minimum in specified storage conditions.
26. Easy maintainable at unit/site level. Maintenance tool must be adequate.
27. Spare part list, instructions for user, complete equipment schedule and any other
relevant documents must be provided.
28. Must have provision for software / data library up gradation.
29. Must provide warranty of at least 02 years.
30 Documentary evidences are required to support the compliance statement wherever
applicable.
79
EXTRICATION & ACCESS EQUIPMENT (CSSR)
1. Electric Motor operating in range of 230 Volts, 2600 watts + 10% power rating, with a
maximum no load speed of 4900rpm + 10%and full load speed up to 3000 rpm+ 10% 15 Ampere
three core electrical cord of 5 meter length with three pin plug will be provided.
2. The saw is to mount replaceable 12" (300mm) diameter diamond tipped or tungsten carbide
tipped blade not more than 25 mm arbor. The saw should be able to cut to a minimum depth of
100mm. One tungsten carbide tipped blade will be provided as an integral component of the
equipment.
3. It should be possible to adjust the position of the tool body through a minimum of 70 degrees
independently of the cutting depth. It should also be possible to remove the tool base for cutting
closer to walls and should be provided with guide wheels on the tool guard to ensure smooth travel
over the surface material.
80
38. CIRCULAR SAW (ELECTRIC) 16”
Circular saws are heavy duty power tools required in search and rescue operation for various carpentry
tasks associated with access and extrication like cutting and sawing of timber, wooden beams, door frames,
fallen tress etc. Typically these are light enough to be used by one operator and are electrically powered
SPECFICATION
1. Electrically powered motor operating in 100 to 250 volts with power consummation between 1600
to 2500 watts .15 ampere three core electrical cord 5 meter length with three pin plug will be provided.
2. Idling speed of motor up to 2000 to 3000 rpm with a maximum load rpm of 1200 to 1500 rpm. The
motor should have a minimum endurance for continuous operation up to 60 minutes.
3. Should incorporate easily locatable push button start and an electric brake quick stoppage.
4. Size of blade : More than 12 inches diameter with an arbor not exceeding 3.2cm (1.25inches) the
blade provided will be carbide tipped blade with minimum 32 teeth
5. The cutting capacity of the blade should exceed 125 mm at 90 degrees and 82mm at 45 degrees the
saw should enable stable blade rotation and a depth adjustment lever. A shaft lock will be provided for
effecting blade damage.
6. The weight of the saw with blade should not more than 17kg.
7. Rubberized wrap around saw and support handles with protection arrangement for shielding
operator from debris and kick backs will be provided.
8. Noise level during operation at full load should not exceed 100Dbat a distance of one meter.
ACCESSORIES
9. The equipment will be supplied with following.
a) Two Spare carbide tipped blades.
b) Tool Kit
c) Operating and Maintenance manual.
81
40. AIR LIFTING BAG SET WITH AIR CYLINDERS
1. Airlifting bags are pneumatics appliance that Can be used for a variety of lifting purposes in rescue
works in the wake of vehicle and railroad accidents, collapsed shelters or road clearance works
amongst other situations. They can be slid into spaces below loads where normal jacks cannot be
positioned. They can be used over uneven ground surfaces where again normal jacks will be
unstable and dangerous. They can be used to relocate, topple, align and enable lifting by cranes or
chain lifting systems. Whereas normal jacks concentrate the lifting energy over a small area,
airlifting bags provide lifting pressure over a much larger area. They are easy in maintenance effort,
durable and light weight.
SCOPE OF SUPPLY
2.Each set of high pressure airlift bags will an air-jacking system comprising two bags each on
10 sizes in term of maximum lift capacities, i.e. a total of 20 bags, with accessories as indicated
in Para 3 below. The totaled maximum lift capacity of one bag from each size should be in the
range of 245 to 270 metric tons. The individual sizes should range between the maximum lifting
capacities indicated below.
01 to 1.5 tons
1. 2.5 to 3.5 tons
2. 05 to 6.5 tons
3. 9.5 to 11 tons
4. 17 to 21 tons
5. 23 to 26 tons
6. 30 to 33 tons
7. 38 to 42 tons
8. 52 to 56 tons
9. 65 to 70 tons
3. Each set will be provided with the following accessories to operate up to eight bags at a time:-
10. 8 inflation hoses 5 m long in four different colours (two each) with push lock couplers.
11. 8 inflation hoses 10 m long in four different colours (two each) with push lock couplers.
12. 2 dual control box/unit, 8 bar, dead man
13. 4 Single control units, 8 bar
14. 4 pressure reducers for air cylinders 200/300 bars
15. 8 shut off hoses with safety valve and 0.5 m hose
16. 6 compressed air cylinder 300 bar, 5 to 6 liters
17. 4 connection pieces for air cylinders
18. One air bag testing device per three sets of air bags (to be quoted for separately)
82
19.
SPECIFICATIONS
4. The bag should be of multiple layers of Kevlar. Armed construction. While bags up to 26 tons
max lift capacity should be square in shape, higher sizes may be rectangular or square in shape.
The thickness of the bags should not exceed 30 mm. The set of bags should provide lifting
options from a minimum of 7 cm for the smallest size to more than 50 cm for the highest size.
5. They should have anti-slip surfaces to provide good grip and high traction between the bag
and surface of object to be lifted as well as when stacked on top of each other. Markings for
centering should be provided along with fluorescent labels at corners for recognition in the night.
Each bag should have its own storage bag.
6. Operating pressure 8.0 bars. Bursting pressure should not be lower than 32 bars. Testing
pressure to be flowed will be 1.5 times the operating pressure.
7. Operating temperature -20 to 80 degrees centigrade.
83
41. COME ALONG 1.5 TONS
SPECIFICATIONS
QUALITATIVE REQUIREMENTS
Come Along system should be of steel or hard Aluminum Alloy consisting three major parts
i.e. Base, Mast & Boom. The system should provide a safe secure anchorage for confined space
entry, exit and rescue work. The system should be completely collapsible and portable for
advantage of easy transportation. The system should be completely collapsible and portable for
advantage of easy transportation. The system should be corrosion resistant. All adjustment should
be on key plugs easy to assemble and dismantle without any tools. The rated capacity in terms of
working load should be more than 200 Kg. The complete system should have compliance of
European standard or should have certification from NABL approved Lab for safety factor.
Tendered should supply ascending descending device/winch, accessory handle, rope, rescue
stretcher and Full body Harness along with system. Ascending descending device/winch should
work on principle of wrap or contract friction. Ascension handle should be made up of light forged
aluminium Alloy. The handle grip should be comfortable with thermal insulation. Rope should be
made of polyamide. The breaking load of rope should be more than-24 KN (with out end
connection) and more than-18 KN (with end connection). The rope diameter should be 9 mm to
12 mm only. Rescue stretcher should be made up of Fibre/Light weight Aluminium Alloy. It
should be in bucket shape with sufficient number of straps to hold casualty. It can be lifted
vertically up & down. Full body Harness should be complied with EN 361/ 358.
PICTURE OF EQUIPMENT
84
42. COMBINATIONS CUTTER
SPECIFICATION
Purpose
Combination tools are double acting hydraulic tools primarily for cutting and spreading but may be
used, with suitable attachments as necessary for pushing, pulling and pressing or squeezing. They are
used for rescue work following vehicle, tanker or rail accidents, in factories or construction site
accidents and in natural disasters particularly for collapsed shelter search and rescue. Although
specialist and heavier individual function cutters and spreaders are available combi-tools offer a
solution providing multiple functions in a single piece of equipment and its versatility makes it useful
in post disaster rescue work.
Scope of Supply
Each Kombi tool set will be supplied with a power unit and accessories and spares indicated later.
SPECIFICATIONS OF KOMBI-TOOL
General- The kombi -tool should have a light weight, balanced and ergonomic design with anti slip
twist grip handle and safety control. The blades should be made of tempered tool steel. They should
be straight, serrated, regrind able and easily exchangeable. The cylinder body and housing could be
made of high strength aluminum alloy or equivalent material. Pigtail(s) should be fitted with anti-
kink springs or some form of kink protection, have quick connect couplings and automatic locking.
2. Working Pressure -not less than 630 bars
3. Opening (spreading) width -More than 300 mm
4. Minimum spreading force at 2.5cm from tip of blades -35 KN
5. Spreading force at 630 to 720 bars -More than 100 KN
6. Cutting force at 630 to 720 bars -More than 200 KN
7. Pulling force -More than 50 KN
8. Weight - Not more than 20 Kgs inclusive of Hydraulic oil
9. Standard or equivalent) -More than 25 mm diameter
10. The hoses should be of 10 m length and of different colors , if two hoses are to be used. Factor
safety should be of the order of four
11. Operating Temperature -(-) 20 to ( +) 55 degrees Celsius.
85
86
SPECIFICATIONS OF PUMP
87
43. MULTI CABLE WINCH
SPECIFICATIONS
88
44. BULLET CHAIN SAW
SPECIFICATIONS
89
45. DIAMOND CHAIN SAW
GENERAL
Diamond chain saw suitable for cutting reinforced concrete at least 300 mm thickness and with
built in reinforcement up to 12 mm dia. Masonry bricks natural stone or other similar Material.
1. Engine – 2 stroke petrol driven air cooled power shall be not less than 5 H.P.
2.The starter shall be shielded from the dust & water. It shall have electronic ignition protected
from water and single spring clutch proofed from water and concrete.
3. Fuel capacity : 01 litre (Approx)
4. The noise level should not exceed 105 dB at 01 mtr.
5. It shall be fitted with diamond chain, which run over the guide bar. The chain saw shall be
capable of cutting RCC up to 360 mm thick and iron rod up to 12 mm dia.
6. The water supply required by the chain while cutting shall not exceed 10 lts/Min.
7. The chain saw shall also be provided with measures/Attachment for reducing the force
required during cutting operation in order to reduce fatigue on operator.
8. It shall also be provided with foam covered full wrap handles, momentary contract on off
switch, water pressure gauge, 360 degree swivel hose connector, sprocket side cover and guard
flap for operator safety.
9. Weight : Not more than 20 kgs.
10. Cutting rate :- 10 to 25” per min or more.
TECHNICAL EVALUATION/INSPECTION
The technical para meter specified above shall be checked at the time of inspection. The supplier
at his cost shall provide all tools/Eqpt/materials and facility required for testing inspection.
ACCESSORIES:-
1. A spare diamond chain.
90
46. REPLACEMENT 16” DIA DIAMOND TIPPED BLADES
01 Portable cutting torch systems shall be used by everyday liquid fuels like gasoline, diesel, and
kerosene. These liquid fuels, portable system packages, provide operators with the
opportunity to reduce operational safety hazards, take advantage of greater performance
capabilities, and reduce operational costs. The portable cutting system shall be rugged, field
cutting torch system that provides operators with all the components necessary to contact
rapid hot cutting operations. Ideal for rescue or tactical use, these robust tools offers the same
massive power and performance as the largest industrial system, but with a small footprint.
It slices through the steel like knife, jumping air gap, cutting through layers,
punching deep holes in seconds. It cuts everything from thinnest steel up to 14 inches.
02 SAFETY
Automatic shut-off
Gas cutter head and tips shall be produced a refrigeration (cold) effect.
03 PERFORMANCE
I. Multi-layer cutting efficiency.
II. Allows cutting where optimal position is not possible.
III. Higher level of oxidation.
04 The flame temperature of the gas cutter ranges not less than 5000 degrees Fahrenheit
(forceful flame).
05 Oxygen fuel cutting system should be such that completely filled oxygen cylinder and fuel
Cylinder should be able to cut at least 2 inch thick steel for more than 90 min.
06 The package shall include a trans-fill cable for field expedient filling of the jumbo-D bottle
from a large bottle, as well as a adapter to allow operators to use medical oxygen bottles.
07 Comprising of main components as under:
(A) Liquid Fuel Torch (20 inch, 90 degree)
(B) Cutting Tips (0, 81, & 83)
(C) Liquid Fuel Hose (20 foot)
91
08 OXYGEN HOSE (WHIP LINE - 20 FOOT)
i. Liquid Fuel Tank (2 quart)
ii. Fuel Quick Disconnects
iii. Oxygen Quick Disconnects
iv. Oxygen Flashback Arrestor
v. System to be supplied with Oxygen Cylinder
vi. Medium Duty Oxygen Regulator (CGA 540)
vii. Heavy Duty Igniter
viii. Carry Case with Bracket
ix. Filler Pigtail
x. Medical Yoke Adapter
xi. Spare Parts Kit
xii. Tool Kit
xiii. Adjustable Wrench
xiv. Welding Gloves
xv. Safety Glasses (Shade 5)
xvi. Approved UL Certified
92
48. ROTARY RESCUE SAW
Specifications
94
-A piece of iron rod of dia2”(Quality of iron shall be the same which is
utilized in iron bars used for buildings and constructions).
-A piece of bullet proof glass of thickness 12mm minimum.
-A Piece of stone slab of dimension of 14” X 12” X 4” thickness of slab
shall be 4” and the same shall be cut across it cut thickness completely.
d SPEED OF CUTTING :- Speed of cutting shall be tested in cutting of
concrete slabs as mentioned above. Subject to compliance in all respects,
the Rotary Rescue Saw shall be listed in descending order quickest on top
and the financial bid shall be opened in respect of all the bidders who have
demonstrated cutting time not more than 50% of the quickest cutting time
and the lowest financial offer shall be selected.
(Note :- Simple glass can be broken and eliminated with the help of
hammer and so Rotary Rescue Saw should not be tested for cutting of
simple glass).
DIAMOND TIPPED BLADE
1 Diamond blade
2 Blade RPM – above 4000-5500.
3 Diameter 16’
4 Minimum cutting of depth of 100 mm.
5 Type of blade- Multipurpose ( For cutting concrete, metal bullet
proof glass, wood).
6 Internationally certified on quality standards.
95
49. RAMSET WITH MATCHING FOOT PUMP
Purpose
RAMs are hydraulic tools used for pushing apart and
staying two masses of material in order to create space
for extrication of victims following vehicle crashes,
earthquakes or rail and industrial accidents. They can
be single or multistage (telescopic) and operated by
hydraulic pumps which may be based on IC engine
power or on hand/foot pumping. The oil from thepump
is used with either a two hose connection to the RAM
or by a single hose with two concentric chambers.
Scope of Supply
Two stages telescopic RAM with foot pump.
RAM support
Maintenance set
Specifications
Max. Working pressure : 630 to 720 bar
Max. Spreading force
1st plunger ;>20 t
2nd plunger :> 8 t
Length retracted : < 60cm
Total stroke :> 70 cm
Max. Length (incl. Cross heads) :<130 cm
Weight, ready for use : <20 Kg
Temperature reach : -20C + 60C
Safety factor
Tool, hydraulic 2
Safety factor extension hoses 4
Accessories
Spare hose(s) (not less than 2 mtrs)
Maintenance set
Cross head
Ram support
Specifications of Hand pump
Operating pressure : 630 bar to 720 bar
Weight (ready for use) : 11.2 kg
Temperature reach : -20 + 60 C 0
Accessories
Maintenance set
Standards
Equipment must conform to prEN 13204 and/or
NFPA 1936 standards for hydraulic tools and
certifications will be submitted with tender.
96
50. HYDRAULIC JACK 10/20 TONS (WEDGE JACK TOE JACK)
TECHNICAL SPECIFICATION
WEDGE JACK
Working Pressure 700-750 bar
Lifting Height 50mm Minimum
Insertion height Not more than 14 mm
Spreading Force 20T or more
Wedge angle 150 Min
Weight, ready for use Not more than 15 Kgs
TOE JACK
Insertion height toe Not more than 60 mm
Low cap height More than 12”
Stroke 250 mm Minimum
Maximum lifting Force at the center 12 T Minimum
Maximum lifting force On the toe 10 T Minimum
Temperature reach -200C + 600C
One Hydraulic foot pump along with 10 meter hose matching with Toe Jack and Wedge
Jack is also required.
97
51. Air Plasma Cutting Machine
98
99
PICTURE OF EQUIPMENT
100
52. CHAIN SAW 36 INCH
101
PICTURE OF EQUIPMENT
102
53. Chain Saw 50 Inch
103
PICTURE OF EQUIPMENT
104
54. ROTARY HAMMER DRILL BITs
105
55. KEYHOLE SAWS WITH SET OF FOUR SAWS
106
56. RECIPROCATING SAW BLADES (WOOD)
58. DIAMOND TIPPED BLADE (DIA- 300 MM) FOR ANGLE CUTTERR
Specification mentioned in SL No. 37
59. COMPOSITE BLADE METAL FOR ANGLE CUTTER (DIA 300 MM)
Specification mentioned in SL No. 37
107
60. WOODEN PLANKS
Specifications
108
61. GALVANIZED METAL TUBES
Specifications
109
POWER TOOLS (CSSR)
08. Equipment must have dust seal to protect from entering of dust inside the machine.
09 Eqpt. Should be certified from national BSA/international (EPTO) agencies.
10. Noise level :- not more than 120 Db.
11. Easy to operate SUITABLE on/off SWITCH.
12. Equipment must have active vibration absorbing system (AVAS). And should fulfil
adequate safety norms as per international standard.
13. Equipment must be supplied with two (one flat & one pointed tipped) spare bits. Including
standard Greece, spare EAR plugs, dust cap.
110
(B). CHIPPING HAMMER HEAVY WEIGHT (25-30 KG)
111
63. BRAETHING APPARATUS (B.A) SET WITH SPARE CYLINDER
Qualitative Requirement
1. GENERAL: The self contained, Positive pressure and open circuit air breathing apparatus shall
be certified for use by the fire fighters for use by the fire fighters for 45 minutes total working
duration.
2. TECHNICAL SPECIFICATION:
a) Back Plate and Body Harness: This shall be made of non-metallic, antistatic, impact,
chemical & fire resistant material and ortho TECHNICAL EVALUATION:
b) The technical evaluation of the SCBA shall be subjected to the following:-
a) Meeting the requirement as mentioned from Sl No. 1 TO 3 above.
b) Designed in conformity to EN/DIN/US/BIS 10245 standards, conformity certificate and
CCOE certificate to be submitted along with the offerpedic ally designed and
manufactured in conformity to EN/DIN/US/BIS 10245 standards and certified for use by
the fire fighters, It shall facilitate mounting of air cylinder through cam lock. The body
harness shall be wearer friendly and safe for carryking load while all buckles shall be
quick release type.
b) Pressure reducer: This shall be so designed so as to meet the air demand for two users
simultaneously at a stable pressure on the outlet with inlet pressure varying from 300 bars to
20 bars and shall confirm to provisions in pr EN 137-2002 class II.
c) Face Mask: The shall be reverted edge seal type and made of flame resistant material
confirming to EN 136. The reflex seal on the outer mask shall be so designed so as to facemask
to reduce dead space, speech transmitter for clear voice reproduction and a wide angle
panoramic vision visor made of Polycarbonate material and shall e self - de- misting type. The
head straps shall be easy to tighten and quick to release.
112
d) Demand valve: The lung operated demand valve design shall either be titling diaphragm type
or piston type. This shall be provided on the facemask and connected o the pressure reducer
with the help of rubber hose through quick connector. The demand valve shall be rated for
minimum 500 Lpm airflow and shall activate with the first breath.
e) Pressure gauge: This shall be bourdon pressure gauge with luminescent dial with reassure
making in bar and encased in fire resistant rubber cover. The gauge shall be connected to
pressure reducer through non-metallic rubber hose.
f) Hoses: The low pressure hoses shall be flexible and non-kinking type and suitably reinforced
to with stand 30 bar air pressure while the high - Pressure hoses shall either be flexible or rigid
metallic tube suitably secured to the back plate so as not to obstruct the movement of the
wearer.
g) Warning Whistle: This shall be fitted either on the back plate or provided along with the
pressure gauge assembly and shall be automatic in operation giving audible alarm of
minimum 90 dB intensity at 1 meter distance of low cylinder pressure in the range of
50+ 5 Bar.
h) 'Y' manifold for additional connections: This set shall have provision through suitably
placed ' Y' manifold to facilitate receiving air from a different source and supplying air for
additional facemask.
i) Air Cylinder: This shall be corrosion and impact resistant and made of light alloy fully
wrapped. The size of the cylinder shall be such that it can hold sufficient quantity of air [Not
less than 1800 litres] for providing 45 minutes total working duration when charged at 300bars
pressure. The cylinder shall be provided with cross flow valve and EN 144+2 compliant. The
cylinder shall be duly approved by the Chief Controller Explosive Nagpur and shall be capable
of with standing a minimum hydraulic testing pressure of 450 bars.
j) Weight "The weight of the ready to use set shall not be more than 12.5 kgs.
3. APPROVAL: The complete set shall have relevant EN or equivalent approval and
certificate to this effect shall be furnished along with the offer.
TECHNICAL EVALUATION:-
The technical evaluation of the SCBA shall be subjected to the
following:-
80
114
115
65. DISTRESS SIGNAL UNIT
WARRANTY : The Distress Signal Unit offered shall carry warranty for not less than 02 years.
TECHNICAL EVALUATION: The technical evaluation of DSU shall be subject to the following.
a) Meeting the requirement as mentioned from SL No. 1 TO 4 above.
b) Design in conformity to EN/DIN/US standards and certificate to be submitted alongwith the
offer and.
Weight of DSU subject to compliance in all other respect the units shall be listed in descending
order lightest on top and the financial bid shall be opened in respect of first five bidders and the
lowest financial offer would be selected.
116
66. FIRE PROXIMITY SUIT
117
SPECIFICATION
118
119
120
67. ROTARY HAMMER DRILL
121
68. RECIPROCATING SAW
Technical specification
1. Rated power:- Not less than 900 watt at 220 -240 volts
2. Stroke rate (at no load): Not less than 2700/min.
3. Stroke length : Not less than 28 mm
4. Cutting depth(wood)- Above 165 mm
5. Cutting depth(steel sheet) – More than 20 mm
6. With required accessories and electrical cord of minimum 5 mtr length with 5 amp three/two pinplug along
with an extension cord of 10 Mtr.
7. Rate current- Not more than 6 amp
8. Noise level < 100 db
9. Spare blades for metal & wood cutting 10 Nos with suitable protective carry case.
10. Weight- Not more than 5 Kg with blade.
11. The starting current drawn by the motor should be limited to prevent the electric supply fuseblowing.
This also prevents the tool starting with a jolt.
12. Air cooled.
13. Rust proof.
14. Internationally certified on standards.
Saw must be capable of cutting a variety of materials like- all kind of wood and metal. Firm shouldgive live
demonstration in above regard on the samples provided by NDRF.
123
69. CORDLESS HAMMER DRILL
PURPOSE :- Cordless Hammer drills are light weight, battery operated, ergonomically
designed power tools that combine high speed, high torque and a hammer action to enable
drilling, driving and fastening in metal, steel and wood.
SPECIFICATIONS.
10. The following accessories will be provided with each cordless hammer drill set:
. One spare batteries (in addition to oneintegral to the drill).
. Battery charger, which should fully charge the battery in less than one hour. Two
spare bit sets including driver bit.Tool case
124
70. HAZMAT VEHICLE
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
71. POWER PACK WITH UNIT TOOL
152
72. DISASTER MANAGEMENT KIT
Ergency Kit for handling chlorine leakages in toner as well as cylinder comprising of:-
Particulars Nos
1 Big Hood with vent valve 1
2 Rubber Gasket (OD-155mm-ID-90mm) 3
3 Tie Rod Assembly 2
4 Tie Rods 2
5 Tie Rods Washers 8
6 Tie Rods Pieces 4
7 Angles 2
8 Stud with welded handle 1
9 Small Hood 1
10 Yoke stud 1
11 Stud 1
12 Rubber Gasket (OD-155 mm-ID 60MM) 3
13 Blind Fibre Gasket (1” O 3
14 Fiber Gasket ( 1.25” OD- 0.75”ID) 3
15 Cap Nut 1
16 Steel Patch Plate 1
17 Rubber Gasket (150 mm x 80 mm) 2
18 Round Yoke Plate 1
19 Cap Serew 1
20 Chain (96” long) 2
153
21 Drift Pins (in 2 Sizes) 2
22 Hammer 1
23 Valve Cap 1
24 Youke Clamp 1
25 Flexible Copper Tubing to draw chlorine 1
26 Nozzle 1
27 Teflon Tape 1
28 Canister Gas mask 1
29 PVC Hand Gloves –Pair 1
30 PVC Apron 1
31 Gas Tight Rubber Goggles 1
32 Ammonia Solution Bottle 1
33 Valve Spindle (10mm square) 1
34 Spanner-30 x 32 mm 1
35 Spanner – ¾ “ x 5/8 “ BS 1
36 Instruction Sheet 1
37 Steel Box 1
38 Fiber Gasket (1” OD-1/2 “ID) 3
39Fresh Airline Respirator 1
40Base Plates 2
41Universal Ring 1
UTILITY HOLSTER :- This should be rugged, water resistant . The utility holster should have large front
pocket, two elastic loops. D ring and protective cover flap with hook and loop closer to accommodate most
of the barrel- shaped mini flashlight.
Over all chemical suits ( PVC) EN complaints - 03 Nos
Glove for rescue job ( soft leather) EN Complaints - 03 pairs
Gloves for handling hazardous - 03 pairs
Chemical ( PVC) EN Complaints.
154
73. PVC SUITS
Qualitative Requirements
The suit is a PVC material, consisting of Coat, Pant and hood with replaceable acrylic visor.
This suit clothing is used for protection of the wearer against acid and alkali splashes in
chemical, fertilizers and pharmaceutical material.
Technical specification:
The suit is designed and manufactured of high quality PVC considering comfort of movement
to the wearer. The joints are uniformly welded to avoid chemical spilling inside the clothing.
Non-metallic buttons or otherwise are provided for total protection to the wearer.
155
74. HEAD LIGHT
Qualitative Requirements
Purpose of this head light to provide adequate light in the night etc at disaster site so that gas
cutting etc. done for rescue operation. Minor caped lamp assembly incorporation led acid type
battery conforming to IS : 5679/1986
Picture of Equipment
156
75. REFLECTIVE JACKET
b) Background Fabric
100% polyester. 125 gsm made from bright glossy yarn, adhering
to EN 471 standard. It shall have excellent colour Fastness and
should be UV treated.
c) Colour
Florescent reddish-orange/ florescent lime/yellow.
d) Reflecting tapes
Glass bead type reflecting tape, EN 471 class 2 approved, 50mm
wide, color of reflecting tape will be silver grey.
e) Accessories
i) Binding: - Binding will be black in colour. 100% polyester
fabric will be used in binding with excellent colour fastening.
ii) Velcro: - Velcro shall be 25 mm wide and 50mm in length
positioned vertically for perfect fastening. The Velcro will be
black.
Size: Length 27 inches and width 23 inches.
Cost: 500/- Approx.
157
76. VENTILATOR & AIR TUBE 7 METERS LONG
158
77. FLOATING PUMP
PICTURE OF EQUIPMENT
GENERAL
For the purpose of fire fighting and rescue operation light weight, reliable, self priming
pump that floats, discharge water @ at least 180 ltr/min.
The pump is having suitable cooling system to permit the pump to run continuously and
easy to start by one person.The pump is that of centrifugal type and direct coupledto the
engine.
159
78. FIRE ENTRY SUIT
160
LIGHTING & POWER EQUIPMENT (CSSR)
79. INFLATABLE LIGHTING TOWER
161
80. PORTABLE GENERATORS 10.5 KVA
Qualitative Requirement Picture of Equipment
a) Rated output-2100-2300 Watt
b) Maximum output 2400 watt
c) Fuel :kerosene/petrol
List of items required/Proposed for the up Gradation of
training institutes/Centers (BIDR BSF Academy)
with breaching system
d) Rated current : 10.5 amp
e) Over load protector for AC & DC earthling
f) Other provision : provision for battery charging, pull manual
start facility
g) Rated voltage : 220 volts
h) Rated frequency-50 Hertz
i) DC output- Only for charging 12 volts automotive batteries,
Maximum charging output 8.3
j) Dimension : (LXWXH) 605mm x 425mm x 550mm (+20%
margins)
k) Dry weight : 60-65 kg
l) Engine type : 4 stroke, 1 cylinder
m) Cooling System : Forced air cooling
n) Ignition system : transistorize coil ignition
o) Oil capacity 1 to 1.5 liters
p) Fuel tank capacity : 1to 1.5 liters
162
81. (A) PORTABLE GENERATOR 2.5 KVA
SPECIFICATIONS
Qualitative Requirement Picture of Equiptment
a) Rated out put - 2100-2300 watt
b) Maximum Out put 2400-2600 watt
c) Fuel: Kerosene/ Petrol
d) Rated Current: 10.5 amp
e) Over load protector: for AC & DC Earthling
f) Other Provision: Provision for battery charging, pull
cord manual start facility
g) Rated Voltage: 220 volts
H) Rated Frequency: 50 Hertz
I) DC out put: Only for charging 12 volts automotive batteries,
Maximum charging out 8.3 amp
j) Dimension: (LXWXH) 605 mmx425 mmx550 (+20%
margines)
Dry Weight: 60 to 65 Kgs
Engine Type: 4 stroke, 1 cylindre
k) Cooling System: Forced air cooling
l) Ignition System: Transistorized coil ignition
m) Oil Capacity: 1 to 1.5 Litres
n) Fuel tank Capacity:` 12 to 15 litres
SN NOMENCLATURE PARAMETER
1 Rating 5KVA
2 Phase Single
3 Frequency 50 Hz (±2)
4 Voltage (AC) 230 V (±5 %)
5 Voltage (DC) 12 V for Battery charging
6 Engine 4 Stroke, Single cylinder Engine Power : 5.3 kw at
3000 RPM.
7 Displacement 400-450 cc
8 Starting System Electric (12V) / Recoil
9 Dimension (L x W x H) Maximum 1160 x 660 x 750 mm (+ 10%)
10 Cooling Air Cooled
11 Weight 230 Kg Maximum
12 Fuel Diesel
13 Fuel Tank Capacity 15 Liters
14 Wheels and Handles Yes
15 Low Oil pressure Alert Yes
16 PF 0.8pf
17 Control Panel Volt, Hour, Ampere, DC Charging
18 Safeties Low Lube Oil Protection, Overheat Cutout,
Overload
19 Engine Should be certified by ARAI
20 Generator should comply with latest CPCB Norms
163
RADIO & COMMUNICATION EQUIPMENT (CSSR)
82. WALKIE TALKIE SETS
1 General
i) Frequency 136 -174 MHz (Full band) Functional check: B.O.O. will check operation of
Range radio set by programming lowest, highest and any
random frequency in 136-174 MHz range with the
help of measuring instruments.
ii) No of Channel 255 or higher BOO will check all these parameters one by one
iii) Channel 12.5 KHz or better with the help of standard testing instruments. If the
spacing standard test instruments are not available then firm
iv) Frequency ± 1.5 PPM or better must produce certificate of any Govt. accredited lab
stability or National Accreditation Board for Testing and
Calibration Laboratories (NABL) approved
laboratory or International Laboratory
Accreditation Corporation (ILAC) approved
laboratory.
v) Protocol & Digital DMR (TDMA) BOO will check all these parameters with the help
Technology Technology. of standard testing instruments. If the standard test
instruments are not available then firm must
produce certificate of any Govt. accredited lab or
National Accreditation Board for Testing and
Calibration Laboratories (NABL) approved
laboratory or International Laboratory
Accreditation Corporation (ILAC) approved
laboratory
vi) Type of Analog : 11K0F3E BOO will check all these parameters with the help
Emission Digital : 4FSK or equivalent of standard testing instruments. If the standard test
(Modulation) technique complying to open instruments are not available then firm must
standard / nonproprietary produce certificate of any Govt. accredited lab or
Digital Protocol as defined by National Accreditation Board for Testing and
an international standard body Calibration Laboratories (NABL) approved
like ETSI/FCC etc. laboratory or International Laboratory
Accreditation Corporation (ILAC) approved
laboratory.
vii) Type of Simplex, press to talk Simplex means set either work in receive mode or
operation in transmit mode. Same will be checked
practically.
viii) Type of Rugged flexible Helical BOO will check physically and practically to
Antenna antenna assess fitment, flexibility & ruggedness of
antenna.
ix) Weight Less than 450 gm with battery BOO will check practically to measure weight by
164
weighing machine.
x) Power source Ni-Mhor Lithium–ion or Li- Physical check to assess type, make & voltage/
polymer battery pack of 2000 capacity of battery and it should be as per
mAH or more with belt specification. In addition firm must produce
clip(Bidder shall mention DC certificate of any Govt. accredited Lab. Or NABL
Voltage and Chemistry). or ILAC approved laboratory.
xi) Protection (i) Reverse polarity protection i) BOO will check it by connecting Radio setwith
DC supply in reverse polarity and switch the set
to“ON’ position. There should not be any harm
to the Radio Set.
ii) BOO will check by switching “ON’ Radio set
(ii) Protection against high and removing antenna/dummy load and PTT be
VSWR pressed. In such a condition there should not be
any harm to Radio set.
2 Transmitter
i) RF Power 1 / 5 Watts (Programmable / BOO will check all these parameters in the entire
output Selectable) frequency range mentioned in the QR with the help
ii) FM Hum & -40 dB or better of standard testing instruments. If the standard test
Noise instruments are not available then firm must
iii) Modulation ±2.5 KHz @ 12.5 KHz produce certificate of any Govt. accredited Lab or
Limiting National Accreditation Board for Testing and
iv) Adjacent -60 dB or better Calibration Laboratories (NABL) approved
Channel Power laboratory or International Laboratory
v) Audio Less than 3% AccreditationCorporation (ILAC) approved
Distortion laboratory.
3 Receiver
i) Sensitivity i) Analog :- 0.30 μVfor 12 dB BOO will check all these parameters in the entire
SINAD or better frequency range mentioned in the QR with the help
ii) Digital :- 0.30 μV at 5% of standard testing instruments. If the standard test
BER or better instruments are not available then firm must
ii) Selectivity 60 dB or better produce certificate of any Govt. accredited Lab or
(Adjacent National Accreditation Board for Testing and
Chanel ) Calibration Laboratories (NABL) approved
iii) Inter- 60 dB or better laboratory or International Laboratory
modulation Accreditation Corporation (ILAC) approved
iv) Audio output 500 mW laboratory.
v) Audio +1,-3 dB
Response
vi) Rated Audio Less than 3%
Distortion
4 ENVIRONMENTAL SPECIFICATION
i) Operating -300C to +600C Firm must produce certificate of any Government
Temperature accredited Lab. Or NABL or ILAC approved
ii) Storage -400C to +700C laboratory.
Temperature
iii) Humidity Max. 95% @ +400C non-
condensing
iv) Environmental As per MIL 810 C,D,E,F Firm must produce certificate of any Government
standard (i.e) accredited Lab. Or NABL or ILAC approved
Low & High laboratory for the desired or better MIL standard.
Temperature,
Low pressure,
Temperature
Shock, Solar
Radiation, Rain,
Salt Fog,
165
Vibration, Dust
& Shock
v) Dust & water IP 57 or better Firm must produce certificate of any Government
Intrusion accredited Lab. or NABL or ILAC approved
laboratory.
5 Accessories
i) Battery Single unit smart charger BOO will check it practically by charging the
Charger (capable to charge Lithium-ion, batteries from smart charger and note down
Ni-MH, Lithium polymer) whether the batteries are charge properly or
otherwise.
ii) Hands free Kit The vender should provide Check practically by connecting Hands free kit
(VOXunit with minimum of two variants for with radio set. By making voice call Radio set
PTT)(optional) trails. should start transmission without pressing PTT.
On ‘no speech’ Radio set should switch
automatically to reception mode.
iii) Programming All necessary software and Check Practically to assess that all necessary
kit hardware required for software and hardware required for programming
programming of the set. of the set is available and working properly.
iv) Literature i) User’s manual with each Physically check to confirm that User and
radio sets should be provided Technical manual are available in Hard as well as
free of cost in soft as well as in Soft Copy.
hard copy.
ii) Technical repairing manual
with complete block diagram,
circuit layout etc should be
provided as per quantity
mentioned in list of store..
v) Battery Two extra Lithium –ion or Ni- Physical/Practical check to assess that extra
Mh or Li-polymer batteries battery is as per specification, compatible with
with each Radio Set. Radio set and working properly.
vi) Leather case One good quality leather case Practically /Physically check by inserting radio set
(Optional) with belt clip & shoulder strap. in it to assess that radio set can be easily inserted
in leather case. Leather case should have
belt clip and shoulder strip of sufficient length.
6 Configuration
i) Caller ID Should be available BOO will check it by programming two radio sets
display on same frequency and different ID. Make call
from one radio and check display in another
radio set, ID of caller radio should be displayed.
ii) Facility for Program locking channel or key pad facilities in
locking the Should be available radio set and check whether the channel or key
channel or key pads locked or otherwise.
pad locking
iii) Scan with Should be available Radio sets programmed with priority scanning on
priority pressing the scan button, will starts scanning
channels with the priority.
iv) Transmitter The time should be PTT of Radio set pressed continuously. Radio set
Time Out programmed to best suit the comes automatically in reception mode after
Timer (TOT) application. completion of time programmed for TOT option.
v) LCD display Should be available Practical/Physical check by switching on the
radio set, there should be display on the LCD
screen.
vi) Mode of calls Selective Call, Group Call, BOO will check it practically by making call.
Inter and Intra Group call
facility
vii) Remote Radio Should be available BOO will check it practically by sending kill
Kill / Stun / command to particular radio. Radio set received
Revive facility kill command will get killed. Similarly, Set
should revive if we send the revive command to
killed radio.
viii) Mode of Radio should operate in analog BOO will be check practically by making call
operation mode and digital mode. from existing analog sets to digital set after setting
(Compatible with existing all it in Analog mode and vice-versa. For checking
type of VHF analogue radio sets interoperability with existing digital radio system,
viz :Motorola, Icom, Kenwood, if available, make calls between them and the
Vertex etc.) proposed radio sets (in digital mode) and verify
proper communication should
happen if both digital radio systems are based on
same technology.
ix) Emergency Allows user to obtain help in BOO will check it practically by pressing
Button critical situations. emergency button.
x) SMS Texting Should be capable of sending BOO will check it practically by sending pre-
pre-defined messages & short defined message from one radio to another.
messages from keypads as Message should be displayed on the screen of
Optional. receiving radio.
xi) Programming Front panel programming with BOO will check it practically by programming
password protection or PC radio from front panel having password
programming. protection. Similarly, Board will also program
radio with the help of PC, Radio set should be
programmed from front panel as well as from PC
also.
xii) DTMF front Should be available BOO will check it Physically/Practically that
panel key pad radio set is having DTMF key pad with back lit.
with back lit
xiii) Battery Should be available BOO will check it practically that battery strength
strength bar bar indicates the strength bar as increasing/
decreasing when battery is
charged/discharged.
xiv)Support GPS Inbuilt GPS system with accuracy of less than Firm will demonstrate features
10 meters (facility should be available in the related with GPS, GIS and
radio set and should be demonstrated Networking mentioned at Sl.No.6
during trial. NDRF may opt to purchase the xiv to xvi) to Board or Officers
tariff of PGS later on) during the trial and all function
xv) GIS Radio should have application protocol should work as per requirement.
interface along with software applications to
provide locations and messaging on
PC/Console. (Standard slot facility should be
available in the radio set for connection of PC
or other hardware and should be
demonstrated during trial. NDRF may opt to
purchase the tariff hardware and
software for GIS later on)
xvi)Networking Should be IP based for automatic roaming
etc.(facility should be available in the radio
set and should be demonstrated during trial.
NDRF may opt to use this facility later on)
Field Trial The actual performance of the Field trial of equipment will be conducted by a
radio set will be assessed. Board of Officers in the operational area of the
force in the presence of Vendor/representative of
firms to ascertain the user satisfaction before the
7
proposal is accepted. Radio equipment with all
required accessories will be provided by the
participating firm’s on “No Cost No
Commitment” basis at the indenter discretion.
167
83. SATELLITE PHONES
Mss Type –D portable terminal should support DAMA and PAMA selection. It should support signaling and
communication protocol of ISRO HUB.
Battery Charging from main without removing from terminal.
Battery replacement should be possible from outside without opening main cover. Battery should sustain for
at least 12 Hr. operational ( Receive mode) and talk time should be greater than 3.0 Hr.
Compass should rugged enough to take care of transportation.
Terminal package design be highly reliable for disaster management application.
168
84. SPECIFICATION OF VHF DIGITAL MOBILE/BASE STATION TRANS RECEIVER SET
i) Frequency 136 - 174 MHz (Full band) Functional check: B.O.O. will check operation
Range of radio set by programming lowest, highest
and any random frequency in 136-174 MHz
range with the help of
measuring instruments.
ii) No of 255 or higher BOO will check all these parameters one by
Channel one with the help of standard testing
iii) Channel 12.5 KHz or better instruments. If the standard test instruments
spacing are not available then firm must produce
iv) Frequency ± 1.5 PPM or better certificate of any Govt. accredited lab or
stability National Accreditation Board for Testing and
Calibration Laboratories (NABL) approved
laboratory or International Laboratory
Accreditation Corporation (ILAC) approved
laboratory.
v) Protocol & Digital DMR (TDMA) BOO will check all these parameters with the
Technology Technology. help of standard testing instruments. If the
standard test instruments are not available then
firm must produce certificate of any Govt.
accredited lab or National Accreditation
Board for Testing and Calibration
Laboratories (NABL) approved laboratory or
International Laboratory Accreditation
Corporation (ILAC) approved
laboratory
vi) Type of Analog : 11K0F3E BOO will check all these parameters with the
Emission Digital : 4FSK or equivalent help of standard testing instruments. If the
(Modulation) technique complying to open standard test instruments are not available then
standard / nonproprietary firm must produce certificate of any Govt.
Digital Protocol as defined by accredited lab or National Accreditation
international standard bodylike Board for Testing and Calibration
ETSI/PCC etc. Laboratories (NABL) approved laboratory or
International Laboratory
Accreditation Corporation (ILAC) approved
laboratory.
vii) Type of Simplex, press to talk Simplex means set either work in receive
operation mode or in transmit mode. Same will be
checked practically.
viii) Weight Less than 2000 gms BOO will check practically to measure
weight by weighing machine.
ix) Power source 13.8 Volt DC ±15% Apply 13.8 VDC ± 15% from power supply
and check that whether set is working
properly or otherwise.
x) Protection (i) Reverse polarity protection i) BOO will check it by connecting Radio set
(ii) Protection against high with DC supply in reverse polarity and
VSWR switch the set to“ON’ position. There
should not be any harm to the Radio Set.
ii) BOO will check by switching “ON’ Radio
set and removing antenna/dummy load and
PTT be pressed. In such a condition there
should not be any harm to Radio set.
2 Transmitter
i) RF Power 25 Watts (programmable / B.O.O. will check all these parameters in the
output Selectable) entire frequency range mentioned in the QR
ii) FM Hum / -40 dB or better with the help of standard testing instruments.
Noise If the standard test instruments are not
iii) Modulation ± 2.5 KHz @ 12.5 KHz available then firm must produce certificate
Limiting of any Govt. accredited lab or National
iv) Adjacent -60 dB or better Accreditation Board for Testing and
Channel Calibration Laboratories [NABL] approved
Power laboratory or International Laboratory
v) Audio Less than 3% Accreditation Corporation (ILAC) approved
Distortion laboratory.
3 Receiver
i) Sensitivity i) Analog :- 0.30 μVfor 12 dB B.O.O. will check all these parameters in the
SINADor better entire frequency range mentioned in the QR
ii) Digital :- 0.30 μV at 5% with the help of standard testing instruments.
BER or better If the standard test instruments are not
ii) Selectivity 60 dB or better available then firm must produce certificate
(Adjacent of any Govt. accredited lab or National
Chanel) Accreditation Board for Testing and
iii) Inter- 70 dB or better Calibration Laboratories [NABL] approved
modulation laboratory or International Laboratory
iv) Audio output 3 W or more Accreditation Corporation (ILAC) approved
v) Audio +1,-3 dB laboratory.
Response
vi) Rated Audio Less than 3%
Distortion
4 ENVIRONMENTAL SPECIFICATION
i) Operating -300C to +600C Firm must produce certificate of any
Temperature Government accredited Lab. or NABL or
ii) Storage -400C to +700C ILAC approved laboratory.
Temperature
iii) Humidity Max. 95% @ +400C non-
condensing
iv) Environmenta Firm must produce certificate of any
l standard (i.e) As per MIL 810 C,D,E,F Government accredited Lab. or NABL or
Low & ILAC approved laboratory for the desired or
HighTemperat better MIL standard.
ure, Low
pressure,
Temperature
Shock, Solar
Radiation,
Rain, Salt
Fog,
Vibration,
Dust & Shock
v) Dust & water IP 54 or better Firm must produce certificate of any
Intrusion Government accredited Lab. or NABL or
ILAC approved laboratory.
5 Accessories
i) Microphone DTMF Microphone should be B.O.O. will check physically ad practically
supplied with Radio that DTMF Microphone supplied with radio
and is working properly.
ii) Battery cable Should be supplied with Radio Physically check by connecting battery cable
& Mounting & mounting fixtures with radio.
fixtures
iii) Antenna i) 0dB/3dB gain whip antenna Physically check by connecting antenna with
with 3 meters, Co-axial cable all its accessories with radio set and check
with connector, magnetic base serviceability whether antenna matched or
/ mounting bracket for vehicle not.
use will be provided as per
quantity mentioned in list of
store.
ii) 3dB/6dB gain Omni
Directional antenna with 30
meter RF Cable for base
station will be provided as per
quantity mentioned in list of
store.
iv) Programming All necessary programming Physically check to assess that all necessary
kit software and hardware software and hardware required for
required for the set will be programming are available and working
provided as per quantity properly.
mentioned in list of store.
v) Literature i) User’s manual with each Physically check to confirm that User and
radio sets should be provided Technical manual are available in Hard as
free of cost in soft as well as well as in Soft Copy.
hard copy.
ii) Technical repairing manual
with complete block diagram,
circuit layout etc should be
provided in soft as well as hard
copy as per quantity
mentioned in list of store.
6 Configuration
i) Caller ID Should be available By programming two radio sets with same
display frequency and different ID and making call
from one radio and check display in another
radio set, ID of caller radio should be
displayed.
ii) Busy channel Should be available Programmed one radio with busy channel lock
lock out out option and make call from another radio
on same frequency. In the mean time if we
want to make call from first radio, its
transmitter will remain disable till PTT of
second radio is released.
iii) Scan with Should be available Radio sets programmed with priority
priority scanning on pressing the scan button will
start scanning channels with the priority.
iv) Transmitter The time should be PTT of Radio set programmed with TOT
Time Out programmed to best suit the option be pressed continuously. Radio set
Timer (TOT) application comes automatically in reception mode after
completion of time programmed for TOT
option.
v) LCD display Should be available Practical/Physical check by switching on the
radio set, there should be display on the LCD
screen.
vi) Mode of calls Selective Call, Group Call, BOO will check it practically by making call.
Inter and Intra Group call
facility
vii) Remote Radio Should be available BOO will check it practically by sending kill
Kill / Stun / command to particular radio. Radio set
Revive facility received kill command will get killed.
Similarly, Set should revive if we send the
revive command to killed radio.
viii) Mode of Radio should operate in analog BOO will be check practically by making call
operation mode and digital mode. from existing analog sets to digital set after
(Compatible with existing all setting it in Analog mode and vice-versa. For
type of VHF analogue radio checking interoperability with existing digital
sets viz : Motorola, Icom, radio system, if available, make calls between
Kenwood, Vertex etc.) them and the proposed radio sets (in digital
mode) and verify proper
communication should happen if both digital
radio systems are based on same technology.
ix) Emergency Allows a user to obtain help in BOO will check it practically by pressing
Button critical situations. emergency button.
x) SMS Texting Should be capable of sending BOO will check it practically by sending pre-
pre-defined messages & short defined message from one radio to another.
messages from keypad as Message should be displayed in the screen of
Optional. receiving radio.
xi) Programming Front panel programming with BOO will check it practically by
password protection or PC programming radio from front panel having
programming. password protection. Similarly, Board will
also program radio with the help of PC, Radio
set should be programmed from front
panel as well as from PC also.
xii) Support GPS Inbuilt GPS system with Firm will demonstrate features related with
accuracy of less than 10 GPS, GIS and Networking mentioned at
meters (facility should be Sl.No.6 (xii to xiv) to Board of Officers during
available in the radio set and trial.
should be demonstrated
during trial. NDRF may be
opt to purchase the tariff of
GPS later on)
xiii) Networking Should be IP based for
automatic roaming etc.
(facility should be availablein
the radio set and should be
demonstrated during trial.
NDRF may opt to use
this facility later on)
xiv) GIS Radio should have application
protocol interface along with
software applications to
provide locations and
messaging on PC/Console.
(Standard slot facility should
be available in the radio set
for connection of PC or
other hardware and should
be demonstrated duringtrial.
NDRF may opt to purchase
the tariff hardware and
software for GIS later
on)
Field Trial The actual performance of the Field trial of equipment will be conducted by
radio set will be assessed. a Board of Officers in the operational area of
the force in the presence of
Vendor/representative of firms to ascertainthe
user satisfaction before the proposal is
7
accepted. Radio equipment with all required
accessories will be provided by the
participating firm’s on “No Cost No
Commitment” basis at the indenter
discretion.
173
85. DIGITAL VHF REPEATER SET (PORTABLE RADIO)
1 General
i) Frequency Range 136 - 174 MHz (Full Functional check: B.O.O. will check operation
band) of radio set by programming lowest, highestand
any random frequency in 136-174 MHz
range with the help of measuring instruments.
ii) No of Channel 16 or more BOO will check all these parameters one by one
Capacity with the help of standard testing instruments. If
iii) Channel spacing 12.5 KHz or better the standard test instruments are not available
iv) Frequency stability ±1.5 PPM or better then firm must produce certificate of any Govt.
accredited lab or National Accreditation Board
for Testing and Calibration Laboratories
(NABL) approved laboratory or
International Laboratory Accreditation
Corporation (ILAC) approved laboratory.
v) Protocol & DigitalDMR (TDMA) BOO will check all these parameters with the
Technology Technology. help of standard testing instruments. If the
standard test instruments are not available then
firm must produce certificate of any Govt.
accredited lab or National Accreditation Board
for Testing and Calibration Laboratories
(NABL) approved laboratory or International
Laboratory Accreditation Corporation (ILAC)
approved laboratory
vi) Type of Emission Analog : 11K0F3E BOO will check all these parameters with the
(Modulation) Digital : 4FSK or help of standard testing instruments. If the
equivalent technique standard test instruments are not available then
complying to open firm must produce certificate of any Govt.
standard /accredited lab or National Accreditation Board
nonproprietary Digital for Testing and Calibration Laboratories
Protocol as defined by (NABL) approved laboratory or International
an international Laboratory Accreditation Corporation (ILAC)
standard body like approved laboratory.
ETSI/FCC etc.
vii) Weight Less than 15 Kg BOO will check practically to measure weight
by weighing machine.
viii) Power source i) DC -13.8 Volt + Apply 230 VAC ±15% and 13.8 VDC ±15%
15% one by one and check that whether set is
ii) AC – 230 Volt + working properly or otherwise.
15%, 50Hz
iii) There should be
provision to shift
automatically on DC
supply during mains
failure & when mains
174
supply restored it
should be shifted on
mains from DC supply
ix) Protection (i) Reverse polarity i) BOO will check it by connecting Radio set
protection with DC supply in reverse polarity and
(ii) Protection against switch the set to“ON’ position. There should
high VSWR not be any harm to the Radio Set.
ii) BOO set be switched “ON’ removing
antenna/dummy load and PTT be pressed.
In such a condition there should not be any
harm to Radio set.
2 Transmitter
i) RF Power output 45 Watt or more B.O.O. will check all these parameters in the
(programmable / entire frequency range mentioned in the QRwith
Selectable) the help of standard testing instruments. If the
ii) FM Hum & Noise -40 dB or better standard test instruments are not available then
iii) Modulation + 2.5 KHz @ 12.5 firm must produce certificate of any Govt.
Limiting KHz accredited lab or National Accreditation Board
iv) Adjacent Channel -60 dB or better for Testing and Calibration Laboratories
Power [NABL] approved laboratory or International
v) Audio Distortion Less than 3% Laboratory Accreditation Corporation (ILAC)
approved laboratory.
3 Receiver
i) Sensitivity i) Analog :- 0.30 μV B.O.O. will check all these parameters in the
(12 dB SINAD ) or entire frequency range mentioned in the QRwith
better the help of standard testing instruments. If the
ii) Digital :- 0.30 μV at standard test instruments are not available then
5% BER or better firm must produce certificate of any Govt.
ii) Selectivity 60 dB or better accredited lab or National Accreditation Board
(Adjacent Chanel ) for Testing and Calibration Laboratories
iii) Inter-modulation 70 dB or better [NABL] approved laboratory or International
iv) Audio Response +1,-3 dB Laboratory Accreditation Corporation (ILAC)
v) Rated Audio Less than 3% approved laboratory.
Distortion
4 ENVIRONMENTAL SPECIFICATION
i) Operating -300C to +600C Firm must produce certificate of any
Temperature Government accredited Lab. or NABL or ILAC
ii) Storage -400C to +700C approved laboratory.
Temperature
iii) Humidity Max. 95% @ +400C
non-condensing.
5 Networking Should be capable to Firm will show Networking and interfaces
support IP site related function of repeater practically by
connects. connecting it in user organization network.
6 Interfaces Ethernet port RJ-45 to
provide
a) Wide area IP
connectivity for Voice
and Data.
b) Remote monitoring
and status check.
7 Accessories
Battery cable & Should be supplied B.O.O. will check it practically by connecting
Mounting fixtures with Repeater battery cable & mounting fixtures with
repeater.
Antenna i) 3dB/6dB gain Omni BOO will check it practically by connecting
directional antenna antenna & accessories with repeater. During
with 45 meter RF transmission there should be no mismatch
Cable RG-217 for base between radio and antenna.
station will beprovided
as per quantity
mentioned
in list of store.
Programming kit All necessary BOO will check it practically that all necessary
programming software programming software and hardware are
and hardware required available as per user requirement.
for the set will be
provided as per
quantity mentioned
in list of store.
Literature i) User’s manual with BOO will check it physically that user and
each radio sets should technical manual are available as per user
be provided free ofcost requirement.
in soft as well as hard
copy.
ii) Technical repairing
manual with complete
block diagram, circuit
layout etc. should be
provided in soft as well
as hard copy as per
quantity
mentioned in list of
store.
Field Trial The actual Field trial of equipment will be conducted by a
performance of the Board of Officers in the operational area of the
radio set will be force in the presence of Vendor/representative of
assessed. firms to ascertain the user satisfaction beforethe
8
proposal is accepted. Radio equipment with all
required accessories will be provided by the
participating firm’s on “No Cost No
Commitment” basis at the indenter discretion.
176
86. PORTABLE SHELTERS 10'X14'
177
87. PORTABLE SHELTERS 10'X23X7
Specifications Picture of Equipment
General: Portable shelter is designed to accommodate the personnel
of Specialist Response Teams, Medical First Aid Assistance,
Disaster Relief Equipment, Triage and for victims of the affected
area in the event of natural disaster.
The technical data of the portable shelter should
meet following requirements:-
a) The portable shelter should be easy to set up.
b) It should be simple, no framework and structure should be
involved. The integral floors should set the dimensions of the shelter
automatically on set up. Anchoring and guys Should simply keep it
in place during strong winds.
c) It should be lightweight so that 2 people can easily-lift it.
d) Material should stay clean and dry and shall not absorb spills,
improving hygiene.
e) Shelter walls open up from inside if fast escape shall be
required.
f) The shelter should be totally weather resistant and keeps the
occupants clean, dry and warm in high winds, cold temperatures,
driving rain and heavy snow.
g) The rigid wall panels should be supported significant weight for
organizing and storing the possessions of a cagily in a temporary
circumstance with hangers and shelves.
h) The double walled panel should be on insulation 'R' factor
of at least 1.4, allowing the shelter should be heat and cooled
efficiently.
i) The white roof section should be allowed ample light
transmission, giving
the interior an airy and spacious atmosphere.
j) When lit from the inside at night, the material should be opaque
enough to
give privacy and the shale interior allows efficient use of the light
source.
k) Any flat panel should have a hole or flap cut into it by the
occupant
for exhaust ducting, water supply lines, drain pipes, extra
ventilation etc.
l) The portable shelter should be repairable easily and permanently
with
duct tape.
m) Shelter should be moved with whole set up and with interior
contents in place. This allows easy reorganization of established
campmates if a road allowance needs to be widened or a drainage
ditch needs to be widened ora drainage ditch needs to be constructed
with a change in seasons.
n) The material used for the fabrication of shelter should be weather
proof.
o) The weight of the shelter (10' x23' x7') should not be more than
80 Kg.
178
MFR & AMBULANCE EQPT. (03 ITEMS)
SPECIFICATION
181
DIVING EQUIPMENT (FWR) (06 ITEMS)
(a) The requirement of Self Contained Underwater Air Breathing Apparatus (SCUBA) is to enable a diver
to breathe underwater using this set up to a depth of 35 meters. The equipment is required for
undertaking a diving operation in lakes/rivers/reservoirs/open water (sea) and to assist the diver to
undertake the task in a safe and hazard-free manner.
(b) The SCUBA set should indicate the reserve air pressure and should also supply air for inflation of the
Buoyancy Jacket (Buoyancy Control Device) for emergency ascent to the surface. The equipment is
required to supply continuous compensated air to a diver at the depth he is diving.
Regulation/Standards.
The Self Contained Underwater Air Breathing Apparatus (SCUBA) should comply to certification as per
EN250:2014 (for testing & marking of Respiratory Equipment) or equivalent Standards (EN 16972:2020,
EN 13274-2:2019, EN13274-7:2019, EN148-1:2018, EN 14594:2018).
Functionality.
The equipment should be capable of being used by any diver underwater during a diving operation.
The role of each item should be as per characteristics enumerated along with the description/ main features.
PART II
92. Introduction. Self-Contained Underwater Air Breathing Apparatus (SCUBA) is used to enable a
diver to dive up to depths of 35mts. As the name suggests the equipment is self-contained in terms of air
supply for the diver and has an inbuilt capacity to regulate air pressure in accordance with the depth of
dive.
93. General. The characteristics of each sub-assembly of Self Contained Underwater Air Breathing
Apparatus (SCUBA) are as follow: -
(a) Full Facemask. The facemask should be with breathing valve assembly and have a positive
pressure (of at least 01 Mili Bar) inside. The mask should have provision to integrate with
‘Underwater Communication System’ (DUCS as well as WUCS) and should fit on the divers face
without any ingress of water. The straps should hold the mask in place even in strong current (2 -
3 knots).
182
(b) Octopus Assembly. An additional mouth piece with associated demand valve should be
provided for use in emergency in case air supply to facemask fails or for use by the buddy diver.
(c) Cylinder Pack assembly. Compressed air cylinder pack with neck fitting of control valve
should be provided and pressure gauge should be mentioned along with cylinder pack
assembly.
(d) Harness The Harness basic structure should be comfortable to wear and should have provision
for mounting air cylinders and other accessories on the set. Harness to have adjustable straps and
belt so as to make a snug fit and ensure hands free movement of the diver.
(e) Regulator Assembly A pressure compensated regulator unit should be with first stage reducer
assembly to convert cylinder HP pressure to low pressure.
(f) Buoyancy Control Device (BCD). A BCD associated to the set shall be fitted with inflation
option through main cylinders, separate cylinder and mouthpiece. Deflation should be through
a corrugated hose fastened with a Velcro in a direction that does not disturb the diver. Emergency
whistle and pockets/ recess for detachable weight should be available. Additional demand valve
with ergonomic safe grip mouthpiece for use by diver / buddy in an emergency should be inbuilt
in the BCD. The BCD should have a suitable arrangement for fitment of cylinders in case the
harness in not being used.
(g) Tool Kit. The diving set test and tool kit for the periodical maintenance and testing of the Divers
Harness
94. Environmental Conditions. The entire equipment should be suited for Indian Weather Conditions
and not require any environment control for stowage.
183
(a) Specified hub for maintenance. All the items should afford easy for a specified hub for maintenance,
by replacement of consumable spare parts or by way of replacement with new items. The supplier/
OEM are required to recommend a list of onsite spares. The equipment should be supplied along with
special tool kit and test equipment as required for the same.
(b) Product Support. The OEM/ supplier should support each item of the equipment supplied, for a period
of its life span. Any obsolescence of the component/ spare/ item need to be intimated by the firm, well
in time, to enable stocking of spares by the NDRF. The firm should also recommend/ offer suitable
substitutes/ replacement for such components. In addition, up-gradation/ modification to the equipment,
resulting in enhancement in the performance should be intimated and offered to the NDRF. The firm
should also indicate their willingness to undertake AMC/ periodic maintenance (which would be separate
contract on expiry of the warranty period) either directly or their authorized Reps in India.
187
SPECIFICATIONS FOR ACCESSORIES FOR DIVING EQUIPMENT
Purpose.
(a) The requirement of diving accessories is to provide safety to a Diver while undertaking a diving
operation and to assist the diver to undertake the task in a safe and hazard-free manner.
(b) A diver is required to be comfortable in swimming underwater after donning this equipment along
with a diving set so that he does not lose energy to struggle in water.
2. Regulation/Standards.
3. Functionality. The equipment should be capable of being used by a diver underwater during a diving
operation and free swimming. The role of each item should be as per characteristics enumerated along
with the description/main features.
4. The item enumerated in the succeeding paragraphs are accessories used by a diver to enhance his
efficiency during a diving operation and when carrying out free swimming. The diving accessories must
meet the under mentioned requirements:-
(a)Should be suited for tropical climate and not require temperature / environment controlled stowage.
(b) Should not require any special chemical agents for cleaning/ after use routine washing.
(c) Should be rugged / break resistant and suitable rough use for diving operation.
5.
(j) Snorkel Tube To enable the diverto (i) The snorkel comprise of a silicon tubewith
breathe while — a soft comfortable mouth piece to enable a
carrying out surface diver to breathe whilst swimming just below
swimming with swim the water surface. Also, a provision to attach
mask the snorkel to the swim mask.
****
PICTURE OF EQUIPMENT
192
Appendix- ‘A’
SPECIFICATION OF DIVE COMPUTER
1. The dive computer should be water proof chronometer and should be able to monitor diver’s depth,
duration of dive and movement underwater using a series of algorithms.
2. It should facilitate the diver to keep track of your surface-interval duration and to plan the next dive
and should be of non-magnetic material
3. The dive computer should comply with EU standards EN250:2000 and EN13319:2000.
Additionally the key features of the dive computer should include following specifications:-
Sl. Specification Remarks
(a) Display Full color 2.2” QVGA LCD with always on LED backlight
(b) Pressure ( depth) sensor Piezo-resistive
(c) Calibrated Range 0 Bar to 10 Bar
(d) Accuracy +/-20 mBar( at surface)
+/-100 mBar( at 10 bar)
(e) Depth Certification 100 mtrs
(f) Surface Pressure Range 500 mBar to 1040 mBar
(g) Minimum Depth of Dive 1 m of sea water
(h) Operating temperature range +4 ºC to +32ºC
(j) Battery and Battery Operating Rechargeable and commercially off the shelf available
Life The battery should function for a period of minimum 24
Hours in 1 charge
(k) Compass Resolution and 1º/35 º
Accuracy
(l) Compass Tilt Compensation Yes, essential to compensate for any roll and pitch
(m) Dive Log Capacity Approximately 1000 hours
(n) Weight Should be less than 200 gms
(p) Size of the Dive Computer Befitting for individual usage on the wrist; allowing the
diver in free operation.
(q) Additional Facility Strap should have an additional locking facility
193
92. PORTABLE AIR COMPRESSOR MACHINE
Sl. TECHNICAL SPECIFICATION PICTURE OF EQUIPMENT
1. OBJECTIVE
Portable BA Compressor is required for thepurpose
of refilling BA cylinders (300 Bar) for firefighting
as well as underwater BA cylinders(200 Bar) for
use by NDRFs. The set should to
capable to fill 300 bar (10% maximum efficiency).
2. MAIN COMPONENTS OF EQUIPMENT
i) Standard 300 Bar DIN adaptors for charging fire
fighting BA cylinder and 200 Bar INT adopter for
refilling under water diving BA cylinder.
ii) Immediate and final pressure safety valves and
pressure gauges.
iii) Two charging hoses (one each with adopter for
200 & 300 bar) for refilling the cylinder one at a
time.
iv) Repair Kit / Tool Kit.
v) The compressor should be Trolley mounted
having sufficient road clearance and wheels locking
arrangements so as to avoid movement
while during operations.
3. GENERAL DIMENSIONS:-
i) The set should be lightweight, rugged & trans- portable (with lockable wheels) &
weight up to 175 kg.
ii) Operating Pressure 300 to 200 bar and should be able to fill cylinders at 300 bar as
well as 200 bar ( or any pressure between 300 to 200 bar) by simply selecting/ setting the
pressure setting on a pressure switch on the compressor.
iii) Charging rate to be 9 cfm( +/-5%) for standard international filling norm.
4. GENERAL FEATURES :-
i) To be compact, robust, machine should not require any foundation.
ii) Design should ensure minimum wearing of components and case of maintenance.
iii) The compressor should be oil lubricated using Splash or Pumped lubrication.
iv) Filtration system should be at intake and at final point of use to ensure highest level
of purity of air delivered and to ensure that the quality of breathing air is as per EN 12021
or CGA-E or any equivalent international Standard for Breathing Air. The firm should
furnish test certificate from Govt. Approved/ international or equivalent.
v) Provision for full range of automated control devices to monitor both compressor and
working conditions should be provided. The compressor should have noise level up to 85
dB at 1m distance. The control panel on the compressor should have the START, STOP
and EMERGENCY STOP button. The panel should have pressure switch where the user
can select level of pressure at which he wants to fill the cylinders. The compressor should
stop when desired pressure is reached i.e. the compressor should have the feature of AUTO
STOP. The compressor should also have feature of AUTO DRAIN of the moisture in the
system and it should get drained at regular intervals. The disposal of the drain should be
pollution free in a tank. The compressor should have inter stage control device and final
stage Pressure gauge for the operator to monitor. The compressor should
also have OIL LEVEL INDICATOR.
vi) Eco friendly condensate collection.
vii) Construction to be of modular type.
194
viii) Machine should be electric driven suitable for 3 phase 400-440 V 50 HZ supply.
5. SAFETY FEATURES
The equipment must have adequate safety features to ensure complete safety during
handling.
6. SPARES
i) Each compressor to be supplied with Spares parts including Two Sets of filter
cartridges and one oil refill.
ii) List of one year on Board Spares to be provided.
iii) List of five year spares to be provided.
7. DOCUMENTATION
i) General arrangement drawing giving overall and all important dimensions with
sufficient details so that all standard equipment can be identified.
ii) Operational Manual giving details of maintenance and repair instructions.
iii) Test and trial report, if any along with inspections certificate.
8. STATUS
The present status of the system ( that is, whether it is in service in the firm’s country, or
is in the service abroad, or is at developmental stage) be stated.
9. MTBF & MTTR
Mean Time between Failures and Mean Time to Repair figures of the system, as also its
major sub units are to be stated.
10. COMMISSIONING
The compressor are to be commissioned by the competent at site and also provide
training on use, operation, maintenance, trouble shooting to the users.
11. PRESENTATION
Firm is to furnish preservation procedure of the compressor set, if any.
195
93. HIGH PRESSURE BREATHING AIR COMPRESSORS
TECHNICAL SPECIFICATIONS
PART-I
1. Purpose. The Portable High Pressure Breathing Air Compressor is required for charging of Air diving
Sets and storage cylinders with Breathing Air to support diving operations.
2. Functionality. The equipment should be Man-Portable and capable of charging High Pressure Breathing
air cylinders upto a working pressure of 300 bars.
PART II
4. General Dimensions.
(a) The compressor should be a completely assembled unit with Compressor and Diesel engine
mounted on the same base frame.
(b) Space constraints: Ease of operation and maintenance is to be ensured while designing the
layout of the system components. The limiting dimensions for the equipment are as under and
the supplier is to indicate the parameters in the following format: -
196
5. General Features/characteristics:- The general characteristics should be as follows:-
(a) Design should be such that there is minimum wearing of components for ease of maintenance.
(b) Lubrication system should be such that air being pumped is totally safe from contamination.
No hand priming of the lubrication system is to be required.
(c) Filtration should take place throughout the system, at intake, during compression and at final
point of use to ensure highest levels of purity of gas delivered.
(d) Eco friendly condensate collection.
(e) To be user friendly for operation and maintenance.
6. Safety Features:-
(a) No running parts should be exposed.
(b) Pressure relief valves to be provided for each stage.
(c) Every reasonable and practical effort shall be made to minimize equipment noise through sub-
assembly and component design. All parts of the equipment and accessories are to be designed
to ensure resistance to fracture distortion or misalignment due to forces of vibration.
(d) Suitable change over arrangement should be made for the compressor to deliver output pressure
equal to the test pressure, for pressure testing of the system piping after installation/ periodic
repair/testing.
7. Environmental Conditions:- The equipment should not require a controlled environment for
stowage and should bear temperature ranges of +5 to 45 °C and 90% humidity. It should withstand air
contamination through oil, salt and other contaminants.
8. Purity of air quality:- As per international standards conforming to DIN 3188/BIS/EN or equivalent
standards. The air purity standards required for discharged air are as follows: -
(i) Odour - Nil
(ii) Carbon Dioxide - less than 500 ppm
(iii) Carbon Monoxide - less than 10 ppm
(iv) Oil Contents - less than 0.0015 mg/its
(b) Equipment parts list with vendor part numbers for all spares including recommended Base &
Depot spare list for one year.
(c) Arrangement drawings.
(d) Paper particular, company part numbers with description of all components of the equipment is
to be provided.
197
PART III
MAINTENANCE
(a) On Board Maintenance:- All the items should afford easy maintenance, by replacement of
consumable spare parts or by way of replacement with new items. The equipment should be
supplied along with special tool kit and test equipment as required for the same.
(b) Base and Depot Spares/ Stocking:- Manufacturers Recommended List (MRL) of Base and
Depot (B & D) spares and On Board Spares (OBS) must be provided with cost. Adequacy and
continued availability of spares/ replacement of the item (depending upon the life span) must
be ensured prior to placement of orders for this equipment.
(d) Product Support:- The OEM/ supplier should support each item of the equipment supplied, for
a period of its life span. Any obsolescence of the component/ spare/ item needs to be intimated
by the firm, well in time, to enable stocking of spares by the NDRF. The firm should also
recommend/ offer suitable substitutes/ replacement for such components. In addition, up-
gradation/ modification to the equipment, resulting in enhancement in the performance should
be intimated and offered to the NDRF.
(e) AMC:- The firm should also indicate their willingness to undertake AMC (which would be
separate contract on expiry of the warranty period) either directly or through their authorized
Reps in India.
11. Testing Procedures:- The equipment should adhere to the environmental test conditions & proof
thereof as per International standards. The supplier should agree to trials of the equipment by the NDRF at
'No Cost No Commitment ' basis. All relevant certificates relating to HP pipes, valves, gauges, purifier
cartridge and air sample report from a Govt./ International recognised agency must be submitted.
**********
198
94. UNDER WATER COMMUNICATION SET
6. Technical Specification:
(a) Weight of Diver Unit Less than 1 Kg + 10%
(b) Diver Unit pressure compensated 10 mtrs+ 10%
(c) Weight of Surface panel 6 Kgs+ 10 %
7. Documentation - Operational and technical manual should be supplied with the equipment.
199
95. UNDER WATER VIDEO CAMERA
1. ROLE: For use during diving operations for high quality underwater imagerecording.
2. MAIN COMPONENTS OF VIDEO CAMERA: The Video System being offered
should have following component:-
a) Under water colour Video camera.
b) Surface Camera Control unit with video colour monitor
c) LEDs
d) Camera Mounting Brackets
e) Umbilical
f) Digital Video recorder
g) Tool kit
3. a) Video camera should work up to depth of 10 meters in water.
b) Weight of the Video Camera (excluding surface unit) should not be more than
700 gms.
c) Umbilical- Outer covering of umbilical should be abrasion resistant.
d) Length of the Umbilical should not be less than 50 meters.
e) Cable should rugged, neutrally
4. GENERAL SPECIFICATIONS/ CHARACTERISTICS:-
a) The video system should have built in digital video recording system,
b) The system should have in built power back up for at least 1 hour
5. Temperature Range- The Video Camera should operate between temperature
ranges of 400 - 500C .
6. DOCUMENTATION: - Operational and technical manual should be supplied with the
eqpt.
PICTURE OF EQUIPMENT
200
96. UNDER WATER TORCH
201
FWR (06 ITEMS)
1. Scope:
This specification relates to the detailed requirements for the design, construction, tests & trials,
documentation and warranty of 4.7m RIBs, intended for NDRF.
2. Declaration of Conformity. The boat builder shall build the boat in accordance with the requirements
brought out in this specification and provide a ‘Declaration on Conformity’ with each boat. The declaration
should also contain details of all test methodologies and test results, results of laboratory analyses, factory
tests on the completed hull, as well as report on the water trials of completed boats. Boat builder shall also
submit compliance matrix indicating Para-wise compliance of this specification along with technical bid.
3. Principal Particulars.
202
g) Economical speed : 6-8 knots under full load
Under full load Condition
Condition
h) Endurance : Not less than 8 hrs. at economical speed and at
full load condition
203
(a) Location of yard.
(b) Last inspection details of the yard.
(c) Validity period of yard certificate.
(d) Capacity and Capability assessment details
(e) Authorization of yard for manufacturing GRP powered boats.
(f) Certification in conformity with classification society Rules and Regulations
9. Inspection, Test & Trials
The boat shall be built under supervision of IRS Class and all the inspections, test and trials are to be carried out
in accordance with class rules and regulations for High speed crafts, Light crafts in GRP / composite construction.
10. Materials
(a) All the materials, workmanship and finish shall be as per international boat building standards and to the
satisfaction of NDRF /IRS. Necessary test reports & specifications of the raw materials/fittings etc. used in the
construction of the boat shall be produced by the Builder.
(b) All the GRP raw materials and hull fittings are to be procured only from classification society approved
manufacturers. Greatest care is to be taken that laminating methods as well as procedures such as bonding and
overlapping conform to practices laid down by classification society
(c) All steel deck fittings shall be of Stainless Steel grade AISI 316. Material test certificates shall be provided
to Inspecting Agency. All forged fittings and the castings shall conform to relevant recognized International/ IS
standards specified in the class rules. The finish of all fittings should be of excellent quality. Stainless Steel (AISI
316) backing plates shall be provided for all deck fittings.
(d) Necessary test reports & specifications of the raw materials/fittings etc used in the construction of the boat
shall be approved by Classification society.
(e) The names and addresses of the firms from whom it is proposed to order/subcontract for various
material/fittings are to be made available to the Inspecting Authority/NDRF and Inspecting Agency, during
inspection. Complete details of the source of each fittings including contact details shall be indicated in Boat
Manual.
(a) The Builder is to keep in mind continuously the fact that, economy of weight and space is of utmost
importance. An actual and accurate weight record of hull structure, fittings, machinery, equipment, accessories
etc shall be forwarded to NDRF/ Class Society along with detail weight, stability and trim calculations through
Inspecting agency after verification.
(b)The lines-plan and off-set tables extracted from the proven/ offered hull design are to be faired to full scale in
mould loft or using suitable Ship Design software. The faired offsets shall be used for the manufacture of plug
after approval from classification society and plug inspection to be witnessed by IRS.
12 Basic GRP Laminate, Tests
Hull and other structural members of the boat shall be manufactured as per the Structural Drawings and Lay-Up
Scheme approved by IRS Classification Society. Glass reinforcement shall be low alkali E type glass and the resin
shall be of unsaturated isopthalic polyester type and shall meet the test requirements as mentioned in latestISO/
BS/ equivalent specifications specified in the relevant class rules. The sample laminate drawn from the hull shall
be tested at a Classification Society/NABL accredited laboratory to relevant standards in presence of Class
surveyor.
13 Inflatable Collar
(a) Inflatable collar of 450 to 500 mm in diameter made of Hypalon (outer layers) and neoprene fabric (inner
layers) composite with1500 GSM and 1670 D-Tex as per ISO 15732, IRS type approved is to be provided. The
inflatable collar shall be subdivided into five in number separate airtight compartments. Each of these
compartments shall be individually inflatable /deflatable, and fitted with air filling and relief valve. The five
compartments of the collar are to be formed by six stern facing conical diaphragms, bonded to the inner surface
of the collar skin. The four internal diaphragms shall be moulded to a minimum of 25mm diameter ends
204
whereas two end diaphragms at the stern (1 each side) shall be moulded to a minimum of 75 mm diameter ends.
End cones are to be suitably stiffened to take impact during astern motion. The tube shall be fitted with heavy-
duty abrasion cladding on the outboard side all around the boat. The Collar should have an additional fendering
layer at locations likely to encounter repeated bashing/rubbing and stepping by personnel and crew.
(b) The collar shall be attached to the hull using Primary and secondary securing arrangement. The primary
arrangement should ensure rigid connection of the inflatable collar to the hull and ensure water tightness between
the collar and hull. However the arrangement should be such that the collar can be disconnected when required
for necessary repairs. Secondary arrangement of securing collar to the boat should be of suitable number of
polyester webbing reinforced straps on to the hull. The securing arrangement should be approved by the
Classification Society as per the class requirements.
(c) The collar shall serve the dual purpose of providing necessary soft fendering action against impact/abrasion
and additional buoyancy to the boat. A heavy duty cladding work shall be made all around the collar.
14. Mandatory Fitment on the Collar.
The collar should be suitably fitted out to withstand the wear and tear due to usage. Towards this, the collar shall
be provided with rubbing strake (rub strip/wear strip) of vinyl /urethane, 8 inch wide (203mm) with raised ribs.
These rubbing strips should be doubled, tripled, quadrupled, etc. to fully protect outside surface of collar in critical
wear areas. Life lines should be attached to the collar D-rings, grommet strips, or fabric loops. Anti-skid coating
of black urethane with anti-slip features should be provided at essential areas.
15. Additional Hull Fittings on Inflatable Collar.
A removable 12mm braided black polypropylene rope covering shall be provided all around the collar as standard
fitment additional to life lines. A drogue type closing fairlead (Material: AISI 316) shall be bonded to the bow
section of the collar. Twelve molded handholds shall be bonded to the upper surfaces of the collar. Additionally,
following items/ fittings also shall be fitted on hull/ Bulwark at suitable location:-
a. 2 Paddle blade pockets.
b. 1 Sea anchor bucket
c. 2 Paddle handle pockets
d. 1 Drogue type fair lead
e. 2 Rope stowage pockets
f. 2 Fairleads near transom (stbd& port)
g. 1 Bow ring
h. 2 Oar locks (each side)
i. OBS of Collar:
(i) Inflation/ Deflation Values - 05 Nos
(ii) Pressure gauge - 01 No
(iii) Election Inflation pump - 01 No
(iv) Inflation Foot Pump (Reputed make) - 02 Nos
Patching material with adhesive- to repair
Damage/leak in buoyancy
205
(b) The construction and fitment of console should comply with latest and relevant IP/ IEC standards as specified
in the class rules. All electrical installations, instrumentations and batteries shall be housed inside the console as
per marine standards. The coxswain shall operate the boat from a seated position. The field of vision from the
main helm position shall conform to the requirements of ISO 11591.
(c) A locker space shall be provided under the console with weatherproof inspection hatches for access to the
batteries and for general stowage of foot operated air pump, loose gear etc.
(d) A navigational compass of reputed make shall be fitted on top of the console in a suitable position for the
coxswain use.
18. Deck
(a) The deck shall be of integral closed hull-deck assembly constructed as per classification society rules with
PVC/PUF foam encapsulated FRP construction. A heavy duty washable Anti-Skid Mat of marine standard be
fastened/ pasted on top of deck floor. An ‘Engine well/ Bilge Sump’ shall be made below the OBM mount.
Additionally, a watertight ‘Battery Compartment’ shall be made beneath deck, if batteries cannot be housed
inside command console.
19. Transom
The transom shall be constructed as integral closed hull-deck-transom assembly with OBM mount. Transom
attachment to the boat shall be designed to withstand, the maximum stresses arising from the output power and
torque of the OBM specified by the manufacturer and the weight of such OBM in sea states upto 5. The height of
the transom should be adequate so as to prevent ingress of water from stern during astern motion.
20. Painting
External surfaces of the boat shall not be painted but the gel coat shall be pigmented with reddish orange highly
visible color
All GRP surfaces inside the hull shall be coated with a layer of tissue mat and coated with gel coat pigmented to
orange.
21. Equipment & Fittings
(a) The boat shall be supplied with Standard Equipment and Fittings as per listing given down below and other
additional equipment/fittings mentioned in this specification. All equipment/fittings shall be of reputed make
designed for marine use.
22 Anchor. A CQR anchor weighing 18 lbs shall be stowed on the foredeck. The anchor shall be connected to a
27m of 12 mm dia Nylon rope, stowed on special hinged horns.
23 Bollards and Fairleads. A drogue type closing fairlead shall be bonded to the bow section of the collar.
Appropriate sized bollards made of Stainless Steel AISI 316 shall be fitted to the centre of the forward deck (one
no.) and at the stern (Two nos.). One pair of appropriate sized fairleads made of Stainless Steel AISI 316 shall be
secured to the transom, one to either side of the OBM transom housing.
24 Seating. The helmsman seat shall be for three persons and padded, raised back pillion type. The seating
arrangement with suitable foot holding straps should be provided for balance 06 more persons onboard.
25 Grab rails and Foot straps. Every seat position shall be provided with suitably located handholds
and foot straps. A stainless steel grab rail shall be positioned along fore and aft centerline of the crew seating,
further two grab rails shall be mounted on the console, at forward and at sides.
26. Mast and Navigation Lights. A mast–head light and a combined sidelights for Port and starboard of relevant
IP standards shall be mounted on a Goal Post Mast (SS 316) fitted at an appropriate location. A stern light shall
be fitted as far aft as possible.
27 Life Saving/Rescue. The following lifesaving equipment shall be provided (All stowed in a wooden
box, secured to Deck at suitable position):-
One throwing quoits, complete with buoyant line.
One first aid kit.
206
28. A manually operated fire extinguisher shall be secured on the side of the helmsman seat.
29. A boat hook shall be provided made of white cedar with Stainless Steel (AISI 316) end hook.
30. All fittings/ items/equipment mentioned in this specification, whether it is fabricated by means of ‘Yard
Supply’ items, or it is procured/ imported from Classification Society approved manufacturers, they should be
of marine quality and the builder is to provide the details regarding source of procurement and the confirmation
of it meeting marine quality requirement along with technical bid.
31. Cradle. One Cradle of Admiralty pattern shall be supplied with the boat
32. Machinery Requirement
(a) The builder shall be responsible for installation of the main propulsion units in accordance with classification
society rules and regulations of High Speed, Light Craft fitted with outboard engines in GRP composite
construction promulgated by IRS Classification Society and meeting the recommendations of engine OEM.
(b) Engine. The boat shall be powered by a standard outboard motor of 40 HP 4 Stroke “M/s Yamaha” OR “M/s
Mariner” OR “M/s Mercury” make or any reputed Brand having service support set-up in India. The OBM shall
be provided with fresh water flushing arrangement & power trim & tilt arrangement. The following aspects are
mandatory for starting/ stopping of engine:-
a. Starting.
i. Both remote and local manual starting arrangements should be provided.
ii.Where there is only electric start, there must be a dual-redundancy starting system with
cross connection. An electric starting system could provide cross-connection to an
appropriately specified secondary battery. This battery need not be dedicated, but must
remain charged at all times.
iii. An over-ride capability must be present, if the Engine stop cord/ switch is accidentally
operated, resulting in engine shut down at a critical moment, such as in big surf.
b. Stopping. Instrumentation of OBM should include an “Emergency Stop switch’ and
a Deadman Switch’.
Engine OBS: Following Engine OBS to be provided.
207
(c) Fuel System.
The engine shall draw fuel from fixed fuel tank of sufficient capacity to meet the endurance requirements
specified in this specification.
The fuel tank shall be constructed of Stainless Steel (AISI 316) and of the size to meet the specified endurance.
The tank shall be fitted beneath the deck. The tank shall be provided with cover plate for cleaning. A calibrated
dipstick shall also be provided which shall be stowed on top of this tank. Fuel water separator to be provided
between fuel tank and OBM.
(c) NUC and Special Ops Lights - both supplied through a common
circuit breaker of suitable rating to the
NUC and SO sockets for
temporary lighting.
42. Identification Tallies. Identification tallies in English engraved on quality melamine plastic laminates
shall be fitted adjacent to following:-
a. Principal electrical outlets.
b. Switches at console
c. Instruments at console.
43. All electrical equipment/fittings are to be of class approved/ COTS. Navigational lights to be fitted are
to be IMO / MMD certified / cleared.
44. Lifting Arrangement
(a) The boat shall be fitted with/ suitable four point lifting arrangement. A four-leg polyester
webbing sling to be supplied along with the boat. The sling is to be shackled to these slinging points
by bow screw shackles. The bolts of these shackles shall be moussed to prevent them working loose.
The sling shall have a safe working load of 1.5 tonnes and an in-use life of two years without any
load testing requirement during this period, from the date of supply. The sling is designed to place
the RIB horizontally in the water. The builder should provide load test certificate for the sling set to
twice the Safe Working Load.
45. Strong Points. All Strong points designed and fitted for towing, anchoring, mooring etc. shall be
fastened permanently to its position and tested with reference to ISO 15084, Small craft – Anchoring mooring
and towing, strong points (or relevant standards promulgated by any classification society).
46. Drawing & Documents
Once the order has been placed for the boats, the firm could progress with ordering of long lead items,
equipment, machinery and fittings. But no construction shall commence until the drawings and
documentations are scrutinized and approved by Classification Society IRS for its compliance with class
rules and the requirements of this specification
47. As Fitted Drawings/Documents. On successful completion of all tests/trials and prior to the delivery of
the boat, the builder shall supply all the drawings approved by classification society, and in addition, supply
following instruction and maintenance manuals of all fitted equipment to NDRF/Inspecting
agency/Consignee.
209
One set of technical documents of OBM, its associated accessories and pumps be forwarded to NDRF
prior to the PDI. The technical documents/manuals should include the following:-
i. Technical description.
ii. System Drawings.
iii. Operation Manual
iv. Maintenance and Workshop Manuals
Parts Catalogue. Both hard and soft copy of parts catalogue be provided.
48. Boat hand book. Containing brief description of all features of the boat and its photographs from
various angels. This should cover following in brief:-
a Functions
b Identity
c Speed
d Endurance
e Displacement
f Draught corresponding to displacements
g Principal Dimension
h Environmental limitation
i Manning requirement
j Carrying capacity
k Brief description of lifting arrangement and precautions to be observed
by the user.
l Safety equipment provided
m Fuel and coolants to be used as recommended by OEMs
n List of principle drawings and documents
o Brief operating instructions on OBM
p Parameters of stability
q Collar fitment and Removal Instructions
r Care and maintenance of collar (including sources and technical details of
collar material)
49. Operation manuals of OBM. The operation manuals shall consist of the following :-
a Introduction
b Operating information
(aa) Normal operation and limiting values
(ab) Operation under special conditions
(ac) Break down and emergency repairs
(ad) Fault finding
(ae) Performance & test data
c. Technical Description
(aa) Construction detail
(ab) Setting to work
(ac) List of non-repairable items
(d) Maintenance and Workshop manuals of OBM. This must include following
:-
a. Preventive and corrective maintenance
b. Procedure/Guidelines to carry out maintenance which is to include Top
Overhaul/ Major Overhaul
c. Performance and other fault location
d Weight and dimension for lifting purpose
e Maintenance tree
210
f Special tools
g Reclamation procedure for worn-out or damaged parts
Alignment procedure
Any special instruction
h Parts catalogue for OBM.
50. Report of Tests and Trials. All tests and trials carried out by the IRS are to be compiled into a book
form and a copy of same is to be forwarded to the consignee along with the boat with a copy to NDRF.
51. Tests & Trials
A programme of tests and trials as per Class requirements shall be prepared by the Builder. On completion
of each test and trials detailed reports of the tests and trials carried out are to be forwarded to NDRF duly
endorsed by IRS.
On satisfactory completion of the trials, detailed reports in bound copy shall be forwarded by the Builder to
NDRF for every boat separately. Reports shall also include proposals (if any) to improve the performance of
the boat and if these are minor in nature, the Builder shall carryout such modifications at no extra cost.
Authority for re-ordering trials rests with NDRF if satisfactory results are not achieved and the Builder
shall comply with such directives as and when issued within the contracted delivery period.
52. Training
Boat builder should provide free training on operation and first line / second line maintenance to two
officers and six other ranks. Training shall be conducted with infrastructure by OEMs at the location of
consignee specified by NDRF and should be in English Language. Training may be conducted in
conjunction with boat construction and acceptance trials.
53. Warranty
The boat(s) supplied against this specification be deemed to bear a warranty of the boat builder against
defective material, equipment, machinery, workmanship and performance for a period of 24 months from
the date of receipt of boat by the consignee. If during this period the boat, its material, machinery or
equipment supplied are found by the consignee or ultimate consignee to be defective/substandard, the
same shall be replaced/repaired within a period of 15 days from reporting, free of charges at site
(anywhere in India) by the boat builder. In case the reported warrantee defect is not rectified within 15
days, the total delay caused in rectification will be added to the Warrantee period.
54. Product Support
All the equipment and machinery fitted onboard should have indigenous product supportability by the
OEM or its authorized reps for a minimum period of 12 years from the date of supply of the boat. The
certificate of the same from the OEM shall be attached along with the technical bid.
STANDARD EQUIPMENT AND FITTINGS
Qty Item
1 Bollard (fwd)
2 Mooring cleats (aft)
2 Stern fairlead (fitted on transom)
2 Mooring warps
1 Calibrated fuel tank dipstick
1 Fuel filler cap with key
1 Bow Fairlead (fitted on collar)
2 Stern fairlead (fitted on collar)
3 Negro Head Bollard (positioned corresponding to fair leads)
4 Navigation lights and white streaming light (Aqua signal
series 25)
1 Set Lifting eye plates
1 Goal Post Mast Support Frame
211
1 Sea Anchor, Stowage bucket, deck eye and line
1 Towing eye ‘U’ bolt through stem
2 Paddles made of white cedar with stowage
2 Boat Hooks with stowage
2 Box stowage
1 set Anchor chocks (to suit supplied 18 lbs CQR anchor)
1 set Canvas covering on all handrails
1 set Point Lifting Slings (Webbing)
2 Mooring rope stowage (collar mounted)
1 Semi Rotary hand pump of capacity 1000 ltrs/hr.
1 Instrument panel spray cover – PVC/Celluloid
1 Battery charger
2 Watertight plug and socket (NUC) and special Ops light
2 Identification plates
1 set Tallies
1 Collar repair kit
1 Anchor CQR type 18 lbs with stowage
27 m Anchor cable 12 mm with stowage
2 One of 1.4 Kg BCF and one of CO2 Fire extinguisher with
stowage
1 Hand signalling lamp with stowage
1 Compass with stowage
1 First aid kit with stowage
10 Life jackets with stowage
1 Stowage box for 6 hand flares
1 Portable search light
1 Set Special tools for overhaul of engine/whistle
1 Electric fog horn
1 Effective radar reflector
2 Maintenance free sealed batteries, 12V, 100AH
1 Aldis Lamp
1 set canvas cover for the boat
1 Cradle
1 FRP repair kit
Additional Fittings on Collar as mentioned
Lifesaving/ Rescue kits as mentioned
Tools and Tool Box as mentioned
212
99. INFLATABLE MOTOR RESCUE BOAT SMALL WITH OBM ( 10 seated)
1. SCOPE:
This specification relates to the detailed requirements for the design, construction, tests & trials, documentation
and warranty of 4.5m Inflatable Boats, intended for NDRF.
2. FUNCTIONS:
3. PRINCIPAL PARTICULARS:-
(a) Length exterior – Not less than 4500 mm
(b) Breadth exterior – Not less than 1960 mm
(c) Length interior - min. 3200 mm
(d) Breadth interior – min. 1000 mm
(e) Dia. of Buoyancy Tube - Not less than 480 mm
(f) Carrying Capacity – 10 men (82.5 Kg per person)
(g) Weight of the craft – Not more than 90 kg for boat &
Not more than 40 Kg for the floor boat & accessories
(Without OBM)
3.2 The craft shall be built of Buoyancy Tube made of Composite Fabric consisting of Hypalon (outer layers) and
Neoprene (inner layers) of 1670 Dtex or equivalent, inspected by IRS as per ISO 15372. The bottom floor of the
boat shall be made of the same fabric as buoyancy tube. Reinforcement of the boat shall be provided using
rubberized strips of Hypalon (outer layer) and Neoprene fabric (inner layer). The stern of the boat formed by a
transom shall be made of Marine Plywood on which OBM can be mounted.
5.9 Special attention shall be paid to the attachment of the floor to the buoyancy tube to ensure that the resulting
joint is water tight. Special care is also to be taken that the floor is perfectly taut and smooth and has no
puckers, when the craft is assembled and ready for use.
Self-Bailers/Drain Valves
5.10 Two self-bailers akin to NRV shall be located on the lowermost part of the transom board near the rear end
fitment of the keel close to the center line. The same shall be provided with a flexible flap to overcome
pressure on the NRV in following seas. The self-bailers shall automatically remove water from the craft at
higher speeds.
Transom
5.11 The transom board shall be fitted and securely bonded to the buoyancy tube and the floor so as to provide a
water tight joint. The Transom shall be designed for use with 30 HP OBM. The transom shall be made of
marine plywood coated with FRP/GRP of appropriate thickness and to be suitably fitted out with engine
mount made of marine grade Aluminum alloy plate and chafing patch. Hypalon coated fabric shall be
pasted on the surface area of the transom to prevent it from damage as well as loosening from the tube body.
Separate strip of suitable size shall be provided on the bottom of the transom to minimize chance of damage.
Details regarding craft identification No. etc. shall be engraved on a builder’s plate fitted on the inner side
of the transom on starboard side. Towing rings, cleat and ‘U’ bracket shall be provided as per approved
drawing.
Floor Boards.
5.12 The Floor boards shall be made of High Strength Tempered Anodized marine grade Aluminum alloy with a
non-skid finish. These boards (Four/Five pieces) shall be interconnected together to form a rigid platform.
The forward/bow piece of floorboard may be made of marine plywood (IS 710) coated with FRP lamination.
Alternatively, Floorboard can be made of High Strength Tempered Anodized marine grade Aluminum alloy
roll-up floor with a non skid finish on top to form a rigid platform.
Keel
5.13 The boat shall be provided with inflatable keel of suitable size to provide the rigidity & stability during
operation of boat.
Stowage Pockets.
5.14 Minimum One Stowage pockets shall be attached to the buoyancy tube in the forward in board side. The
stowage pockets provided shall be capable of holding dynamic weight of 6 Kgs. Holes are to be provided
at the bottom of the pocket to drain water (Size 340mm x 280mm x 90mm).
Rubbing Strips..
5.15 Following single piece Rubbing Strips of moulded neoprene rubber of 2” width (where not mentioned) and
extending along the entire length shall be attached to the buoyancy tube for the protection of the craft:-
(a) Bow rubbing strip 4”.
(b) Outer anti chafing strip 100mm wide on both sides.
(c) Anti-Chafing Strip under Keel.
(d) Two Beaching Strips 100 mm wide under buoyancy tubes.
(e) Chafing patch for coxswain’s position
Carrying Handles.
5.16 Minimum Four Carrying handles shall be provided, two on each side and one front lifting handle. The handles
shall be suitably reinforced to take a weight of 300 kgs all together. The handles shall be of Moulded Neoprene
Rubber bonded to the buoyancy tubes.
Towing Fittings and Securing Arrangements.
5.17 Following Towing fittings shall be provided. Towing fittings shall consist of suitably sized D Shackle of SS
AISI 316(to pass towing rope) securely attached to fabric reinforcing patches bonded to the buoyancy
tube.
(a) Towing/ Lifting fittings, forward – One on either side of the craft, below the buoyancy tube at the
beginning forward curve in the buoyancy tube.
(b) Towing fittings, aft – One on either side on the transom, shall be used if craft is employed for towing
purposes.
(c) Load Test. The towing arrangement shall be load tested as per ISO 6185-3.
Oars & Oar Securing Assemblies.
5.18 Two nos. of oars to be provided. Oars shall be positioned parallel/30º to the vertical when secured inside
the inboard side of buoyancy tubes. Adequate securing arrangement shall be provided so that the oars are
intact.
Adhesive
6.2 The adhesive shall be Neoprene based contact adhesive of good quality and to be suitable for service in
tropical environments as per specification. The adhesive shall consist of a dispersion of polychloroprene in
a low boiling point solvent and may have additions of resins to promote building tack. The adhesive shall
consist of 2 components, Part 1 and Part 2, Part I being the basic neoprene dispersion and part 2, the
accelerator (hardener).
6.3 The adhesive should be approved by Classification Society for use on inflatable and meeting the minimum
requirements specified in ISO 6185-3 (2014).
6.4 Alternate adhesive superior in properties are also acceptable subject to type approval of Classification
Society as per ISO 6185-3(2014).
7. PRINCIPAL COMPONENTS OF BOAT
The principal components of the complete assembly are as follows:-
7.1 Hull
7.1.1 Buoyancy tube - Divided in minimum 04 compartments and complete with rubber conical flat ends.
7.1.2 Bulkheads –Dividing the buoyancy tube into min.4 compartments.
7.1.3 Inflation/deflation valves – one set per chamber.
7.1.4 Transom- fitted with engine mount, anti-chaff patch.
7.1.5 Floor - in proofed fabric
7.1.6 Keelson chafing strip – 1 No.
7.1.7 Aft chaffing strip – 1 No.
7.1.8 Inflatable Keel- 1 No.
7.2 Hull Fittings
(i) Bow Rubbing strip - 1 No.
(ii) Side Rubbing strip Aft - 1 set
(iii) Carrying Handles (Patch rubber with handle) - 4 Nos
(iv) Grab line - 1 set
(v) SS to AISI - 316 Hook on transom - 2 Nos
(vi) SS to AISI - 316 “D” rings - 2 Nos
(vii) Pockets for stowage - 1 Nos
(One for wireless set & one for inflation bellow pump)
(viii) Oars (Shall be light weight not more than 4Kgs and positively buoyant in water)
(ix) Repair Kit (small) – fabric patches 05, adhesive tube (Dendrite) 500 gm, roughing tool, spanners of
required sizes.
7.3 Valises and Store bags
(i) Heavy duty storage bag for Hull – 01 No.
(ii) Storage bag for oars & other accessories – 01 No
216
7.4 Additional Spares
(i) Inflation/ Deflation Valves - 10 Nos
(ii) Pressure gauge - 01 Nos
(iii) Plugs for Water Drain - 04 Nos
(iv) NRV for Water Drain - 10 Nos
(v) Electric Inflation pump - 01 No
(vi) Bellow Inflation Foot Pump - 02 Nos
(vii) Patching material with adhesive to repair leak/damage in buoyancy tube.
8. PRODUCTION.
8.1 Manufacturing of the craft should be as per the detailed drawings approved by Indian Register of Shipping
(IRS) and meeting the requirements mentioned in this specification. The production processes should also
be approved and supervised by the IRS.
Tolerance
8.2 General tolerances on all dimensions shall be ±1.5 mm unless otherwise specified in this specification or
approved by Classification Society. The exceptions to this general limit shall be in respect of stuck-on
components length of webbing and cordage, and the overall dimensions of components etc; these items shall
be given a sliding scale tolerance which increases in accordance with the magnitude of dimensions.
Production Damages
8.3 Any Production damage irrespective of size shall be repaired by complete part / panel replacement only. The
replacement is to undertaken by the contractor free of charge at the consignee place as soon as possible and
in any case not later than one month from the date of receipt of intimation.
8.4 No patch repair is permitted on buoyancy tube/ floor. In case of production damages only part/ Panel
Replacement shall be permitted.
8.5 Where a part panel replacement is necessary, the following parameters shall apply:
(i) On the buoyancy tubes, not more than one part panel replacement will be permitted on each craft.
(ii) On the floor not more than one part panel replacement will be permitted on each craft
9. RECORDS
9.1 The builder shall develop and maintain records that demonstrate the effective operation of his quality control
system and shall make these records available for review of the Inspecting agency. Inspection records shall
include explicit identification of the material, part sub-assembly, equipment, sub-system or system, the
nature and number of observations made, the number and type of deficiencies found the quantities approved
or rejected and the nature of the corrective action taken, as appropriate. Records shall be retained until
disposal is directed by the Inspector. The contractor shall furnish a copy of any record to the Inspector, on
request.
10. DRAWING & DOCUMENTS
10.1 Within one month of placement of order the builder shall submit the design and manufacturing drawings for
the approval of the Classification society. Construction of the craft is to commence only after the approval
of all drawings by Class. Drawing approval should include approval of Classification Society for component
level detailed production drawing required for manufacturing the craft.
10.2 As Fitted Drawings/Documents. On successful completion of all tests/trials and prior to the delivery of the
specific boat, the Builder shall supply to consignee two sets each of the following as fitted /as made drawings
and documents with the craft.
10.2.1 Buoyancy tubes
10.2.2 End cones of buoyancy tube
10.2.3 Floor and details of joint between floor and buoyancy tubes.
10.2.4 Transom with details of joint between transom, floor and buoyancy tube
10.2.5 Assembly drawings for keelson and floor board
10.2.6 Fitment details of each of fittings:-
217
(a) Inflation/Deflation valves
(b) Self bailers
(c) Rubbing Strips
(d) Carrying Handle
(e) Towing fittings,
(f) OBM attachment drawings illustrating Engine support.
(g) Fuel oil/L.O. system with storage provisions
10.3 The builder shall also supply soft copy of all the As Fitted /As Made drawings to the consignee.
11. INSPECTION.
11.1 The inspection authority for the boats will be Indian Register of Shipping (IRS). The complete inspection of
the craft as mentioned at Para 4 of this specification will be undertaken by Classification Society as per
approved QAP. Towards this builder will submit the draft QAP for the approval of Classification Society,
within one month of placement of order.
11.2 The cost of conducting tests and the material required for the purpose are to be borne by the builder. The
suitable OBM (30 HP) and POL for conducting trials shall be provided by the builder at the site of trials.
In case the builder premises does not have river front, the builder should transport the first craft to suitable
location in India (mainland) specified by the order placing authority.
12. USER ACCEPTANCE OF FIRST CRAFT OF EVERY ORDER
On successful completion and clearance post clearance from Classification Society, the first boat of the every
order will be subjected to extensive user trials covering all functional requirements as well as test & trials brought
out in this Specification. The trials shall be conducted jointly by Classification Society and Customer nominated
team. Deficiencies observed by the trial team w.r.t the requirements stipulated in this specification should be
liquidated by the builder at no extra cost. Subsequent crafts of the order shall be cleared by inspecting agency only
after liquidation of all deficiencies observed during user acceptance trials of first craft.
13. WARRANTY CLAUSE
13.1 The inflatable crafts supplied shall bear a warranty of the contractor, against defective material, workmanship
and performance for a period of 24 months from the date of receipt of the consignment of the stores. During
this period if any of the stores supplied found defective the same shall be replaced by the contractor free of
charge at the consignee place as soon as possible and in any case not later than one month from date of
receipt of intimation by the contractor. Delay in replacement /repair beyond one month shall invite penalty
@ 0.5% per week or part thereof of the cost of goods/stores/parts/assembly in question. In addition Inflatable
crafts should have manufacturers /builders warrantee for 05 years for the fabric used and 24 months for the
adhesion at joints, under normal exploitation
Dimensions
18.5 The dimensions of the craft shall be measured with the craft inflated and completely rigged.
18.6. The diameter of the buoyancy chambers shall be taken at 3 points along each parallel side. The width shall
be measured at the transom and at a point midship. The internal lengths shall be measured between a pump
line from inner one of the buoyancy tube to the bottom end of transom along the floorboards.
Air Inflation Tests
18.7 The under mentioned tests shall be carried out of the craft when completed with all fittings. During the tests
draughts shall be guarded against and the temperature shall be kept as constant as possible throughout the
test.
18.7.1 For every 1° Centigrade (1 degree Fahrenheit) rise above the temperature at commencement of
the test, 0.004 bar (0.058 PSI or 1.5 inch of water) is subtracted from the final pressure reading
and for every 1° Centigrade (1 degree Fahrenheit) fall in temperature 0.004 bar (0.058 PSI) shall
be added to the final pressure reading. If the temperature variation during the period of the test is
greater than 3.0° C the test is invalid and a further test shall be made under more constant
temperature conditions. Accurate thermometer readings shall be taken.
Inflation Test
Preliminary Inflation Tests
18.8 The whole of the buoyancy tube shall be inflated 1.2 times of nominal pressure defined by manufacturer
(but min. 2 PSI (55 inches of water) to pre-stretch the boat and left for 30 minutes. The pressure at the end
of this test shall not be noted, but craft examined for undue stretch or distortion.
Air tightness Pressure Test
18.9 The whole of the buoyancy tube shall be inflated to nominal pressure defined by manufacturer (but min.
0.14 kg/cm2 or 2 PSI) and left for 24 hrs., the pressure drop after correction for temp. change shall not be
greater than 20% in any compartment.
Bulkhead/Overpressure Test
18.10 Each Chamber of the buoyancy tube shall to be inflated to 1.5 times of nominal pressure defined by
manufacturer (but min. 3 PSI) with all other chambers remaining deflated and left for 30 minutes. No
damage or rupture shall occur. Fall in pressure corrected for change in temperature shall not to exceed
0.012 Kg/cm2 or 4.5 inch of water column.
18.11 The tests stipulated in 18.12 to 18.15 below shall be carried out in calm conditions in smooth water. Service
Floor Boards with additional 10 Kg weight shall be used for the tests.
Floatation Test
18.12 Each craft shall be inflated and assembled complete with keelson and bottom boards. It shall be floated in
water. A load of 825 Kg shall be distributed evenly over the floor boards and the craft left floating for 30
minutes. No leakage of water is to occur. Any defects found at the conclusion of this test shall be made
good by the builder.
Free Board
18.13 The free board of the vessel when floating fully inflated in calm water and loaded with a test load of 825
Kg. shall not be less than 1/6th the diameter of the main buoyancy tube, forming a side of the vessel, such
free board being measured at mid length of the vessel.
Assembly/ De-assembly
18.14 It shall be proven that the craft can be assembled and de-assembled as per standard procedures.
Deflation
18.15 Deflation tests shall be carried to prove that the craft can be successfully deflated.
Swamp & Stability Examination
18.16 Swamp & stability check to be carried out as per ISO 6185-3.
Damage Test
18.17 The craft shall be capable of supporting 825 kgs with any two alternate compartments deflated.
Power Trials
18.18 Power trials with the outboard engine (30 HP OBM) shall be conducted under various loads (light load &
full load min.) along with turing circle, maneuverability trials, crash stop and performance of the boat shall
be satisfactory during trials.
Towing Tests
18.19 (a) The boat shall be tested in the manner described below.
(b) Embark the maximum number of persons reckoned and position them uniformly within the seated
area.
(c) Tow the boat by its towing point at a speed of not less than 4 knots, allowing a tow line length of 3
boat length.
(d) Carryout manoeuvres for not less than 15 min.
(e) The boat shall be closely examined at the end of the test period for any structural failure in the form
of fracture, tear etc. on any part of the hull or boat component, such as deck or thwarts, and including
any boundary interface such as floor/hull.
(f) The point of attachment of the tow line shall remain secure during the period of the test.
(g) Evidence of any of the referred-to structural failures shall be regarded as failure of the boat.
Righting Test
18.20 The capsized craft shall be capable of being righted by two men with an average weight of 82.5 Kg each.
For this test if two men each weighing 82.5 Kg are not available, then 3 men whose total weight does not
exceed 250 kgs may be used. During this test, the craft shall be in its light condition with no engine and
or other equipment fitted in the craft.
Rowing test for Oars
18.21 It shall be proved that the craft loaded with 825 can be oar propelled. The craft shall be turned, brought
alongside etc. The test shall be conducted over a distance of 300 meter in light load & full load condition
of attachment to tube shall be examined for any damage.
220
19. TEST SCHEDULE FOR PRODUCTION CRAFTS.
19.1 Fabrics : Clause 18.2 applies
19.2 Cordages : Clause 18.4 applies
19.3 Dimensions : Clause 18.5 applies
19.4 Other Tests : Test prescribed in clauses 18.7 to 18.21 shall be carried out on all crafts
except for 18.16, 18.17 & 18.20 which required only on first boat of the
order unless there is no changes in stability or design data.
19.5 Minimum 20 Nos. of boats to be offered in a lot for inspection.
20. COMPLETION
20.1 The craft shall be completed in all respects to the satisfaction of the Inspector. All items of equipment to be
checked. The craft shall be assembled on the shop floor and a check is to be carried out that the parts fit
properly.
20.2 On completion of all tests and examinations the hull and bottom boards, etc. shall be packed into their
valises, before dispatch.
221
APPENDIX-B
Sl SPECIFICATIONS
No
1.0 Scope:
This specification relates to the detailed technical requirements of 30 HP Four Stroke
Outboard Motor (OBM) intended to be used on 4.5m Inflatable Boats of NDRF.
2.0 FUNCTIONS
The 30 HP Four Stroke Outboard Motor (OBM) is intended to be used on 4.5m Inflatable
Boats, which shall perform the following tasks :-
(a) Search & Rescue during floods
(b) Transport men and material
3.0 Requirements
3.1 The make & model of OBM shall be of reputed make. OBM make should have indigenous
product support throughout India.
3.2 OBM shall be compatible (throttle response throughout its speed range, shaft length, propeller
etc.) with 4.5m Inflatable Boats of NDRF and can be quickly attached to boat whenever
required.
3.3 The Outboard motor shall be of four strokes, three cylinders in-line gasoline engine with
suitable propeller.
3.4 The OBM should be capable of developing 30 HP.
3.5 The OBM shall have electronic fuel injection system.
3.6 The engine cooling system shall be water cooled with thermostat.
3.7 The OBM shall be provided with tiller handle for steering.
3.8 The OBM shall be provided with manual trim & tilt.
3.9 The exhaust shall be through propeller.
3.10 The lubrication system shall be wet sump.
3.11 The OBM shall be ultra-low emission ratings.
3.12 The length of the shaft of OBM shall be compatible with transom height of 4.5m Inflatable
Boats of NDRF (Long shaft).
3.13 The engine and drive line shall be fitted in enclosed housing to protect from water.
3.14 OBM shall be manual starting capability.
3.15 OBM shall have forward, neutral & reverse gear shifting arrangement.
3.16 The OBM shall be provided with OEM supplied standard fuel tank along with suitable
accessories such as connecting fuel hoses, male & female adopter.
3.16 OBM shall be provided with owner’s manual & service manual.
3.17 OEM recommended standard spares are to be provided.
On-board spares (OBS)
3.17.1) Engine oil filter - 03 nos.
3.17.2) Fuel Filter - 06 nos.
3.17.3) Air Filter - 02 nos.
3.17.4) Fuel line with priming valve and connectors – 01 No.
3.17.5) Propeller - 01 No.
3.17.6) Spark plug - 03 Nos.
3.17.7) Spark plug wrench - 01 No.
3.17.8) Water pump repair kit – 01 set
3.17.9) Water pump impeller – 01 No.
3.17.10) Gear oil drawn screw washer – 06 nos.
3.17.11) Lubrication oil drain plug washer – 02 nos.
3.17.12) Fuses of all system complete - 02 set
3.18 OEM Shall be provided with suitable storage stand.
3.19 Dry weight of the OBM shall not be more than 85 Kgs.
4.0 INSPECTION
4.1 The inspection authority for the Outboard Motors will be DG NDRF and IRS. The charges of
inspection authority shall be borne by the firm
4.2 The cost of conducting tests including POL and the material required for the purpose are to be
borne by the firm
5.0 PACKING INSTRUCTION
5.1 The unit shall be suitably packed to withstand the hazards of rail / road transit and with a view
to avoid any damage during transit and safe arrival at consignee’s address.
6.0 TEST & TRIALS
6.1 Verification of OEM documents/certificate w.r.t. to engine model, sr. no., capacity, product
description, emission rating etc. including owner’s manual & service manual.
6.2 Visual examination of each OBM.
6.3 Installation of OBM on NDRF supplied boat.
a) OBM should be capable of quickly attached to the boat.
b) Shaft length of the OBM should be compatible with the transom height of boat.
6.4 Water trials of NDRF boats along with each new OBM covering:-
a) Endurance trial on full load for one hour of one OBM in each lot being offered for survey.
b) Performance of each OBM at light & full load.
c) Maneuvering trial with each OBM
d) Turing circle of with each OBM
e) Astern Trial of with each OBM
f) Verification of trim & tilt arrangement of each OBM.
6.5 Verification of accessories & OBS of each OBM.
223
100. INFLATABLE MOTOR RESCUE BOATS BIG (20 SEATED)
O.B.M. 50 HP :
CQAE/2010/1615/(a)
Univarsel
FOREWARD
1. This specification has been prepared by the Controller ate of quality Assurance (Engineering Equipment),
Aundh Camp, Pune-411027 on behalf of Director General Quality Assurance, Ministry of Defence, New
Delhi.
2. This specification has been prepared to lay down general requirements. This would be used to guide
manufacture/quality Assurance/Inspection used for Boat Assault Universal Type 1A.
3. This specification consists of 27 page.
4. This specification shall be used for tender enquiry, procurement , manufacture and quality assurance proposes
of the equipment covered in the specification.
5. This specification is restricted document and therefore should not be communicated to anyone who is not
authorized to receive it.
6. This specification with accompaniments should be returned to issuing /purchasing authority on completion
of tender formalities or completion of supply order.
7. The Controller, CQAE, Aundh Camp, Pune-411027 is the authority holding sealed particulars ( AHSP) and
doubt, regarding any statement covered by this specification shall be referred to the AHSP who will clarity
the same. In case of any anomaly the AHSP’s decision on technical requirement shall be final and binding
on the supplier. Any legal or contractual conation shall be final and binding on the supplier. Any legal or
contractual conation shall be referred to the contract placing authority.
8. The quality Assurance Authority for the item covered in this specification is the CONTROLLER, CQAE,
PUNE-411027 and quality assurance officer of the area concerned will be the Senior Quality Assurance
Officer (SQAO) or Senior Quality Assurance Establishment ( Engineering Equipment’s) located at Mumbai,
Kolkata, Chennai, New Delhi or an officer nominated by him. SQAO shall carry out bulk quality assurance
of the item.
9. Clause by clause reference of this specification should be confirmed in writing along with tender enquiry
documents/quotation otherwise the tender documents are liable to be refected due to incomplete/inadquate
details.
10. No deviation for stipulated parameter of specification/drawing will be accepted without the concurrence in
writing by AHSP and no request will be entertained directly from sub-contractor, if any. The main contractor
shall remain responsible for the quality of the product.
11. The contractor shall extend to the defence QA authority or his authorized representative all reasonable
facilities for QA and testing of the equipment including gauges free of cost. In order to ensure that the stores
224
ordered are produced strictly as per this governing specification the QA authority or this dispatch stage at the
manufacture’s works at all times during the currency of the contract. If the need is felt he will also have free
access to procurement document including books of accounts. In case any sub orders are placed on sub
contractors the prior approval of sub contractors by AHSP shall be obtained and copies of sub contract shall
be provided to AHSP and the SQAO of the area concerned. All inspection and test facilities shall be provided
free of cost for the sub contracted items.
12. Advance or pilot samples, if any stipulated in the contract are required to be submitted to the inspection
authority of CQAE Pune-411027 on door delivery free transportation/handling cost within stipulated delivery
period for testing and approval before undertaking bulk manufacture of item and bulk manufacture if
undertaken by the contractor, prior to approval of advance /pilot sample will be of the risk and cost of the
supplier/contractor. The bulk suppliers will be affected strictly as per the approved advance/pilot sample
including any improvement /modification suggested during approval of the advance/pilot sample.
13. Stage inspection will be carried out right from raw material stage to dispatch of the stores and such stage
inspection shall not be construed as absolving the contractor of his responsibility in carrying out a
comprehensive pre-inspection on his own part and stage inspection by defence QA agency i.e. without any
prejudice to the right to reject the complete/offered article manufactured from such stage inspected
components/sub-assemblies/assemblies, if found not conforming to specified requirements.
14. Any defects as notified during inspection by QA agency shall not be rectified /repaired without prior approval
of the defence QA agency.
15. The manufacturer/contractor is required to incorporate latest technology state of the on manufacturing
procedures and test methods in turning out the product in meeting the requirements of reliability,
serviceability, interchangeability and durability of the product.
16. The warning/safety aspects of the store have to be kept as per standard practice Guidance in manufacture of
the store shall be taken from patent or samples, if any available with the defence authorities.
17. Copies of any national or international or any other specifications, instructions or guidelines stipulated in
this specification for reference shall be obtained from the publishers of the respective documents. The latest
version of these documents shall be applicable.
18. This specification shall be used for the sole purpose of manufacturing and supplying the store to the defence
indenter against a specific contract only and not for any other purpose whatsoever.
19. The manufacturer/suppliers are required to provide all necessary technical information to fully identify the
item. This information is required for defence codification purposes only and in no way jeopardize the
commercial interest of the suppliers. Non-compliance of this requirement by contractor is likely to render his
bid for supplying defence equipment being rejected.
SCOPE
1. This specification intended to govern the manufacturing, material, quality Assurance identification,
preservation and packing of boat Assault Universal type1A.
2. Related Specification, Drawings And Documents
2.1 Specifications:
2.1.1 Indian/British Standards : The following specifications(latest edition) published by bureau of Indian
standards/British standard instituts have been made use in preparation of this specification:
S. NO. SPECIFICATION NO. TITLE
1. IS:736 Wrought aluminium and aluminium alloy plates for general engineering
purposes.
2 IS:737 Wrought aluminium and aluminium alloy sheets and strips for general
engineering purposes.
3 IS:740 Wrought aluminium and aluminium alloy rivets for general engineering
purposes
4 IS: 844 Screw drivers.
5 IS:919 ISO systems of limits and fits.
6 IS:1278 Filler rods and wires for gas welding
8 IS:1285 Wrought aluminium and aluminium alloy extruded round tube and
hollow sections for general engineering purposes
9 IS:1364 Hexagon head bolts, screws and nuts.
10 IS:1365 Slotted countersunk head screws.
11 IS:1366 Slotted cheese head screws.
12 IS:1570 Schedule for wrought steels.
225
13. IS:1572 Electroplated coatings of cadmium on iron and steel
14 IS:1874 Ready mixed paint, universal, zinc chrome priming (synthertic) for light
alloys
15 IS:1875 Cardon steel billets, blooms, slabs and bars for general engineering
purposes.
16 IS:2016 Plain washers.
17. IS:2062 Steel for general structures purposes.
18. IS: 2074 Ready mixed paint, air driving, redoxide zinc chrome priming.
19. IS:2102 Tolerance for linear and angular almensions with out individual tolerance
indication.
20 IS:2507 Cold-rolled steel strips for springs.
21 IS: 2907 Non ferrous rivets
22 IS:4671 Expandable polystyrene for thermal insulation.
23 IS:5192 Natural rubber compounds
24 IS:5666 Etch primer
25 IS;6911 Stainless steel plates sheets and strips
26. IS:7283 Hot rolled bars for production of bright bars and machined parts for
engineering application.
27 IS:10607 Ready mixed paint, finishing, general purpose synthetic, SG Shade.
28 BS:970 Wrought steels
2.1.2 Defence specifications: The following defence specifications have been referred to in this
specification.
S.NO. SPECIFICATION TITLE
NO.
1. CQAE/2090/1404 Boat hook, 3.54m
2 IND/ENG/PROV/11 Paddle, Timber
81
3 Ind/ENG/PROV/117 Oar,3.05 m
2
4 IND/GS/13239Lates Chains
t)
5 IND/SL/0062(Latest Wood preservative
)
6 JSS 8010-5 Paint RFU Finishing non slip, Deck, brushing, dark admiralty Gray.
02.2 DRAWING: The use of following drawings (latest) is mandatory for manufacture and supply of
boat assault universal type1A.
s. No. Drawing No. Nomenclature/Description
1. IMGA-00729Sheet 1 Schedule of drawings, material and std parts boat assault universal type
of 4 sheets) 1A.
2. IMGA-00729Sheet 1 Schedule of drawings, material and std parts splash panel for boat assault
of 2 sheets universal type 1A
3. IMGA-0072(Sheet 2 Indoard profile and plan.
of 4 sheet)
4 IMGA-0072(Sheet 3 Outboard profile and bottom plans.
of 4 sheet)
5 IMGA-(Sheet 4 to 4 Line plan.
sheet)
6 IMSA-0050 Stern transom.
7 IMSA-0051 Bow transom
8 IMSA-0052 Coupling arrangement
9 IMPD-0483 Floor beam seat intermediate
10 IMPD-0484 Floor beam seat att
11 IMPD-0485 Floor beam seat forward.
12. IMPD-0486 Connecting angle short
13 IMPD-0487 Connecting angle long.
14 IMPD-0488 Hat stiffener
15 IMPD-0489 Hat stifferetatt
16 IMPD-0490 Bracket indoord femable
17. IMPD-0491 Bracket trackway
18. IMPD-0492 Bracket row lock
19 IMPD-0493 Clamp row lock.
20 IMPD-0494 Clamp chain
21 IMPD-0495 Housing repair Kit
22 IMPD-0496 Box with repair kit
23 IMPD-0497 Foot walk forward
24 IMPD-0498 Foot walk intermediate
25 IMPD-0499 Foot walk aft.
26 IMPD-0501 Closure plate bow end.
27 IMPD-0502 Closure plate intermediate.
28 IMPD-0503 Skid.
29 IMPD-0504 Mid Wale
30 IMPD-0505 Chine
31 IMPD-0506 Side stiffener diagonal
32. IMPD-0507 Side stiffener vertical short
33 IMPD-0508 Hand rail
34 IMPD-0509 Sheet sten
35. IMPD-0510 Inner plates
36 IMPD-0511 Stiffener intermediate
37 Impd-0512 Boundary angle, side
38 IMPD-0513 Boundary angle, bottom
39 IMPD-0514 Doubler plate port outboard.
40 IMPD-0515 Doubler plate port inboard.
41 IMPD-0516 Doubler plate stbd outboard
42. IMPD-0517 Doubler plate stbd inboard.
43 IMPD-0518 Filler block side
44 IMPD-0519 Filler block centre
45 IMPD-0520 Chine end, closure plates
46 IMPD-0521 Outer plate
47 IMPD-0522 Stifffener End.
48 IMPD-524 PINdECK COUPLING
49 IMPD-0525 Link side
50 IMPD-0526 Bracket with pivot on
51 IMPD-0527 Bottom Lock pin, Link side
52 IMPD-0528 Doubler plate side.
53 IMPD-0529 Doubler plate transom
54 IMPD-0547 Splash Panel, Centre
55 IMPD-0548 Splash Panel
56 IMPD-0549 Bracket
57 IMPD-0550 Clamp screw
58 IMPD-0551 Button.
59 IMPD-0552 Clamp screw Handle.
60 IMPD-0553 Clamp splash panel
61 IMGA-0073(Sheet 2 Splash panel Assembly.
of 2 sheets)
62 IMPD-0531 Doubler plate port Intermediate.
63 IMPD-0532 Doubler Plate stbd intermediate.
64 IMPD-0533 Anchor Ring Bracket
65 IMPD-0534 AnchorRing
66 IMPD-0500 Closure plate stern end.
67 IMPD-0530 Dolley Rivering.
68 IMPD-0535 Side stifferner, VerticalLong’ ‘A’
227
69 IMPD-0536 Horizontal stiffener short
70 IMPD-0537 Horizontal stiffener long
71 IMPD-0538 Side stiffener, Vertical long,’B’
72 IMPD-0539 Side Stifener, Vertical long,’C’
73 IMPD-0523 Deck coupling
74 IMPD-0540 Cap, Detachable, Nylong for pin pivot
75 IMPD-0573 Buoyancy Material ( Thermocale).
76 IMPD-1497 Hook Boat.
77 IMPD-0340 Bailer FBE
78 IMPD-0542 Row Lock with Chain
79 IMPD-0543 Spike Braiding
80 IMPD-1835 Paddle, timber
81 IMPD-1824 Oar,3.048m
82&83 ISK-0790 & 0792 Pop Rivet, Blind, Aluminium alloy
84 GGA-0056 Gauge drawing-Link side
85 GGA-0057 Drilling jig of deck coupling
86 GGA-0058 Drilling jig of DECK COUPLING.
87 Gsa-0085 Sub Assy Jig Body
88 GSA-0086 Jig welding assy
89 GSA-0087 Sub Assy Jig Unit.
90& 124 GPD-0493 to GPD- Detailed drawings of Jigs.
0527
NOTES:
i. Indian /British standard specifications are obtainable from bureau of Indian standard, Mank
Bhawa, 9 Hahadur shah Zafar Marg, New Delhi -02 or from their regionnal offices. These
standards are mandatory for production and supply of this store.
ii. Copies of the drawings listed out at clause 02.2 and defence specifications listed out at Srl No.
1 , 2 & 3 to clause 02.1.2 are obtainable from the controller,CQAE, Aundh Camp, Pune-
411027 on payment of hire charges ( non refundable). Defence specificaions listed ut at srl No.
4, 5,& 6 TO CLAUSE 02.1.2 ARE OBTAINABLE FROM THE CONTROLLER, cqa(gs).
Kanpur, Controller CQA (Materials), Kanpur and Directorate of standardizaton. New Delhi
respectively on payment of hire charges (non refundable).
iii. Reference to this specification in relation to any Indian standard/any other
specification/drawing in any tender enquiry/supply orders/acceptance of tenders means the
paper particulars (above documents) shall be latest one and the current edition at the date of
such tender/contract/AT/SO.
TECHNICAL REQUIREMENT/END USE
3.1 General Description.
3.1.1 Boat assault universal type (BAUT) 1A is used for ferrying of 16 fully armed personnel and
2 operating crew for assault or able to transport a cargoof 1400 Kg at a free board of 310mm. It
is also used for evacuation of causalities. Heavier loads up to 2300 kg can be transported with a
free board of 200 mm provided the condition of water current permits. Two boats can be coupled
together stern to stem thereby forming a single boat of double carrying capacity.
3.1.2. The boat is made out aluminium alloy sheets with reveted construction and is nearly flat
bottomed with trapezoidal hull wich ends in a slightly uptumed bow structural rigidity to the boat
is given by providing corrugations to the bottom sheet stiffeners to the side speets and a floor seat
beams which are tilled with buoyancy material. The floor seat beams, apart from acting seats for
the Personnel, provides a reserve buoyancy of over 100 kg and render the boat practically
unsinkable. Brackets assembly to the boat. Housing for the storage of repair kit is provided in the
third floor seat beam from bow side.
3.1.3. The boat can be propelled manually with 8 oars/paddles or by an OBM of 34kw rating
(supply of OBM is not included in the scope of this specification which can be fitted either at bow
end or at stem end.
228
3.1.4 TECHNICAL DATA
03.3.1 Length : 5200 mm
03.03.2 Width : 2100 mm
03.3.3 Depth : 510 mm
03.3.4 Weight ( less OBM) : 200 Kg ( Approx)
S. No. Typical Load Free Board Draught Speed
03.2.1 Splash Panel Set:The splash panel Set is fittedto the bowof the boat when heavily loaded boats
are required to be operated in heavy water currents to prevent water splashing into the boat. It is
made out of aluminium alloy sheets and is fitted with rubber pads. The complete set consists of
three panels as given beloow:
03.2.1.1 Splash Panel Centre: It is made of aluminium alloy sheets and is trapezoidal in shape. It is 2148
mm length, 581 mm height and weights 20 kg. It is provided with 3 clamps to fit on the boat. It
is fitted with rubber pad at the bottom to prevent entry of the water through the gap between the
bottom of .
03.2.1.2 Splash Panel Port: It is made of aluminium alloy sheets and is triangular in shape. It is 2150 mm
log, 430 mm high and weight 13 kg. It is provided with two clamps for fitting on the port side of
the boat.
03.02.1.3 Splash Panel starboard: It is identical to splash panel p that the clamps are fitted in opposite
side.
03.2.2 ACCESSORIES: The following accessories shall be supplied alongwith each boat.
S. No. Cat/Part No. Designation Qty per Drg No. Specification No.
Baut
229
2 E2/2090- Bailer, FBE 1 Im-0340 -
000043
03.2.3 Repair Kit : The repair kit comprising of the following items shall be provided with each boat:
7 SEALANT, 2 M LONG 1 NO
11 Screw, slotted round head or cheese 12 nos IS:1366 AND is;2010 TYPE b.4.5d
head m4x12n4.8 with punched
washer
230
13 Screw, self tapping, sheet metal pan 12 NOS Is:7173
head cone end A10X13MM
03.02.4 Spares : The following spares shall be supplied alongwith each boat:
1 Coupling Deck 1 No
RAW MATERIALS
04.1 All the raw materials used for manufacture of boat Assault Universal Type 1 A should be as
specified in the drawings mentioned vide clause 02.3 of this specification and as given
hereunder, unless otherwise specified in the relevant drawings. Test certificates of materials
from recognized laboratories shall be obtained showing physical and chemical properties of all
the items. All materials wherein speciaton/drawing no,s are not indicated shall be of the best
quality available in the market and shall preferably having BIS markings.
04.1.1 Aluminium Alloy Sheets, Strips and Plates : Aluminium alloy sheets and strips shall conform
to IS: 737 designatin 53000-H2 Aluminium alloy plates shall conform to IS: 736 designation
53000-H2.
04.1.2 Aluminium Alloy Revets: Aluminium alloy revets shall conform to IS: 740 designation
53000-O
04.1.3 Aluminium alloy tubing: Aluminium alloy tubing shall conform to IS: 1285 type 64430-WP.
04.1.4 Carbon forging steel:Carbon steel for forging deck coupling shall conform to class
IIofIS:1875.
04.1.5 Stainless steel plates, sheets & strips : Stainless steel plates, sheets & strips shall conform to
Gde. 304 S1 or S2 to IS: 6911 in annealed condition.
04.1.6 Stainless steel bars, rods and Pins : Stainless steel bars, rods and pins shall conform to AISI
type 304 annealed only.
04.1.7 Structural steel: Structural steel shall conform to IS:2062 Gde Fe 410 WC.
04.1.8 Steel pins:Steel used for pins shall conform to IS: 1570 (Pt-II) 20 C8 or 40C8 cold folled or
cold drawn.
04.01.9 Steel side ling & pin deck coupling: Steel used for these items shall conform to BS: 970, EN24,
S R, U V or W depending on th ruling section being used for manufacture of above compenents.
231
04.1.10 Spring steel:Spring steel sheets and strips for bracket, Row lock, clamp Row lock and clamp
chain shall conform to IS:2507 designation C-98 hardened and tempered.
04.1.11 Buoyance Material : The buoyancy material shall be expended polystyrene of density 35
Kg/m3 conforming to IS:4671 Type ‘N’. The average material prepared for final insertion under
the floor beam seat shall be 35 Kg/m3 with a tolerance of -5% to +10%.
04.1.12 Timber: Timber used shall be teak. It shall be of good quality, clear, grown properly air dried
and thoroughly seasoned grown to form where required free from injurious knots, gaps,
pronounced shakes or other defects and entirety to the satisfaction if the inspection authority.
Such items as sawn timbers which show the grain running off the timber shall be rejected by the
inspection authority and special care shall be taken to the running of the grain of the wood used.
04.1.13 Sealing tape: Sealing tape shall have a nominal thickness of 0.5mm. Sealing tape shall be used
between all metal surfaces joined by rivets or bolts whose heads are exposed to the wetted
surface. Only one thickness of sealing tape shall be used. only width of the sealing tape shall be
used per seam, except in cases where seam width is more than 38mm. The sealing tape shall be
applied without stretching or tearing and shall cover the entire contact surface. Surfaces to be
taped shall be cleaned and treated in accordance with the procedure given at clause 05.3of this
specification.
04.1.14 Sealing compound: Sealing compound shall be an oil resistant elastomeric base and shall
consist of two parts. One part shall be applied as a viscous paste that will cure to a tough, rubbery
state upon the addition of the accelerator, the second part. Alternatively, the sealing compound
used shall be of the best commercial quality, preferably poly-sulphide liquid polymer ( synthetic
rubber compund). It shall pass the founctional tests mentioned in appendix’’A to this
specifcation. Each lot of the sealing compund should be tested by this method. The method of
application of the sealing compund shall be as given at clause 05.4 of this specification.
04.1.15 Welding Electordes: Welding electrodes shall be compatible with the material welding
electrode for aluminium alloy shall conform to IS:1278 Designation NG-6.
04.1.16 Chain MS: The chain used for securing Pin, Deck coupling and Row locks shall be of approved
quality conforming to specification No. IND/GS/1323/Least) plain type havingweight of 0.108
Kg/m and shall be glavanized.
04.1.17 Luminous paint : The luminous paint used for marking deck coupling shall be of the best
commercial quality
04.1.18 Rubber: The rubber pads and cock, rubber shall be made from synthetic natural rubber
material conform to IS: 5192 typeB Gde-2.
04.1.19 Sealant: The sealant provided in the repair kit shall be of the best commercial quality.
04.1.20 Pop Rivet, Blind, Aluminium Alloy, Snap Head: Material used for these revets shall
conform to IS: 740 designation NR-5-0 Drawing No. ISK -0790 andISK -0792.
04.1.21 Snap Head Rivet:Material used for these rivets shall conform to IS:740 designation NR-5-0.
The rivets shall be as per IS:2907.
232
04.1.22 Nylon: Material used for pressure injection moulding of Cap Detachable Nylon pin and pivot
shall be Nylon 66 manufacture by M/s ICI, UK in sealed containers having a density of 1.14+
0.04 G/CC and a melting point of 250 C to 260 C.
05.1 Hull : The construction of Hull shall be as per relevant drawings indicated at clause 02.2 to this
specification. All forming and bonding process shall be done without application of heat. Hull
line shall be full sixe and shall be accurately flared. Templates shall be used to check conformity
to the Hull fabricating jig with the lines to check the flaring of important parts of the Hull. The
alignment of the fabricating jig shall be checked after errection to ensure full bearing of all
faying surfaces with the skin. The electrodes used for welding shall be as stated at clause
04.1.15.
05.2 RIVETTED CONNECTIONS: Rivet holes shall be drilled or reamed to porper size except that
rivet holes may be punched in sub assemblies when positive means to prevent driffing are
employed. Counter sinking shall be performed with positive limit stops fitted to the tool. If used
below the water line, the holes shall be drilled to provide interference fits for hone filling type
rivet pins. Rivetting and backing tool shall be of proper sixes and shape to drive and for the
specified heads. Automatic or squeeze type riveters will be permitted for driving rivets in sub
assemblies provided the pressure employed does not cause undue distortion of the materials.
Aluminium rivet driving shall be completed in one operation. Length of shank shall be sufficient
to fil the hole and fully form the head. Rivet heads shall be full. concentric with rivets holes and
full contact with the surface of the member. Rivets with faulty heads. Under size driven points
with incomplete on the mattle or revets otherwise defective shall be revmoved and replaced .
Defective rivets shall be removed by drilling out with a drill smaller in diameter than the rivt
and chipping with claw type rivet chisel. Where an enlargement of a rivet hole accurs, the hole
shall be reamed to a true circle and a proper larger size rivet be driven. Rivets within 75mm of
weld shall be driven after completion of weld. Scribe lines shall not be used or locating rivets.
05.3 Sealing tape : Sealingtape shall be applied onlyafter pre-treatment of faying surfaces with etch
primer. Seam sealers such as two components eprov adhesive may be used to stop the seam leaks
provided the leakage is not are to rivetting or other defects. In case of seam leaks which are
inaccessible for rivetting and wilding, a sealer consisting of fine aluminium powder suspended
in two component epoxy or metal binding resin may be used to seal water leaks,
The surface should be thoroughly cleaned and dried to remove grease, burrs and other
contamination. Apply the sealing compound liberally and pressed using wooden spatula. The
sealing compound should then be applied on the tape and again pressed with spatula to ensure
proper impregnation into the tape. The second aluminium alloy surface to be joined should then
be kept over the tape . Rivetting should be carried out only after a lapese of 5 to 10 minutes
after the solvent has eaporates, Alternatively, The sealing tape should be dipped in the sealing
compound and then placed between the surfaces to be rivetted.
233
05.5 Welding: The surface of parts to be welded shall be free from rust, scale, Paint grease and other
foreign matter. The supplier shall be responsible for proper edge preparation and clamping. Prior
to welding, oxide film or surface shall be removed by solvent or by wire brushing. Welds shall
transmit stress without permanent deformation of failure when the parts connected by the welds
are subjected to proof service loading. Aluminium welding shall be done by inert gas ( argon)
shielded are method, using welding rods as recommended for the alloys being welded to obtain
maximum strength and crack resistance of the weld.
05.6 Bonding of synthetic Rubber to Metal : Metal surfaces shall be sanded smooth and cleaned
free from paint, scales, rust and contaminates. Metal, wood and rubber bending surfaces shall be
wiped clean with a solvent and allowed to dry. One brush coat of adhesive shall be applied to
each surface. It shall be allowed to dry for one hour or until non-tacky when a second coatof
adhesive has become tacky or had dried for not less than 15 minutees. The rubber strips shall
be applied and rolled down and the metal or wood surface contact pressure shall be applied as
required for not less than 12 hours. Adhesive shall be epoxy resin.
06.1 The dimensions of all components, sub assemblies, assemblies of boat assault universal type
1A shall be as per relevant drawings mentioned of clause of clause 02.2 to this specification.
06.2 Tolerances as per IS: 4897 for unmachined dimenson(casting) and as per IS: 2102 medium
grade for machined dimensions shall be maintained unless otherwise specified in the relevant
drawing.
07.1 Workmanship: The stores shall have satisfactory workmanship, It shall be free from burrs from
machined process and ail sharp edges to be rounded off for ease of handling. The surface of all
finished members shall be smooth and free from kinks. Burrs, scribe lines and scraiches. Use of
punches or any other tools which scratches for marking of aluminium plates/sheets/extrusion is
strictly prohibited, only soft marking pencils shall be used for this purpose. The store shall be
free from casting defects and rolling defects.
07.2 Cleaning : The boat hull and other parts of the equipment including set of splash pane is shall
be cleaned and treated as stated herein. All surfaces shall be washed with mineral spirits and
shall then be swabbed hot solution of 10% chromic acid. Parts inaccessible for painting after
assembly with hull including underside of floor seat beams and footwalks shall be cleaned.
Treated and painted before installation. Cleaning/treating shall be done as described below.
07.2.1 Aluminium and Aluminium alloy surfaces : Aluminium and aluminium alloy surfaces shall
be thoroughly cleaned to remove all the traces of oil grase, dirt or other foreign substances. This
shall be followed by 3 to 5 min immersion or pressure spray in a hot solution of 10% chromic
acid after which the surfaces shall be checked at regular intervals to ensure that the solution is
maintained at the specified strength.
07.2.2 Steel side ling, pin deck coupling, steel pins, Hardware and Hardware items such as bolts,
cap screws, washers, pins springs and other steel components :-these items should cadmium
platedto a thickness of 13 microns (minimum) as per grade ‘A’ to IS:1572, unless otherwise
specified in the relevant drawings.
234
07.3 Treatment before painting: Aluminium, aluminium alloys and ferrous metal surfaces to be
painted shall be treated with Etch primer ( wash primer) conforming to IS:5666 as soon as
possible after cleaning. Any previously cleaned surface found rust or other contamination shall
be recleaned prior to treatment. Etch primer shall not be applied to any painted or wet surface
or in rainy weather. The wash primer is intended for use on clean metal surfaces of oil types as
a treatment prior to application of the primer system to increase the adhesion of the primer. The
pre treatment should be coated with primer as soon as possible. The dry film thickness should
be about 0.3 mil to 0.5 mil. The resion compound should be well stirred and then all of the acid
component should be added slowly with stirred. The pre treatment is then ready for use. if the
resin component is gelled or thickened, do not add the acid component as on unsatisfactory
product will result. The gelation is a temporary condition resulting from cold storage and can be
corrected by placing the resin component in a heated room or in a warm bath until if liquefies.
The pre treatment is most effective when freshly mixed and must be used within 8 hours offer
the addition of acid component. The acid component is not a thinner.
It is a necessary activator and must be used exactly as required.
07.4 Primer Coating: One coat of paint ready kixed, universal, zinc chrome priming (synthetic)
conforming to IS: 1874 shall be applied to all metallic surfaces.
07.5 Finish paint: After drying the primer coat, two coats of paint, ready mixed finishing, general
purpose syntheti, OG shade conforming to IS: 136-7 shall be opplied to surfaces except the
walking surface of the gunwale footwalks and doubler plate fixed to the stern transom which
shall be applied with two coats of paint RFU finishing Non slip, Dect Brushing Dark Admiralty
Gray conforming to ISS-8010-02, Each coat of paint shall be dried and hard before
the mext coat is applied.
07.6 Fungus and water resistance treatment to wood : Dressed timber shall be dipped, sprayed
or brushed with composition wood preseivative to specifiction no.IND/SL/0062 and allowed to
dry for alleast 24 hours.
08. PRE-INSPECTION BY MANUFACTURER :
08.1 Manufacturers shall carry out pre-inspection of item thoroughly and satisfy himself that stores
are meeting all the requirement of this speficiation and relevant drawings before offering to
inspecting officer.
08.2 Manufacturer shall submit pre inspection reports to the quality assurance authority/quality
assurance officer alongwith the call letter for QA check.
09 QUALITY ASSURANCE CHECK
09.1 All materials and finished parts shall be subject to QA check by the inspecting officer before
dispatch. The contractor shall provide the inspecting officer withtow copies of allsub orders for
materials and for parts of work sub-confracted He shall also quote alll specification requiremnets
in tender eqquiries or while placing sub-orders and should clearly specify in the sub-order that
QA check will be arranged by Controller, Controllerate of quality Assurance Engg. Eqpt Aungh
Camp, Pune-411027 or his authorised representative. The contractor shall offer at his own
expenses to the inspection authority/inspecting officer all reasonable facilities for carring out
inspection of stores. The contractor is also requried to provide free of cost one set of all
inspection gauges as per relevant drawing duly inspected by inspecting officer. The gauges, on
completion of contract, shall be handed over to the SQAE(E) of the concerned area
for their retention.
09.2 QUALITY ASSURANCE CHECK OF ADVANCE SAMPLE. The quality Assurance check
for advance sample of boat Assault Universal type 1A shall be carried out as per this
specification and test schedule attached with this specification by inspection authority i.e.
controller CQAE, Aundh Camp , Pune-411027 . The inspection authority can, however, carry
out any further tests; it considered necessary, so as to ensure that the store conforms to the
235
specified requirements.
09.2.1 The firm shall submit two nos of advance samples of acceptable quality, complete in all respect
including, one set of gauges, accessories and draft literatures, to the controller CQAE. Aundh
Camp, Pune-411027 for evaluation and testing. The firm shall also provide test pieces of raw
material insixe and shape as per specification IS: 1608 and IS: 1598 in sufficient quantities and
with same degree of heat treatment for resting chemical and mechanical
properties
09.2.2 The advance samples shall also be occompanied with pre-inspection reports for dimensional and
weighment check, test certificate for raw material and bought out items, other parameter
including periormance requirement , details of gauge calibration etc as per relevant drawings.
this specification and test schedule.
09.2.3 The technical evaluation of advance samples may take 4 to 5 weeks from the date of receipt of
advance samples af CQAE,Pune. The samples may be retained for guidance with the SQAE(E)
of the area concerned, if accepted.
09.2.4 The Contractor shall undertake the bulk production only, after receipt of acceptance of
advance samples/bulk production clearance (BPC) from the Inspection Authority ( AHSP).
09.3 QUALITY ASSURANCE CHECK : BULK SUPPLIES
09.3.1 The quality Assurance check shall be carried out by concerned SQAO for bulk production at
manufacturer’s premises as mentoned in S/O / AT
09.3.2 It is mandatory on part of manufacturer to submit pre-inspection report while tendering the
bulk stores for QA check.
09.3.3 The bulk production QA check shall be carried out strictly as per test schedule No.
CQAE/TS/1456 attached to this specification.
10. TEST FACILITIES
10.1 The manufacturer shall provide all test facilities free of cost for carrying out QA check. In
order to conduct smooth QA check, manufacturer shall provide the following test facilities at
their premises:-
10.1.1 A still water tank of minimum size 6m lengthx3m widthx1m depth to accommodate the baot
infully submerged condition for leak tests.
10.1.2 Variable dead weights ( static weights) of minimu 2000 Kg and other facilities for load tests.
10.1.3 Couplings of boats and class 5 rafts.
10.1.4 Jeep with arrangements for loading of jeep.
10.1.5 Measuring instruments required for dimensional and weightment checks.
10.1.6 OBM, 34 kw with 510 mm transom height and consumables, place ( river/lake etc) and other
facilities for performance checks.
10.1.7 Inspection gauges as per relevant drawings, duly approved by inspection authority.
10.1.8 Arrangement for measurement of boat speed during performance checks preferably with GPS.
10.1.9 Any other inspection facilities required for carrying out checks as per test schedule to this
specification.
1. IDENTIFICATION
11.1 Each boat shall be provided with an aluminium anodized name plate of suitable size with
following details:-
Nomenclature - Boat Assault Universal Type 1A
Part No. - E2/1940-000115
Month and year of manufacturing
Firm’s Address
Supply order No. & Date
Warranty expires on
236
11.2 Further, each boat shall be marked with a 2 part serial number consisting of the year built and
the boat number, Example ( 2003.1) . The serial number shall be stenciled on the prot and
starboard sides near the bow in arabic figures of 35 mm high.
12 PACKING & MARKING
12.1 Component parts such as pin deck coupling, bolts, nuts, washers and repair kit with toools and
literaturs shall be placed in the box provided in the rhird floor seat beam from bow end and the
box opening shall be properly secured to prevent their loss. Row locks shall be properly secured
to the boat as shown in the drawings. Items like oars, paddles, boat hooks, bailers,
wheel chocks and bridging spikes shall be properly packed to avaid damage intransit.
12.2 The following marking on the packages should be done:
.Nomenclature
.Cat/Part No.
.Consignee
. Gross weight
. Supply order No. date.
13. LITERATURE
13.1 Three copies of under mentoned draft literature in defence format, duly printed, shall be
forwarded to the inspection authority i.e. CQAE Aundh Camp Pune-411027 for vetting
alongwith advance sample.
13.1.1 User hand book
User hand book covering the operation maintenance instruction and repair of the equipment as
per specimen defence service format obtainable from CQAE Pune-411207.
13.1.2 Idenfification part list pertaining to the equipment shall be as per defence format obtainable from
CQAE, Pune-411027. Details like main assembly/component, part no nomenclature of item
overall dimensions /soize details of material details of specification reference drawing no
alongwith suitable sketches and price list of all items covered in the IPL shall also be
indicated.
13.2 Number of copies of literature required as indicated in the tender enquiry/or acceptance of tender
shall be supplied only offer draft copies have been accepted by inspection authority and opproval
for bulk printing has been obtained. All the lierature shall be bound in durable
waterproof laminated cover.
13.3 In addition to the above, 4 copies each of the printed literatures shall be supplied to the
controller, CQAE, Pune-411027 duly approved by the inspecting officer.
13.4 Required for condification ( Defence standardization) purpose, certails of sub-assembly,
assembly and all bought out/commercial items shall be provided by the manufacturer.
14. WARRANTY
14.1 The boat assult universal type 1A covered by this specification shall bear warranty of contractor
against any defect in material, workmanship, finish and performance for a period of 12 months
from the date of receipt of stores of Consignee’s end. The contractor shall be responsible to
rectify c replace the stores if found to be dfective by Consignee/user within the warranty period
mentioned above. The stores rectified/replaced shall be deemed to bear a
futher warranty for a period of 12 months from the date of such replacement/rectification.
15. SUGGESTION FOR IMPROVEMENT
15.1 The user of this specification, if finds any need for improvement/amendment to this
specification from the technical/commercial point of view may communicate his sugestion in
writing to converned SQAE(E)/Controller. CQAE, Aundh Camp, Pune-411027
237
TEST SCHEDULE FOR BOAT ASSAULT UNIVERSAL TYPE-1A
S. NO. PARAMETER TO BE CHECKED REMARKS/AAQUANTUM OF CHECK
1. Visaul InspectionThe boats shall be checked visually for Advance sample and 100% bulk Non-
workmanship finish and painting check the conformance of any one of more of
following:- parameter shall be the cause for rejection.
(a) Completencess fo the boat including
accessories and literature as per
relevant drawings and specification
No. IND/ENG/PROV/07059 (i)
(b) Eqpt is free from all visual defectssuch Check wherther the rivet lines arewithin
as cracks bends rivetting and welding proper gauge distance on framing members
defects rivet spacing is in agreemnet wit that
casting/extrusion/rolling defects burrs indicated in the drawings.sfaulty rivets are
& other damages. removed and replaced rivets are not loose
(c) All sharp edges are removed and and rivet head is in full cantact with
corners rounded off. menmber. There should not be any weld
(d) The painting should be uniform. No defects such as base metal cracks adjacentto
peeling should be observed. or behind welds, crater cracks in weld metal,
spatter, udnercutting of base metal
and lack of fusion.
2. Raw Materials. All the raw materials shall be checked for Obtain raw material test certificates for all
chemical composition & mechanical raw materials issued by an accredited lab.
properties as per relevant drawings/as Manufacturers test certificates for bought out
mentoned in clause 4 to specification No. items shall be obtained.
cqae/1940/1575 The manufacturer shall provide requred test
pieces for testing of chemical composition
& mechanical properties.
3. Dimensional & i.All major dimensions and weight will be Advance sample: 100%
weighment checked as per relevant Dimensions and weight
checks drawings/specification. Bulk: Sampling as per IS:2500
(ii) Following items will be 100% gauged i).AQL:4 IL:2
with connected gauges shown against them:
Item Gauge drg -100% Check.
a. Deck coupling i.GPD-0497 -All the tauges shall be calibrated by an
ii.GPD-0504 accreaited agency under the arrangement of
b. Pin deck coupling i. GPD-0496 the inspecting officer and approved by the
c.Bracket with pivot pin i. GPD-0493 inspection authority (CQAE, Pune) before
ii.GPD-0494 the same are used for inspection.
iii.GPD-0495
d. Link side i. GGA-0056
ii.GPD-0501
iii.GPD-0502
iv.GPD-0503
4. PERFORMANCE CHECKS
(a)Leak Test Before the hull is painted each boat will be 100% Bulk and advance samples shall be
submerged in water or filled with water offered in unpainted condition for this test.
within 100 mm of the top of the off gunwale Repair to the boat failing this test shall be
for 10 minutes. Any leake=age found in the accomplished by redriving or replacement
boat during the test shall make the boat liable of rivets and not by the addition of sealing
for rejection compound. Replacement of rivers may be of
same size if the river hole is not enlarged or
damaged. If the reivet hole is enlarged, the
larger size rivet shall be used.
238
(b)Functional Tests The following functional tests shall be Advance sample: Conformance to
required to be carried out on single and performance date as per clause 03.1.5 to
coupled boats: spech nO. CQAE/1940/1575&Reserve.
i.Loading test : A single boat laden with buoyancy (100%).
1600 kg shall give an average free board of Bulk : Sampling as per IS: 2500 (Pt-)
not less than 270 mm. Two boats shall be 1). AQL: 4, IL:2
coupled together and loadedwith 2000kg
equally distributed in both the boats. There
shall be no damages to deck couplings, deck
coupling pin or side ling.
ii.Speed test : A single empty boat shall be
fitted with 34 KW OBM of 510 mm transom
height. The speed offained shall be 10m/sec
in still water. A single boat laden with 2 men
and 1400 Kg shall aftain a speed of
3.4m/sec.Acoupled boat when empty shall
aftain a speed of 5m/sec and coupled boat
kadeb wutg 2000jg eqyakkt dustruvyted in
two boats shall attain a speed
of 4.25m/Sec in still water with the above
OBM.
iii. Loading of Jeep: The boats shall be
coupled logether and loaded with a 106MM
RCL Gun mounted jeep with ammunition
and crew There shall be no damages to deck
couplings, side link or to bow of the boat,
The speed of the coupled boat so laden shall
be 2.5m/sec in still water when propelled by
an OBM of 34KW nad 510 mm transom
height.
iv. Reserve Buoyancy: The reservebuoyancy
will be checed by filling the empty boat with
water and allowing 2 persons ( or equivalent
load) to stand inside the boat. The boat
should not sink in this
condition.
5. Identificat Check against requirement as per Advance samples & 100% bulk
ion para 11 of spech
6. Accessori Check completeness as per spech Advance samples & 100% bulk
es
7 Literature Check as per para 13 of spech & Advance samples & 100% bulk.
approved draft.
8 Packing Check suitability of packing as per Advance samples & 100% bulk.
& clause 12 of spech.
Marking
239
METHOD OF TESTING SEALING COMPOUND.
The sealing compound to be teated should be subjected to the following functional teste.
(a) Leakoro of noss test:
(i). Three rivetted test pieces are fabricated as folling cut a circular sheet 70 mm dia out of A1 alloy
53000HZ 1:6 mm thick sheet drill 12 nos sholes, each 4.5 mm dia with pitch between rivets as
shown in the sketch(Refer sheet ‘A’ in sketch below). Take another sheet, 150 mm150 mmx
1.6 mm thick of A1., alloy 53000 HZ drill 12 non holes 4.5 mm dia with the pitch 9 (Refer
sheet “B’ in sketch below) as for the circular sheet.
Place sealing tape (dipped in or liberally coated by Geal in compoiund being tested depending
upon the method adopted actual fabrication of boat) between the two sheets “A’ and ‘B’ and
riveta and rivetting dolly (refer sketch below).Ensure proper formating of rivet heads. Three such
test pieces should be prepared.
ii.Allow the three test pieces prepared as above to age at room temperature for 72 hrs. After 72 hrs
of ageing, one test piecdshould be tested by subjecting it to 100 cma of water column head
inwaterproofness test apparatus (for low pressure for 76 mm diameter disk desoribed inBS:903Part
G-5) for a austained period of one hour. If there is no leakage of water aither from the seems or
around the rivet heads, the test piece is sonsidered to have passed this test. If this test piece fails,
the remaining two test apecirans should be passed this test if both these apecimens are
found to be satisfactory as per the above test procedure.
(b) Compatibility for applicationon A1 Alloy.
Sealing compound under testing is applied directly on three pieces of A1 alloy 53000 HZ
sheet. These are eranised resally after 72nhrs of againg at room temperature. If there is no sign of
adverae oheanieal reacties between the sealing compound and any f the A1 Alloy sheets, the
sample sealing compound is considered to here passed this test.
(c) Ageing Test. Repeat tests (a) and (b) above after 20 days 9 from the date of fabrication of test
pieces) or againg at room temperature. If the sample passes these tests, it is considered to have
passed this test also.
2. If the sample of sealing compound passes tests mentioned in paras 1(a), (b) and (c) above, the
same is considered as acceptable.
240
SPECIFICATION FOR OUTBOARD MOTOR 50 HP NO. COAE/20101615a)
0.0 FOREWORD
0.1 This specification has been prepared by the controllerate of quality Assurance ( Engineering
equipment), Aundh Camp, Pune-411027 on behalf of Director General Quality Assurance,
Ministry of Defence, New Delhi.
0.2 This specification has been prepared to lay down general requirements. This would be used to
guide manufacture/quality Assurance/Inspection of out board Motor 50 HP.
0.3 This Specification consists of 26 pages.
0.4 This specification hsall be used for tender enquity, procurement, manufacture and quality
Assurance purpose of the equipment covered in this specification.
0.5 This specification is restricted document and therefre should not be communicated to anyone
who is not authorised to receive it.
0.6 This specifiction with accompaniments should be teturned to issuing/purchasing authority on
completion of tender formlities or completion of supply order.
0.7 The controller, CQAE, Aundh Camp, Pune-411027 is the authority holding sealed particulars (
AHSP) for doubt, regarding any statement covered by this specification shall be referred to the
AHSP who will clarity the same. In case, any anomaly the AHSP’s decision on technical
requirement shall be final and binding on the supplier. Any legal or contractual condition shall be
referred to the contract placing authority.
0.8 The quality Assurance Authority for the item covered in this specification is the CONTROLLER,
CQAE,Pune,411027 and quality Assurance officer of the area converned will be the senior quality
Assurance officer ( SQAO) of senior quality Assurance Establishment located at Mumbai,
Kolkata, Chennai, New Delhi or an officer nominated by him. SQAO shall carry out
bulk quality Assurance of the item.
0.9 Clause by clause reference of this specification should be confirmed in writing along with tender
enquiry documents/quotation otherwise the tender documents are liable to be rejected for
incomplete/inadequate details.
0.10 No deviation for stipulated parameter of specification/drawing will be accepted without the
convurrence in writing the AHSP and no request will be entered directly from sub-contractor, if
any . the main contractor shall remain responsible for the quality of the product.
0.11 The contractor shall extend to the Defence QA authority or his authorized representative all
reasonable facilities for QA and testing of the equipment including gauges at free of cost. In order
to ensure that the stores ordered are produced strictly as per this governing specification, the QA
Authority or his authorised representative will be provided free access from raw material to
dispatch stage at the manufacturer’s works at all times during the currency of the contract. In case
sub orders are placed on sub-contractors, the prior approval of sub-contractors by AHSP hsall be
obtained and copies of sub contract shall be provided to AHSP and QAO of the area concerned.
All inspection and test facilities shall be provided free of cost for the sub contracted
items.
0.12 Advance or pilot samples, if any, stipulated in the contract are required to be submitted to the
inspection authority at CQAE, Pune-411027 on door delivery on free transportation/handling cost
within stipulated delivery period for testing and approval before undertaking bulk manufacture of
item. Bulk manufacture, if undertaken by the contractor prior to approval of advance/pilot sample
will be at the risk and cost of the supplier/manufacturer/contractor. The bulk supplies will be
affected strictly as per approved advance/pilot sample including any
improvement/modificationsuggested during approval of the advance/pilot sample.
0.13 Stage inspection will be carried out right from raw material stage to despatch of the stores and such
stage inspection shall not be constructed as absolving the contractor of his responsibility in carrying
out a comprehensive pre-inspection on his own part and stage inspection by defence QA Agency.
i.e. without any prejudice to the right to reject the complete/offered article/ manufacutred from
such stage inspected components/sub-assemblles/assemblles, if found not
conforming to specified requirements.
0.14 Any of this defects as noticed during inspection by QA agency shall not be rectified/repaired
without prior approval of the defence QA Agency.
0.15 The manufacturer/contractor is required to incorporate latest technology state of the art
manufacturing procedures and test methods in truning out the product in meeting the
requirements of reliability, serviceability, Interchangeability and durability of the product.
0.16 The qarning/safety aspects of the store has to be kept as per standard practice. Guidance in
manufacture of the store shall be taken from patent of samples, if any available with the defence
authorities .
0.17 Copies of any national or international or any other specifications, instructions or guides
stipulated in this specification for reference shall be obtained from the publishers of the
respective documents. The latest version of these documents shall be applicable.
0.18 This specification shall be used for the sole purpose of manufacturing and supplying the store to
the defence indentor against a specific contract only and not for any other purpose whatsoever.
0.19 The manufacture/supplies are required to provide all necessary technical information to fully
identity the item. This information is required for defence codfication purposes only and in no way
jeopardize the commercial interest of the suppliers. Non compliance of this requirement by
contractor is likely to render his bid for supplying defence equipment being rejected.
0.20 Not withstanding above it is at the discretion of controller to accept any change/deviation, in any
of the parameters mentioned above, before finalization of the contract.
1.0 SCOPE
This specification covers the required technical features of out board motors 50 HP tiller handle
with rope start and with swivel bracket for mounting OBMs on boats. This specification provies
guidance to contractors/suppliers, manufacturers, quality assurance agencies and
stockists/indentors etc.
2.0 END USE
2.1 The out board motors 50 HP tiller handle with rope start and with swivel bracket is intended to be
used for propulsion of boats and light fafts existing in Army especially for storm boats, for
construction and ferry of military bridges, ferry of class 40 rafts etc, and also during flood relief
operations as aid to vicil authority. The OBM shall be used in various terrains of out country with
diverse silty, himid or sultry conditions prevalling at rivers canals & costal areas.
2.2 The performance shall not get degraded in high surface conditions even with wave height of
appx. one metre.
242
3. CLIMATIC/SITE CONDITIONS
The equipment shall be so designed and manufactured as to be able to be stored and to perform at
its rated capacity, when used in different climatic conditions as given below:-
3.1 The equipment shall be so designed and manufactured with adequate protection, as to be capable
of operating at their rated capacity and of storage in rainy and saline weather and should have
reasonable protection against deterioration caused by these factors.
3.2 The equipment shall be so designed and manufactured with adequate protection, as to be capable
of operating at their rated capacity and of storage in rainy and saline weather and should have
reasonable protection against deterioration caused by these factors.
3.3 HUMIDITY:- The equipment will be designed for use and storage at 100% relative humidity at
all temperature below 30ºC ambient. At and above this temperature it will be designed for a
relative humidity NOT in excess of that corresponding to a vapour pressure of 4KPA of mercury.
4.0 RELATED SPECIFICATION/RFERENCES
4.1 The following standards have been referred in this specification.
Specification Title
IS: 8982 Ready mix paint finishing air drying for war equipment
IS: 2074 Ready mix paint finishing, air drying red oxide Zinc Chrome priming.
5.0 MATERIALS
5.1 All materials and components used for the manufacture of the equipment shall be of standard
quality and shall conform to latest relevant ISO standard or relevant specification of country of
origin and shall be capable of withstanding extreme climatic conditions.
5.2 Minimum range and variety of components shall be used specially in case of fasteners.
5.3 The propellar used hsall be of aluminium
5.4 The contractor shall submit the list of materials and component along with relevant specification,
test report and sources of supply proposed to be used for fabrication, manufacture of equipmentto
quality assurance authority before undertaking fabrication /assembly of equipment for
approval.
5.5 Once the list of above has been finalized , no change, whatsoever shall be made in it without
prior permission in writing from the QA authority.
5.6 The selection of material/process, wherever not specified shall be at the discretion ofthe
supplier/manufacturer and the ultimate responsibility of the performance of the equipment at its
rated capacity under specified conditions shall be the sole responsibility fo the contractor.
6.0 MARKING
6.1 The following details shall be incorpotated on an anodised aluminum plate and shall be fitted
permanently at a prominent locaiton of the equipment such that in the course of normal use, the
marking shall not get damaged or become invisible. A blank space 25x25 mm shall be provided
on the right bottom pf the plate to affix the quality assurance officer acceptance mark/stamp.
6.2 Complete equipment
6.2.1 Designaton Out board motor 50 HP
6.2.2. ds Cat/Part No. (Will be intimated later by the inspecting authority CQAE,)
6.2.3 S/O No. & Dated
6.2.4 Model and Sr No. of the
Eqpt
6.2.5 Mfr’s Name & Address
6.2.6 Month & Year of
manufacture
6.2.7 Warranty Guarantee
expires on
6.2.8 Acceptance mark
(25mmx25mm)
6.3 Warning plates and plates having instructions giving “Dos&DONTs” shall be of anodized
aluminum plate and shall be fitted permanently at a prominent place.
243
7.0 WORKMAN SHIP & FINISH
7.1 The somplete equipment shall be finished smooth all over and general workmanship and finish
shall be of high standard and conform to the general engineering practices to satisfacton of
quality assurance officer.
7.2 All steel frames, panels and parts are to be sound and free from all flaws and defects and should
be properly fitted/secured.
7.3 Sharp edges and corners are to be well rounded off.
7.4 Welding/brazing/soldering must be executed neatly and must be free from flaws and defects (
Welded/Brazed/Soldered joints will be subjected to inspection by quality assurance officer before
painting, If required).
7.5 The equipment shall be treated and painted to prevent rusting and corrosion.
7.6 The OBM should be operating in normal and salty water at times , it should invariably be
provided with” Anode Sacrificer” ( Anti-corrosive anodes) which should be suitably fitted to
remain submerged in water during operation to prevent gaivanic corrosion of under water metal
parts.
7.7 All electrical wires and cables shall have proper color codes for easy indentification and shall
conform to respective IS/JSS/BS.
MANUFACTURE AND CONSTRUCTIN REQUIREMENTS
8.1 The outboard motor 50 HP shall be of teller handle with swivei brackets so that OBM can be used
on boats existing in service. The design and construction of OBM shall be such that it can be
carried and mounted on the boat/disrnantied by two persons. All parts of the OBM shall be
accessible for operation and servicing.
8.2 The OBM shall be rope start and shall have single cylinder /multi cylinder, SI Water cooled
engine. The Indian supplier shall also arrange to supply one set of equivalent spark plug which is
indigenously available as spare with each OBM.
8.3 TECHNICAL REQUIREMENTS
8.3.1 The OBM shall be compact, rugged and easy to perated, handle and most safe.
8.3.2 OBM should be most convenient to maneuver both when propelling loaded and unioaded
boats/rafts Its steering handle should be very light and free to handle specially when propelling
heavy loads and at high speeds.
8.3.3 The OBM shall be highly efficient, low cost running coupled with outstanding reliability.
8.3.4 The weight of OBM shold be such that it shold be easy for two persons to carry it. The weight of
OBM should not exceed 108 Kg .
8.3.5 The fuel tank capacity of the OBM shall be such that it can run continuously at full throttle for a
minimum of 2 hours. The tank capacity to be specified by the manufacturer. Fuel tank with Air
vent facility also needs to be provided by the manufacturer.
8.3.6 The BOM engine shall operate byu leaded/unleaded petrol.
8.3.7 The fuel tank shall be portable and shall have fuel line from tank to OBM with primer bulb to
provided correct fuel flow for engine.
8.3.8 The gear shift lever shall be part of the throttle to facilitate ease in handling with neutral,
forwarded and reverse gears.
8.3.9 The OBM shall have twist grip throttle system for high response throttle control.
8.3.10 The propeller used shall be of Aluminum.
8.3.11 When OBM is in neutral it shall be possible for the propeller to be swung up.
8.3.12 The OBM shall be copable of propelling various crafts in currents of 1.5 metere per scond at a
speed of 8 kms per hour and in still water 12 km pr hour.
8.3.13 The OBM shall be provided with carrying handle to facilitate carriaage by two persons for short
distances. The carrying handles should be as per OEM’s approved drawing.
8.3.14 The engine box shall be fitted with heat suppression cladding in order to reduce the noise to
avoid interference in radio transmission when OBM is operational.
8.3.15 Each OBM is operational.
8.3.15.1 Transom height-500 MM approx.
8.3.15.2 Steering angle-70º min ( 35º on either sidde)
8.3.15.3 Starting Method-Manual
8.3.15.4 Steering handle with combined steering cum throttle.
8.3.15.5 Twist grip throttle
244
8.3.15.6 Three gears, F-N-R (Forward-Neutral and Reverse) with gear shift lever.
8.3.15.7 Tiller control facility.
8.3.15.8 Cooling system with heavy duty water pump.
8.3.15.9 The OBM shall develop 50 HP at 4500-6000 RPM.
8.3.15.10 The OBM shall be to stroke/four stroke.
8.3.15.11 Tilt lever and trim tab adjustment mechanism.
8.3.15.12 OBM shall be provided with a control module for auto-monitoring of gauges and
vital engine functions.
8.3.15.13 All controls shall be so positioned for easy accessibility to operate.
8.3.15.14 All components of OBMs of given make and model shall be fully interchangeable
with each other.
8.3.15.15 OBM shall be preferably suitable for fitment on various cfafts with existing OBM
brackets.
8.315.16 It shall be possible to install the OBM on the various crafts with the help of two
men quickly and with ease.
8.3.15.17 OBM shall be able to operate in salty and sand laden condition. The
manufacturer/supplier shall highlight in their offer following special features to
meet this requiremnet:-
a. The working surfaces of insert pump body of cooling water pump components and
cooling water circult shall have minimum hardness for safe operation of OBM in salty
water.
b. The impeller shall be made of material having high water resistance and flexibility.
c. The suction and delivery parts of cooling water pump along with cylinder head water
jacket shall be so designed as to avoid accumulation of silt in the cylidner head water
jacket.
d. The water intake parts locatd at the lower unit of OBM shall have screen to protect entry
of foreign particles into the cooling water circult.
e. The OBM shall be equipped with an automatic cut-out device or guard against high
cylinder head temperature.
f. A gadget shall be provided to detect running of pump in dry condition (i.e. when pump is
without water).
9 SAFETY REQUIREMENTS
9.1 Each OBM shall be supplied with safety features that are standard practices in industry to make
the OBM complete and self contained for its safe operations and maintenance.
9.2 Each OBM shall also be provided with following safety features /devices in addition to normal
safety features
9.2.1 Speed limit overheat warning ( SLOW).
9.2.2 Emergency ignition stop switch.
9.2.3 Not start in gear position.
9.2.4 Reverse lock/release system
9.2.5 Tilt turn lever
9.2.6 Clip and lane yard assembly.
9.3 All moving parts shall be suitably enclosed and safeguarded in accordance with appropriate
requirement of relevant safely regulations.
9.4 Warning and caution plates, if required, printed in red shall be displayed at locations which
require careful and cautious handling by operators.
10 CARRIED SPARES/TOOLS AND ACCESSORIES
A complete set of toools, standard accessories and fast moving spares reqired for normal
operation of two years maintenance and one overhaul of each equipment shall be supplied along
with each equipment free of cost. Following are the desirable spares and tools.
10.1 CARRIED SPARES
10.1.1 Spare Aluminum propeller 02
10.1.2 Starter Rope 01
10.1.3 Spark Plug 01 ( Imported)
10.1.4 Cotter pin 01
10.1.5 Spark plug ( Indian) 2 Nos ( one set)
245
10.1.6 Gasket for gear oil filling plug 2 nos ( One set)
10.1.7 Gasket Kit 1 Set
10.1.8 Screen for fuel filter 1 Set
10.2 CARRIED TOOLS
10.2.1 Screw Driver multy 01
10.2.2 Plier 01
10.2.3 Tube box 10-13 01
10.2.4 Plug spanner 01
10.2.5 Rod 01
10.2.6 Screw Driver ( Oil plug) 01
10.2.7 Ring spanner 12x13 01
10.2.8 Ring spanner 18x19 01
10.2.9 Oil can 500 ml 01
10.2.10 Chain steel (Galvanised) for holding OBM with boat.
10.3 SPECIAL MAINTENANCE TOOLS( SMTs) ANDSPECIAL TEST EQUIPMENTS (STEs).
The priced list of items forming part of SMTs and STE s required for undertaking overhauling of
OBMs shall be given as per RFP/TE along with quotation. The firm will give an undertaking to
supply these items as per qty required against the contract.
10.4 SPARES REQUIRED FOR MAINTENANCE
10.4.1 The Supplier shall provide manufacturer’s recommended list of spares to support maintenance of
each OBM for minimum two years of operations, and quote these separately as per the RFP/TE.
10.4.2 Manufacturers should give guarantee for supply of spares for normal maintenance and
overhauling for the excepted service life of the equipment as declared by the manufacturer.
10.5 Even thought the list of carried spares and tools is specified in clause.
10.1 & 10.2 A complete set of accessories, toools and spares as essential/necessary shall be provided by the
manufacturer since this will vary as per model of OBM.
10.6 a suitable metallic tool box with lock and key arrangement shall be provided. The tool box shall
contain packing list of tools duly laminated and fixed inside the box and the box.
11. LITERATURE
Four coples of under mentioned literature in defence format shall be forwarded to the quality
assurance authority/AHSP i.e. CQAE, Aundh Camp, Pune 411027 for VETTING AND
APPROVAL ALONG WITH ADVANCE SAMPLE, Bulk printing of litrature should be carried
out only after the draft is approved by CQAE, Pune.
11.1. USER HAND HAND BOOK
The user hand book shall be as per the guidelines given in format ‘CQAE/143A” obtainable from
CQAE or SQAE concerned in ( Billingual i.e. both in english & hindi. The UHB will contain a list
of bought out items/sub-assembly alongwith complete address of source of supply. The
firmssupplier will also indicate the expected service life of the equipment in the UHB under
technical data.The sixe of UHB will be 140x200 mm. (wxh).
246
101. LIFE BUOY
TECHNICAL SPECIFICATION
GENERAL:-It should be useful in Deep Sea, in case of Flood, Safety measures for sea
vessels & sea Mishap. It should be totally moisture proof and non-inflammable.
It should be manufactured from durable High visibility orange synthetic material, which
requires no maintenance. The Retro reflective Tape used should be Solas approved, which
helps to identity victims in distress. Its inner diameter should be at least 45 Cms, and outer
diameter should be at least 70 cms. Having width: at least 10 cms. Floatability: more than
17 Kgs.
TESTING :
It should be prototype Tested i.e. Flotation Test, Strength Test.
It should be 24 hrs water Immersion tested.
Weight: 2.3 Kg to 3.5 Kgs.
Weight Test: 50 Kg.
247
102. SYNTHETIC LIFE JACKET
Picture of Equipment
1. IRS approved
2. High- Visibility Orange colour fabric cover.
3. Adjustable buckle for tightening and specially designed with Velcro fitment for
easy/quick donning in an emergency
4. Special construction of the jacket allows the wearer quick turning in case of being
knocked unconscious in water.
5. Chemically resistant to sea water and petroleum products.
6. Retro-reflective tape solas approved.
7. Inner foam: Soft Polyethelene
8. Size : 68x37x10 cms
9. Floatability : 16.5 Kg +
10. Accessory : Whistle
11. Shelf life : 05 years
12. Colur : Orange
13. Approvals: Life jacket should be IRS approved and stamped, confirming toSOLAS
74 as amended Reg III/4,III/7,III/34,X/3, 1994 & 2000HSC codes VIII/8. 1 LSA
code Reg I/1.2 and II/2.1.1 IMO Resolution MSC .81 (70) part 1,
MSC 200 (80), MSC 218 (82)< MSC 201(81) and MSC 207 (81)
248
MOUNTAINEERING EQUIPMENT (16 ITEMS)
249
104. CARABINEER
250
105. CANVAS WATER TANK 200 LTRS
251
106. KEROSENE OIL HEATERS
252
107. ROCK PITON
253
108. ICE PITON
254
109. AVALANCHE CORD
255
CONSRUCTION PARTICULAR particular of card
shall be as under.
1. Sheath
a) Count -1260 dx1
b) No of spindles – 16 (yellow 14) ( blue -2)
2. Core
a) Count -1260 dx2 (twisted together)
b) No of core ends-10
The construction details of the cord may be varied to
suit the manufacturing condition provided the finish and
requirement as given in clause 6 are successfully met.
256
110. AVALANCHE ROD
257
111. ICE AXE
QUALITATIVE PICTURE OF
REQUIREMENTS EQUIPMENT
SPECIFICATION REQUIERD FOR THE PRODUCT
1. The dimension of leather cover shall be such as to fit the
corresponding iceaxe.
2. The tolerance on intolerance dimension shall be
according to bestmanufacturing practice.
MATERIAL AND HARDNESS
Head :- steel grade 40 Ni3cr 65 M055 confirming to IS 5517-1987
specification for steel for hardening and tempering (first revision)
the sulphur or phosphorus content shall not exceed 0.05 %. The
head shall be evenly hardened and tempered and shall have a
hardness of 350 to 450 HV
SPIKE :- steel 40 Ni3Cr65M055 of IS:5517-1978.The spike shall
be evenly hardened and tempered to hardness of 350 to 450 HV.
FERRULE :_ Steel type of D IS 513 1986 specification for cold
filled low carbon steel and strips (third revision)
HANDLE :_ Ash or high and medium density wood based
laminated conforming to type V of IS :3513 (Part3)-1966
specification for high and medium density wood based laminates
(compare) part general purpose.
THONG (COMPLTE WITH RING) : Thong from nylon tape
with a minimumbreaking strength of 1900 N (190kg) and ring
from steel C14 of IS : 1570- 1961 schedules for wrought steel for
general engineering purpose.
COVERS : leather buffalo curried.
RIVETS :- shall confirm to IS :2155-1982 specification for cold
forged solid steel rivets for hot closing (6 to 16mm diameter )first
revision.
MANUFACTRE :
HEAD :- The head shall be soundly forged in one piece. The
rivets holes shallbe countersunk to receive the rivets heads. The
serrations on the pick shall be subjected to crack detection test
The rivets shall be securely clichéd and shall be finished flush
with surface straps.
SPIKE :-Forced in to the tapper at the bottom of the handle. The
spike shall beforced into the taper at the bottom of the handle after
fitting the ferrule so that the spike shall be tight fit thorough the
length of shank without splinting or weakling the handle.
FERRULE :_ The ferrule shall be either solid drawn or brazed or
weded. Thelarger end of the ferrule shall be reasonably flushed
with the handle after fitting with out wreakeing the handle at this
point to achieve this undercutting of he handle may be avoided
and at the broad end the inside of the ferrule may be given a
small radius. The ferrule shall be further secured to the handle
with screw. The ferrule shall be tight fit and shall be driven on the
end of the handle before inserting the spike.
HANDLE :- The blank for the handle shall be quarter sawn and
free from defects. The timber shall have a growth rate of 4 to 10
rings per 25 mm measured radically and the proportion of the
summer wood to spring wood shall be not less than 50% percent
(The timber ash meeting these requirementis expected to have a
density of more than 0.65 per cubic centimeter at 15 % moisture
content. The timber shall be straight grained and the maximum
inclination of grain and fiber shall not exceed 1:2 and shall be
properly seasoned to a moisture content of not less than 10 % and
not more than 15% .
The handle shall be made to the shape as shown in fig.6 and
grooves provided
259
to accommodate the strap of the head without weakening the handle. The
handle shall then be tightly fitted into the recess in the head. The straps of the
head shall be snugly fitted and bedded down flush with the handle and securely
riveted. Care shall be taken to ensure the rivet holes are at right angles to the
growth rings of the timber. The rivets shall be countersunk and flush with the
surface. After fitting, there shall be not looseness and all sharp edges and
corners shall be removed. A very high standard of riveting is required to ensure
that the timber of the handle is not weakened during riveting and the head is
securely fitted to the handle.
THONG :- (Complete with Ring ) :- The ring of the thong shall be soundly
forged. The ring shall slide freely on the handle from the under side of the head
to the stopper. The tape shall be securely stitched to the ring. The stitching shall
be even tension throughout.
A screw shall be fitted to the candle to prevent the thong falling off the ice axe.
HANDLE COVER :- The loop to take the strap of covers for pick end shall
be sufficiently raided to take the strap easily the covers for adze end hall be
securely fitted with line prong buckle normal size 16 mm according to is 4274-
1981 specification of buckles first revision alternative the covers Amy be fitted
with suitable instant fasteners.
The thread shall be used for the stitching shall be four ply thread flax undyed
the thread shall be well twisted and black waxed .
WORKMANSHIP AND FINISH :- The head, spike, ferrule and the ring shall
be free from cracks pits, rust flaws seams and other defect.
The brazing or welding of the ferrule shall be even continues and sound.
The tape for the thong shall be free from all weaving defect.
The leather for covers shall be neatly and smoothly rubbed down and creased.
The stitching shall be even tension throughout with all loose end securely
fastened off. The awl employed should not be too large for thread, sewing by
hook awl method is probated.
The ring and buckles shall be suitable oil blanked.
The exposed surfaces at the handle shall be thoroughly waxed. The handle shall
be finished smooth. The rivets shall be properly countersunk and finishedflush
with surface.
All sharp edges shall be removed.
The head ferrule and spike shall be finished bright the head shall be protected
against corrosion by using suitable grease and waxed paper given any one of
the following anti corrosive coating.
Nickel and chromium plating to service grade No. 2 of IS 1068-1985
specification for electroplated coating of nickels plus chromium and copper
plus nickel plus chromium on iron and steel. (ii Service )
Cadmium coating to service grade NO 2 of IS : 1572-1968 Specification for
electroplated coating of cadmium on iron and steel first revision.
The handle when finished to the dimension shall be coated a head end and
spike end with bituminous paint before assembly.
260
112. GENERATOR 2 KVA
SPECIFICATION
Qualitative Requirement Picture of Equipment
a) Rated out put - 2100-2300 watt
b) Maximum Out put 2400-2600 watt
c) Fuel: Kerosene/ Petrol
d) Rated Current: 10.5 amp
e) Over load protector: for AC & DC Earthling
f) Other Provision: Provision for battery charging, pull
cord manual start facility
g) Rated Voltage: 220 volts
H) Rated Frequency: 50 Hertz
I) DC out put: Only for charging 12 volts automotive batteries,
Maximum charging out 8.3 amp
j) Dimension: (LXWXH) 605 mmx425 mmx550 (+20%
margins)
Dry Weight: 60 to 65 Kgs
Engine Type: 4 stroke, 1 cylinder
k) Cooling System: Forced air cooling
l) Ignition System: Transistorized coil ignition
m) Oil Capacity: 1 to 1.5 Liters
n) Fuel tank Capacity:` 12 to 15 liters
261
113. SLEEPING BAG
SPECIFICATION:-
QUALITATIVE REQUIREMENTS
Size: Regular (suitable for heights between 175 cm-190 cm)
Color: Dark
Type of Sleeping Bag Type B:
according to EN13537 3-Season Bag
standard
Weight 1.00-1.5 KG
Insulation Synthetic fill, non-allergic;
Outer shell 100% polyester, inside min. 50% cotton, anti-carcinogen, anti-allergic
Material. Outer shell should be treated with a durable water repellent
(DWR) finish.
Additional Specifications Pouch for sleeping bag: storage/transport should not have long
strings/cords.
There should not be any string/cord on the product. Zippers and
Velcro are acceptable. Use of anti-carcinogen and anti-allergic
materials is imperative.
If any items use a string/cord, it can be removed by your company
before delivery. This may be an acceptable alternative but it must be
specified in the technical proposal, explaining any negative
implications of the removal of the string/cord to the functioning of
the product.
Packing Instructions The label for each piece shall consist of composition details and
washing instructions. Each piece must be packed in soft, waterproof
material with zip lock or Velcro, no long strings/ cords, in dark colour
with logo imprint on the corner of the sleeping bag. Approximate
size: 37.5 cm x 15.5 cm x 11.0 cm. The pieces in the
primary packing should then be placed in a carton box. The carton
boxes shall be palletized and stretch wrapped
Other The offer can consist of several manufacturers/ models/products as long
as they all meet the specifications required.
262
114. GROUND SHEET
263
115. RUCK SACK
QUALITATIVE REQUIREMENTS
a) Adjustable back system with frame.
b) Large main compartment.
c) Bottom compartment
d) Front loading system
e) Water proof with rain cover.
f) Made from high quality of polyester.
g) Easy access to adjust all gears
h) Total weight of rucksack up to 02 Kg;
i) Padded shoulder straps
j) Aluminum frame weight up to 01 kg
k) Thermo formed HIP belt with flexible suspension.
l) Volume - 70 ltrs
m) Ht. of Rucksack - 70 to 95 cms.
n) Width of Rucksack - 35 to 37 cms
o) 1 ZIP top LID pocket - size 131/2 x 6" x 3"
p) Side pockets -04
i) Size of upper pocket (2) = 111/2 x 6" x 3"
ii) Size of lower pocket (2) = 6" x 6" x 3"
q) 2 side straps on upper side pocket of 2 to 3 cm width for
support
r) Colour: Orange.
264
116. TENTS MEDIUM ARCTIC
265
117. WARM JACKET/ COAT PARKA
266
118. ROPES (CLIMBING/ RAPPELLING)
a) Construction particular :-
b) The construction details of the rope will be varied to suit the manufacturing conditions provided
the finish and requirement as given in clause 7 are successfully met.
268