Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

1 2 3 4 5 6 7 8

0+10 KEY PLAN:


0

A
A A

N
0+050

182.50

95.00
95.00
0+025
C

95.00
0+548

NOTE:
0+525

0+500

0+475

0+450
B

0+425

0+400

0+375
B 1-Access road clash with 5 7 tree B

0+000
0+350

0+025
0+325

0+050
0+300

0+075
0+275

0+100
0+250

0+125
0+200
2 access road clash with vallay at STN 0+450.00

0+150
0+175
LEGEND ( PLAN )
0+000 LUP
C
B CENTER LINE
EDGE OF LANE
EDGE OF ASPHALT
EDGE OF VERGE

C C

D D

0+547.66
0+000.00

0+025.00

0+050.00

0+075.00

0+200.00

0+225.00

0+250.00

0+275.00

0+300.00

0+325.00

0+350.00

0+375.00

0+400.00

0+425.00

0+450.00

0+475.00

0+500.00

0+525.00
0+100.00

0+125.00

0+150.00

0+175.00
35.46

35.29

34.95

34.42

33.49

33.32

32.25
34.77

34.60

33.97

33.73

32.97

32.80

32.47

32.08
35.64

32.64
35.81

31.75

31.59
35.10

33.13

31.91
35.46

34.95

34.42

33.32

32.25
35.63

34.77

34.03

32.97
35.28

34.60

33.48

32.08
33.64

32.64

32.44
32.81
33.15

31.75

31.59
35.10

31.91
E

0.03
0.09
0.01

0.01

0.01

0.02
0.07
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.01
REV/02 ISSUED FOR APPROVAL 09-05-2023 M.AGWA

REV/01 ISSUED FOR APPROVAL 28/01/2023 SAYED E

PROFILE FOR ENTRY AND


PROFILE FOR ACCESS ROAD PCY -02 EXIT AT PCY-02 ISSUE NO:
PURPOSE OF ISSUE:

CLIENT:
DESCRIPTION

FOR APPROVAL
DATE BY

PROJECT MANAGEMENT CONSULTANT:

1.00 .50 3.65 .50 1.00 .50 3.65 1.00


1.00
1.00
.50 3.65 .50 17.50

.50 1.00 1.00 .50 3.65 3.65 0.50

HARD STRIP
CARRIAGEWAY
HARD STRIP
HARD STRIP

SHOULDER

HARD STRIP
HARD STRIP

CARRIAGEWAY
F

HARD STRIP
VERGE

VERGE
CARRIAGEWAY F
VERGE

VERGE

VERGE
BECHTEL ENGINEERING COMPANY
CARRIAGEWAY

DESIGN CONSULTANT: CONTRACTOR:

DESIGN CONSULTANT / CONTRACTOR NEOM / EPM

DRAWN M.AGWA 09-05-2023


CHECKED M.AGWA 09-05-2023 CHECKED
APPROVED M.AGWA 09-05-2023 APPROVED

PIVOT POINT PIVOT POINT PIVOT POINT


G 1.5% 1.5% G
PIVOT POINT
1.5% SCALE NTS SHEET SIZE A0
1.5% PIVOT POINT PROTEZIONE
PROTEZIONE2

4:

1:1
PIVOT POINT
1
DISCIPLINE NAME:
1:1

4:1
1:1

4:1
PROTEZIONE2
PROTEZIONE

CIVIL
1:1

4:1
1:1
4:
1:1

1
1:1

4:1
NGL NGL Natural Ground
Natural Ground
NGL ROADS PLAN / PROFILE / CROSS SECTION
NGL Natural Ground

RC 2 5.00CM THICK ASPHALT CONCRETE WEARING COURSE NGL PCY-2-SHEET-2 OF 2


NGL
RC 2 5.00CM THICK ASPHALT CONCRETE WEARING COURSE
10.00CM THICK ASPHALT CONCRETE BASE COURSE Natural Ground PROJECT NAME :
MC 1 5.00CM THICK ASPHALT CONCRETE WEARING COURSE 10.00CM THICK ASPHALT CONCRETE BASE COURSE
10.00CM THICK ASPHALT CONCRETE BASE COURSE RC 2 MC 1 LOGISTIC FACILITIES IN THE CONNECTOR
MC 1 MC 1
10.00CM THICK ASPHALT CONCRETE BASE COURSE 10.00CM THICK ASPHALT CONCRETE BASE COURSE
30.00CM THICK AGGREGATE ROAD BASE COURSE MC 1 (CH 00+000 TO CH 75+000)
10.00CM THICK ASPHALT CONCRETE BASE COURSE 30.00CM THICK AGGREGATE ROAD BASE COURSE
TO ACHIEVE THE STANDARD REQUIRED MIN. MC 1
30.00CM THICK AGGREGATE ROAD BASE COURSE TO ACHIEVE THE STANDARD REQUIRED MIN. WORK ORDER NO .1100001344/015
CBR≥80% @ 98% COMPACTION WITH MDD TO ACHIEVE THE STANDARD REQUIRED MIN. CBR≥80% @ 98% COMPACTION WITH MDD
CBR≥80% @ 98% COMPACTION WITH MDD INITIAL SITE PREPARATION
25.00 CM SUB BASE - FORMATION SURFACE 25.00 CM SUB BASE - FORMATION SURFACE
TO BE PREPARED TO ACHIEVE THE STANDARD REQUIRED 25.00 CM SUB BASE - FORMATION SURFACE TO BE PREPARED TO ACHIEVE THE STANDARD REQUIRED NEOM
TO BE PREPARED TO ACHIEVE THE STANDARD REQUIRED MIN. SOAKED CBR≥ 50% @ 98% COMPACTION WITH MDD.
MIN. SOAKED CBR≥ 50% @ 98% COMPACTION WITH MDD. MIN. SOAKED CBR≥ 50% @ 98% COMPACTION WITH MDD.
KINGDOM SAUDI ARABIA
H REGION ASSET CODE CONTRACT CODE H
PROPOSED CROSS SECTION "C" PROPOSED CROSS SECTION "B" PROPOSED CROSS SECTION "A" 18 606000 1100001344
DRAWING NUMBER
ORG DISCIPLINE C. DOCUMENT TYPE SEQUENTIAL NUMBER REV NO.

1 2 3
CROSS SECTION 4 5 6 7
ASB CIV SHD

8
115022 02

You might also like