Professional Documents
Culture Documents
Installation Report
Installation Report
Customer’s Name :
&
Address :
Installation Rendered:
Assembled the unit and checked.
Performed the functional test and demonstration.
Recommendation:
Instrument must connect with ground.
Instrument room must be cool, dust free.
Swap the room once in a day.
Contact with us for any quarries or technical Problem.
Use Compatible ON-line UPS never use IPS.