Download as pdf
Download as pdf
You are on page 1of 4
KERJA-KERJA AWALAN PEMBINAAN JAMBATAN SUNGAI SEWA KE KAWASAN IRIH DI KAMPUNG BUNUK, JALAN PUNCAK BORNEO, KUCHING SUMMARY OF TENDER TEM DESCRIPTION UNIT ary RATE AMOUNT (RM) (RM) aries and General Provide Contractor's All Risk Insurance including Third Party Liability. Provide Workmen Compensation Insurance. ‘Works Programme, Progress Report and Safety Report. ‘Compliance with National Safety and Health and Environment Hazard Act and Code of Practice including: i. Registration of Engineering Construction Works with DOSH, ii, General Duty of Contractor. ili Safety Signboard iv. Site Safety Supervisor. Mobilization of all construction personnel, plant and equipment. To Provide Safety Equipments For S.0. Clearing and tidy up site upon completion of works. Demobilization of all construction Personnel, plants and equipment. For all costs and expenses incurred in carrying out the requirement of the contract not otherwise included in the summary of tender. Construction and maintain one(1) Project Signboard. Nos. Total C/F To Grand Summary FRAME 1of4 KERJA-KERJA AWALAN PEMBINAAN JAMBATAN SUNGAI SEWA KE KAWASAN IRIH DI KAMPUNG BUNUK, JALAN PUNCAK BORNEO, KUCHING SUMMARY OF TENDER ITEM DESCRIPTION, UNIT ary AMOUNT (RM) (RM) Earthworks & Site Preparatior To provide labour and machinery for clearing, grubbing within the Site of all trees, bushes, etc. and setting out the allignment for the abutment. (Approx. 700m* ) ‘Tempora To To provide temporary access to site for machinaries, construction materials etc. in safe and proper manner. 700.00 ls 430 is Total C/E To Grand Summary Piling Works (Provisional Precast Concrete Piles - 200mm x [200mm _(3m + 3m| Supply, deliver, handle and pitch initial pile 3 m long. (30 Nos.) Supply, deliver, handle and pitch extension pile 3 m long. (30 Nos.) Drive Only in position (60 nos.) Butt weld connection 0.60m girth between edges of and including mild steel extension head, base cap plates, bars etc and including coated heavily with bituminous compound for jointing of R.C piles. Cut off and dump away surplus length of precast concrete pile and strip off pile head, bend back reinforcement for connection as specified. Nos. Nos, 90 180 30 30 Total C/F To Grand Summary FRAME 2ofa KERJA-KERJA AWALAN PEMBINAAN JAMBATAN SUNGAI SEWA KE KAWASAN IRIH DI KAMPUNG BUNUK, JALAN PUNCAK BORNEO, KUCHING SUMMARY OF TENDER RATE | AMOUNT Tem DESCRIPTION unit} ary (Rm) (Rm) 5. | Abutment Construction. a.| Supply and lay SOmm thk. Lean Concrete 15p/20 as blinding. 120 | Supply and lay Reinforced Concrete 35/20 to Pile Cap. m™ 30 | c.| Supply and lay Reinforced Concrete 35/20 to Abutment and Wingwall 80 d.| Supply and construct the formworks as describe to Class F1 & U1 finish type including false work to sides of approach slab, platform slab, transition slab, side and soffit of pile cap and R.C. wingwall 180 e.| Supply, bend, cut, tie & install all types of Hot Rolled Type2 Deform Steel Reinforcement bars je. T12, T16, 120 & 125 Ton 7 } | Sub-soil drainage behind the Abutment. i. Supply, lay, spread & compact granular backfill material 10 , ii, Supply & install SOmm dia. PVC Weepholes at 750mm. m 20 | Supply and construct Signages for the bridge c/w R.C. Footing, Post, i. Obstruction Marker Nos. 2 ii, Weight Limit Sign (3Ton) Nos. 2 i, Bridge Name Sign Nos. 2 h| Supply and install galvanised guardrail c/w Footing, Post, Supporting Frame including all necessary excavation works. M 2 ) Total C/F To Grand Summary FRAME 30f4 KERJA-KERJA AWALAN PEMBINAAN JAMBATAN SUNGAI SEWA KE KAWASAN IRIH DI KAMPUNG BUNUK, JALAN PUNCAK BORNEO, KUCHING SUMMARY OF TENDER RATE ‘AMOUNT ITEM DESCRIPTION ‘UNIT ary (RM) (RM) 6. Installation Of Bailey Bridge a| To provide labour, machinares, tools, transportation, bearing pate, etc. for installation of Bailey Bridge (9m. approx) Is |- 1s is b.| To provide labour, machinaries, tools etc. for fabrication of bridge parts. us. us us c.| To supply and install 4.5mm thk (36.99 kg/m?) Chequered Plate as bridge decking c/w all necessary accessories. | ton | 1.39 Total C/F To Grand Summary 7. | Bridge Approach Construction a.| Fill spread, grade and compact in layers to formation level using imported suitable fill material to abutment. m | 270 b.| Supply, spread and compact 150 mm thick crusher run (50 mm DCR ) with 2 layer of quarry sand on top to falls and cambers. (approx. 60 m length x 5.0m width x 150mm thk.) c| Supply and apply one coat of bituminous prime coat. (approx. 60 m length x 3.0m width) m | 180.00 4.] Supply, spread and compact 50 mm thick Asphaltic Concrete Wearing Course (ACW 20) approx. 60 m length x 3.0m width x SOmm thk,) ~ 45 m | 9.00 Total C/F To Grand Summary Grand Summary FRAME 4of4

You might also like