KERJA-KERJA AWALAN PEMBINAAN JAMBATAN SUNGAI SEWA KE KAWASAN IRIH DI
KAMPUNG BUNUK, JALAN PUNCAK BORNEO, KUCHING
SUMMARY OF TENDER
TEM
DESCRIPTION
UNIT
ary
RATE
AMOUNT
(RM)
(RM)
aries and General
Provide Contractor's All Risk Insurance
including Third Party Liability.
Provide Workmen Compensation
Insurance.
‘Works Programme, Progress Report
and Safety Report.
‘Compliance with National Safety and
Health and Environment Hazard Act and
Code of Practice including:
i. Registration of Engineering
Construction Works with DOSH,
ii, General Duty of Contractor.
ili Safety Signboard
iv. Site Safety Supervisor.
Mobilization of all construction
personnel, plant and equipment.
To Provide Safety Equipments For S.0.
Clearing and tidy up site upon
completion of works.
Demobilization of all construction
Personnel, plants and equipment.
For all costs and expenses incurred in
carrying out the requirement of the
contract not otherwise included in the
summary of tender.
Construction and maintain one(1)
Project Signboard.
Nos.
Total C/F To Grand Summary
FRAME
1of4KERJA-KERJA AWALAN PEMBINAAN JAMBATAN SUNGAI SEWA KE KAWASAN IRIH DI
KAMPUNG BUNUK, JALAN PUNCAK BORNEO, KUCHING
SUMMARY OF TENDER
ITEM
DESCRIPTION,
UNIT
ary
AMOUNT
(RM)
(RM)
Earthworks & Site Preparatior
To provide labour and machinery for
clearing, grubbing within the Site of all
trees, bushes, etc. and setting out the
allignment for the abutment. (Approx.
700m* )
‘Tempora To
To provide temporary access to site for
machinaries, construction materials etc.
in safe and proper manner.
700.00
ls
430
is
Total
C/E To Grand Summary
Piling Works (Provisional
Precast Concrete Piles - 200mm x
[200mm _(3m + 3m|
Supply, deliver, handle and pitch initial
pile 3 m long. (30 Nos.)
Supply, deliver, handle and pitch
extension pile 3 m long. (30 Nos.)
Drive Only in position (60 nos.)
Butt weld connection 0.60m girth
between edges of and including mild
steel extension head, base cap plates,
bars etc and including coated heavily
with bituminous compound for jointing
of R.C piles.
Cut off and dump away surplus length of
precast concrete pile and strip off pile
head, bend back reinforcement for
connection as specified.
Nos.
Nos,
90
180
30
30
Total C/F To Grand Summary
FRAME
2ofaKERJA-KERJA AWALAN PEMBINAAN JAMBATAN SUNGAI SEWA KE KAWASAN IRIH DI
KAMPUNG BUNUK, JALAN PUNCAK BORNEO, KUCHING
SUMMARY OF TENDER
RATE | AMOUNT
Tem DESCRIPTION unit} ary
(Rm) (Rm)
5. | Abutment Construction.
a.| Supply and lay SOmm thk. Lean
Concrete 15p/20 as blinding. 120
| Supply and lay Reinforced Concrete
35/20 to Pile Cap. m™ 30 |
c.| Supply and lay Reinforced Concrete
35/20 to Abutment and Wingwall 80
d.| Supply and construct the formworks as
describe to Class F1 & U1 finish type
including false work to sides of
approach slab, platform slab, transition
slab, side and soffit of pile cap and R.C.
wingwall 180
e.| Supply, bend, cut, tie & install all types
of Hot Rolled Type2 Deform Steel
Reinforcement bars je. T12, T16, 120 &
125 Ton 7 }
| Sub-soil drainage behind the Abutment.
i. Supply, lay, spread & compact
granular backfill material 10 ,
ii, Supply & install SOmm dia. PVC
Weepholes at 750mm. m 20
| Supply and construct Signages for the
bridge c/w R.C. Footing, Post,
i. Obstruction Marker Nos. 2
ii, Weight Limit Sign (3Ton) Nos. 2
i, Bridge Name Sign Nos. 2
h| Supply and install galvanised guardrail
c/w Footing, Post, Supporting Frame
including all necessary excavation
works. M 2 )
Total C/F To Grand Summary
FRAME
30f4KERJA-KERJA AWALAN PEMBINAAN JAMBATAN SUNGAI SEWA KE KAWASAN IRIH DI
KAMPUNG BUNUK, JALAN PUNCAK BORNEO, KUCHING
SUMMARY OF TENDER
RATE ‘AMOUNT
ITEM DESCRIPTION ‘UNIT ary
(RM) (RM)
6. Installation Of Bailey Bridge
a| To provide labour, machinares, tools,
transportation, bearing pate, etc. for
installation of Bailey Bridge (9m.
approx) Is |- 1s is
b.| To provide labour, machinaries, tools
etc. for fabrication of bridge parts. us. us us
c.| To supply and install 4.5mm thk (36.99
kg/m?) Chequered Plate as bridge
decking c/w all necessary accessories. | ton | 1.39
Total C/F To Grand Summary
7. | Bridge Approach Construction
a.| Fill spread, grade and compact in layers
to formation level using imported
suitable fill material to abutment. m | 270
b.| Supply, spread and compact 150 mm
thick crusher run (50 mm DCR ) with 2
layer of quarry sand on top to falls and
cambers. (approx. 60 m length x 5.0m
width x 150mm thk.)
c| Supply and apply one coat of
bituminous prime coat. (approx. 60 m
length x 3.0m width) m | 180.00
4.] Supply, spread and compact 50 mm
thick Asphaltic Concrete Wearing
Course (ACW 20) approx. 60 m length x
3.0m width x SOmm thk,)
~ 45
m | 9.00
Total C/F To Grand Summary
Grand Summary
FRAME
4of4