Download as pdf
Download as pdf
You are on page 1of 81
Agplus® SAFCO PLATE BEARING TEST REPORT FOR NABA ALSAHA HOSPITAL PROJECT RIYADH, ‘THE KINGDOM OF SAUDI ARABIA. PROJECT # RY-23-01839-SI FOR MESSRS AL-KAYAN TECHNICAL ARABIAN CONTRACTING CO. RIYADH KINGDOM OF SAUDI ARABIA SEPTEMBER, 2023(G) RABI AL-AWWAL, 1445 (H) 7 { g { Se) NABA ALSAHA Hospital project site ¢, “< Peoerne ones! . ‘ Bulking No, 3810 Jamiah treet, AFM, Unit No.2 Riyadh 12629-6968, Kingdom of Saud Arabia +966 01 4723771 p us 74965 01 4776465 wwrwapplus.com SAFCO September 20, 2023, Ref: RY-23-01839-SI Messrs: AL-KAYAN TECHNICAL ARABIAN CONTRACTING CO. Riyadh, Kingdom of Saudi Arabia ‘Subject: Plate Bearing Test report for NABA ALSAHA Hospital project related to Riyadh, the Kingdom of Saudi Arabia. Dear Sir: Soil and Foundation Company (Applus SAFCO) is pleased to submit this report of the Plate Bearing tests (twelve plate load test) at the location of the proposed NABA ALSAHA Hospital Project that is conducted by Soil & Foundation Company (Applus SAFCO) on ‘September 13 to 17, 2023 on information given by the client Messrs / Al-Kayan Technical Arabian Contracting Co. for the above subject project located in Riyadh — KSA. This report includes the results of the engineering analysis and interpretation of the findings ‘and conclusions. In the event that additional information or clarifications are required, please contact our office at your convenience. We would like to take this opportunity to thank you for your confidence and look forward to be of service to you in the near future. ‘SOIL & FOUNDATION CO., LTD Emad a ¢ a Engr. Emad Al Shair Deputy Branch Manager, Riyadh Branch NASA ALSAHA Hospital pron ake Project #RY-23.0185% Agplus® SAFCO Distribution List Number of Hard Copies| _ Number of Soft Copies Company 1 1 “AL-KAYAN TECHNICAL ARABIAN CONTRACTING CO. Revision Log Revision No. Date Description 0 September 20, 2023 Final report [Prepared By: \Approved By: Reviewed By: Sariullah Khan Dr Aamer Hamed Engr. Manzer Adanuf General Geologist, Geotechnical Manager Laboratory Manager —Ziullik ag WABAALSARA Hospial poet ste Project #RY-28-01899-91 Agplus® SAFCO TABLE OF CONTENTS Contents 2) INTRODUCTION... 2) PURPOSE OF STUDY. 3) TYPE OF MATERIALS, 4) TEST CARRIED OUT.. 5) TEST RESULTS.. 6) ANALYSIS OF RESULTS. 7) CONCLUSIONS. 8) NOTES... LIST OF APPENDISES APPENDIX A: PLATE BEARING TEST RESULTS & CURVES APPENDIX B: PLATE BEARING TEST LOCATION PLAN WABA ALSARA Hosptial projet ale Projet # RY-23-01859°5 Agplus® SAFCO 1) INTRODUCTION According to your request No. QC-5701; the results of the twelve (12) Plate Bearing Tests (conducted at -16.0m below from the NGL and above two (02) meter thick engineering fill layer) at the location of the proposed NABA ALSAHA Hospital Project, located in Riyadh), that are conducted by Messrs/ Soil and Foundation Co. Ltd., (Aplus SAFCO) based on information given by the client Messrs Al-Kayan Technical Arabian Contracting Co., for the above subject project in Riyadh ~ KSA) The twelve (12) plate load tests were performed on September 13 to 17, 2023. 2) PURPOSE OF STUDY Its understood that the purpose of the check for the provided plate bearing test results, requested is to determine the expected settlements under loading and to specify the bearing pressure at site (at location of plate load tests). 3) TYPE OF MATERIALS Based on information given by the client Messrs/ Al-Kayan Technical Arabian Contracting Co., the plate bearing tests were carried out at -16.0m below from the NGL. and above two (02) meter thick engineering fil layer at the prepared foundation level 4) TEST CARRIED OUT The plate bearing tests were carried out according to: ‘+ ASTM D 1194, standard test Method for "Bearing Capacity of Soil for Static Load on Spread Footings’. 60.0cm diameter circular plate was used for bearing test. A heavy louder was used as the reaction load. 5) TEST RESULTS ‘The arithmetic Pressure-Settlement cycles of loading and unloading are presented in Appendix A. 6) ANALYSIS OF RESULTS ‘The tests were carried out up to a maximum applied pressure of 6.0kgicm®. (Practically it is recommended to conduct the plate bearing test to the maximum applied pressure 3 times of design pressure, which is about 2.0 kg/cm?).. The following equations are generally used for interpretation of the plate bearing tests results to full size footings: . For Sands and Gravel (Cohesion, C=0) (2 a= onx( 5] soe Where: ABA ALSARA Hospital projed se Projet #RY-23-01899°1 Agplus® SAFCO = Ultimate Bearing Capacity for the Footing r= Ultimate Bearing Capacity for the plate B,= Width of the footing Bp = Width (diameter) of the plate In most building codes, a maximum total settlement of 25mm (1 inch) is usually allowed for building on isolated footings, while for Raft Type of Foundation the maximum total settlement is 50mm (2 inch). However, the differential settlement shall not exceed (0.002 x L) where L is the centre-to-centre distance between two adjacent footings under consideration ‘The obtained settlement from the test and the expected settlement under footing is considered relatively low (the maximum permissible settlement is 25mm for isolated footings). Ss; (Zee} as, (2) B, +B, ———— . (3) 2x By B, +B, Where: ‘Sr= Settlement of the footing = Settlement of the plate B,= Width of the footing = Width (diameter) of the plate Assuming the maximum total settlement of 25mm in most codes for buildings for isolated footings and 50mm for Mat Type of Foundations, the following allowable bearing pressures are calculated from graphs (for design pressure 2.0 kg/cm? the maximum Settlement of the plate is about 1.04 mm at the location of the Plate Load Test No. 9): Table No.1 0.6096. 4.00 3.13 20 0.6096 5.00 3.30 20 0.6096 20.00 3.92 2.0 0.6096 40.00 4.04 20 0.6096 70.00 4.09 NABA ALSAA Hospial projed ae Project # RY-23-01888-S1 Agplus® SAFCO 7) CONCLUSIONS Using the settlement criteria and based on the test results; and considering a factor of safety of 3 for the estimated applied bearing capacity it is concluded that the estimated allowable bearing pressure is greater than 2.0 kg/cm’ 8) NOTES ‘+ It should be emphasized that the results of the plate bearing test apply only to the ground that is significantly stressed by the plate, this is typically a depth of about one and a half (1.5) times to two (02) times the diameter of the plate. Generally, the depth of ground stressed by a structural foundation will be much greater than that stressed by the loading test if the foundations are wider than the width of the test plate (at the locations of the plate load tests). ‘+ Plate bearing tests are particularly suitable for coarse granular materials which cannot bbe tested by a normal laboratory means or by penetration tests. The main pitfall in predicting settlement from these tests is that the zone of stressed soil beneath the plate is much smaller than actual and is not reflected within the deeper strata whose load bearing and settlement characteristics may critically affect the behaviour of the foundation (at location of plate load test). * The estimated bearing capacity given above is based on the assumption that tested materials are homogeneous to a depth of at least 1.5 times the width of the proposed foundation (at location of plate load test). + The scope of this report, as requested by the client, is limited to confirm the compaction of the fill material, and to determine the bearing capacity of the tested locations at the determined elevation only and considering the above assumptions, * According to the plate load test results the construction over this prepared compacted foundation surface and the top (60cm) from this layer and Bearing Capacity (as it is informed by the client 200 KPa) is accepted (at location of plate load test). However, all other recommendations provided in our Geotechnical Investigation Report Ref. # RY-23-01839-SI submitted on August 06, 2023, shall be followed NABAALSARA Hospital project sie Projct #RY-25-01890.51 Agplus® SAFCO APPENDIX A PLATE BEARING TEST RESULTS & CURVES NABA AISAHA Hospital pect te Project # RY-23-01830-S1 September 14, 2023 Ref: QC-5701 Messrs: ALKAYAN TECHNICAL ARABIAN CONTRACTING CO. Riyadh Area, Kingdom of Saudi Arabia SUBJ: PLATE LOAD TEST No.1 FOR NABA ALSAHA HOSPITAL PROJECT, RIYADH AREA, KINGDOM OF SAUDI ARABIA Dear Sir: We are pleased to submit herewith the result of Plate Load Test (dry/unsoaked method) that was conducted last September 13, 2023, of the above-mentioned project located at South of Elevator, Riyadh Area, Kingdom of Saudi Arabia. ASTM D 1194 (Standard Test Method for Bearing Capacity of soil for static load) was used as test reference for the plate load test. The depth of the tested layer is equal to twice the diameter of the 60.0em diameter plate used in the test. The test result shows that the maximum settlement for 6.0kg/cm? load was 1.61 mm. Please see attached test result for further review, We appreciate this opportunity to be of service to you on this project. Please do not hesitate to contact us if you have any question on the results of the tests, or if we can be of any further service. Thank you and best regards, SOIL & FOUNDATION CO., LTD. 4 lawang Engr. Omar Asfer Engr. Munzer Adanuf Tab. er Laboratory Supervisor Laboratory Manager Tog hE ona standards PLATE LOAD GRAPH lus [PROJECT __[NABA ALSAHA HOSPITAL DATE [is-Sep-23 ICLIENT _—ALKAYAN TECHNICAL ARABIAN CONTRACTING CO. REF, NO, [OC-5701 i LOCATION — [SOUTH OF ELEVATOR TEST NO._[1 FTEST COND_[DRVIUNSOAKED rest REF, —[asTuo 160 i 0.000 7 | 0.200 1 I = 0.400 - E ooo - = | | E 0800 — - | q £1000 | — | \ ore 3 120 : I 1.400 | — } 1.600 i ie | 0005 10 4418 20 25 90 35 40 45 50 65 60 i LOAD INTENSITY (kolem®) i SUMMARY OF SETTLEMENT LOAD | conormon| SETTLEMENT REMARKS I (kgiem*) (mm) 0.0 JUNSOAKED] 0.00 INTL i +10 [unsoakeo| 072 LOADING 20 |UNSOAKEO| 025 LOADING 30 |UNSOAKED| 055 LOADING 30 __[UNSOAKED| 131 TOADING i 60 JUNSOAKED| 1.61 LOADING 40 [UNSOAKED] 165 UNLOADING 20 |UNSOAKEO| 128 UNLOADING i co [onsoareot 00 UNLOADING i raped Tage ond standards Tog hE, onc i PLATE LOAD TEST SAFCO i [PRovecT _ [NABAALSAHA HOSPITAL DATE [19-Sep-23 ICLIENT __[ALKAYAN TECHNICAL ARABIAN CONTRACTING CO. IREFNo. _ |ac-5701 Location _|sourH oF ELEVATOR ITESTNo. |i PLATE TACK LOAD COLUMN cere tom ene nor) form lWweichT 30.00 WEIGHT _(g) 25,00 [WEIGHT (kg) | INITIAL READING i pat aror pel Gases | cace2 | caces | AVE I ve95_| 2005 | 2248 | 21.19 LOADING: I TOAD: 10 Kg / om LOAD DIAL GAGE (0.01 mm) SETTLEMENT] TEMP. | TIME, (Bar) | GAGE’ | cace2 | caces | Ave | (mm) () 2 400 | 1905 | 2085 | 2238 | 2103 [0.10 38 6 400 | 1984 | 2003 | 2236 | 2101 | a1 38 12 za00 | 1984 | 2083 | 2296 | oxo | o12 38 165 3400 | 1904 | 2003 | 2236 | 2101 | 012 38 i a I LOAD : 2.0 kg /om* Load DIAL GAGE (0.01 mm) SETTLEMENT] TEMP. i we [Team | eneer | exe] oxacs Tae | om | (6) 24 seco | _ta72 | 2071 | 2225 | 2089 [029 38 i 24 59.00 1971 2070 | 2224 | 2088 | 024 38 27 00 | 1e71_| 2070 | 2226 | 2088 | 024 23 20 5000 | 1970 | 2069 | 2223 | 2087 | 025 38 i 33 se00 | 1970 | 2060 | 2223 | 2087 | 025 38 36 50.00 | 1970 | 2069 | 2223 | 2087 | 025 38 I Page 2016 standards PROJECT ae ____Arplus DATE NABA ALSAHA HOSPITAL SAFCO [CLIENT |ALKAYAN TECHNICAL ARABIAN CONTRACTING CO. REFNo. __|ac-5701 LOCATION |SOUTH OF ELEVATOR [TEST No. [1 [TEST COND. DRYIUNSOAKED. TEST REF, [ASTD 119 TOAD: 3.0 kg/ om LOAD. TIME (BAR) GAGE1 | GAGE2 | GAGE3 | AVE. (mm) (°c) TIME (BAR) GAGE1 | GAGE2 | GAGE3 | AVE. (mm) (ec) LOAD : 5.0 kg/cm? we [Team [ences] cacea | cases [we | om | cer Fase Tog onc standards PROJECT [NABA ALSAHA HOSPITAL pate [ise i CLIENT [ALKAVAN TECHNICAL ARASIANONTRAGTINGCO [REF Wo, _[ao-sro1 LOCATION _ [SOUTH OF ELEVATOR [rest No._|1 i [TEST COND. |ORY/UNSOAKED [TEST REF. [astu 0 1106 n [COAD: 6OKg/em™ TOAD DIAL GAGE (0.01 mm) SETTLEMENT] TEMP. TIME (BAR) GAGE1 | GAGE2 | GAGE3 | AVE. (mm) ce) i sieve [seer [sas [2120 [eo | vee [28 96 reroo | 1883 | 1260 | 2128 | ros7| 156 39° i 29 yex00 | 1881_| 1059 | 2128 | tose | 157 39 102 1100 | 1879 | 1257 | 2127 | 1954 | 158 29 405 1s100 | 1877 | sess | 2126 | 1953 | 1.60 39 I UNLOADING ease aOKg Tom Te (ear) | cacet | cacez | caces | ave. | (mm (°c) 114 sooo | 1880 | tase | 2120 | 1056 | 157 39 i 47 tooo | 1881 | 1260 | 2130 | 1957 | 156 29 120) tio00 | 1801 | se60 | 2130 | 1957 | 158 2 123 s1000_ | 1862 | 1061 | 2131 | 1958 | 155 2 I LOAD : 20 kg /om’ LOAD DIAL GAGE (0.01 mm) SETTLEMENT] TEMP. i TIME (BAR) GAGE1 | GAGE2 | GAGES | AVE. (mm) (°c) 129 sooo | 1008 | tao | 2136 | 1964 | 148 39 i 1322 sooo | tess | seco | 2196 | 1964 | 1.48 39 135 sooo | 1803 | reco | 216 | 1968 | 148 39 | fe 138. 59.00 18.88. 18.69 21.36. 19.64, 1.48 39 ‘at sooo | tees | seco | 2136 | r96a| 148 39 1 148 sooo | 1690 | 1a60 | 2196 | 196s | 148 32 i Page 40/5 Together | beyond standards PROJECT —_[NABAALSAHA HOSPITAL DATE —_|13-Sep- EP ILOCATION _|SOUTH OF ELEVATOR, TEST No. 1 i [TEST COND. [DRYIUNSOAKED rest REF. [asTu0 1108 i LOAD : 0.0 kg/cm? LOAD DIAL GAGE (0.01 mm) SETTLEMENT] TEMP. i TIME wear) | caces | cace2 | aces | ave. (mm) (°c) 147 0.00 194a_| 2028 | 219 | 2053 | 060 29 i 150 0.00 seas _| 2026 | 2180 | 2053 | 060 39 153 0.00 seas | 2026 | 2180 | 2053 | 060 39 188 0.00 seaa_[ 2026 | 2169 | 2053] 60 39 162 0.00 reas | 2026 | 2180 | 2053] 060 30 i Page 50f5 Together i beyond standards September 14, 2023 Ref: QC-S701 Messrs: ALKAYAN TECHNICAL ARABIAN CONTRACTING CO. Riyadh Area, Kingdom of Saudi Arabia SUBJ: PLATE LOAD TEST No.2 FOR NABA ALSAHA HOSPITAL PROJECT, RIYADH AREA, KINGDOM OF SAUDI ARABIA Dear Sir: We are pleased to submit herewith the result of Plate Load Test (dry/unsoaked method) that was conducted last September 13, 2023, of the above-mentioned project located at South of Elevator, Riyadh Area, Kingdom of Saudi Arabia. ASTM D 1194 (Standard Test Method for Bearing Capacity of soil for static load) was used as test reference for the plate load test. The depth of the tested layer is equal to twice the diameter of the 60.0cm diameter plate used in the test. The test result shows that the maximum settlement for 6.0kg/cm? load ‘was 0.99 mm. Please see attached test result for further review. We appreciate this opportunity to be of service to you on this project. Please do not hesitate to contact us if you have any question on the results of the tests, or if we can be of any further service. Thank you and best regards, ‘SOIL & FOUNDATION CO., LTD. wang Engr. Omar Asfer Engr. Munzer Adanuf Lab. Eniginéer Laboratory Supervisor Laboratory Manager : Agplus SAFCO Togthhey on standards PLATE LOAD GRAPH ISAFCO PROJECT INABA ALSAHA HOSPITAL DATE Fis Sep-23 CLIENT [ALKAYAN TECHNICAL ARABIAN CONTRACTING CO. IREF. NO. lac-s701 LOCATION [SOUTH OF ELEVATOR TEST NO. 2 |TEST COND. DRYIUNSOAKED [TEST REF. lasnao tive i 25 30 LOAD INTENSITY (kg/em) ‘SUMMARY OF SETTLEMENT one, Yeonormen) SETTLEMENT REMARKS (00 [UNSOAKED| 0.00 INITIAL 70 [UNSOAKED| 040 LOADING 20 __|UNSOAKED] 030 LOADING 3.0 [UNSOAKED| 039 LOADING 40 lunsoaxen] 08 LOADING 50 __|UNSOAKED] O74 LOADING 60 ___|UNSOAKED] 088) LOADING 40 |unsoaxeo] 094 UNLOADING 20 __|UNSOAKED] 088 UNLOADING 0.0 [uNsoAKeD] 023 UNLOADING Page 1 ofS Teg hn standards Le aco ie Agplus I [PLATE LOAD TEST FP reo PROJECT [NABAALSAHA HOSPITAL DATE |i9-sep-29 i cuenr __|aLxavan TEouNCAL ARABIAN CONTRAGTINGCO [REF War acon Location _ [sour oF ELEVATOR [rest No. [2 | frest COND, [DRY/UNSOAKED [rest REF. [aso rio PLATE JACK LOAD COLUMN IWeichT (49) 30.00 WEIGHT (kg) | 25:00 [WEIGHT tka) I [LOAD kg J cm’ INITIAL READING I DIAL GAGE (0.01 mm) gacet | cace2 | cases | AVE. ziae | 2218 [2140 | 21.67 i LOADING i LOAD: 1.0kg/em™ | LOAD DIAL GAGE (0.01 mm) SETTLEMENT] TEMP, TIME (BAR) GAGE 1 GAGE2 | GAGE3 | AVE. (mm) (ec) i a sa Lag well gt gag | 6 sa00 | 2taa | 2208 [2134 [nso | 008 39 I ° 34.00 zia3 | 2207 | 2133 | 2158 | 009 38 12 saoo | 2is3 | 2207 | 2193 | 2158 | 0.09 39 15 soo | 2133 [207 | 2133 | 2158 | 0.09 39 I 18 3400 | 2is2 | 2206 | 2132 | 2157 | 010 39 I [_toap: 20Ke/ent LOAD DIAL GAGE (0.01 mm) SETTLEMENT] TEMP, I TIME (BAR) GAGE1 | GAGE2 | GAGE3 | AVE. (mm), (ce) 24 sooo | 211s | ares | 2120 [2140 | 026 39 24 saoo | 2113 [ 2tea | 2ni9 | 2139 | 028 39 30 sooo | 2112 | 2103 | xis | 2138 | 029 39 I 33 sa00 | 2112 | 212 | oni7 | 2137 | 020 39 36 sa0o | 2112 | 2ie2 | ani | 21s7 | 030 39 1 Page 20f6 I Together ih beyond I standards PROJECT [NASA ALSAHA HOSPITAL DATE 13. ei CLIENT |ALKAYAN TECHNICAL ARABIAN CONTRACTING CO. REF No. _|ac-s701 LOCATION __|SOUTH OF ELEVATOR TESTNo._|2 DRY/UNSOAKED. [rest REF. [AsTap 1104 LOAD DIAL GAGE (0.01 mm) SETTLEMENT] TEMP. TIME wear) | Gacet | Gace2 | Gaces | ave. | (mm) (sc) 39 65.00 aos [27a | are | 2130 [ 036 39 42 85.00 zio4 | oi7a [aa | 120 | 037 30 45 85.00 2103 | 2172 | 2110 | 2128 | 038 39 48 85.00 zio2 | 2171 | 2109 | 2127 | 039 39 51 85.00 2102 | 2171 | 2100 | a127 [030 39 54 85.00 aio2 | 2171 | 2100 | 2127 [ 039 39 LOAD: 4.0 kg/cm LOAD DIAL GAGE (0.01 mm) SETTLEMENT] TEMP. TIME (ear) | Gace1 | cace2 | Gaces | ave. | (mm) (cy Ea 110.00 zoor_| 2157 | 2098 | 2115 | 051 30 60 410.00 zoso | 2158 | 2097 | 2114 | 053 39 63 110.00 zoss | 21585 | 2006 | 2119 | 054 38 66 110.00 zos7_| 2154 | 2095 | 2112| 055 38 68 410.00 oss | 2153 | 2094 | 2111 | 056 39 72 110.00 zoas_| 2153 | 20908 | a1 056 39 LOAD : 5.0kg/em* LOAD DIAL GAGE (0.01 mm) SETTLEMENT| TEMP. TIME (ear) | cace1 | cace2 | caces | ave. | (mm) (cc) 75 135,00 2075 | 21.40 | 2082 | 2000 | 068 39 78 135,00 zo73_| 2138 | 2079 | 2087 | 070 39 at 136.00 zo71_| 2136 | 2078 | 2095 | 072 39 a4 436,00 2070 | 2135 | 2077 | 2004 | 073 30 ar 135,00 zoea_| 2136 | 2076 | 2093 | 074 39 90 495.00 zoeo | 2134 | 2076 | 2093 | 074 30 Page 3 ofS Tog thE os standards Togt he ong standards | © i [CLIENT |JALKAYAN TECHNICAL ARABIAN CONTRACTING CO. |REF No. [QC-5701 ILOCATION _|SOUTH OF ELEVATOR |TESTNo. |2 I [TEST COND. |DRY/UNSOAKED ITEST REF. astm 1194 TIME (BAR) GAGE1 GAGE2 GAGE 3 AVE. (mm) (°c) ee] eign | gaan | ates | anor [ero | Sage | oe Te RESO I io | ea ako | ana ea Toc TE ie || as |v g8 | Pav | Coen aw | a i 108, ver0o | 2046 | 2106 | 2051 | 2068] 090 2 i UNLOADING (era) | I Tan Sal auat Tay ecrcac TEe TIME (BAR) GAGE 1 GAGE2 | GAGES AVE. (mm) (ee) i 114 s1oco | 2060 | 2110 | 2056 | 2072| 095 39 fais] oop | osmss a] Pca oar [ome | ee oma aa | 11090 [ane | ents | onsr [-anzs | noe | a9 i rans gg ae a [eer en a es | Saag [ene [S| ater [Pons] Sine ew i LOAD : 2.0 kg / cm’ Toa paras anna sera |S veias | TIME (BAR) GAGE 1 GAGE2 | GAGE3 AVE. (mm) ce) wo | soo | 208 | 2120 | zoe | onre | nos | s0 I eee | ange | atan | eneo Tone | ose | so Ee |e we | pasa | Sosa | Seon [ove I at | =O [ Son | Tone | na awe |g orate a i aia] exon | aa a [ane | 1 aa | eno | anand | 220) “anon [Vane = was oo i noite i PROJECT _[NABA ALSANAHOSPITAL pate |issep23 AFCO CLIENT [ALKAYAN TECHNICAL ARABIAN CONTRACTING GO [REF No___|ac-s701 Location _|sourH oF ELevaTOR TESTNo. [2 [rest COND. [orviUNsoaKeD frestner.frowosice | LOAD: OO Kg lem LOAD DIAL GAGE (0.01 mm) SETTLEMENT] TEMP. Time ean) | cases | cace2 | cases | ave | mm | (°c) ur ooo | 2120 | aiss | ants [2r4¢ | 02s 2 150 oo | aiz0 | as | ants | 2140 | 025 2 159 ooo | azo [2190 | ants | 2148 | 023 22 156 ooo | 2120 [ares [ants | 2144 | 02s 32 159 ooo | 2120 | 2195 | arts | 2144 | 023 2 162 ooo [2120 | args [ants | 2144 | 023 9 Page of Tog onc standards September 14, 2023 Ref: QC-5701 Messrs: ALKAYAN TECHNICAL ARABIAN CONTRACTING CO. Riyadh Area, Kingdom of Saudi Arabia SUBJ: PLATE LOAD TEST No.3 FOR NABA ALSAHA HOSPITAL PROJECT, RIYADH AREA, KINGDOM OF SAUDI ARABIA Dear Sir: We are pleased to submit herewith the result of Plate Load Test (dry/unsoaked method) that was conducted last September 13, 2023, of the above-mentioned project located at South of Elevator, Riyadh Area, Kingdom of Saudi Arabia. ASTM D 1194 (Standard Test Method for Bearing Capacity of soil for static load) was used as test reference for the plate load test. The depth of the tested layer is equal to twice the diameter of the 60.0cm diameter plate used in the test. The test result shows that the maximum settlement for 6.0kg/cm? load was 1.33 mm. Please see attached test result for further review. We appreciate this opportunity to be of service to you on this project. Please do not hesitate to contact us if you have any question on the results of the tests, or if we can be of any further service. Thank you and best regards, SOIL & FOUNDATION CO., LTD. Jang Engr. Omar Asfer Engr. Munzer Adanuf Lab. Erigl Laboratory Supervisor Laboratory Manager Together standards PLATE LOAD GRAPH [PROJECT — NASA ATSARA HOSPITAL DATE Tis Sep-25 CLIENT [ALKAYAN TECHNICAL ARABIAN CONTRACTING CO. REF.NO. 00-5701 LOCATION — SOUTH OF ELEVATOR TEST NO.__|3. TEST COND. [DRYIUNSOAKED [TEST REF. [asto vee 0.400 0.600 0.800 [MEASURED SETTLEMENT mm) 4.000 4.200 1.400 oo 05 10 15 20 25 30 35 40 45 50 55 60 LOAD INTENSITY (kgiem) ‘SUMMARY OF SETTLEMENT AD eonomon] SELEWENT pears 00 [owsonreoy 000 rs 10 |onsonveo, 074 ToRONNG 20 —[nsonreo] 082 TORONNG a ToRONG 40 jonsonren) 077 TORONNG 50 Junsonnen) 400 LORONNG 30 [unsoneeol 129 CORON 70 [onsonceo) 108 TRLoAoWa 20 junsonceo) 47 UNLOADING 00 jowsonces) 04s GROANS Together lus® SAFCO yond standards PLATE LOAD TEST SAFCO |PROJECT INABA ALSAHA HOSPITAL DATE. 13-Sep-23 cLlcNT | WRAYAN TECHNICAL ARAB GCoWTRAGTNG GO. [REF Ne. —lacarox Locarion [sours oF e.evaror fest No. fest COND, Jomvansomeo Fat res nasties PLATE TREK TOAD COLUMN DIAMETER fom) 60.00 ICAPACITY _(t) 50.00_|LENGTH (m) fweicat —— ta) eiGiT —o9) WEGHT Ao) LOAD : 0.0 kg/ cm’] INITIAL READING DIAL GAGE (0.01 mm) cacet | cace2 | caces | ave, zoss | 1826 | 1805 | 10.45 LOADING LOAD DIAL GAGE (0.01 mm) SETTLEMENT] TEMP. (aR) | GAGE? | GAGE2 | GAGES | AVE. | (mm) (ec) 400 | 2048 | ter | 1005 | tes7 | o00 40 6 saoo | 2048 | tar | 1805 | 1937 | 009 40 @ soo | 2047 | ta7e | 1884 | 1036 | 010 40 12 3400 | 2047 | ta76 | 1884 | 1036 | 010 40 15 saoo_ | 2047 | ta7e | 1605 | 1936 | 009 40 18 3ao0__| 2047 | 1076 | 1680 | 1934] on 40 LOAD: 2.0 kg /em* LOAD DIAL GAGE (0.01 mm) SETTLEMENT| TEMP. TIME (ear) | cace1 | cace2 | caces | ave. | (mm) (ec) 24 59.00 203 1e43_ | 1e76 | 1017 | 029 40 24 58.00 2030 | 141 | 1875 | 1915 | 030 40 ar 59.00 2020 | 140 | 1875 | 1915 | o3t 40 30 58.00 2020 | 1a40 | 1875 | 1915 | 031 40 33 8.00 2028 | 1e30 | 1874 | 1914 | 032 40 36 58.00 2028 | 1830 | 1874 | 1914 [| 032 40 Page 2 of 5 Tog hE onc standards nme meee See eee eee eS eS eS ee jo |B ia PROJECT INABA ALSAHA HOSPITAL |DATE. /13-Sep-2¢ TOAD: 3.0kg/cm™ ; TIME (BAR) GAGE 1 GAGE2 | GAGES AVE. {mm) (°c) LOAD | ___ DIAL GAGE (0.01 mm) SETTLEMENT] TEMP. TIME (BAR) GAGE 1 GAGE2 | GAGES AVE. (mm) (ce) LOAD : 5.0 kg/cm* ie LOAD DIAL GAGE (0.01 mm) SETTLEMENT] TEMP. Me (ear) | Gases | Gace2 | caces | ave. | (mm | (°c) 75 13500 | 1972 | seo | te | 1853 | oss 40 72 13500 | 1972 | 164 | 1600 | 1843 | os7 40 a1 13800 | 1971 | 1763 | 1608 | te47 | 098 40 24 13500 | 1970 | 102 | 1207 | te47| ooo 40 87 13500 | 1970 | 1762 | aor | 1045 | ooo 40 30 13500 | 196 | 1762 | 106 | 1245] 1.00 40 Page 3016 Tegel on standards SAFCO Tog ond standards i ee _____Arolus® PROIEGT rasa SATA RGSPTAL pate [oer i [CLIENT |ALKAYAN TECHNICAL ARABIAN CONTRACTING CO. IREF No. |QC-5701 ocaTion [south oF ELEVATOR rest No [5 i [TEST COND. |ORY/UNSOAKED [TEST REF. [astm 1194 TIME (BAR) GAGE1 | GAGE2 | GAGES | AVE. (mm) ce) ee ee Sea apien tease] rar ran [eases] a0 ag fon 0a eamton [oe se | ran 2) are [Saf Sse [a i oe | ver | e88 | rs | ws Deel 1 | 0 I UNLOADING I Tom Sir Gnoe oTiE) serrcanent] EWP TIME (BAR) GAGE1 | GAGE2 | GAGE3 | AVE. (mm) (ec) i ila | chal ae = | Sarre See | too [seas [rz | erre [ants | 10 | ap eo pawn | eee aro |e | ae Saw ee [toa | eda [trae arn nie [as I LOAD : 2.0 kg/cm? Toa aL GAGE (0.01 mm) cement] TEM i TIME (BAR) GAGE 1 GAGE 2 GAGE 3 AVE. (mm) (ec) | 0 | we [rm | om | os) on | o i 132 59,00 19.49 17.44 az1_| 18.28 4.17 40 as | ewig | aaa (ran [Sar les | ar [an an | meno | oa | ran ern [sess | er | an i jai | areca | saa | ean Sr t | aae |p oo |e \ aS [eremgo | awa | rane Sarat [ive Lost Saleen 1 Pueacts @ ma Applus pate _[oseaFt sarco Tote ong standards PROJECT _[NABA ALSAHA HOSPITAL i CLIENT _[ALKAYAN TECHNICAL ARABIAN CONTRACTING CO. REF No. |ac-s701 LOCATION _|[soUTH OF ELEVATOR Test No. [3 i [TEST COND, [DRYIUNSOAKED lrest rer. [ast ies i LOAD: 0.0 kg/em™ LOAD DIAL GAGE (0.01 mm) SETTLEMENT I TIME (ear) | Gace | cace2 | caces | ave. (mm) “a7 0.00 zo0a | 146 | 1250 | 1900] 045 150 0.00 2004 | 1846 | 1850 | 1900] 04s 40 i we) ome | oe [nea Ins | oo | os [a 156 0.00 2004 | 1846 | 1250 | 1900] 045 40 i 169 0.00 2004 | 1846 | 1650 | 1900 | 045 40 162 0.00 200s | 1846 | 1250 | 1900 | 045 40 I Page 5 ofS September 16, 2023 Ref: QC-5701 Messrs: ALKAYAN TECHNICAL ARABIAN CONTRACTING CO. Riyadh Area, Kingdom of Saudi Arabia SUBJ: PLATE LOAD TEST No.4 FOR NABA ALSAHA HOSPITAL PROJECT, RIYADH AREA, KINGDOM OF SAUDI ARABIA Dear Sir: We are pleased to submit herewith the result of Plate Load Test (dry/unsoaked method) that was conducted last September 14, 2023, of the above-mentioned project located at Blevator-1, Riyadh Area, Kingdom of Saudi Arabia. ASTM D 1194 (Standard Test Method for Bearing Capacity of soil for static load) was used as test reference for the plate load test. The depth of the tested layer is equal to twice the diameter of the 60.0cm diameter plate used in the test. The test result shows that the maximum settlement for 6.0kg/cm? load was 1.62 mm. Please see attached test result for further review, We appreciate this opportunity to be of service to you on this project. Please do not hesitate to contact us if you have any question on the results of the tests, or if we can be of any further service, Thank you and best regards, SOIL & FOUNDATION CO., LTD. a ang _Engr. Omar Asfer Engr. Munzer Adanuf Lab. Engi Laboratory Supervisor Laboratory Manager : Agplus SAFCO Tog the standards PLATE LOAD GRAPH [PROJECT NABAALSAHA HOSPITAL [DATE [14-Sep-23 CLIENT |ALKAYAN TECHNICAL ARABIAN CONTRACTING GO, REF. NO. [00-5701 LOCATION [ELEVATOR -1 TEST NO._|4 TEST COND. [DRYIUNSOAKED. [TEST REF. [ASTD 1108 0.400 0.600 anes eee eee 0.800 1.000 4.200 MEASURED SETTLEMENT (min) oo 05 10 15 20 25 30 LOAD INTENSITY (kg/cm) ‘SUMMARY OF SETTLEMENT LOAD |conpirion| SETTLEMENT REMARKS (kgiem?) (mm) 0.0 [UNSOAKED| 0.00) INITIAL 110 |UNsoakeo| 021 LOADING 20 __[UNSOAKED| 0.38) LOADING 3.0 __|UNSOAKED| ost LOADING 40 __[UNSOAKED| 097, LOADING 50 __|UNSOAKED| 1.18 LOADING 60 __|UNSOAKED| 162 LOADING 40 __[UNSOAKED| 188 UNLOADING 20 __|UNSOAKED| 145) UNLOADING 0.0 __[UNSOAKED| 0.80 UNLOADING Tog hE os standards PLATE LOAD TEST eee Page 2015 TogeH ond standards i PROJECT [ABA ALSAHAHOSPITAL DATE [14-Sep-23 CLIENT _|ALKAYAN TECHNICAL ARABIAN CONTRACTING CO. REFNo. [ac-s701 Location _[ELevaTOR- 1 [TEST No. [4 PLATE JACK LOAD COLUMN Bo oaeres en [on former nT noo nor WEIGHT ig) 3000 WEIGHT _ (kg) 25.00 |WEIGHT (k INITIAL READING | DIAL GAGE (0.01 mm) ace | cace2 | caces | ave. 1 zo17_| 2018 | 2a7_| 2061 LOADING i LOAD: 1.0 kg /om™ LOAD DIAL GAGE (0.01 mm) SETTLEMENT] TEMP. i TIME (BAR) Gace’ | GAGE2 | GAGES | AVE. (mm) (°c) 3 34.00 2003 | 1999 | 2130 | 204e | o17 37 6 24.00 zooe | 1998 | 2120 | 2043 | 0.16 37 12 34.00 zoor | iver | 2128 | 2042 | 019 37 16 34.00 2000 | 1906 | 2127 | 2041 | 020 37 i FE | LOAD : 2.0 kg /cm* LOAD DIAL GAGE (0.01 mm) SETTLEMENT] | TEMP. i tme_[ “ean | oaser | oase2 | cxces ave | tm | (2) 2 59.00 veas_| 1982 | 2100 | 2026 | 034 37 I 24 59.00 19.87 19.79 21.07 | 20.24 0.36 37 27 59.00 vaes | 1979 | 2106 | 2024 | 037 37 30 58.00 vas | 1978 [2105 | 2023 | 0.38 37 I 33 59.00 1a85 | 1978 | 2105 | 2023 | 038 37 36 59.00 vaas_| 1978 | 2104 | 2022 | 038 37 ee ee i |PROJECT INABA ALSAHA HOSPITAL DATE |14-Sep-2¢ SAFCO CLIENT |ALKAVAN TECHNICAL ARABIAN CONTRAGTINGCO. [REF No. _[ac-s701 lLocarion _[eLeVATOR- + irestNo,_|s | HTEST COND. [ORYIUNSOAKED ester. swore | i | toAD: s.okeTem™ | LOAD. DIAL GAGE (0.01 mm) Tsermuement] TEMP. TIME. (BAR) GAGE 1 GAGE2 | GAGE3 | AVE. (mm) (ey i a 2 e500 | 1071 | 1950 | 2076 | 2003 | 058 38 i 45 85.00 19.69 19.57 20.76_| 20.01 0.60 38 48 ss.00 | 1960 | 1067 | 2076 | 2001 | 60 38 st e500 | 1968 | 1888 | 2078 | 2000 | 061 38 | 54 85.00 taes_| 1956 | 2075 | 2000] ost 38, TOAD DIAL GAGE (001 mm) GETTLeWENT] TEMP. i ie TIME (BAR) GAGE1 | GAGE2 | GAGES | AVE. (mm) (°C) 7 s1o00 | tea | 1028 | z0a1_| 1971 | oso w eo r1000 | 1040 | toz« | 2090 | 1907 | oss 38 i sa} 11000 | sos | 191 | 2097 | 100s | oes | oe 6 s10co | 1030 | 1020 | 2037 | 106s | ose 38 i 68 110.00 so37_| 1919 | 2038 | 1964 | 097 38 (rea v1o00 | 1937 | 191 | 2008 [106s | os7 8 rae I [tno sorgren? i cas mT Serine areal TIME (BAR) GAGE1 | GAGE2 | GAGE3 | AVE. (mm) (ec) 75 ‘2500 | 1929 | 1008 | 2020 | 1053 | 1.08 8 i Ds ras [ing amp eg |g day 1 13500 | 1921 | 1000 | 201 | 1945 | 116 28 I 4 ‘eso | 1019 | 1000 | 2019 | 104s | 1.17 38 7 aso | 1018 | tess | 2012 | 1043 | 118 38 I 90. 435.00 19.18 18.97. 20.12 19.42, 4.18 38 Page 3015 Tonether i oq Seyond standards Agplus® 14-sep23 J SA FCO Tog hE ong standards PROJECT _[NABA ALSAHA HOSPITAL, DATE i ouenr —[Aavan TEoHen, ABNGONTRAGTNG CO. REFN. _lac-7o1 Location _|evevator-+ [TeSTNo. [4 I [Test conp. |orviuNsoaKeD [Test REF. _|astao 1104 TOAD: 6.0 kg/ om’ [aoe Me (Bar) | GAGE1 | Gace2 | GAGES | AVE | (mm (°c) 6 reroo_| 1883 | 1a50 | 1973 | 1905 | 158 39 i 9 seroo | tase | sass | 1972 [1904 | 157 39 102 1100 | 1870 | 1956 | 1260 | 1901 | 150 39 4105 seroo | 1e77 | 1as4 | 167 | 1299] 161 39 i Spear [ar | Test ine ace a i UNLOADING TOAD: 40Kg/em TM (war) | Gacet | Gace2 | caces | Ave. | (mm | (°C) 14 sio00 | 1a72 | 1957 _| 1969 | 1902] 159 39 i a7 11000 | 1860 | 1258 | 1970 | 1903 | 158 99 120 sioo0 | tao | 1083 | 1070 | 1903 | 158 39 123 sio00_| 1a80 | 1858 | 1970 | 1903 | 158 29 LOAD DIAL GAGE (0.01 mm) SeTTueMeNT] | TEMP. | TIME ear, _| cace | cace2 | caces | ave. | im | (°C) 129 sooo | te | 1072 | 1904 | 1016 | 145 39 I 192 sooo | te | 1a72 | 1004 | ror | 145 39 135, sooo | te91 | 1a72 | 18s | to16 | 145 29 138 saoo | 1801 | 1072 | 1964 | tore | 145 29 i 144 sooo | seer | 1072 | toe | rose | 14s 39 i Page 4 of 6 Togelhe standards PROJECT _|NABAALSAHA HOSPITAL DATE lLocaTiON _|evevator- + TEST No. [4 i [TEST COND. [DRY/UNSOAKED reser. _|asruo ree q LOAD: 0.0kg/em* LOAD DIAL GAGE (0.01 mm) SETTLEMENT] TEMP. i TIME (ear) | cace1 | cace2 | caces | Ave. (rom) (ec) 147 0.00 1ear_| 1940 | 2084 | 1000] 080 32 150 ooo | tear | 1040 | 2058 | 1980 | 080 38 185 ooo | 1947 | 1240 | 2054 | 1920 | 080 39 i 159 ooo | 147 | 1240 | 2058 | 1980 | 080 39 162 00 | 1947 | 1240 | 2054 | 1980 | 080 22 I Page Sof September 16, 2023 Ref: QC-5701 Messrs: ALKAYAN TECHNICAL ARABIAN CONTRACTING CO. Riyadh Area, Kingdom of Saudi Arabia SUBJ: PLATE LOAD TEST No.5 FOR NABA ALSAHA HOSPITAL PROJECT, RIYADH AREA, KINGDOM OF SAUDI ARABIA Dear Sir: We are pleased to submit herewith the result of Plate Load Test (dry/unsoaked method) that was conducted last September 14, 2023, of the above-mentioned project located at Elevator-2, Riyadh Area, Kingdom of Saudi Arabia. ASTM D 1194 (Standard Test Method for Bearing Capacity of soil for static load) was used as test reference for the plate load test. The depth of the tested layer is equal to twice the diameter of the 60.0cm diameter plate used in the test. The test result shows that the maximum settlement for 6.0kg/cm? load was 1.26 mm. Please see attached test result for further review. We appreciate this opportunity to be of service to you on this project. Please do not hesitate to contact us if you have any question on the results of the tests, or if we can be of any further service. Thank you and best regards, SOIL & FOUNDATION CO., LTD. Engr. Omar Asfer Engr. Munzer Adanuf Laboratory Supervisor Laboratory Manager Tog onc standards Buch menceimras eee: = APIS PLATE LOAD GRAPH SAFCO PR INABA ALSAHA HOSPITAL TATE Ta-Sep 28 ICLIENT _—|ALKAVAN TECHNIGAL ARABIAN CONTRACTING CO. REF. NO,__|GC-5707 [LOCATION [ELEVATOR -2 TESTNO._[5. FTEST COND._[ORYIUNSOAKED. IrEST REF. —_|asTaD 4 MEASURED SETTLEMENT (om) 02830 40 LOAD INTENSITY ¢kalem*) ‘SUMMARY OF SETTLEMENT ‘SETTLEMENT a CONDITION MARKS, (rum) lUNSOAKED] 0.00 INITIAL, lUNSOAKED| 0.13 LOADING luNsoaKED| 038 LOADING [UNSOAKED| 082 LOADING |UNSOAKED| 0.86 LOADING [UNSOAKED| 1.04) LOADING [UNSOAKED| 1.26 LOADING [UNSOAKED| 1.22, UNLOADING UNSOAKED| (0.80 UNLOADING UNSOAKED| 0.48 UNLOADING Page tof 5 Hher Tog on standards came aie ; Agplus® Page 2 of 5 a | PLATE LOAD TEST SACO [PROJECT _[NABAALSAHA HOSPITAL DATE 14-Sep-23 Location _[ELevator-2 [Test No._|s i [TEST COND, [ORYiUNSOAKED rest REF. _|asrwo ee PLATE JACK LOAD COLUMN i aucten ten [aco —lospaory ty) | soon [vcr WEIGHT (kg) 30.00 WEIGHT _(xg) 25.00 |WEIGHT (kg) i LOAD : 0.0 kg / em’| INITIAL READING i DIAL GAGE (001 mm) cace1 | cace2 | caces | Ave. I zasz | 1982 | 2004 | 21.86 LOADING I LOAD: 1.0 kg/ em LOAD DIAL GAGE (0.01 mm) SETTLEMENT] TEMP. i TIME (aR) | Gacet | Gace2 | Gaces | AVE. | (mm) (ec) 3 34.00 zero | 1969 | 2087 | 2175 | ot 39 é 34.00) zaea_| 1967 | 2085 | 2173 | 013 38 i 2 zaco | 2468 | 1967 | 2005 | 2173 [018 20 2 34.00 zaes | 1067 | 2085 | 2173 | 013 30 16 34.00 zaes | 1967 | 2085 | 2173 | 013 39 i LOAD : 2.0 kg/cm? LOAD DIAL GAGE (0.01 mm) SETTLEMENT] TEMP. | TIME (ar)_| caces | cace2 | caces | ave. | mm) (ee) 21 58.00 zaaz | 1943 | 2069 | 2153 | 033 39 i 24 52,00 2445 | 1940 | 2068 | 2150 [036 39 27 58.00 2aas | 1940 | 2088 | 2150 | 036 38 30 58.00 zaas | 1939 | 2065 | 2149 | 037 39 i 33 58.00 24.43, 19.38 2064 | 21.48 0.38 39 36 59.00 243 | 1938 | 2064 | 2148 | 038 38 standards Together 4 | PROJECT [NAGA ALSAHA HOSPITAL DATE [iaser CLIENT |AKAVAN TECHNICAL ARABIAN CONTRACTING CO. [REF No. [00-570 ILOCATION _|ELEVATOR -2 ITEST No. _|5 rest COND. [oRYiUNSOAKED rest rer swore DIAL GAGE 0.04 am) SeTTLENENT] TEMP. rwe__ [ean | cacei | once | cases we | (mm | (°c) 2 e500 | 2421 | 1016 | 2040 | ziz0 | os | 2 500 | 2420 | soe | 2040 | 2127 | 050 | a0 4 ‘s 500 | zai | 1013 | 2047 | 2126 | ogo | 99 8 sco | ze | 1013 | 048 | 2120 | ogo | 0 1 500 | 2417 | 1012 | 2045 | 225 | oe | 39 st 500 | 2417 | 19.12 | aoas | 2124 062 | 29 a eS Toa DIAL GAGE 004 mm) SeTTLeNeNT] —TEWP, TIME (BAR) GAGE1 | GAGE2 | GAGE3 | AVE. (mm) (°C) sx | 1000 | see [120s | 2020 | 2107 | 070 | a9 co | 11000 | 2320 | 1980 | 2020 | 2x05 | oer | wooo | zs5 | 1eee | 2027 [2100 | oo | cs | tro0o | 2sse | seer | 2026 | z1o | oe | oo co | 1000 | ass9 | 1008 | 202s | 2101 | os | 20 721 11000 | 2882 | 1085 | aos | 2100 [086 | 99 LOAD : 5.0 kg/cm? LOAD DIAL GAGE (0.01 mm) cernewent] TEMP, TIME (BAR) GAGE 1 GAGE2 | GAGE3 | AVE. (mm) (°c) 76 | 12500 | 2060 [ 1260 [ 2015 | 2008 | oo | 29 7a | 13500 | 2078 [seer [2012 | 2005 [ 100 | 29 et 13500 | 2377 | 1o08 | 201 | 2005 | sor | 30 ea 13500_| 2076 | 1o0s | 210 | zee | 102 | 99 sx_| 13500 | 2075 | 106s | 2000 | zoes | 103 | oe co | 19500 | 2074 | 1063 | 2000 | zoe [ 10 | 29 Page 9015 Together lus SAFCO deyond standards PROJECT [NASA ALSAHA HOSPITAL DATE. JLOCATION _|ELEVATOR -2 |TESTNo. _|5 i fest COND. [DRY/UNSOAKED [rest REF. |astuo ies GAGE1 | GAGE2 | GAGE3 | AVE. (mm) (ce) i ee ee ee [ee [ones Dr Tae 6 1er00 | 2356 | seas | 1995 | 206s | 1.20 22 9 e100 | 2365 | aaa | 1993 | 206s | 122 39 405 tero0_ | 2359 | 1842 | 1080 | 2061] 125 39 | UNLOADING TOAD: 40Kgrem™ | i i Songs ore =| eee ME (BAR) | GAGE1 | GaGe2 | GAGES | AVE. | (mm) i 14 tio00 | 2355 | 1243 | 1001 | 2063 | 123 114 sioo0 | 23se | 1245 | tose | zoos | 122 39 47 s1o00_ | 2356 | 1045 | 1992 | zoe] 122 20 i [ie [oe [as | ne [ae] ia |= 123 t1000 | 2356 | 1045 | 1902 | 2064 | 122 38 1 LOAD DIAL GAGE (0.01 mm) SETTLEMENT] TEMP. i Time (war) | cages | Gacez | caces | ave. | (mm) (°c) 129 seco | 2360 | 1o5s | 1997 | 2104 | cee 39 i 132 59.00, zae3_| 1957 | 1997 | 2106 | 080 39 135, sooo | 2363 | 1957 | +907 | 2106 | oo 39 498 saco_| 2364 | 1957 2106 | 080 39 i | soo | ee | wer 2t0s | oa |» 1 va | s900_| 2364 | 1057 | 1297 [2106 | 080 39 a Page 4 ofS Together | beyond standards PROJECT _|NABAALSAHA HOSPITAL DATE E rh Tog thE os standards BL _euewr aver resica anasmncommcrncco, Ieee na loess JLOCATION _|ELEVATOR -2 ITESTNo. [5 I ITEST COND. |DRY/UNSOAKED [TesT REF. _|ASTMD 1194 i LOAD : 0,0 kg /cm* pal okaE pote oerumne] Ton I TIME (ear) | Gace1 | Gace2 | Gaces | Ave. (mm) (ec) eggs as gg ar aca gg | Fa oh as ea aaron | ae i ee September 16, 2023 Ref: QC-5701 Messrs: ALKAYAN TECHNICAL ARABIAN CONTRACTING CO. Riyadh Area, Kingdom of Saudi Arabia SUBJ: PLATE LOAD TEST No.6 FOR NABA ALSAHA HOSPITAL PROJECT, RIYADH AREA, KINGDOM OF SAUDI ARABIA Dear Sir: We are pleased to submit herewith the result of Plate Load Test (dry/unsoaked method) that was conducted last September 14, 2023, of the above-mentioned project located at East of the Elevator-2, Riyadh Area, Kingdom of Saudi Arabia. ASTM D 1194 (Standard Test Method for Bearing Capacity of soit for static load) was used as test reference Jor the plate load test. The depth of the tested layer is equal to twice the diameter of the 60.0cm diameter plate used in the test. The test result shows that the maximum settlement for 6.0kg/cm? load was 1.52 mm. Please see attached test result for further review. We appreciate this opportunity to be of service to you on this project. Please do not hesitate to contact us if you have any question on the results of the tests, or if we can be of any further service, Thank you and best regards, SOIL & FOUNDATION CO., LTD. ie ang Engr. Omar Asfer Engr. Munzer Adanuf Lab. By r Laboratory Supervisor Laboratory Manager . Arp SAFCO Tog oc standards oe ee Agplus PLATE LOAD GRAPH SAFCO eS eee) [PROJECT —[NABA ALSAHA HOSPITAL [DATE [i-sep-23_] [CLIENT [ALKAYAN TECHNICAL ARABIAN CONTRACTING CO, IREF.NO._ac-5707 LOCATION — |EAST OF THE ELEVATOR -2 ITESTNO. [6 [TEST COND. [DRVIUNSOAKED. [TEST REF. _[AsTuD Hier 0.000 0.200 0.400 0.800 0.800 | 4.900 MEASURED SETTLEMENT (mm) 1.200 1.400 | — , 1.800) 00 05 «10 152 0 25 «30 (35 LOAD INTENSITY (kgfem!) SUMMARY OF SETTLEMENT eoH0.Teonomon] SETTLEMENT REMARKS 00 [oNsoareo] a0 ITAL 10 |unsoareo] 02a Toaowe 20 Junsoareo) oa TOAD 30 unsoaxeol 08 LOADING 40 |onsoaxeo] 098 TOADNG 30 |unsoaxeop 178 TOADS 60 junsonxeol 182 TOAD 40 Junsoaxeo] ta? UNLOAOHG 20 unsoaxeo] ———r08 UNLOADING 00 |unsonxeol oar UNLOADING page tots Tog hE onc standards Arp lus SAFCO Tog on standards i | [PLATE LOAD TEST ] PRneoT a en anueaTAl GATE asa I CLIENT ALKAYAN TECHNICAL ARABIAN CONTRACTING 60. ]REF Nox Joceror pocATN” EKStor Hie aEVATOA rasrnsiske i rest con, [onyiuNsoaKED Tester hasnore PLATE oRGR ToaD COLUM 0 bee ee ee ee ert gay onan leer eg eee I LOAD ibaa INITIAL READING i DIAL GAGE (0.01 mm). ence eigen PE mame mesa ast i LOADING i O kg /. om ow paLGias aia erica TET TIME (BAR) GAGE 1 GAGE 2 GAGE 3 AVE. (mm) (ec) i Se pkg [asa ones | eee | as | coe al eo] adeg [wwe | nes] ese ae oe Te I 8 34.00 19.62 20.59 1695 | 19.12 022 39 sa sao ane) Panes | tas [ate ee | et | ase [onigee Tl eaag | mee [ath = eee | LOAD : 2.0 kg/.cm* L iam BAL ason aaa aeriaseni| are | TIME (BAR) GAGE1 GAGE 2 GAGES AVE. (mm) (°c) ed Ee 7 2a [as soma vena gpa Tl ernen [tees | oes | ae i | gpg I Trsere uae tag ieee eee Soe [gga | erage onan aires [tae ene ee | 33 59.00 19.66 20.38 16.78 18.94 0.40 39 2 sos me te ee ee \ raza PROJECT _|NABAALSAHA HOSPITAL DATE 14-Sep-2023] S A FCO ICLIENT, |ALKAYAN TECHNICAL ARABIAN CONTRACTING CO. REF No. _|ac-s701 LOCATION __|EAST OF THE ELEVATOR-2 TEST No. _|6 [TEST COND. [ORY/UNSOAKED [restREr. [ASTD 1104 TOAD: 3.0 kg/ em Tog ong standards TIME (wary | Gacet | GAGE? | GAGES | AVE. | (mm) (°c) I 39 asco | 1952 | 201 | 163 | te7e | 056 38 42 aso0_ | 1947 | 2015 | 1650 | 1074 | 061 32 45 esoo [1946 [2014 | 1658 | 1873 | 062 39 31 e500 | teas [2013 | 1656 | 1071 | 069 39 i 54 sco [1944 | 2012 | 1655 [1270] 064 39 LOAD: 40kg/ om TIME qwar)_| cacet | cace2 | caces | ave. | mm (°e) i sx | 11000 [1029 | toes | see | sar | ons | a9 60 sioo0_| tore | 1982 | 1628 | rea [ost 30 I 63 410.00 49.17 19.80 16.26 | 18.41 0.93 39 66 sooo | 1945 | 1970 | 1625 | 1840 | os 39 69 sooo | 1015 | 1970 | 1625 | te40 | os 39 | [00 | sete | 197 [1524 | 1339 | 008 | 90 I LOAD: 5.0 kg/cm? LOAD, DIAL GAGE (0.01 mm) SETTLEMENT] | TEMP. i TM ear) | caces | cace2 | caces | ave. | im | (°c) 75 saso0_| 1903 | 1260 | 1618 | te27 | 1.07 29 81 13500 | 187 | 1056 | 1609 | se21 | 1.14 39 i 4 13.00 _| 1895 | 1055 | 1605 | te10 | 116 39 87 sas00_| 1095 | 184 [1603 | te17 [sar 38 $0 1500 | 180s | t95¢ | 1602 | 1817] 1.18 30 PROJECT INABA ALSAHA HOSPITAL [DATE 14-Sep-23 |SAFCO | ICLIENT __|ALKAYAN TECHNICAL ARABIAN CONTRACTING CO. REF No. _|ac-s7o1 LocaTION EAST OF THE ELEVATOR-2 [TEST No. |e I [TEST COND. [DRY/UNSOAKED [TesTREF. [actu ro0 LOAD : 6.0 kg / cm’ i =] LOAD DIAL GAGE (0.01 mm) SETTLEMENT] TEMP, TIME (BAR) GAGE 4 GAGE2 | GAGES | AVE. (mm) (°c) | 3 161.00 se7a_| 1920 | 1574 | ar02] 1.42 29 96 11.00 | 1868 | 1021 | 1560 | 1706 | 140 39 99 161.00 | 1865 | 1919 | 1568 | 17.98 | 150 30 i 102 rei00 | sees | 1918 [ 1567 | 1703 | 151 a 105 seco | 1864 | 1017 | 1566 | 1762 | 1.50 38 | 108 161.00 18.63 19.47 1566_| 17.82 1.52 39 i UNLOADING [_toab: a0Kerem?—] I e TOAD DIAL GAGE [DOT aD sermiewenr] TEMP” TIME (BAR) GAGE 1 GAGE2 | GAGE3 | AVE. (mm) (ee) i 414 410.00 18.67 19.21 4570_| 17.86 4.48 ES 114 +1000 | 1863 | 1922 | 1571 | 107 | 147 39 17 +1000 | 1868 [4022 [1571 | 1797 [147 32 i wo | 11000 | 1808 | sez | 1571 | ser | 147 | a9 123, sio00 | 1368 | te22 | 1671 | aver | var 39 a vs [v0 [ase [2 [en Tver | | i LOAD : 2.0 kg/cm LOAD DIAL GAGE (0.01 mm) SETTLEMENT] TEMP. | TIME ear) | aces | cace2 | cases | ave. | (mm | (°C) 129 seco | 1a7e | sea2 | 1600 | 1790 | 135 39 i 132 sooo | 1976 | 1932 | 1500 | 1790 | 125 39 136 seo | 1e76 [1032 | 1590 | 190 | 135 30 198 seo | 1a76 | 1032 | 1590 | 1790 | 1.35 39 144 se0o [1376 [1992 | 1500 | 1790 | 135 39 I Page dof Together beyond i standards PROJECT INABA ALSAHA HOSPITAL DATE 14-Sep-23 JSAFCO LOCATION _ EAST OF THE ELEVATOR-2 [TEST No. [5 i ITEST COND. |DRY/UNSOAKED [TEST REF. [ASTM 0 1194 i LOAD : 0.0 kg/cm? LOAD DIAL GAGE (0.01 mm) SETTLEMENT] TEMP. i TIME (BAR) GAGE1 | GAGE2 | GAGES | AVE. (rm) (°c) 147 0.00 1o40_ | 1998 | 1686 | tees | o70 20 150 0.00 1942 | too | 1658 | 1866 | oe 39 i 1s | ooo | 1942 | 150 | ses0 | ssa | 067 | 20 186 0.00 1943_| 2000 | 1650 | se67 | 67 29 I 159 0.00 1943 | 2000 | 1659 | re67 | ocr 20 162 0.00 1943 [2000 | 1650 | 1067 | 067 29 r Pages of 5 Together J beyond | standards September 17, 2023 Ref: QC-5701 Messrs: ALKAYAN TECHNICAL ARABIAN CONTRACTING CO. Riyadh Area, Kingdom of Saudi Arabia SUBJ: PLATE LOAD TEST No.7 FOR NABA ALSAHA HOSPITAL PROJECT, RIYADH AREA, KINGDOM OF SAUDI ARABIA Dear Sir: We are pleased to submit herewith the result of Plate Load Test (dry/unsoaked method) that was conducted last September 16, 2023, of the above-mentioned project located at West of the Elevator-1, Riyadh Area, Kingdom of Saudi Arabia. ASTM D 1194 (Standard Test Method for Bearing Capacity of soil for static load) was used as test reference for the plate load test. The depth of the tested layer is equal to twice the diameter of the 60.0cm diameter plate used in the test. The test result shows that the maximum settlement for 6.0kg/cm? load was 2.04 mm. Please see attached test result for further review. We appreciate this opportunity to be of service to you on this project. Please do not hesitate to contact us if you have any question on the results of the tests, or if we can be of any further service. Thank you and best regards, SOIL & FOUNDATION CO., LTD. ‘ fell ang Engr. Omar Asfer Engr. Munzer Adanuf Lab. B ir Laboratory Supervisor Laboratory Manager : Arplus® SAFCO Together standards PLATE LOAD GRAPH [NAGA ALSAHA HOSPITAL ]OATE Sep] [CLIENT [ALKAYAN TECHNICAL ARABIAN CONTRACTING CO, REF. NO. [00-5701 WEST OF THE ELEVATOR- 1 TEST NO._[7 J JDRYUNSOAKED [Test REF. [asTwo 1160 0.500 1.000 41500 MEASURED SETTLEMENT (rm) 00 05 10 15 20 25 30 35 40 LOAD INTENSITY (kg/em’) ‘SUMMARY OF SETTLEMENT ‘SETTLEMENT ‘CONDITION i lUNSOAKED| REMARKS INITIAL UNSOAKED| LOADING UNSOAKEt LOADING luNSOAKED| LOADING UNSOAKED| LOADING lUNSOAKED| LOADING [UNSOAKED] LOADING lUNSOAKED| UNLOADING [UNSOAKED| UNLOADING UNSOAKED| UNLOADING Tog on standards PLATE LOAD TEST Tog AE on standards i —— PROJECT INABA ALSAHA HOSPITAL DATE 16-Sep-23 I TEST COND. [DRY/UNSOAKED. [TEST REF. _|astwp 1164 i pee — tn | aor emer te [a bo i LOAD 0g en INITIAL READING i DIAL GAGE (0.01 mm) i LOADING i LOAD: 1.0 kg/em™ LoaD | DIAL GAGE (0.04 mm) SETTLEMENT] TEMP. | TIME (BAR) GAGE 1 GAGE2 | GAGE3 | AVE. (mm) (ec) I 9 34,00 20.05 2110 | 2243 | 21.08 034 39 | eee | LOAD : 2.0 kg/cm? | TIME (BAR) GAGE1 GAGE2 | GAGES | AVE. (mm) (°C) i 21 ~sa00 | 1978 [2066 | ats0 | soar | oss Ts i 33 59.00 1976 20.83 2188 | 2082 0.61 39 FE s PROJECT __|NABA ALSAHA HOSPITAL, DATE |16-Sep-2023] S A F.C CLIENT |ALKAYAN TECHNICAL ARABIAN CONTRACTING CO. REF No. |ac-s701 LOCATION _|WEST OF THE ELEVATOR - 1 TEST No. _|7 [TEST COND. [pRY/UNSOAKED [rest Re. [AStW0 s100 LOAD: S.0kg/om E LOAD DIAL GAGE (0.01 mm) SETTLEMENT] TEMP. TIME wear) | cace1 | Gace2 | GAGES | AVE. (mm) (°c) 38 85.00 s9ss_| 2066 | 2174 | 2065 [079 39 a2 85.00 1954 | 2065 | 2173 | 2064 | 080 39 45 85.00 19s2_| 2063 [2171 | 2062 | o82 39 48 85.00 tos2_| 2063 | 2171 | 2062 [082 39 5 85.00 1o51_| 2062 | 2170 | 2061 | 083 39 54 25.00 so51_[ 2062 [2170 [2061 [083 38 LOAD: 4.0 kg lem? LOAD DIAL GAGE (0.01 mm) SETTLEMENT] TEMP, TIME wear) | aces | cace2 | caces | ave. | (mm) (ec) 7 410.00 1924 | 2037 | 2147 | 2036 | 1.08 39 60 110.00, 1921 | 2035 | 2145 | 2034 | 1.40 30 110.00 to17_| 2092 | 2149 | 2031 4.13 38 6 410.00 tors | 2031 | 2142 | 2030 | 4.14 39 69 110.00 so1o_| 2027 | 2137 | 2025 | 1.19 39 2 110.00 sg09_| 20268 | 2136 [2024 [120 39 LOAD DIAL GAGE (0.01 mm) SETTLEMENT| TEM TIME wear) | Gace1 | cace2 | caces | ave. | (mm) (°C) 75 435.00 seo1_| 2012 | 2124 | 2000 | 4.35 38 78 436.00 sees | 2004 | 2120 | 2003 | 1.41 39 8 135.00 1ee2_| 2003 | 2110 | 2001 4.42. 39 24 135.00 were | 1997 | 2114 | 1006 | 1.48 39 a 496.00 174 | 1995 | 2113 | 1904 | 4.50 39 80 135.00 se7s_| 1940 | 2112 | 1975 | 1.69 39 Page 3 ofS Tog the on standards PROJECT __[NABA ALSAHA HOSPITAL pate |re.sep2s "| sAFCO Eo cunt hwvaecmon aancsmmitacs — eerie levers JLOCATION _|WEST OF THE ELEVATOR-1 [TEST No. __|7 i [TEST COND. |DRY/UNSOAKED [TEST REF. |asTMD 1104 TOAD: 60 Kg/ om Time (Bar) | Gace1 | Gace2 | Gases | Ave. | (mm) (ec) 96 rei00 | 1326 | 1052 | 2070 | to4o | 1.04 397° Ey 161.00 | 1921 | 1043 | 2065 | 10.45 | 199 39 405, sero0_| tae | 1043 | 2002 | 940 | 209 39 I 708, sero | 1ais_[ 142 | 2081 | 1030 | 2.04 39 I UNLOADING aera] 740 Kgl em i Ta So Gea my] eercaee] Tear TIME (Bar) | GAGe1 | GaGe2 | GAGES | AVE | (mm) (°c) I m1 s1o00 | tare | 1946 | 2056 | 1943 | 201 39 114 sooo | 1818 | 1946 | 2068 | 1043 [201 39 1 47 11000 | 1810 | 1047 | 2065 | 1044 | 2.00 39 20 sooo | ta10 | se4r | 2065 | 1944 | 200 39 123, s1000_| sets | tear [| 2065 | 1044 | 200 33 I 126 r1000 | tate [ to47 | 2065 | 10.44 | 2.00 39 i LOAD : 2.0 kg /em’ LoaD DIAL GAGE (0.01 mm) SETTLEMENT] TEMP. i nu [Bane Nanse | akaesil faa [ewer SS epee ey 20 sao | set | 1960 | 2077 [1056 [180 39 i 132 59.00 18.31 19.60 20.77 | 19.56 1.88 39 135 sooo | 1a31 | 1960 | 2077 | 1956 | 198 30 128 seoo | 1031 | 1960 | 2077 | 1956 | 108 39 i 11 | sooo | eas | too [2077 | 1058 | 108 | 0 144 59,00 sas1_| 1960 | 2077 | 1956 [1.08 39 i Page 4 of Tonether beyond i standards INABA ALSAHA HOSPITAL DATE 16-Sep-23 |ALKAYAN TECHNICAL ARABIAN CONTRACTING CO. REF No. lac-s701 WEST OF THE ELEVATOR- 1 [TEST No. lz DRYMUNSOAKED. lresT REF. lastw 0 1104 Toqte o standards i LOAD DIAL GAGE (0.01 mm) SETTLEMENT] | TEMP, i TIME ar) | cases | cace2 | caces | ave. | (mm (°) 147 0.00 1o0s_| 2030 | 213 | 2030] 1.19 39 4150 0.00 1908 | 2030 | ars | 2030 | 1.13 39 i sx | oco | 908 [2050 | z1ss | aos0 | 11s | a» 186 0.00 1908 | 2030 | o1s3 | 2030 | 1.19 39 I 159 0.00 1908 _| 2030 | 2183 | 2030] 1.13 39 162 0.00 sg08_ [2030 [ 2183 [ 2030] 313 38 i Page 5 of 5 September 17, 2023 Ref: QC-5701 Messrs: ALKAYAN TECHNICAL ARABIAN CONTRACTING CO. Riyadh Area, Kingdom of Saudi Arabia SUBJ: PLATE LOAD TEST No.8 FOR NABA ALSAHA HOSPITAL PROJEt Dear Sir: We are pleased to submit herewith the result of Plate Load Test (dry/unsoaked method) that was conducted last September 16, 2023, of the above-mentioned project located at West Tower Crane, Riyadh Area, Kingdom of Saudi Arabia. ASTM D 1194 (Standard Test Method for Bearing Capacity of soil for static load) was used as test reference for the plate load test. The depth of the tested layer is equal to twice the diameter of the 60.0cm diameter plate used in the test. The test result shows that the maximum settlement for 6.0kg/cm? load was 2.18 mm. Please see attached test result for further review. We appreciate this opportunity to be of service to you on this project. Please do not hesitate to contact us if you have any question on the results of the tests, or if we can be of any further service, Thank you and best regards, SOIL & FOUNDATION CO., LTD. jang —-Engr. Omar Asfer Engr. Munzer Adanuf Lab. E Laboratory Supervisor Laboratory Manager ees Agplus SAFCO Tog tthE onc standards PLATE LOAD GRAPH [PROJECT —[NABAALSAHAHOSPITAL [DATE __—[re.sep.23_| CLIENT JALKAYAN TECHNICAL ARABIAN CONTRACTING CO. IREF. NO. [a¢-6701 LOCATION WEST TOWER CRANE. TEST NO.__[8 TEST COND. DRYIUNSOAKED. EST REF. _|asTw0 1104 MEASURED SETTLEMENT (mm) 20 25 30 35 LOAD INTENSITY (kgJem) ‘SUMMARY OF SETTLEMENT u eee CONDITION SR REMARKS. (00 [UNSOAKEO| 0.00 INTIAL 710 [unsoaxeo] 028 LOADING 20 [UNSOAKED| 053 LOADING 30 |UNSOAKED| 134 LOADING 40__[UNSOAKED| 161 LOADING 50 [UNSOAKED| 187 LOADING 0 [UNsOAKED 248 LOADING 40__[UNSOAKED| 2a8 UNLOADING 20 __[UNSOAKED| 2.00 UNLOADING 0.9 _[UNSOAKED| 122 UNLOADING Page 1 of 5 Tog ong standards PROJECT INABA ALSAHA HOSPITAL Agplus PLATE LOAD TEST _l] FER DATE 16-Sep-23 [CLIENT |ALKAYAN TECHNICAL ARABIAN CONTRACTING CO. REF No. _|ac-s701 LOCATION _|WEST TOWER CRANE TESTNo. |e [TEST COND. [oRYiUNSOAKED TESTREF. [asm 1104 Togee nd standards JACK LOAD COLUMN i cxpaciry uy | sous [enotu ey WEIGHT (kg) 25.00 [WEIGHT (kg) I LOAD : 0.0 kg /cm’| INITIAL READING GAGE2 | GAGES i 2273_[ 2241 LOADING LOAD DIAL GAGE (0.01 mm) SETTLEMENT] TEMP, i TIME, (ear) | cace1 | cace2 | caces | Ave. (mm) (°c) 3 34.00 za4o | 2242 | 2216 | 2266 | 028 39 6 34.00 zasr_| 2240 | 2215 | 2264 | 028 39 i ose [aos ae | oie [oes | os | ae 12 34.00 zas6 | 22a0 | 2215 | 2263 | 029 39 15 34.00 2335 [2239 | 2215 | 2263 | 029 39 i 18 | seeo [38 | 229 | ma18 [2203 | 028 [0 i OKg/em* LOAD DIAL GAGE (0.01 mm) SETTLEMENT] TEMP. 24 59.00 zara | 2222 | 2195 | 2245 | 047 39 | 24 59.00 23.16 22.15 2isa | 22.42 051 30 27 59.00 2314 | 2214 | 2193 | 2240 | 052 39 30 59.00 zara | 2213 | 2193 | 2240 | 052 39 i 33 59.00 zaiz_[ 2213 | 2163 | 2240 | 053 39 38 59.00 23.13 | 2213 [ 2183 | 2240 | 053 39 I Page 20f5 PROJECT [NABA ALSAHA HOSPITAL bate JCLIENT __[ALKAVAN TECHNICAL ARABIAN CONTRACTING CO. [REF No. |ac-s701 LOCATION _|WesT TOWER CRANE [rest No. |e [TEST COND. [DRY/UNSOAKED rest REF. [sto 1108 TOAD: 30 Kg7om™ LOAD DIAL GAGE (0.01 mm) SETTLEMENT] TEMP. Time (Bar) | GAGe1 | Gace2 | Gaces | Ave. | mm | (°C) 39 soo | 2207 | 2103 [| ares | 2165 | 127 3 42 500 | 2200 | 2008 | 2182 | 2160] 1.32 29 45 asco | 2199 | 2007 | 2161 | 2159 | 133 39 43 asco | 2199 | aor | aver | 2150 | 1.33 29 31 asco | 2198 | 2008 | 210 | 2158 | 1.34 39 54 asco | 2198 | 2006 | 2180 | 2158 | 134 39 [ LOAD: 40kg/cm™ | LOAD DIAL GAGE (0.01 mm) SETTLEMENT] TEMP. TIME: (Bar) | Gacet | GaGE2 | GAGES | AVE. (ram) (°c) 57 ro0o | 2183 | 2o7ra | arse | 2140 | 152 39 0 r1o00 | 2177 | 2070 | 2re2 | 2138 | 1.56 33 83 sio00_ | 2174 | 2068 | 2ns7 | 2133 | 150 39 85 rio00 | 217s | 2067 | arse | 2132 | 160 39 v1o00 | 2173 | 206s | ass | 21s2 | 161 39 72 viooo | 2173 | 2066 | 2155 [21a] 161 39 LOAD: 5.0 kg/em* DIAL GAGE (0.01 min) SETTLEMENT] TEMP. TIME cacet | cace2 | caces | ave. | (mm | (°c) 75 aiss_| 2047 | 2rg7 | onsa | 178 39 73 aist | 2043 | 2135 | onto | 143 39 at ziao | 2041 | 2194 | 2n08 | 104 30 8a zie | 20.40 sa_| anor | 185 39 87 2iar_| 2039 2 | 2105 | 1.86 38 29 21a | 2038 2105 | 187 39 Page 30f5 wold SAFCO Together standards PROJECT INABA ALSAHA HOSPITAL DATE e-sep-23 | SAFCO CLIENT __[ALKAYAN TECHNICAL ARABIAN CONTRACTING CO. REF No. _|a0-s701 LOCATION _|WEST TOWER CRANE [TEST No. |e [TEST COND. [DRY/UNSOAKED [rest rer. [asmio oe LOAD: 6.0 kg/em™ LOAD: 4.0kg7em™ LOAD DIAL GAGE (0.01 mm) SETTLEMENT] TEMP. TIME (ear) | cacet | cace2 | caces | ave. | (mm) (eC) 93 161.00 2126 | 2014 | 2110 | 2083 | 209 39 98 161.00 2121 | 2010 | 21.08 | 2070 | 213 30+ 98 161.00 2119 | 2000 | 2105 | 2078 | 218 38 102 161.00 zie | 2008 | 21.04 | 2077 | 216 39 105 161.00 2116_| 2007 | 2103 | 2075 | 2.17 39 108 161.00 211s | 2006 | 2102 | 2074 [218 UNLOADING LOAD DIAL GAGE (0.01 mm) SETTLEMENT] TEMP. TIME (ear) | _Gace1 | Gace2 | cases | ave. | (mm) (ec) 114 410.00 211s | 2010 | 2108 | 2070 | 2.14 39 114 110.00 21a | 2010 | 2108 | 2070 | 214 38 a7 410.00 2119 | 2011 | 2109 | 2080 | 2.13 38 420 410.00 zite_| 2011 | 2109 | 2080 | 213 38 423 410.00 zig | 2011 | 2109 | 2080 | 2.13 39 126 110.00 zie | 2011 | 2109 | 2080 [ 213 39 LOAD : 2.0 kg/cm? LOAD DIAL GAGE (0.01 mm) SETTLEMENT] TEMP. TIME wear) | cace1 | cace2 | caces | ave. | (mm) hc) 128 59.00 2120 | 2027 | 2121 | 2092 | 200 39 432 58.00 2120 | 2027 | 2121 | 2092 | 200 38 435 59.00 2120 | 2027 | 2121 | 2092 | 200 38 138 59.00 2129 | 2027 | 2121 | 2092 | 200 39 441 59.00 2120 | 2027 | 2121 | 2092 | 200 39 144 59.00 2120 | 2027 | 2121 | 2092 | 200 39 Page 4 of 5 Tog standards Together 4 standards PROJECT [NABA ALSAHA HOSPITAL DATE LOCATION _|west TOWER CRANE TEST No. _|3 i [TEST COND. [DRViUNSOAKED frestrer._|astwo ise i LOAD : 0.0 kg/em* DIAL GAGE (0.01 mm) SETTLEMENT] | TEMP, I GAGE1 | GAGE2 | GAGES | AVE. (mm) (ec) zoo | 220 | ae2 | arm | 12 39 150 0.00 z200 | 2120 | 21e2 | arr | 122 39 i a | ow | 20 [aie [ain [en | ae [ao 186 0.00 2200 | 220 | 2192 | avr | 122 39 162 0.09 zoo | 220 | 2192 [am | 122 39 i Page 6 of 5 September 17, 2023 Ref: QC-5701 Messrs: ALKAYAN TECHNICAL ARABIAN CONTRACTING CO. Riyadh Area, Kingdom of Saudi Arabia ‘SUBJ: PLATE LOAD TEST No.9 FOR NABA ALSAHA HOSPITAL PROJECT, RIYADH ‘KINGDOM OF SAUDI ARABIA Dear Sir: We are pleased to submit herewith the result of Plate Load Test (dry/unsoaked method) that was conducted last September 16, 2023, of the above-mentioned project located at Between the two elevators, Riyadh Area, Kingdom of Saudi Arabia. ASTM D 1194 (Standard Test Method for Bearing Capacity of soil for ‘static load) was used as test reference for the plate load test. The depth of the tested layer is equal to twice the diameter of the 60.0cm diameter plate used in the test. The test result shows that the maximum settlement for 6.0kg/cm? load was 2.91 mm. Please see attached test result for further review. We appreciate this opportunity to be of service to you on this project. Please do not hesitate to contact us if you have any question on the results of the tests, or if we can be of any further service. Thank you and best regards, SOIL & FOUNDATION CO., LTD. a Cl wang Engr. Omar Asfer Engr. Munzer Adanuf Lab. ir Laboratory Supervisor Laboratory Manager Agplus® SAFCO Tog hE ong standards

You might also like