Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Net Support Force

Height Length Power


Model Weight R1 R2
H(mm) L(mm) (KW)
KN KN KN
ML 35 B1000
A 6000person/hour 3500 9904 64 64 57 7.5
speed 0.5m/s
ConcRete opening L=9904
Truss Length 9824
Floor opening ≥6460+1.428×S
2002 Working Point 4999 2823 1540 1540
when distance between handrail center line and balustrade 1237 1237
is less than 500mm,triangle protect plate shall be provided.
1000 1000
Min=300

900
S

1010

400
230

1. According to safety standard, the escalator


Min=2300

MOTOR(IP21) step=600mm, the truss length should add 417MM.

H=3500
2. On the R1,R2, parts for loading shall be
provided, it's carrying capacity shall be more
than R1,R2.
76

3. When installation happens up second floor,


8

remove the pit. The up and lower pit should be


91
7

symmetrical.
900

35°

4. At the landings of the escalator, a


sufficient unrestricted area shall be available.
≥1100

The width shall be at least1237mm.The depth


1010

A shall be at least 2500mm, measured from the end


1:10
of the balustrade.
≥4140 5. Main power is three phase 380VAC +7%, 40A.
≥3200 Lighting power is single phase220VAC,15A.User
provide a grounded point with a less than
4Ω.Line assembly of main power shall follow
Ø100
three phase five lines. (By others)
≥ 80KN
Floor opening ≥6460+1.428×S AFFIRM:The customer accept the drawing
cast after assembly
170 customer
Affirm:
Fitment surface 170
Date:

135
1000
1237
1540
Order:

300
Min=4200

≥3200
Compact NO.:
Darwing Travolater

1237
1000

1540
steel stick δ20×150×1600
customer Design Layout
steel 6-Φ16×150 40
170 Approve MLTJT23090973B
Main power and lighting power Φ80

You might also like