04B-2
PROSEDUR No. Keluaran : 07
KAWALAN KESELAMATAN DAN No. Pindaan : 00
KESIHATAN PEKERJAAN Tarikh : 14 Januari 2022
JKR MALAYSIA Muka Surat : 1/1
LAMPIRAN 2
PELAPORAN PELAKSANAAN SISTEM PENGURUSAN KESELAMATAN DAN KESIHATAN
PEKERJAAN (SPKKP) BAGI PROJEK JKR MALAYSIA BAGI BULAN MARCH TAHUN 2023
MAKLUMAT PROJEK
MENGGANTIKAN JAMBATAN FT023/038/13, TANGKAK, JOHOR
Nama Projek
Kos Kontrak Asal RM 6,801,200.00 Tarikh Milik Tapak 09 DISEMBER 2021
PP / PD Jurutera Daerah JKR (D)Tangkak Tarikh Siap Semasa 06 DISEMBER 2023
No. Daftar JKKP JH/22/03/180380 Tempoh Kontrak 24 Bulan
Kemajuan Kerja Fizikal Projek (Peratus & Tarikh Semasa) 40.68% (15/04/2023)
MAKLUMAT PEGAWAI DAN PENYELIA KESELAMATAN DAN KESIHATAN (SHO & SSS)
Nama SHO -
No. Pendaftaran - Tarikh Tamat Sah -
Nama SSS MUHD KHUDHAIRI BIN ABD MUBIN
No. Pendaftaran HQ/17/SSS/02/01918 Tarikh Tamat Sah 30/06/2025
*MAKLUMAT PENILAIAN PEMATUHAN PERUNDANGAN
Bil. Notis Diterima - Bil. Telah Ditutup :- Bil. Belum Ditutup :-
Bil. NCP Diberi - Bil. Telah Ditutup :- Bil. Belum Ditutup :-
- Bil. Kompaun Telah Dibayar :- Bil. Kompaun Belum Dibayar :-
Bil. Kompaun Diterima
Bil. Pendakwaan Diterima -
Dilaksana ( Telah / Belum ) Peratus (%) Pematuhan :
Prosedur Penilaian Pematuhan Tarikh Dilaksana : 31/10/2022 90.3%
Perundangan [JKR.PK(O).04C-01] Bil. Pematuhan : ( 28 ) Bil. Ketidakakuran : ( 3 ) Bil. Tidak Berkaitan : ( 50 )
**STATISTIK KEMALANGAN DAN PENYAKIT PEKERJAAN
Bil. Maut : ( - )
Bil. Parah : ( - ) Bil. Penyakit : ( - )
Bil. Kes Bil. Ringan : ( - )
Bil. Nyaris : ( - ) Bil. LTI :( - )
JAWATANKUASA KESELAMATAN DAN KESIHATAN (SAFETY AND HEALTH COMMITTEE - SHC)
Tarikh Mesyuarat SHC Terkini ( - ) – Akan diadakan (3 bulan) Sekali
Tarikh Pemeriksaan Tempat Kerja Terkini ( - ) Akan diadakan (2 minggu) Sekali
MAKLUMAT PROGRAM BERKAITAN KESELAMATAN DAN KESIHATAN PEKERJAAN
(KKP)
Dirancang : 7
Bil. Takwim Program KKP Dilaksana : 1
Nota : 1) Sertakan salinan Log Book JKKP, Notis, NCP, Kompaun dan Pendakwaan yang diterima.
2) Sertakan salinan Laporan Siasatan Insiden untuk kes Maut, Parah dan Penyakit yang berlaku.
3) Rujuk Panduan Pengisian Maklumat Borang melalui Portal Laman Web SPB (Carian item Rujukan).
4) Gunakan lampiran tambahan jika ruang yang disediakan tidak mencukupi.
....................................................................... .......................................................................
(PDT JKR) (PP / PD / WPP / WPD JKR)
Borang ini perlu diisi dan dikemukakan kepada Urus Setia SPKKP JKR Malaysia sebelum 10hb pada bulan berikutnya.
SAFETY & HEALTH
MONTHLY REPORT
JUNE 2023
CONTRACT NO : JKR/IP/CJ/309/2021
JKKP NO : JH/22/03/180380
…………………………. …………………………………..
MUHAMMAD KHUDHAIRI BIN ABD MUBIN ANIS AQILAH BINTI MURBA
Site Safety Supervisor PROJECT ENGINEER
HQ/17/SSS/02/01918 012-7447311
019-2669244
MAKLUMAT PROJEK
Page 3 of 32
Tempoh Tanggungan Kecacatan : 12 Bulan
FMA, AKKP REGULATION, LAW AND RULES OR DESIGNATED GUIDELINES TO BE COMPLY AND
IMPLEMENTED SUMMARY RECORDS.
11
Working At Height Regulation YES NO N/A REMARKS
11.1 Assessment On The Works /
OSHA Sec 15(20)(b)
Working Procedure/HIRARC/JSA
11.2
Supervision And Training OSHA Sec 15(2)( c )
11.3
Flagman Training OSHA Sec 15(2)( c )
1. PROGRAM PERFORMED AND CONDUCTED TO ENSURE HEALTHY AND SAFE WORKING ENVIRONMENT
AT SITE.
NO METHOD ACTION
1. Work Area Safety To be planned as work is still in preliminary stage.
Audit.
3. Taklimat Keselamatan Form : Activity should be recorded and photos taken.
untuk pekerja baru.
4. PPE Handing Over And Activity still ongoing and new PPE issued to New Workers induced.
Distribution Form: briefed, explained and understood by the workers. Kept in SAFETY FILE.
5. Toolbox Talk Planned to be Conducted once A Week. (attachment 8)
Page 5 of 32
6. OSH Comittee. N/a
12 Miscellaneous To Be Planned
2. LOST TIME STATISTIC AND INJURY WITHOUT LOSS TIME RECORDS. (Period 16 MEI 23 - 15 JUNE 23)
HSE STATISTIC JUNE 2023
Total Man Hours Worked 560 Hours 560 Hours 22,224 Hours
Total Man Hours Worked Without LTI 896 Hours 672 Hours 23,792 Hours
Last Recorded Safe Man Hours Work 896 Hours 672 Hours 23,792 Hours
3. MACHINE, VEHICLES, PARTS, TOOLS, MATERIAL AND PROCESS OR WORKING METHODS WHICH
COULD CAUSE INJURY TO WOKERS OR ANY OTHER PERSONNEL USED AT SITE SUMMARY
RECORDS.
4. PERSONNEL PROTECTIVE EQUIPTMENT TO REDUCE RISKS WHICH COULD CAUSE BODY INJURY TO
ANY PERSONNEL OR WORKERS AT SITE RECORD SUMMARY.
2. Safety Shoes - All Workers has been provided the safety shoes
3. Reflector Vast. - All Workers has been provided the reflector vast
Page 7 of 32
5. SHO/SSS OPPORTUNITY FOR IMPROVEMENT TO ANY SUBSTITUTION TO ANY STRUCTURE OR
WORKING AREA ARRANGEMENT FOR IMPROVED AND HEALTHY WORKING ENVIRONMENT.
6 Summon - N/A
Page 9 of 32
ATTACHMENT 2 : CARTA ORGANISASI
KESELAMATAN
Page 11 of 32
CARTA ORGANISASI BAHAGIAN KESELAMATAN DAN KESIHATAN PEKERJA
(SIGMA ONE DEVELOPMENT SDN BHD)
PENGERUSI
(MOHD YAZID BIN YAHAYA)
SETIAUSAHA
(MUHD KHUDHAIRI BIN ABD MUBIN)
WAKIL PEKERJA
WAKIL MAJIKAN
1) RAMLI BIN ABDULLAH
2) AZREENOOR ATIEQAH BINTI ABD
1) ANIS AQILAH BINTI MURBA
MANAB
ATTACHMENT 3 : JADUAL AKTIVITI
TAHUNAN/BULANAN BHG.KESELAMATAN
No. Dokumen : JKR.PK(P).14-1
PROSEDUR No. Keluaran : 07
PROGRAM PENGURUSAN ALAM SEKITAR, KESELAMATAN DAN No. Pindaan : 00
KESIHATAN PEKERJAAN SERTA PENGURUSAN TENAGA Tarikh : 14 January 2022
JKR MALAYSIA Muka Surat :1/1
OBJEKTIF Pematuhan Keselamatan Dan Kesihatan di Tempat Kerja (OSHA 1994 & FMA 1967)
SASARAN Memastikan setiap program yang dijalankan mengikut kehendak Akta Keselamatan Dan Kesihatan Pekerjaan
Page 15 of 32
ATTACHMENT 4 : CIDB PEKERJA SODSB
NO NAMA KAD TARIKH JAWATAN
PENGENALAN LUPUT KERJA
1 MUHD KHUDHAIRI MUBIN 911026-14-6241 26/10/2025 PENYELIA
KESELAMATAN
TAPAK
Page 17 of 32
ATTACHMENT 5 : SURAT SALINAN TMP
Page 19 of 32
ATTACHMENT 6 : SENARAI JENTERA DAN
PEKERJA (BULANAN)
ATTACHMENT 7 : AKTIVITI KERJA
KERJA-KERJA DILAKUKAN
MELAKUKAN
TOOLBOX MEETING
MELAKUKAN
PEMERIKSAAN KE
ATAS EXCAVATOR
SETIAP BULAN
PLUG DALAM
KEADAAN BAIK
DIGUNAKAN
Page 25 of 32
KEMAS SAMPAH-
SAMPAH YANG ADA
MEMERIKSA ROLLER
COMPACTOR
MEMERIKSA LORI 3
TAN
PEMERIKSAAN
GENSET DAN SET
WELDING SEBELUM
KERJA MEMBAIKI
JAMBATAN
MELAKUKAN LATIHAN
INDUKSI KEPADA
PEKERJA-PEKERJA
JKR.
Page 27 of 32
PEMERIKSAAN JALAN
SEMENTARA DALAM
KEADAAN SEMPURNA
HEALTH & SAFETY
SIGMA ONE DEVELOPMENT MANAGEMENT SYSTEM
SDN BHD TOOLBOX RECORD Page 29 of 1
HSE-FORM NO.-REV.
SIGNATURE :
REVIEW BY :
TITLE :
Page 29 of 32
HEALTH & SAFETY
SIGMA ONE DEVELOPMENT MANAGEMENT SYSTEM
SDN BHD TOOLBOX RECORD Page 30 of 1
HSE-FORM NO.-REV.
SIGNATURE :
REVIEW BY :
TITLE :
HEALTH & SAFETY
SIGMA ONE DEVELOPMENT MANAGEMENT SYSTEM
SDN BHD TOOLBOX RECORD Page 31 of 1
HSE-FORM NO.-REV.
SIGNATURE :
REVIEW BY :
TITLE :
Page 31 of 32