CONSTRUCTION OF ZAWAR ANICUT

TOTAL C.S. AREA OF OGEE = (S1 +S2+S3+S4+S5+S6 ) - PCC AREA = 121.58 - 7.93 = 113.65 SqM
TOTAL C.S. AREA OF PLUM = [{(4.76+12.81)/2x8.50}+{(8.50/0.5)X0.5X0.45X0.5}] = 76.585 Sqm
T.B.L. 109.90 1.50 5.00
UPSTREAM WINGWALL
M.W.L. 108.40
14.24
1.19 5.39
0.55
15.87
Conc. M-20, A-20 3.24
mm
DOWNSTREAM WINGWALL
4.76
100.50
8.00
DEEPEST NSL - 96.00
8.54 0.50
0.45
0.20
PCC Nominal mix 1:2:4 1.09
with Plum A-80 mm 1.60
1.21
22.00
3.40 94.00
0.60 M THICK, M-25, A-20 mm
19.83 1.00
1.65 0.40 M THICK, M-15, A-40 mm 93.00
19.60
CON. M-15,
A-40
1.00
92.00 12.81 0.25:1
PCC M-15, A-40MM 0.50
91.50 3.00
0.5:1
16.11
0.50
TYPICAL C/S OF OVERFLOW AND STILLING BASIN FROM RD 10.0 M TO 100.0 M
Assistant Engineer Executive Engineer
Junior Engineer
Water Resources Sub Div. Water Resources Division
Water Resources Sub Div.