RENCANA ANGGARAN BIAYA

PEKERJAAN ELEKTRIKAL
PEMBANGUNAN GEDUNG PUSBINDIKLATREN
KEMENTERIAN PERENCANAAN PEMBANGUNAN NASIONAL/BAPPENAS
Jl. Proklamasi No 70, Jakarta

HARGA JUMLAH HARGA


NO. URAIAN PEKERJAAN VOLUME SAT
SATUAN (Rp) (Rp)

IV. PEKERJAAN ELEKTRIKAL

IV.I. PANEL DAYA TEGANGAN RENDAH


Pengadaan dan pemasangan panel termasuk
pentanahan panel sesuai dgn gambar rencana
dan spesifikasi teknis.
Komponen panel sesuai dgn. gambar rencana
dan spesifikasi teknis.
Floor standing, tebal pelat 2,0 mm, cat bakar

a LVMDP 1.00 unit


Floor standing, tebal pelat 2,0 mm, cat bakar

- 2 x MCCB 400 A, 4 P, 50 kA (adjustable trip unit) 2.00


ex ASCO seri 7000
- 2 x Contactor 400 A + electric - mech. Interlock 2.00
ex ASCO seri 7000
- ATS digital controller ex ASCO seri 7000 2.00
- 1 x MCCB 320 A, 3 P, 36 kA 1.00
- 3 x MCCB 50 A, 3 P, 36 kA 3.00
- 1 x MCCB 200 A, 3 P, 36 kA 1.00
- 14 x MCCB 40 A, 3 P, 36 kA 14.00
- 6 x CT 400/5A 6.00
- 6 x A-meter 0 - 400 A 6.00
- 2 x V-meter 0 - 500 V + VSS 7 posisi 2.00
- 2 x kW-meter 0 - 200 kW 2.00
- 1 x kWH-meter 3 Phasa 1.00
- 2 x F-meter 45 - 55 Hz 2.00
- 1 x Cosphi-meter 1.00
- 1 x Digital Multi Function meter PM820 1.00
- 8 x Aux relay 220 VAC 8.00
- 6 x fuse 2 A + fuse holder 6.00
- 6 x pilot lamp 6.00
- 6 x push button ON (metal) 6.00
- 6 x push button OFF (metal) 6.00
- 1 lot busbar 600 A full neutral, 5 bus 1.00
- 1 lot control wiring + aksesori 1.00
- 1 lot panel 160 (L) x 60 (D) x 220 (T) cm 1.00
- 1 lot pentanahan 1.00

c PP-PUMP (Pompa Air Bersih & Hydrant) 1.00 unit


Wall mounted, tebal pelat 2 mm, cat bakar

- 1 x MCCB 160 A, 3 P, 36 kA 1.00


- 1 x MCCB 125 A, 3 P, 36 kA 1.00
- 3 x MCCB 15 A, 3 P, 10 kA 3.00
- 1 x Y-D starter 5 kW 1.00
- 1 x Y-D starter 37 kW 1.00
- 2 x Direct on Line Starter 1,5 kW 2.00
- 3 x CT 200/5A 3.00
- 3 x CT 20/5A 3.00
- 3 x CT 150/5A 3.00
- 3 x A-meter 0 - 200 A 3.00
- 3 x A-meter 0 - 150 A 3.00
- 3 x A-meter 0 - 20 A 3.00
- 1 x V-meter 0 - 500 V + VSS 7 posisi 1.00
- 9 x fuse 2 A + fuse holder 9.00
- 9 x pilot lamp 9.00
- 4 x A/O/M selector switch 4.00
- 4 x push button ON (metal) 4.00
- 4 x push button OFF (metal) 4.00
- 1 x Phase Failure Relay 1.00
- 1 lot busbar 250 A full neutral, 5 bus 1.00
- 1 lot control wiring + aksesori 1.00
- 1 lot panel 70 (L) x 30 (d) x 100 (T) cm 1.00
- 1 lot pentanahan 1.00
HARGA JUMLAH HARGA
NO. URAIAN PEKERJAAN VOLUME SAT
SATUAN (Rp) (Rp)

d PP-BOOSTER PUMP (Panel Daya Pompa Booster) 1.00 unit


Wall mounted, tebal pelat 2 mm, cat bakar

- 1 x MCCB 25 A, 3 P, 18 kA 1.00
- 3 x MCB 10 A, 3 P, 10 kA 3.00
- 3 x CT 40/5A 3.00
- 2 x Direct on Line Starter 1,5 kW 2.00
- 3 x fuse 2 A + fuse holder 3.00
- 3 x pilot lamp 3.00
- 2 x A/O/M selector switch 2.00
- 2 x push button ON 4.00
- 2 x push button OFF 4.00
- 4 x indikator lamp 4.00
- 1 x Phase Failure Relay 1.00
- 1 lot busbar 40 A full neutral, 5 bus 1.00
- 1 lot control wiring + aksesori 1.00
- 1 lot panel 50 (L) x 25 (D) x 60 (T) cm 1.00
- 1 lot pentanahan 1.00

f LP-GF (Panel Penerangan Ground floor) 1.00 unit


Wall mounted, tebal pelat 1,8 mm, cat bakar

- 1 x MCCB 25 A, 3 P, 10 kA 1.00
- 7 x MCB 6 A, 1 P, 6 kA 7.00
- 3 x fuse 2 A + fuse holder 3.00
- 3 x pilot lamp 3.00
- 1 lot busbar 40 A full neutral, 5 bus 1.00
- 1 lot internal wiring + aksesori 1.00
- 1 lot panel 50 (L) x 25 (D) x 60 (T) cm 1.00
- 1 lot instalasi kabel grounding 1.00

g LP-1 (Panel Penerangan Lantai 1) 1.00 unit


Wall mounted, tebal pelat 1,8 mm, cat bakar

- 1 x MCCB 25 A, 3 P, 10 kA 1.00
-10 x MCB 6 A, 1 P, 6 kA 10.00
- 3 x fuse 2 A + fuse holder 3.00
- 3 x pilot lamp 3.00
- 1 lot busbar 40 A full neutral, 5 bus 1.00
- 1 lot internal wiring + aksesori 1.00
- 1 lot panel 50 (L) x 25 (D) x 60 (T) cm 1.00
- 1 lot pentanahan 1.00
- 1 x MCCB 25 A, 3 P, 10 kA 1.00
-7 x MCB 10 A, 1 P, 6 kA 7.00
-7 x MCB 6 A, 1 P, 6 kA 7.00
- 3 x fuse 2 A + fuse holder 3.00
- 3 x pilot lamp 3.00
- 1 lot busbar 40 A full neutral, 5 bus 1.00
- 1 lot internal wiring + aksesori 1.00
- 1 lot panel 50 (L) x 25 (D) x 60 (T) cm 1.00
- 1 lot instalasi kabel grounding 1.00

i LP-2 (Panel Penerangan Lantai 2) 1.00 unit


Wall mounted, tebal pelat 1,8 mm, cat bakar

- 1 x MCCB 25 A, 3 P, 10 kA 1.00
- 20 x MCB 6 A, 1 P, 6 kA 20.00
- 3 x fuse 2 A + fuse holder 3.00
- 3 x pilot lamp 3.00
- 1 lot busbar 40 A full neutral, 5 bus 1.00
- 1 lot internal wiring + aksesori 1.00
- 1 lot panel 50 (L) x 25 (D) x 60 (T) cm 1.00
- 1 lot instalasi kabel grounding 1.00
HARGA JUMLAH HARGA
NO. URAIAN PEKERJAAN VOLUME SAT
SATUAN (Rp) (Rp)

j LP-3 (Panel Penerangan Lantai 3) 1.00 unit


Wall mounted, tebal pelat 1,8 mm, cat bakar

- 1 x MCCB 25 A, 3 P, 10 kA 1.00
- 26 x MCB 6 A, 1 P, 6 kA 26.00
- 3 x fuse 2 A + fuse holder 3.00
- 3 x pilot lamp 3.00
- 1 lot busbar 40 A full neutral, 5 bus 1.00
- 1 lot internal wiring + aksesori 1.00
- 1 lot panel 50 (L) x 25 (D) x 60 (T) cm 1.00
- 1 lot instalasi kabel grounding 1.00

k LP-4 (Panel Penerangan Lantai 4) 1.00 unit


Wall mounted, tebal pelat 1,8 mm, cat bakar

- 1 x MCCB 25 A, 3 P, 10 kA 1.00
- 16 x MCB 6 A, 1 P, 6 kA 16.00
- 3 x fuse 2 A + fuse holder 3.00
- 3 x pilot lamp 3.00
- 1 lot busbar 40 A full neutral, 5 bus 1.00
- 1 lot internal wiring + aksesori 1.00
- 1 lot panel 50 (L) x 25 (D) x 60 (T) cm 1.00
- 1 lot instalasi kabel grounding 1.00

l LP-PJ (Panel Penerangan Pos Jaga & Luar) 1.00 unit


Wall mounted, tebal pelat 1,8 mm, cat bakar
water proof

- 1 x MCCB 16 A, 3 P, 10 kA 1.00
- 5 x MCB 6 A, 1 P, 6 kA 5.00
- 3 x fuse 2 A + fuse holder 3.00
- 3 x pilot lamp 3.00
- 1 lot busbar 40 A full neutral, 5 bus 1.00
- 1 lot control wiring + aksesori 1.00
- 1 lot panel 25 (L) x 20 (D) x 25 (T) cm 1.00
- 1 lot instalasi kabel grounding 1.00

m PP-KOMP-1 (Panel Stop Kontak UPS) 1.00 unit


Wall mounted, tebal pelat 1,8 mm, cat bakar

- UPS 5 kVA (di luar panel) 1.00 unit


- 1 x MCCB 25 A, 3 P, 10 kA 1.00
- 7 x MCB 6 A, 1 P, 6 kA 7.00
- 3 x fuse 2 A + fuse holder 3.00
- 3 x pilot lamp 3.00
- 1 lot busbar 40 A full neutral, 5 bus 1.00
- 1 lot internal wiring + aksesori 1.00
- 1 lot panel 50 (L) x 25 (D) x 60 (T) cm 1.00
- 1 lot instalasi kabel grounding 1.00

m PP-KOMP-M (Panel Stop Kontak UPS) 1.00 unit


Wall mounted, tebal pelat 1,8 mm, cat bakar

- UPS 5 kVA (di luar panel) 1.00 unit


- 1 x MCCB 25 A, 3 P, 10 kA 1.00
- 10 x MCB 6 A, 1 P, 6 kA 10.00
- 3 x fuse 2 A + fuse holder 3.00
- 3 x pilot lamp 3.00
- 1 lot busbar 40 A full neutral, 5 bus 1.00
- 1 lot internal wiring + aksesori 1.00
- 1 lot panel 50 (L) x 25 (D) x 60 (T) cm 1.00
- 1 lot instalasi kabel grounding 1.00
HARGA JUMLAH HARGA
NO. URAIAN PEKERJAAN VOLUME SAT
SATUAN (Rp) (Rp)

m PP-KOMP-2 (Panel Stop Kontak UPS) 1.00 unit


Wall mounted, tebal pelat 1,8 mm, cat bakar

- UPS 10 kVA (di luar panel) 1.00 unit


- 1 x MCCB 25 A, 3 P, 10 kA 1.00

- 20 x MCB 16 A, 1 P, 6 kA 20.00
- 3 x fuse 2 A + fuse holder 3.00
- 3 x pilot lamp 3.00
- 1 lot busbar 60 A full neutral, 5 bus 1.00
- 1 lot internal wiring + aksesori 1.00
- 1 lot panel 50 (L) x 25 (D) x 60 (T) cm 1.00
- 1 lot instalasi kabel grounding 1.00

m PP-KOMP-3 (Panel Stop Kontak UPS) 1.00 unit


Wall mounted, tebal pelat 1,8 mm, cat bakar

- UPS 15 kVA (di luar panel) 1.00 unit


- 1 x MCCB 25 A, 3 P, 10 kA 3.00
- 27 x MCB 16 A, 1 P, 6 kA 27.00
- 3 x fuse 2 A + fuse holder 3.00
- 3 x pilot lamp 3.00
- 1 lot busbar 60 A full neutral, 5 bus 1.00
- 1 lot internal wiring + aksesori 1.00
- 1 lot panel 50 (L) x 25 (D) x 60 (T) cm 1.00
- 1 lot instalasi kabel grounding 1.00

o PP-Biotech (Pompa Pengolahan limbah air kotor) 1.00 unit


Wall mounted, tebal pelat 2 mm, cat bakar

- 1 x MCCB 25 A, 3 P, 10 kA 1.00
- 5 x MCB 6 A, 3 P, 10 kA 5.00
- 2 x MCB 6 A, 1 P, 6 kA 2.00
- 2 x Y-D starter 37 kW 2.00
- 9 x Direct on Line Starter 1,5 kW 3.00
- 9 x CT 40/5A 9.00
- 9 x A-meter 0 - 20 A 9.00
- 9 x fuse 2 A + fuse holder 9.00
- 3 x pilot lamp 3.00

- 2 x A/O/M selector switch 2.00


- 2 x push button ON 2.00
- 2 x push button OFF 2.00
- 4 x indikator lamp 4.00
- 1 x Phase Failure Relay 1.00
- 1 lot busbar 60 A full neutral, 5 bus 1.00
- 1 lot control wiring + aksesori 1.00
- 1 lot panel 70 (L) x 30 (D) x 100 (T) cm 1.00
- 1 lot instalasi kabel grounding 1.00

p PP-SUMP PIT ( Panel Daya Pompa Sumpit) 1.00 unit


Wall mounted, tebal pelat 2 mm, cat bakar

- 1 x MCCB 25 A, 3 P, 10 kA 1.00
- 3 x MCB 6 A, 3 P, 10 kA 3.00
- 9 x Direct on Line Starter 1,5 kW 3.00
- 1 x Phase Failure Relay 1.00
- 3 x fuse 2 A + fuse holder 3.00
- 3 x pilot lamp 3.00
- 2 x A/O/M selector switch 2.00
- 2 x push button ON 2.00
- 2 x push button OFF 2.00
- 2 x indikator lamp 2.00
- 1 lot busbar 40 A full neutral, 5 bus 1.00
- 1 lot control wiring + aksesori 1.00
- 1 lot panel 50 (L) x 25 (D) x 60 (T) cm 1.00
- 1 lot instalasi kabel grounding 1.00

SUB TOTAL I
HARGA JUMLAH HARGA
NO. URAIAN PEKERJAAN VOLUME SAT
SATUAN (Rp) (Rp)

IV.II KABEL DAYA

Pekerjaan kabel daya termasuk pengadaan dan


pemasangan sepatu kabel, cable conduit, cable
jointing, penggalian tanah serta penimbunan
kembali (perapihan).
Termasuk di dalam pekerjaan ini adalah peng-
ujian tahanan isolasi kabel (megger test).

2.1 Dari kWh-meter PLN ke LVMDP


NYFGbY 4 x 120 sqmm 20.00 m
2.2 Dari LVMDP ke LP - GF
NYY 4 x 4 sqmm 30.00 m
2.3 Dari LVMDP ke LP - 1
NYY 4 x 4 sqmm 38.00 m
2.4 Dari LVMDP ke LP - 2
NYY 4 x 4 sqmm 52.00 m
2.5 Dari LVMDP ke LP - 3
NYY 4 x 4 sqmm 60.00 m
2.6 Dari LVMDP ke LP - 4
NYY 4 x 4 sqmm 72.00 m
2.7 Dari LVMDP ke LP - PJ
NYFGbY 4 x 6 sqmm 50.00 m
2.8 Dari LVMDP ke PP - Komp-1
NYY 4 x 4 sqmm 43.00 m
2.9 Dari LVMDP ke PP - Komp-M
NYY 4 x 4 sqmm 50.00 m
2.10 Dari LVMDP ke PP - Komp-2
NYY 4 x 4 sqmm 55.00 m
2.11 Dari LVMDP ke PP - Komp-3
NYY 4 x 4 sqmm 60.00 m
2.12 Dari PP - OCU - 2 ke PP - BOOSTER PUMP
NYY 4 x 4 sqmm 5.00 m
2.13 Dari PP- BOOSTER PUMP ke Booster Pump
NYY 4 x 2,5 sqmm 18.00 m
2.14 Dari LVMDP ke PP - PUMP
NYY 4 x 35 sqmm 16.00 m
2.15 Dari PP-PUMP ke seluruh pompa air bersih (PAB)
NYY 4 x 2,5 sqmm 15.00 m
2.16 Dari PP-PUMP ke pompa jockey hydrant JP
NYY 2 x (3 x 4 sqmm) 4.00 m
2.17 Dari PP-PUMP ke pompa utama hydrant MHP
NYY 2 x (3 x 35 sqmm) 6.00 m
2.18 Dari LVMDP ke PP - SUMP PIT
NYY 4 x 4 sqmm 20.00 m
2.19 Dari LVMDP ke PP - BIOTECH
NYY 4 x 4 sqmm 30.00 m

SUB TOTAL II

III INSTALASI PENERANGAN / DAYA


3.1 Ground floor

a Lampu TL 2 x 36 W (V-SHAPE) 38.00 bh


setara Philips.
b Lampu TL 2 x 36 W (V-SHAPE) + Emergency Kit 4.00 bh
setara Philips.
c Lampu TL 2 x 18 W (V-SHAPE) 6.00 bh
setara Philips.
d Lampu Lampu baret PLE - T 18 W (SCB 20 ACR) 2.00 bh
setara Philips.
e Exit Lamp TL 2 x 10 W 1.00 bh
setara Philips.
f Instalasi titik cahaya dalam gedung lengkap 51.00 ttk
g Instalasi stop kontak 1 fasa, 200 VA, 220 V + out let stop 3.00 ttk
h Saklar tunggal 2.00 bh
Sakla ganda 3.00 bh
Saklar hotel tunggal 2.00 bh
i Lampu down light plc 13 6.00 bh
HARGA JUMLAH HARGA
NO. URAIAN PEKERJAAN VOLUME SAT
SATUAN (Rp) (Rp)

3.2 Lantai - Satu

a Lampu TL 2 x 36 W (RMO) 27.00 bh


setara Philips.
b Lampu TL 2 x 36 W (RMO) + Emergency Kit 2.00 bh
setara Philips.
c Lampu TL 2 x 18 W (RMO) 1.00 bh
setara Philips.
d D. light PLE - T 18 W (RD150 REFF E27), 20.00 bh
setara Philips.
e D. light PLE - T 18 W (RD150 REFF E27) + Emergency 1.00 bh
setara Philips.
j Instalasi titik cahaya dalam gedung lengkap 51.00 ttk
k Instalasi stop kontak 1 fasa, 200 VA, 220 V + out let stop 11.00 ttk
j Instalasi stop kontak 1 fasa, 200 VA, 220 V + out let stop 2.00 ttk
di bawahlantaimenggunakan konduit high impact
n Saklar tunggal 6.00 bh
Sakla ganda 8.00 bh
Saklar hotel tunggal 2.00 bh

3.2 Lantai - 2

a Lampu TL 2 x 36 W (RM-300) 19.00 bh


setara Philips.
b Lampu TL 2 x 36 W (RMO) + Emergency Kit 3.00 bh
setara Philips.
c Lampu TL 2 x 18 W Daylight (RM-300) 1.00 bh
setara Philips.
d D. light PLE - T 18 W (RD150 REFF E27), 14.00 bh
setara Philips.

e D. light PLE - T 18 W (RD150 REFF E27) + Emergency 1.00 bh


setara Philips.
d Lampu Lampu baret PLE - T 18 W (SCB 20 ACR) 4.00 bh
setara Philips.
e Exit Lamp TL 2 x 10 W 3.00 bh
setara Philips.
j Instalasi titik cahaya dalam gedung lengkap 45.00 ttk
k Instalasi stop kontak 1 fasa, 200 VA, 220 V + out let stop 14.00 ttk
j Instalasi stop kontak 1 fasa, 200 VA, 220 V + out let stop 11.00 ttk
di bawahlantaimenggunakan konduit high impact
n Saklar tunggal 13.00 bh
Sakla ganda 7.00 bh
Saklar hotel tunggal 2.00 bh

3.2 Lantai - 3

a Lampu TL 2 x 36 W (RM-300) 19.00 bh


setara Philips.
b Lampu TL 2 x 36 W (RMO) + Emergency Kit 3.00 bh
setara Philips.
c Lampu TL 2 x 18 W Daylight (RM-300) 3.00 bh
setara Philips.
d D. light PLE - T 18 W (RD150 REFF E27), 10.00 bh
setara Philips.
e D. light PLE - T 18 W (RD150 REFF E27) + Emergency 1.00 bh
setara Philips.
d Lampu Lampu baret PLE - T 18 W (SCB 20 ACR) 4.00 bh
setara Philips.
e Exit Lamp TL 2 x 10 W 2.00 bh
setara Philips.
j Instalasi titik cahaya dalam gedung lengkap 42.00 ttk
k Instalasi stop kontak 1 fasa, 200 VA, 220 V + out let stop 15.00 ttk

j Instalasi stop kontak 1 fasa, 200 VA, 220 V + out let stop 16.00 ttk
di bawahlantaimenggunakan konduit high impact
n Saklar tunggal 17.00 bh
Sakla ganda 6.00 bh
Saklar hotel tunggal 2.00 bh
HARGA JUMLAH HARGA
NO. URAIAN PEKERJAAN VOLUME SAT
SATUAN (Rp) (Rp)

3.3 Lantai - 4

a Lampu TL 2 x 36 W (RM-300) 18.00 bh


setara Philips.
b Lampu TL 2 x 36 W (RMO) + Emergency Kit 2.00 bh
setara Philips.
d D. light PLE - T 18 W (RD150 REFF E27), 15.00 bh
setara Philips.
e D. light PLE - T 18 W (RD150 REFF E27) + Emergency 2.00 bh
setara Philips.

d Lampu Lampu baret PLE - T 18 W (SCB 20 ACR) 5.00 bh


setara Philips.
e Exit Lamp TL 2 x 10 W 2.00 bh
setara Philips.
h Instalasi titik cahaya dalam gedung lengkap 44.00 ttk
i Instalasi stop kontak 1 fasa, 200 VA, 220 V + out let stop 23.00 ttk
k Saklar tunggal 14.00 bh
Sakla ganda 16.00 bh
Saklar hotel tunggal 2.00 bh
Saklar hotel ganda 6.00 bh

3.4 Instalasi Penerangan Pos Jaga & Luar

a Lampu taman PLE - T 18 W 4.00 bh


d D. light PLE - T 18 W (RD150 REFF E27), 1.00 bh
setara Philips.
h Instalasi titik cahaya dalam gedung lengkap 5.00 ttk
i Instalasi stop kontak 1 fasa, 200 VA, 220 V + out let stop 2.00 ttk
k Saklar tunggal 1.00 bh
e Kabel instalasi lampu taman, NYFGBY 4 x 4 sqmm, 4.00 ttk
lengkap dgn pasir urug, bata pelindung dan galian tanah.

SUB TOTAL III

IV INSTALASI CABLE TRAY

Perforated type- hot rolled steel sheet, SPHC


2.0 mm thickness, 100 mm height, hot dipped
galvanized.
4.1 Ground floor

a Straight tray 40 cm 30.00 m


c Elbow 40 cm 1.00 bh
e Equal Tee 40 cm 1.00 bh
g Outside Riser 40 cm 1.00 bh
i Alat bantu (mur-baut, hanger rod, hinge fish 1.00 ls
plate dll.)

4.1 Lantai Satu

a Straight tray 40 cm 16.00 m


b Straight tray 30 cm 16.00 m
c Elbow 40 cm 3.00 bh
d Elbow 30 cm 2.00 bh
g Outside Riser 40 cm 2.00 bh
h Outside Riser 30 cm 1.00 bh
i Alat bantu (mur-baut, hanger rod, hinge fish 1.00 ls
plate dll.)
a Straight tray 40 cm 33.00 m
b Straight tray 30 cm 33.00 m
e Cross Tee 40 cm 1.00 bh
f Cross Tee 30 cm 1.00 bh
g Outside Riser 40 cm 2.00 bh
h Outside Riser 30 cm 2.00 bh
i Alat bantu (mur-baut, hanger rod, hinge fish 1.00 ls
plate dll.)
HARGA JUMLAH HARGA
NO. URAIAN PEKERJAAN VOLUME SAT
SATUAN (Rp) (Rp)

4.1 Lantai 2

a Straight tray 40 cm 33.00 m


b Straight tray 30 cm 33.00 m
e Cross Tee 40 cm 1.00 bh
f Cross Tee 30 cm 1.00 bh
g Outside Riser 40 cm 1.00 bh

h Outside Riser 30 cm 1.00 bh


i Alat bantu (mur-baut, hanger rod, hinge fish 1.00 ls
plate dll.)

4.2 Lantai 3

a Straight tray 40 cm 33.00 m


b Straight tray 30 cm 33.00 m
d Cross Tee 40 cm 1.00 bh
e Cross Tee 30 cm 1.00 bh
f Outside Riser 40 cm 1.00 bh
g Outside Riser 30 cm 1.00 bh
i Alat bantu (mur-baut, hanger rod, hinge fish 1.00 ls
plate dll.)

4.1 Lantai 4

a Straight tray 40 cm 16.00 m


b Straight tray 30 cm 16.00 m

c Elbow 40 cm 3.00 bh
d Elbow 30 cm 2.00 bh
g Outside Riser 40 cm 2.00 bh
h Outside Riser 30 cm 1.00 bh
i Alat bantu (mur-baut, hanger rod, hinge fish 1.00 ls
plate dll.)

SUB TOTAL IV

V INSTALASI UNDERFLOOR DUCT

Hot dip pre-galvanized steel sheet, 2 ch. 120 : 70


mm, 38 mm height - underfloor duct.

5.1 Lantai 1

a Straight duct 120 : 70 : T=38 22.00 m


b Elbow 3.00 bh
c Tee 1.00 bh
d Riser 90 o 1.00 bh
e Intersection box type SS c/w box base, frame, 2.00 bh
metal cover & base plate
Base plate memuat :
- 2 buah stop kontak 1 ph, 220 V, 10 A
- 2 buah female RJ-45 untuk saluran data
- 2 buah female RJ-11 untuk saluran telepon
f Alat bantu (mur-baut, fisher, sekrup dll) 1.00 ls

5.2 Lantai 2

a Straight duct 120 : 70 : T=38 50.00 m


b Elbow 3.00 bh
c Tee 4.00 bh
d Riser 90 o 1.00 bh
e Intersection box type SS c/w box base, frame, 11.00 bh
metal cover & base plate
Base plate memuat :
- 2 buah stop kontak 1 ph, 220 V, 10 A
- 2 buah female RJ-45 untuk saluran data
- 2 buah female RJ-11 untuk saluran telepon
f Alat bantu (mur-baut, fisher, sekrup dll) 1.00 ls
HARGA JUMLAH HARGA
NO. URAIAN PEKERJAAN VOLUME SAT
SATUAN (Rp) (Rp)

5.2 Lantai 3

a Straight duct 120 : 70 : T=38 34.00 m


b Elbow 3.00 bh
c Tee 3.00 bh
d Riser 90 o 1.00 bh
e Intersection box type SS c/w box base, frame, 16.00 bh
metal cover & base plate
Base plate memuat :
- 2 buah stop kontak 1 ph, 220 V, 10 A
- 2 buah female RJ-45 untuk saluran data
- 2 buah female RJ-11 untuk saluran telepon
f Alat bantu (mur-baut, fisher, sekrup dll) 1.00 ls

SUB TOTAL V

VI INSTALASI PENANGKAL PETIR

6.1 Dynasphere system 3000 air terminal 1.00 bh


6.2 Termination kit 1.00 sat
6.3 Fiberglass mast 1.00 sat
6.4 Triaxial Down Conductor 85.00 m
6.5 Lighting even control 1.00 ls
6.6 Material bantu (klem, fisher, sekrup dll.) 1.00 ls
6.7 Pentanahan + bak kontrol 1.00 ttk

SUB TOTAL VI
VII PENYAMBUNGAN DAYA PLN

Pekerjaan ini meliputi pembayaran BP, UJL, 0.00 ls


pengurusan administrasi, pengadaan dan pemasangan
kabel TR dan pengujian instalasi oleh pihak PLN

SUB TOTAL VII

VIII TESTING & COMMISSIONING 1.00 ls

SUB TOTAL VIII


RENCANA ANGGARAN BIAYA
PEKERJAAN ELEKTRIKAL
PEMBANGUNAN GEDUNG PUSBINDIKLATREN
KEMENTERIAN PERENCANAAN PEMBANGUNAN NASIONAL/BAPPENAS
Jl. Proklamasi No 70, Jakarta

NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN ( Rp) JUMLAH HARGA (Rp)

IV.IX PEKERJAAN TELEPON


a INSTALASI OUTLET TELEPON
Instalasi lengkap dgn. tel. receptacle outlet,
pengkabelan dgn. ITC 2 x 2 x 0,6 sqmm di
dalam konduit PVC high-impact heavy duty

a.1 Lantai - Ground floor


1 Instalasi titik outlet telepon lkp dgn telephone 1.00 ttk
receptacle outlet(dinding)
2 Analog DTMF hand set 1.00 unit

a.2 Lantai - 1
1 Instalasi titik outlet telepon lkp dgn telephone 5.00 ttk
receptacle outlet(dinding)
2 Analog DTMF hand set 5.00 unit
3 Terminal Box kap. 40 prs 1.00 unit

1 Instalasi titik outlet telepon lkp dgn telephone 4.00 ttk


receptacle outlet(dinding)
2 Analog DTMF hand set 4.00 unit
3 Terminal Box kap. 10 prs 1.00 unit

a.3 Lantai - 2
1 Instalasi titik outlet telepon lkp dgn telephone 8.00 ttk
receptacle outlet(dinding)
2 Analog DTMF hand set 8.00 unit
3 Terminal Box kap. 40 prs 1.00 unit

a.4 Lantai - 3
1 Instalasi titik outlet telepon lkp dgn telephone 12.00 ttk
receptacle outlet(dinding)
2 Analog DTMF hand set 12.00 unit
3 Terminal Box kap. 10 prs 1.00 unit

a.5. Lantai - 4
1 Instalasi titik outlet telepon lkp dgn telephone 1.00 ttk
receptacle outlet(dinding)
2 Analog DTMF hand set 1.00 unit

Sub Total
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN ( Rp) JUMLAH HARGA (Rp)

b INSTALASI KABEL PENGHUBUNG


1 Dari CTB-TELKOM ke MDF
JATC 20 x 2 x 0,6 sqmm 50.00 m
2 Dari CTB-TELKOM ke PABX
JATC20 x 2 x 0,6 sqmm 50.00 m
3 Dari PABX ke MDF
1TC 60 x 2 x 0,6 sqmm 5.00 m
4 Dari MDF ke TB-TL-1
1TC 20 x 2 x 0,6 sqmm 10.00 m
5 Dari MDF ke TB-TL-M
1TC 40 x 2 x 0,6 sqmm 12.00 m
4 Dari MDF ke TB-TL-2
1TC 20 x 2 x 0,6 sqmm 18.00 m
5 Dari MDF ke TB-TL-3
1TC 40 x 2 x 0,6 sqmm 24.00 m

Sub Total

c SAMBUNGAN PT. TELKOM 4.00 sst

Sub Total
Jumlah Total
RENCANA ANGGARAN BIAYA
PEKERJAAN ELEKTRIKAL
PEMBANGUNAN GEDUNG PUSBINDIKLATREN
KEMENTERIAN PERENCANAAN PEMBANGUNAN NASIONAL/BAPPENAS
Jl. Proklamasi No 70, Jakarta

HARGA SATUAN
NO URAIAN PEKERJAAN VOLUME SAT JUMLAH HARGA (Rp)
(Rp)

IV.X PEKERJAAN FIRE ALARM


a INSTALASI
a.1 Peralatan Utama

1 Fire alarm control panel (FACP) kap.10 zone 1.00 unit


lengkap dengan battery charger dan battery
untuk 20 jam operasi.
2 Annouciator Panel 1.00 unit
3 MDF 1.00 unit

a.2 Instalasi Detektor, Horn dan Lamp

2 Ground floor
- ROR & fixed temperature detector 8.00 bh
- Smoke temperature detector 1.00 bh
- Manual call point / MCP 1.00 bh
- Alarm bell dia. 4" 1.00 bh
- Alarm lamp 1.00 bh
- Terminal box 1.00 unit
- Instalasi detektor dan MCP 10.00 ttk
- Instalasi alarm dan bell 1.00 ttk

3 Lantai 1
- ROR & fixed temperature detector 6.00 bh
- Fixed temperature detector 1.00 bh
- Smoke temperature detector 1.00 bh
- Manual call point / MCP 1.00 bh
- Alarm bell dia. 4" 1.00 bh
- Alarm lamp 1.00 bh
- Terminal box 1.00 unit
- Instalasi detektor dan MCP 9.00 ttk
- Instalasi alarm dan bell 2.00 ttk
- ROR & fixed temperature detector 4.00 bh
- Manual call point / MCP 1.00 bh
- Alarm bell dia. 4" 1.00 bh

- Alarm lamp 1.00 bh


- Instalasi detektor dan MCP 5.00 ttk
- Instalasi alarm dan bell 2.00 ttk

4 Lantai 2
- ROR & fixed temperature detector 9.00 bh
- Fixed temperature detector 1.00 bh
- Smoke temperature detector 1.00 bh
- Manual call point / MCP 1.00 bh
- Alarm bell dia. 4" 1.00 bh
- Alarm lamp 1.00 bh
- Terminal box 1.00 unit
- Instalasi detektor dan MCP 12.00 ttk
- Instalasi alarm dan bell 2.00 ttk
HARGA SATUAN
NO URAIAN PEKERJAAN VOLUME SAT JUMLAH HARGA (Rp)
(Rp)

5 Lantai 3
- ROR & fixed temperature detector 10.00 bh
- Fixed temperature detector 1.00 bh
- Smoke temperature detector 3.00 bh
- Manual call point / MCP 2.00 bh
- Alarm bell dia. 4" 1.00 bh
- Alarm lamp 1.00 bh
- Terminal box 1.00 unit
- Instalasi detektor dan MCP 16.00 ttk
- Instalasi alarm dan bell 2.00 ttk

6 Lantai 4
- ROR & fixed temperature detector 9.00 bh
- Fixed temperature detector 1.00 bh
- Manual call point / MCP 1.00 bh
- Alarm bell dia. 4" 1.00 bh
- Alarm lamp 1.00 bh
- Terminal box 1.00 unit
- Instalasi detektor dan MCP 11.00 ttk
- Instalasi alarm dan bell 2.00 ttk

a.3 Instalasi Kabel Penghubung

1 Dari FACP ke MDF


- NYA 20 x 1 x 2,5 sqmm 5.00 m
- NYA 20x 1 x 1,5 sqmm 5.00 m
2 Dari MDF ke TB-FA-B
- NYY 4 x 2,5 sqmm 18.00 m
- NYY 4 x 1,5 sqmm 18.00 m
3 Dari MDF ke TB-FA-GF
- NYY 4 x 2,5 sqmm 11.00 m

- NYY 4 x 1,5 sqmm 11.00 m


4 Dari MDF ke TB-FA-1
- NYY 4 x 2,5 sqmm 10.00 m
- NYY 4 x 1,5 sqmm 10.00 m
4 Dari MDF ke TB-FA-2
- NYY 4 x 2,5 sqmm 11.00 m
- NYY 4 x 1,5 sqmm 11.00 m
3 Dari MDF ke TB-FA-3
- NYY 4 x 2,5 sqmm 12.00 m
- NYY 4 x 1,5 sqmm 12.00 m
4 Dari MDF ke TB-FA-4
- NYY 4 x 2,5 sqmm 22.00 m
- NYY 4 x 1,5 sqmm 22.00 m

Sub Total

b TESTING & COMMISSIONING 1.00 ls

Sub Total
Jumlah Total
RENCANA ANGGARAN BIAYA
PEKERJAAN ELEKTRIKAL
PEMBANGUNAN GEDUNG PUSBINDIKLATREN
KEMENTERIAN PERENCANAAN PEMBANGUNAN NASIONAL/BAPPENAS
Jl. Proklamasi No 70, Jakarta

HARGA SATUAN JUMLAH HARGA


NO URAIAN PEKERJAAN VOLUME SAT
(Rp) (Rp)

IV.XI PEKERJAAN INSTALASI OUTLET DATA


Instalasi lengkap dgn. data outlet (RJ-45)
pengkabelan dengan. UTP CAT- 6 di dlm
konduit PVC high-impact heavy duty atau
di dalam underfloor ducting system

a Lantai 1

1 Instalasi outlet data, lenkap dgn outlet data 4.00 ttk

2 Outlet Data RJ 45 4.00 ttk

3 Swicth Panel kap. 24 input lengkapdengan rak 1.00 bh

1 Instalasi outlet data, lenkap dgn outlet data 7.00 ttk

2 Outlet Data RJ 45 7.00 ttk

3 Swicth Panel kap. 24 input lengkapdengan rak 1.00 bh

c Lantai 2

1 Instalasi outlet data, lenkap dgn outlet data 17.00 ttk

2 Outlet Data RJ 45 17.00 ttk

3 Swicth Panel kap. 24 input lengkapdengan rak 1.00 bh

d Lantai 3

1 Instalasi outlet data, lenkap dgn outlet data 24.00 ttk

2 Outlet Data RJ 45 24.00 ttk

3 Swicth Panel kap. 24 input lengkapdengan rak 1.00 bh

e Kabel Penghubung

Dari Server di Ruang Data ke seluruh 60.00 m


Swicth Panel. UTP CAT- 5 di dlm
konduit PVC high-impact heavy duty.

Sub Total

f TESTING & COMMISSIONING 1.00 ls

Sub Total
Jumlah Total
RENCANA ANGGARAN BIAYA
PEKERJAAN ELEKTRIKAL
PEMBANGUNAN GEDUNG PUSBINDIKLATREN
KEMENTERIAN PERENCANAAN PEMBANGUNAN NASIONAL/BAPPENAS
Jl. Proklamasi No 70, Jakarta

HARGA SATUAN
NO URAIAN PEKERJAAN VOLUME SAT JUMLAH HARGA (Rp)
(Rp)

IV. XII PEKERJAAN SOUND SYSTEM


a BACKGROUND MUSIC

a.1 Peralatan Utama Loud Speaker


1 Power Amplifier 480 W ( ex BOSCH) 5.00 bh s
3 Monitor Panel (MP-032A) 1.00 bh
4 5-Zone Selector Module (V-1062) 1.00 bh
5 Line Amplifier Module (V-1071A) 1.00 bh
6 Paging Microphone (VR-1001) 1.00 bh
7 Chime Module (V-1015) 1.00 bh
8 Mic Preamp Mod w/ Compr. (V-1052A) 1.00 bh
9 Allert Signal Module (V-1014) 1.00 bh
10 AM/FM Tuner Module (V-1032) 1.00 bh
11 Multi DVD player INCL SACD ( Sony) 1.00 bh
12 Microphone Input Module (V-1005) 1.00 bh
13 Aux Input Module (V-1154) 2.00 bh
14 Program Selector Module (V-1061) 1.00 bh
15 Power Supply Module (V-1082) 1.00 bh
16 Blank Panel (BK-013A/023A/033A) 1.00 lot
17 Mixer Frame (V-1000) 1.00 lot
18 Power Switch Panel (PS-011G) 1.00 bh
19 Junction Box (JB-600A) 1.00 bh
20 Blower Unit (BP-031G) 1.00 bh
21 Perforated Panel (PF-013A/023A) 1.00 lot
22 Audio Rack System (CR-271N) 1.00 bh
23 Alat Bantu (pengkabelan, mur-baut dll) 1.00 lot
24 Main Distribution Frame (MDF) utk. BGM 1.00 bh
25 Magnetic Contactor 220V/16 A + wiring 1.00 set

a.2 Instalasi Loud Speaker

a.2.1 Lantai 1
1 20 cm Ceiling Speaker 6W / 100 V 7.00 bh
Ex : TOA Seri PC 34 RW
2 30 W Attenuator Ex TOA Seri - 311 4.00 bh
3 Instalasi Ceiling Speaker 7.00 ttk
4 Instalasi Attenuator 4.00 ttk
5 Terminal Box ( TB-SS-1 ) 1.00 bh

Mezanin
1 20 cm Ceiling Speaker 6W / 100 V 4.00 bh
Ex : TOA Seri PC 34 RW
2 30 W Attenuator Ex TOA Seri - 311 3.00 bh

3 Instalasi Ceiling Speaker 4.00 ttk


4 Instalasi Attenuator 3.00 ttk

a.2.1 Lantai 2
1 20 cm Ceiling Speaker 6W / 100 V 11.00 bh
Ex : TOA Seri PC 34 RW
2 30 W Attenuator Ex TOA Seri - 311 7.00 bh
3 Instalasi Ceiling Speaker 11.00 ttk
4 Instalasi Attenuator 7.00 ttk
5 Terminal Box ( TB-SS-2 ) 1.00 bh
HARGA SATUAN
NO URAIAN PEKERJAAN VOLUME SAT JUMLAH HARGA (Rp)
(Rp)

a.2.2 Lantai 3
1 20 cm Ceiling Speaker 6W / 100 V 13.00 bh
Ex : TOA Seri PC 34 RW
2 30 W Attenuator Ex TOA Seri - 311 7.00 bh
3 Instalasi Ceiling Speaker 13.00 ttk
4 Instalasi Attenuator 7.00 ttk
5 Terminal Box ( TB-SS-3 ) 1.00 bh

a.2.3 Lantai 4
1 20 cm Ceiling Speaker 6W / 100 V 10.00 bh
Ex : TOA Seri PC 34 RW
2 30 W Attenuator Ex TOA Seri - 311 5.00 bh
3 Instalasi Ceiling Speaker 10.00 ttk
4 Instalasi Attenuator 5.00 ttk
5 Terminal Box ( TB-SS-3 ) 1.00 bh

Sub Total

c TESTING & COMMISSIONING 1.00 ls

Sub Total
Jumlah Total
RENCANA ANGGARAN BIAYA
PEKERJAAN ELEKTRIKAL
PEMBANGUNAN GEDUNG PUSBINDIKLATREN
KEMENTERIAN PERENCANAAN PEMBANGUNAN NASIONAL/BAPPENAS
Jl. Proklamasi No 70, Jakarta

HARGA SATUAN JUMLAH


NO URAIAN PEKERJAAN VOLUME SAT
(Rp) HARGA (Rp)

IV.XIII PEKERJAAN INSTALASI GENSET


a PEKERJAAN UNIT KNALPOT GENSET
DAN DUCTING RADIATOR
1 Pengadaan Residential muffer dia. 1 x 12" + 1 bh
jacketing (ex. Lokal)
2 Pemipaan exhaust lengkap dengan jacketing 1 m
BSP 1 x 10" untuk Genset 200 KVA
3 Pengadaan dan pemasangan ducting radiator 1 ls
untuk Genset 200 KVA
4 Pengadaan dan pemasangan Flexible pipe dia. 10" 1 bh
Sub Total

b PEKERJAAN PEMIPAAN
1 Pemipaan Bahan Bakar 1 ls
Pemipaan bahan bakar antara fuel daily tank
dengan mesin dan antara weekly tank dgn
daily tank, pemipaan BSP sch. 30, penyam -
bungan dengan flange, termasuk klem pipa
dan pengecatan
2 Pemipaan Exhaust Gas
Pemipaan exhaust gas di dalam ruang DGS 1 ls
pemipaan dgn. BSP sch 30 dilapis tali asbes
dan alumunium jacketing.
Sub Total
Jumlah Total
RENCANA ANGGARAN BIAYA
PEKERJAAN ELEKTRIKAL
PEMBANGUNAN GEDUNG PUSBINDIKLATREN
KEMENTERIAN PERENCANAAN PEMBANGUNAN NASIONAL/BAPPENAS
Jl. Proklamasi No 70, Jakarta

HARGA JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT
SATUAN (Rp) HARGA (Rp)

IV.XIV. PEKERJAAN INSTALASI MATV


INSTALASI OUTLET TV
1 Lantai 1 1 ttk
Kabel coaxial 5C-2V, 75 ohm ex YURI Japan,
di dlm konduit PVC high impact-heavy gauge
ex EGA/CLIPSAL termasuk F-connector dan
outlet TV.
2 Mezaninne 1 ttk
Kabel coaxial 5C-2V, 75 ohm ex YURI Japan,
di dlm konduit PVC high impact-heavy gauge
ex EGA/CLIPSAL termasuk F-connector dan
outlet TV.

1 Lantai 2 5 ttk
Kabel coaxial 5C-2V, 75 ohm ex YURI Japan,
di dlm konduit PVC high impact-heavy gauge
ex EGA/CLIPSAL termasuk F-connector dan
outlet TV.
2 Lantai 3 10 ttk
Kabel coaxial 5C-2V, 75 ohm ex YURI Japan,
di dlm konduit PVC high impact-heavy gauge
ex EGA/CLIPSAL termasuk F-connector dan
outlet TV.

Total
RENCANA ANGGARAN BIAYA
PEKERJAAN AIR BERSIH
PEMBANGUNAN GEDUNG PUSBINDIKLATREN
KEMENTERIAN PERENCANAAN PEMBANGUNAN NASIONAL/BAPPENAS
Jl. Proklamasi No 70, Jakarta

HARGA SATUAN JUMLAH HARGA


NO URAIAN PEKERJAAN VOLUME SAT
(Rp) (Rp)

V.I PEKERJAAN AIR BERSIH


a PERALATAN UTAMA PEMOMPAAN AIR
BERSIH DI RUANG POMPA LANTAI DASAR

a.1 POMPA AIR BERSIH (PAB) 2.00 unit


1 Pompa
Jenis : Multi stage horizontal -
centrifugal pump - NSP
Debit : 50 USGPM (378,5 l/menit)
Head : 30 m
Efisiensi : 70 % minimum
Kecepatan putar : 1450 rpm
2 Motor Penggerak
Jenis : 3 phase TEFC induction
Tegangan : 380/660 V
Starter : DOL
Daya poros : 1.770 VA (min)
Kopling direct, base skid mounted
Kecepatan putar : 1450 rpm
a.2 Water Level Controller 2.00 set
WLC untuk ground tank dan evelated tank,
lengkap dengan elektroda dan pengkabelan
elektroda antara ground reservoir, elevated
tank dan PP-PUMP
a.3 Priming tank kap.100 lt lengkap dgn. Asessories 1.00 unit

b INSTALASI PEMIPAAN

b.1 Pemipaan di Ruang Pompa


Pemipaan menggunakan GIP med. Class di cat

1 Header dia. 6" 3.00 m


2 Pipa dia. 4" 20.00 m
Pipa dia. 3" 6.00 m
Pipa dia. 2" 12.00 m
Pipa dia. 1" 12.00 m
Pipa dia. 1/2" 6.00 m
3 Gate valve dia. 4" (125 psi-flanged) 4.00 bh
Gate valve dia. 3" (125 psi-flanged) 2.00 bh
Gate valve dia. 2" (125 psi-screwed) 4.00 bh
Gate valve dia. 1" (125 psi-screwed) 1.00 bh
Gate valve dia. 1/2" (125 psi-screwed) 5.00 bh
4 Check valve dia. 3" (125 psi - flanged) 2.00 bh
5 Double sphere flexible joint dia. 3" (flanged) 2.00 bh
6 Double sphere flexible joint dia. 4" (flanged) 2.00 bh
7 Strainer dia. 4" (flanged) 2.00 bh
8 Foot valve dia. 4" (flanged) 2.00 bh
9 Pressure gauge 1.00 bh
10 Pressure switch 2.00 bh
11 Fitting
Tee dia. 6" x 1 1/2" x 6" 1.00 bh
Tee dia. 6" x 2 1/2" x 6" 3.00 bh
Tee dia. 6" x 3" x 6" 3.00 bh
Tee dia. 1/2" x 1/2" x 1/2" 1.00 bh
Elbow dia. 4" 2.00 bh
Elbow dia. 3" 2.00 bh
Elbow dia. 1 1/2" 2.00 bh
Elbow dia. 1/2" 8.00 bh
12 Material bantu (mur-baut,flens,support,klem , 1.00 ls
fitting dll)
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SAT
(Rp) (Rp)

b.3 Ground floor


1 Pipa tegak dia. 3" 8.00 m

b.4 Lantai 1
1 Pipa tegak dia. 3" 8.00 m
Pipa dia. 1 1/2" 12.00 m
Pipa dia. 1" 26.00 m
Pipa dia. 3/4" 8.00 m
Pipa dia. 1/2" 76.00 m
2 Tee dia. 3" x 1 1/2" x 3" 1.00 bh
Tee dia. 1 1/2" x 1" x 1 1/2" 2.00 bh
Tee dia. 1" x 1" x 1" 1.00 bh
Tee dia. 1" x 3/4" x 1" 1.00 bh
Tee dia. 1" x 1/2" x 1" 8.00 bh
Tee dia. 3/4" x 3/4" x 3/4" 1.00 bh
Tee dia. 3/4" x 1/2" x 3/4" 2.00 bh
Tee dia. 1/2" x 1/2" x 1/2" 6.00 bh
3 Elbow dia. 1 1/2" 3.00 bh
Elbow dia. 1" 3.00 bh
Elbow dia. 3/4" 1.00 bh
Elbow dia. 1/2" 20.00 bh
4 Reducer dia. 1 1/2" x 3/4" 1.00 bh
Reducer dia. 1" x 1/2" 2.00 bh
Reducer dia. 3/4" x 1/2" 2.00 bh
5 Gate valve dia. 1 1/2" (125 psi-screwed) 1.00 bh
6 Material bantu (support,klem , socket dll) 1.00 ls

b.5 Lantai 2
1 Pipa tegak dia. 3" 8.00 m
Pipa dia. 1 1/2" 16.00 m
Pipa dia. 1" 12.00 m
Pipa dia. 3/4" 26.00 m
Pipa dia. 1/2" 48.00 m
2 Tee dia. 3" x 1 1/2" x 3" 1.00 bh
Tee dia. 1 1/2" x 1" x 1 1/2" 1.00 bh
Tee dia. 1 1/2" x 3/4" x 1 1/2" 2.00 bh
Tee dia. 1" x 1/2" x 1" 4.00 bh
Tee dia. 3/4" x 1/2" x 3/4" 6.00 bh
Tee dia. 1/2" x 1/2" x 1/2" 5.00 bh
3 Elbow dia. 1 1/2" 4.00 bh
Elbow dia. 1" 2.00 bh
Elbow dia. 3/4" 2.00 bh
Elbow dia. 1/2" 19.00 bh
4 Reducer dia. 1 1/2" x 3/4" 1.00 bh
Reducer dia. 1" x 1/2" 1.00 bh
Reducer dia. 3/4" x 1/2" 2.00 bh
5 Gate valve dia. 1 1/2" (125 psi-screwed) 1.00 bh
6 Material bantu (support,klem , socket dll) 1.00 ls

b.6 Lantai 3
1 Pipa tegak dia. 3" 8.00 m
Pipa tegak dia. 2" 2.00 m
Pipa dia. 1 1/2" 16.00 m
Pipa dia. 1" 12.00 m
Pipa dia. 3/4" 28.00 m
Pipa dia. 1/2" 36.00 m
2 Tee dia. 2" x 1 1/2" x 2" 1.00 bh
Tee dia. 1 1/2" x 1" x 1 1/2" 1.00 bh
Tee dia. 1 1/2" x 3/4" x 1 1/2" 3.00 bh
Tee dia. 1" x 1/2" x 1" 2.00 bh
Tee dia. 3/4" x 1/2" x 3/4" 5.00 bh
Tee dia. 1/2" x 1/2" x 1/2" 7.00 bh
3 Elbow dia. 1 1/2" 4.00 bh
Elbow dia. 1" 2.00 bh
Elbow dia. 3/4" 3.00 bh
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SAT
(Rp) (Rp)

Elbow dia. 1/2" 16.00 bh


4 Reducer dia. 1 1/2" x 3/4" 1.00 bh
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SAT
(Rp) (Rp)

Reducer dia. 1" x 1/2" 1.00 bh


Reducer dia. 3/4" x 1/2" 1.00 bh
5 Gate valve dia. 1 1/2" (125 psi-screwed) 1.00 bh
6 Material bantu (support,klem , socket dll) 1.00 ls

b.7 Lantai 4
1 Pipa tegak dia. 3" 8.00 m
Pipa tegak dia. 2" 2.00 m
Pipa dia. 1 1/2" 6.00 m
Pipa dia. 1" 22.00 m
Pipa dia. 3/4" 18.00 m
Pipa dia. 1/2" 24.00 m
2 Tee dia. 2" x 1 1/2" x 2" 1.00 bh
Tee dia. 1 1/2" x 1" x 1 1/2" 2.00 bh
Tee dia. 1 1/2" x 3/4" x 1 1/2" 1.00 bh
Tee dia. 1" x 3/4" x 1" 1.00 bh
Tee dia. 1" x 1/2" x 1" 6.00 bh
Tee dia. 3/4" x 1/2" x 3/4" 6.00 bh
Tee dia. 1/2" x 1/2" x 1/2" 4.00 bh
3 Elbow dia. 1 1/2" 4.00 bh
Elbow dia. 1" 2.00 bh
Elbow dia. 3/4" 5.00 bh
Elbow dia. 1/2" 12.00 bh
4 Reducer dia. 1 1/2" x 1" 1.00 bh
Reducer dia. 1" x 1/2" 2.00 bh
5 Gate valve dia. 1 1/2" (125 psi-screwed) 1.00 bh
6 Material bantu (support,klem , socket dll) 1.00 ls

b.8 Lantai Atap

b.8.1 Peralatan Utama


1 Tangki Atas, Fiber glass kap. 2 m3 2.00 bh
2 Booster Pump 2.00 set
Pompa (2 unit)
Jenis : horizontal -centrifugal
pump - NSP
Debit : 30 USGPM (113,4 l/menit)
Head : 20 m
Efisiensi : 70 % minimum
Kecepatan putar : 1450 rpm

Motor Penggerak (2 unit)


Jenis : 3 phase TEFC induction

Tegangan : 380/660 V
Starter : DOL
Daya poros : 750 VA (min)
Kopling direct, base skid mounted
Kecepatan putar : 1450 rpm
Pengadaan pompa lengkap dgn panel kontrol
dan kabel power
3 Pressure Tank kap. 500 liter, 10 kg/cm2 1.00 bh
(1 unit)

b.8.2 Instalasi Pemipaan


1 Header dia. 3" 3.00 m
Pipa dia. 2" 28.00 m
Pipa dia. 1 1/2" 16.00 m
Tee dia. 3" x 2" x 3" 1.00 bh
Tee dia. 2" x 2" x 2" 1.00 bh
Tee dia. 2" x 1 1/2" x 2" 1.00 bh
4 Elbow dia. 3" 4.00 bh
Elbow dia. 2" 20.00 bh
Elbow dia. 1 1/2" 9.00 bh
5 Gate Valve dia. 3" (125 psi-flenged) 3.00 bh
Gate Valve dia. 2 1/2" (125 psi-flenged) 2.00 bh
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SAT
(Rp) (Rp)

Gate Valve dia. 2" (125 psi-flenged) 10.00 bh


Gate Valve dia. 1 1/2" (125 psi-flenged) 4.00 bh
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SAT
(Rp) (Rp)

6 Check Valve dia. 2" (125 psi-flenged) 2.00 bh


7 Strainer dia. 2 1/2" (flanged) 2.00 bh
8 Double sphere flexible joint dia. 2 1/2" (flanged) 2.00 bh
Double sphere flexible joint dia. 2" (flanged) 2.00 bh
9 Pressure gauge 1.00 bh
10 Pressure switch 2.00 bh
11 Material bantu (support,klem , socket dll) 1.00 ls

b.8.3 INSTALASI PENYAMBUNGAN METER AIR PDAM / PALIJA 3" 1.00 unit

Sub Total

d TESTING & COMMISSIONING 1.00 ls

Sub Total
Jumlah Total
RENCANA ANGGARAN BIAYA
PEKERJAAN AIR KOTOR
PEMBANGUNAN GEDUNG PUSBINDIKLATREN
KEMENTERIAN PERENCANAAN PEMBANGUNAN NASIONAL/BAPPENAS
Jl. Proklamasi No 70, Jakarta

HARGA SATUAN JUMLAH HARGA


NO URAIAN PEKERJAAN VOLUME SAT
(Rp) (Rp)

V.II PEKERJAAN PEMIPAAN AIR KOTOR / AIR BEKAS


Pemipaan dan fitting menggunakan pipa PVC
kelas AW dengan metode penyambungan
RRJ (rubber ring joint)

a Ground floor
1 Pipa
- dia. 6" 36.00 m
- dia. 4" 40.00 m
- dia. 2" 10.00 m
2 Pipa Tegak
- dia. 6" 4.00 m
- dia. 4" 4.00 m
3 Tee-Wye
- dia. 6" x 6" x 6" 1.00 bh
- dia. 6" x 2" x 6" 1.00 bh
- dia. 4" x 4" x 4" 1.00 bh
- dia. 4" x 2" x 4" 1.00 bh
- dia. 2" x 2" x 2" 1.00 bh
4 Elbow
- dia. 6" 4.00 bh
- dia. 4" 2.00 bh
- dia. 2" 3.00 bh
6 Septictank Biotech model RCX 10 (10m3) 1.00 unit
Pekerjaan sudah termasuk penggalian dan
pengurugan, pondasi struktur.

7 Material bantu (socker, klem, lem dll.) 1.00 ls

b Lantai - 1
1 Pipa
- dia. 4" 34.00 m
- dia. 3" 8.00 m
- dia. 2" 36.00 m
- dia.11/2" 64.00 m
2 Pipa Tegak
- dia. 6" 4.00 m
- dia. 4" 4.00 m
- dia. 3" 4.00 m
- dia. 2" 4.00 m
3 Tee-Wye
- dia. 6" x 4" x 6" 1.00 bh
- dia. 4" x 4" x 4" 6.00 bh
- dia. 4" x 3" x 4" 1.00 bh
- dia. 4" x 2" x 4" 1.00 bh
- dia. 3" x 2" x 3" 5.00 bh
- dia. 3" x 1 1/2" x 3" 1.00 bh
- dia. 2" x 2" x 2" 5.00 bh
- dia. 2" x 1 1/2" x 2" 3.00 bh
- dia. 1 1/2" x 1 1/2" x 1 1/2" 3.00 bh
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SAT
(Rp) (Rp)

4 Elbow
- dia. 4" 6.00 bh
- dia. 2" 12.00 bh
- dia. 1 1/2" 14.00 bh
5 Floor drain dia 2" 6.00 bh
6 Material bantu (socker, klem, lem dll.) 1.00 ls

c Lantai 2

1 Pipa
- dia. 4" 18.00 m
- dia. 3" 12.00 m
- dia. 2" 50.00 m
- dia.1 1/2" 46.00 m
2 Pipa Tegak
- dia. 6" 4.00 m
- dia. 4" 4.00 m
- dia. 3" 4.00 m
- dia. 2" 4.00 m
3 Tee-Wye
- dia. 6" x 4" x 6" 1.00 bh
- dia. 4" x 4" x 4" 5.00 bh
- dia. 4" x 3" x 4" 1.00 bh
- dia. 4" x 2" x 4" 1.00 bh
- dia. 4" x 1 1/2" x 4" 1.00 bh
- dia. 3" x 2" x 3" 7.00 bh
- dia. 3" x 1 1/2" x 3" 2.00 bh
- dia. 2" x 2" x 2" 4.00 bh
- dia. 2" x 1 1/2" x 2" 5.00 bh
- dia. 1 1/2" x 1 1/2" x 1 1/2" 4.00 bh
4 Elbow
- dia. 4" 5.00 bh
- dia. 2" 16.00 bh
- dia. 1 1/2" 20.00 bh
5 Floor drain dia 2" 5.00 bh
6 Material bantu (socker, klem, lem dll.) 1.00 ls

d Lantai 3

1 Pipa
- dia. 4" 18.00 m
- dia. 3" 12.00 m
- dia. 2" 42.00 m
- dia.1 1/2" 20.00 m
2 Pipa Tegak
- dia. 6" 4.00 m
- dia. 4" 4.00 m
- dia. 3" 4.00 m
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SAT
(Rp) (Rp)

3 Tee-Wye
- dia. 6" x 4" x 6" 1.00 bh
- dia. 4" x 4" x 4" 5.00 bh
- dia. 4" x 3" x 4" 1.00 bh
- dia. 4" x 2" x 4" 1.00 bh
- dia. 4" x 1 1/2" x 4" 1.00 bh
- dia. 3" x 2" x 3" 7.00 bh
- dia. 3" x 1 1/2" x 3" 2.00 bh
- dia. 2" x 2" x 2" 2.00 bh
- dia. 2" x 1 1/2" x 2" 3.00 bh
- dia. 1 1/2" x 1 1/2" x 1 1/2" 6.00 bh
4 Elbow
- dia. 4" 5.00 bh
- dia. 2" 16.00 bh
- dia. 1 1/2" 17.00 bh
5 Floor drain dia 2" 5.00 bh
6 Material bantu (socker, klem, lem dll.) 1.00 ls

e Lantai 4

1 Pipa
- dia. 4" 18.00 m
- dia. 3" 12.00 m
- dia. 2" 48.00 m
- dia.1 1/2" 46.00 m
2 Pipa Tegak
- dia. 6" 4.00 m
- dia. 4" 4.00 m
- dia. 3" 4.00 m
3 Tee-Wye
- dia. 6" x 4" x 6" 1.00 bh
- dia. 4" x 4" x 4" 5.00 bh
- dia. 4" x 3" x 4" 1.00 bh
- dia. 4" x 2" x 4" 1.00 bh
- dia. 4" x 1 1/2" x 4" 1.00 bh
- dia. 3" x 2" x 3" 5.00 bh
- dia. 3" x 1 1/2" x 3" 2.00 bh
- dia. 2" x 2" x 2" 3.00 bh
- dia. 2" x 1 1/2" x 2" 6.00 bh
- dia. 1 1/2" x 1 1/2" x 1 1/2" 6.00 bh
4 Elbow
- dia. 4" 5.00 bh
- dia. 2" 17.00 bh
- dia. 1 1/2" 18.00 bh
5 Floor drain dia 2" 5.00 bh
6 Material bantu (socker, klem, lem dll.) 1.00 ls

Sub Total

f TESTING & COMMISSIONING 1.00 ls

Sub Total
Jumlah Total
RENCANA ANGGARAN BIAYA
PEKERJAAN INSTALASI AC
PEMBANGUNAN GEDUNG PUSBINDIKLATREN
KEMENTERIAN PERENCANAAN PEMBANGUNAN NASIONAL/BAPPENAS
Jl. Proklamasi No 70, Jakarta

HARGA SATUAN
NO URAIAN PEKERJAAN VOLUME SAT JUMLAH HARGA (Rp)
(Rp)

V.III PEKERJAAN INSTALASI AIR CONDITIONER

a Lantai 1

1 Instalasi Pemipaan Refrigerant & Drain


Instalasi pemipaan refrigerant dengan pipa tembaga
type L, lengkap dengan isolasi dan tray.
- Instalasi pipa untuk IO/OU 1 PK s/d 4 PK
Pemipaan dengan pipa PVC kelas AW, lengkap
dengan isolasi pipa. 6.00 set
2 Instalasi Kabel Power & Kontrol
- AC 1 s/d 4 PK
Kabel NYM 3 x 2,5 sqmm + NYMHY 3 x 2,5 sqmm
didalam conduit PVC high-impact heavy duty 6.00 ttk
3 Instalasi Exhaust Fan, setara KDK
Pengadaan exhaust lengkap dgn Instalasi power listrik
- Kapasitas 270 cmh (ceiling Type) 2.00 unit
- Kapasitas 210 cmh (ceiling Type) 3.00 unit
- Pipa PVC AW dia. 6" 18.00 m
- Tee dia. 6" x 6" x 6" 3.00 bh
- Ell bow dia. 6" 5.00 bh
- Exhaust Air Louvre 300 x 200 mm 2.00 bh

b Lantai 2

1 Instalasi Pemipaan Refrigerant & Drain


Instalasi pemipaan refrigerant dengan pipa tembaga
type L, lengkap dengan isolasi dan tray.
- Instalasi pipa untuk IO/OU 3/4 PK s/d 3 PK
Pemipaan dengan pipa PVC kelas AW, lengkap
dengan isolasi pipa. 6.00 set
2 Instalasi Kabel Power & Kontrol
- AC 3/4 s/d 3 PK
Kabel NYM 3 x 2,5 sqmm + NYMHY 3 x 2,5 sqmm
didalam conduit PVC high-impact heavy duty 6.00 ttk
3 Instalasi Exhaust Fan, setara KDK
Pengadaan exhaust lengkap dgn Instalasi power listrik
- Kapasitas 320 cmh (ceiling Type) 2.00 unit
- Kapasitas 250 cmh (ceiling Type) 2.00 unit
- Kapasitas 135 cmh (ceiling Type) 1.00 unit
- Pipa PVC AW dia. 6" 14.00 m
- Tee dia. 6" x 6" x 6" 3.00 bh
- Ell bow dia. 6" 5.00 bh
- Exhaust Air Louvre 300 x 200 mm 2.00 bh
HARGA SATUAN
NO URAIAN PEKERJAAN VOLUME SAT JUMLAH HARGA (Rp)
(Rp)

c Lantai 3

1 Instalasi Pemipaan Refrigerant & Pipa Drain


Instalasi pemipaan refrigerant dengan pipa tembaga
type L, lengkap dengan isolasi dan tray.
- Instalasi pipa untuk IO/OU 1 PK s/d 5 PK
Pemipaan dengan pipa PVC kelas AW, lengkap 6.00 set
dengan isolasi pipa.
2 Instalasi Kabel Power & Kontrol
- AC 1 s/d 5 PK
Kabel NYM 3 x 2,5 sqmm + NYMHY 3 x 2,5 sqmm
didalam conduit PVC high-impact heavy duty 6.00 ttk
3 Instalasi Exhaust Fan, setara KDK
Pengadaan exhaust lengkap dgn Instalasi power listrik
- Kapasitas 320 cmh (ceiling Type) 2.00 unit
- Pipa PVC AW dia. 6" 10.00 m
- Tee dia. 6" x 6" x 6" 2.00 bh
- Ell bow dia. 6" 4.00 bh
- Exhaust Air Louvre 300 x 200 mm 2.00 bh

d Lantai 4

1 Instalasi Pemipaan Refrigerant & Pipa Drain


Instalasi pemipaan refrigerant dengan pipa tembaga
type L, lengkap dengan isolasi dan tray.
- Instalasi pipa untuk IO/OU 4 PK
Pemipaan dengan pipa PVC kelas AW, lengkap 4.00 set
dengan isolasi pipa.
2 Instalasi Kabel Power & Kontrol
- AC 4 PK
Kabel NYM 3 x 2,5 sqmm + NYMHY 3 x 2,5 sqmm
didalam conduit PVC high-impact heavy duty 4.00 ttk
3 Instalasi Exhaust Fan, setara KDK
Pengadaan exhaust lengkap dgn Instalasi power listrik
- Kapasitas 320 cmh (ceiling Type) 2.00 unit
- Pipa PVC AW dia. 6" 10.00 m
- Tee dia. 6" x 6" x 6" 2.00 bh
- Ell bow dia. 6" 4.00 bh
- Exhaust Air Louvre 300 x 200 mm 2.00 bh

Total
RENCANA ANGGARAN BIAYA
PEKERJAAN FRE HYDRANT
PEMBANGUNAN GEDUNG PUSBINDIKLATREN
KEMENTERIAN PERENCANAAN PEMBANGUNAN NASIONAL/BAPPENAS
Jl. Proklamasi No 70, Jakarta

HARGA SATUAN JUMLAH HARGA


NO. URAIAN PEKERJAAN VOLUME SAT
(Rp) (Rp)

V.IV. PEKERJAAN FIRE HYDRANT

PERALATAN UTAMA DI RUANG POMPA


1.1 Electric Main Pump 1.00 unit
a Pompa
Jenis : horizontal single/multi stage
centrifugal pump, self priming.
Debit : 500 USGPM
Head : 60 m
Efisiensi : 70 % minimum
Kecepatan putar : 2900 rpm
b Motor Penggerak
Jenis : 3 phase TEFC induction
Tegangan : 380/660 V
Starter : wye-delta
Daya poros : 35.000 VA (min)
Kopling : direct, base skid mounted
Kecepatan putar : 2900 rpm
1.2 Electric Jockey Pump 1.00 unit
a Pompa
Jenis : multi stage
centrifugal pump, self priming
Debit : 50 USGPM
Head : 60 m
Efisiensi : 70 % minimum
Kecepatan putar : 1450 rpm
b Motor Penggerak
Jenis : 3 phase TEFC induction
Tegangan : 380/660 V
Starter : wye-delta
Daya poros : 3.500 (min)
Kopling direct, base skid mounted
Kecepatan putar : 1450 rpm

1.3 Diesel Main Pump 1.00 unit

SUB TOTAL I
HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN VOLUME SAT
(Rp) (Rp)

II INSTALASI PEMIPAAN

2.1 Pemipaan di Ruang Pompa

Pemipaan menggunakan BSP sch. 40, ASTM A-120


di cat warna merah.

a Header dia. 8" 6.00 m


b Pipa
- dia. 6" 16.00 m
- dia. 5" 6.00 m
- dia. 4" 6.00 m
- dia. 3" 6.00 m
- dia. 2 1/2" 6.00 m
- dia. 2" 6.00 m
c Tee
- dia 8" x 6" x 8" 3.00 bh
- dia 8" x 5" x 8" 1.00 bh
- dia 8" x 4" x 8" 2.00 bh
- dia 8" x 3" x 8" 2.00 bh
- dia 8" x 2 1/2" x 8" 1.00 bh
- dia 8" x 2" x 8" 3.00 bh
d Elbow
- dia. 6" 4.00 bh
- dia. 4" 2.00 bh
- dia. 3" 2.00 bh
- dia. 2" 4.00 bh
e Gate Valve
- dia. 6" (150 psi-flanged) 3.00 bh
- dia. 5" (150 psi-flanged) 2.00 bh
- dia. 4" (150 psi-flanged) 2.00 bh
- dia. 3" (125 psi-flanged) 2.00 bh
- dia. 2 1/2" (150 psi-flanged) 1.00 bh
- dia. 2" (125 psi-screwed) 2.00 bh

f Check Valve
- dia. 4" (150 psi - flanged) 2.00 bh
- dia. 2 1/2" (150 psi-flanged) 1.00 bh
g Double Sphere Flexible Joint
- dia. 5" (flanged) 2.00 bh
- dia. 4" (flanged) 2.00 bh
- dia. 2 1/2" (flanged) 1.00 bh
- dia. 2" (flanged) 1.00 bh
h Strainer
- dia. 5" (flanged) 2.00 bh
- dia. 2 1/2" (flanged) 1.00 bh
i Foot valve dia. 6" (flanged) 2.00 bh
j Pressure gauge 0 - 15 kg/cm2 4.00 bh
k Pressure switch 3.00 bh
l Savety valve 12 kg/cm2 dia. 2" (flanged) 1.00 bh
m Pressure tank 1000 lt, 15 kg/cm2 lengkap dgn. 1.00 unit
accessories
n Air Relase Valve (ARV) dia. 2" 1.00 bh
o Material bantu (mur-baut,flens,support,klem , 1.00 ls
fitting dll)
HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN VOLUME SAT
(Rp) (Rp)

2.2 Ground floor


Pemipaan dan fitting menggunakan BSP sch. 40
ASTM A-120, di dalam bangunan (dicat merah)

a Pipa
- dia. 6" (Pipa Tegak) 4.00 m
- dia. 2 1/2" 24.00 m
b Elbow
- dia 2 1/2" 3.00 bh
c Tee
- dia 6" x 2 1/2" x 6" 1.00 bh
c Indoor hydrant box lengkap 1.00 bh
f Multipurpose dry chemical fire extinguisher 4.00 bh
kap. 6 kg lengkap dengan bracket dan nozzle
(portable type)
g Material bantu (mur-baut, flange, socket dll.) 1.00 ls

2.3 Lantai 1
Pemipaan dan fitting menggunakan BSP sch. 40
ASTM A-120, di dalam bangunan (dicat merah)

a Pipa
- dia. 6" (Pipa Tegak) 4.00 m
- dia. 2 1/2" 18.00 m
b Elbow
- dia 2 1/2" 3.00 bh
c Tee
- dia 6" x 2 1/2" x 6" 1.00 bh
e Indoor hydrant box lengkap 1.00 bh
f Multipurpose dry chemical fire extinguisher 4.00 bh
kap. 6 kg lengkap dengan bracket dan nozzle
(portable type)
g Material bantu (mur-baut, flange, socket dll.) 1.00 ls

2.4 Lantai 2
Pemipaan dan fitting menggunakan BSP sch. 40
ASTM A-120, di dalam bangunan (dicat merah)

a Pipa
- dia. 6" (Pipa Tegak) 4.00 m
- dia. 2 1/2" 24.00 m
b Elbow
- dia 2 1/2" 3.00 bh
c Tee
- dia 6" x 2 1/2" x 6" 1.00 bh
e Indoor hydrant box lengkap 1.00 bh
f Multipurpose dry chemical fire extinguisher 4.00 bh
kap. 6 kg lengkap dengan bracket dan nozzle
(portable type)
g Material bantu (mur-baut, flange, socket dll.) 1.00 ls
HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN VOLUME SAT
(Rp) (Rp)

2.5 Lantai 3
Pemipaan dan fitting menggunakan BSP sch. 40
ASTM A-120, di dalam bangunan (dicat merah)

a Pipa
- dia. 4" (Pipa Tegak) 4.00 m
- dia. 2 1/2" 22.00 m
b Elbow
- dia 2 1/2" 3.00 bh
c Tee
- dia 4" x 2 1/2" x 4" 1.00 bh
d Reducer dia 6" x 4" 1.00 bh
e Indoor hydrant box lengkap 1.00 bh
f Multipurpose dry chemical fire extinguisher 4.00 bh
kap. 6 kg lengkap dengan bracket dan nozzle
(portable type)
g Material bantu (mur-baut, flange, socket dll.) 1.00 ls

2.6 Lantai 4
Pemipaan dan fitting menggunakan BSP sch. 40
ASTM A-120, di dalam bangunan (dicat merah)

a Pipa
- dia. 2 1/2" 22.00 m
b Elbow
- dia. 4" 1.00 bh
- dia 2 1/2" 10.00 bh
c Tee
- dia 4" x 2 1/2" x 4" 1.00 bh
e Air release valve dia. 4" 1.00 bh
f Indoor hydrant box lengkap 1.00 bh
g Multipurpose dry chemical fire extinguisher 4.00 bh
kap. 6 kg lengkap dengan bracket dan nozzle
(portable type)
h Material bantu (mur-baut, flange, socket dll.) 1.00 ls

SUB TOTAL II

III TESTING & COMMISSIONING 1.00 ls

SUB TOTAL III


TOTAL
RENCANA ANGGARAN BIAYA
PEKERJAAN SPRINKLER
PEMBANGUNAN GEDUNG PUSBINDIKLATREN
KEMENTERIAN PERENCANAAN PEMBANGUNAN NASIONAL/BAPPENAS
Jl. Proklamasi No 70, Jakarta

NO. URAIAN PEKERJAAN SAT VOLUME HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

V.V. INSTALASI SPRINKLER


1 INSTALASI PEMIPAAN

1.1 Ground floor


Pemipaan dan fitting menggunakan BSP Sch. 40
ASTM A-120, dicat warna merah

a Pipa Distribusi
- dia. 2 1/2" m 8.00
- dia. 2" m 4.00
- dia. 1 1/2" m 40.00
- dia. 1 1/4" m 6.00
- dia. 1" m 38.00
b Pipa Tegak
- dia. 6" (flanged setiap 3 batang) m 4.00
- dia. 2" (flanged setiap 3 batang) m 4.00
c Tee
- dia. 6" x 2 1/2" x 6" (flanged) bh 1.00
- dia. 2 1/2" x 2 1/2" x 2 1/2" bh 2.00
- dia. 2 1/2" x 1 1/2" x 2 1/2" bh 1.00
- dia. 2 1/2" x 1 1/4" x 2 1/2" bh 1.00
- dia. 2" x 1 1/2" x 2" bh 1.00
- dia. 1 1/2" x 1 1/2" x 1 1/2" bh 1.00
- dia. 1 1/2" x 1" x 1 1/2" bh 6.00
- dia. 1 1/4" x 1" x 1 1/4" bh 1.00
- dia. 1" x 1" x 1" bh 4.00
d Elbow
- dia. 1 1/2" bh 2.00
- dia. 1" bh 6.00
e Reducer
- dia. 2 1/2" x 2" bh 1.00
- dia. 2" x 1 1/2" bh 1.00
- dia. 1 1/2" x 1" bh 3.00
- dia. 1 1/4" x 1" bh 1.00
f Red bulb pendant sprinkler head dia. 1/2" bh 15.00
Ex Viking atau setara
g Gate Valve
- dia. 2 1/2" (150 psi-screwed) bh 2.00
- dia. 1 1/2" (150 psi-screwed) bh 1.00
h Flow switch dia. 2 1/2", termasuk penarikan bh 1.00
kabel ke zona fire alarm terdekat
Ex Viking atau setara
i Material bantu ( hanger, flens, mur-baut dll.) ls 1.00
NO. URAIAN PEKERJAAN SAT VOLUME HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

1.2 Lantai 1
Pemipaan dan fitting menggunakan BSP Sch. 40
ASTM A-120, dicat warna merah

a Pipa Distribusi
- dia. 1 1/2" m 24.00
- dia. 1" m 16.00
b Pipa Tegak
- dia. 6" (flanged setiap 3 batang) m 4.00
- dia. 2" (flanged setiap 3 batang) m 4.00
c Tee
- dia. 6" x 2 1/2" x 6" (flanged) bh 1.00
- dia. 2 1/2" x 2 1/2" x 2 1/2" bh 2.00
- dia. 2 1/2" x 1 1/2" x 2 1/2" bh 1.00
- dia. 2 1/2" x 1 1/4" x 2 1/2" bh 1.00
- dia. 2" x 1 1/2" x 2" bh 1.00
- dia. 1 1/2" x 1 1/2" x 1 1/2" bh 1.00
- dia. 1 1/2" x 1" x 1 1/2" bh 6.00
- dia. 1 1/4" x 1" x 1 1/4" bh 1.00
- dia. 1" x 1" x 1" bh 4.00
d Elbow
- dia. 1 1/2" bh 2.00
- dia. 1" bh 3.00
e Reducer
- dia. 1 1/2" x 1" bh 1.00
f Red bulb pendant sprinkler head dia. 1/2" bh 5.00
Ex Viking atau setara
g Gate Valve
- dia. 1 1/2" (150 psi-screwed) bh 3.00
h Flow switch dia. 1 1/2", termasuk penarikan bh 1.00
kabel ke zona fire alarm terdekat
Ex Viking atau setara
i Material bantu ( hanger, flens, mur-baut dll.) ls 1.00
NO. URAIAN PEKERJAAN SAT VOLUME HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

1.3 Lantai 2
Pemipaan dan fitting menggunakan BSP Sch. 40
ASTM A-120, dicat warna merah

a Pipa Distribusi
- dia. 2 1/2" m 14.00
- dia. 2" m 4.00
- dia. 1 1/2" m 44.00
- dia. 1 1/4" m 6.00
- dia. 1" m 42.00
b Pipa Tegak
- dia. 6" (flanged setiap 3 batang) m 4.00
- dia. 2" (flanged setiap 3 batang) m 4.00
c Tee
- dia. 6" x 2 1/2" x 6" (flanged) bh 1.00
- dia. 2 1/2" x 2 1/2" x 2 1/2" bh 2.00
- dia. 2 1/2" x 1 1/2" x 2 1/2" bh 3.00
- dia. 2" x 1 1/2" x 2" bh 1.00
- dia. 1 1/2" x 2 1/2" x 1 1/2" bh 1.00
- dia. 1 1/2" x 1 1/2" x 1 1/2" bh 1.00
- dia. 1 1/2" x 1" x 1 1/2" bh 8.00
- dia. 1 1/4" x 1" x 1 1/4" bh 1.00
- dia. 1" x 1" x 1" bh 4.00
d Elbow
- dia. 2 1/2" bh 2.00
- dia. 1 1/2" bh 4.00
- dia. 1" bh 9.00
e Reducer
- dia. 2 1/2" x 2" bh 1.00
- dia. 2" x 1 1/2" bh 1.00
- dia. 1 1/2" x 1 1/4" bh 1.00
- dia. 1 1/2" x 1" bh 3.00
- dia. 1 1/4" x 1" bh 1.00
f Red bulb pendant sprinkler head dia. 1/2" bh 17.00
Ex Viking atau setara
g Gate Valve
- dia. 2 1/2" (150 psi-screwed) bh 2.00
- dia. 1 1/2" (150 psi-screwed) bh 1.00
h Flow switch dia. 2 1/2", termasuk penarikan bh 1.00
kabel ke zona fire alarm terdekat
Ex Viking atau setara
i Material bantu ( hanger, flens, mur-baut dll.) ls 1.00
NO. URAIAN PEKERJAAN SAT VOLUME HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

1.4 Lantai 3
Pemipaan dan fitting menggunakan BSP Sch. 40
ASTM A-120, dicat warna merah

a Pipa Distribusi
- dia. 2 1/2" m 14.00
- dia. 2" m 4.00
- dia. 1 1/2" m 46.00
- dia. 1 1/4" m 18.00
- dia. 1" m 32.00
b Pipa Tegak
- dia. 4" (flanged setiap 3 batang) m 8.00
c Tee
- dia. 4" x 2 1/2" x 4" (flanged) bh 1.00
- dia. 4" x 1 1/2" x 4" (flanged) bh 1.00
- dia. 2 1/2" x 2 1/2" x 2 1/2" bh 2.00
- dia. 2 1/2" x 1 1/2" x 2 1/2" bh 2.00
- dia. 2" x 1 1/2" x 2" bh 1.00
- dia. 2 1/2" x 1 1/4" x 2 1/2" bh 1.00
- dia. 1 1/2" x 2 1/2" x 1 1/2" bh 1.00
- dia. 1 1/2" x 1 1/2" x 1 1/2" bh 1.00
- dia. 1 1/2" x 1" x 1 1/2" bh 4.00
- dia. 1 1/4" x 1" x 1 1/4" bh 5.00
- dia. 1" x 1" x 1" bh 5.00
d Elbow
- dia. 2 1/2" bh 2.00
- dia. 1 1/2" bh 7.00
- dia. 1" bh 6.00
e Reducer
- dia. 2 1/2" x 2" bh 1.00
- dia. 2" x 1 1/2" bh 1.00
- dia. 1 1/2" x 1 1/4" bh 4.00
- dia. 1 1/4" x 1" bh 5.00
f Red bulb pendant sprinkler head dia. 1/2" bh 23.00
Ex Viking atau setara
g Gate Valve
- dia. 2 1/2" (150 psi-flanged) bh 2.00
- dia. 1 1/2" (150 psi-flanged) bh 1.00
h Flow switch dia. 2 1/2", termasuk penarikan bh 1.00
kabel ke zona fire alarm terdekat
Ex Viking atau setara
i Material bantu ( hanger, flens, mur-baut dll.) ls 1.00
NO. URAIAN PEKERJAAN SAT VOLUME HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

1.5 Lantai 4
Pemipaan dan fitting menggunakan BSP Sch. 40
ASTM A-120, dicat warna merah

a Pipa Distribusi
- dia. 2 1/2" m 10.00
- dia. 2" m 4.00
- dia. 1 1/2" m 36.00
- dia. 1 1/4" m 16.00
- dia. 1" m 30.00
b Pipa Tegak
- dia. 4" (flanged setiap 3 batang) m 8.00
c Tee
- dia. 4" x 2 1/2" x 4" (flanged) bh 1.00
- dia. 4" x 1 1/2" x 4" (flanged) bh 1.00
- dia. 2 1/2" x 2 1/2" x 2 1/2" bh 2.00
- dia. 2 1/2" x 1 1/2" x 2 1/2" bh 2.00
- dia. 2" x 1 1/2" x 2" bh 1.00
- dia. 2 1/2" x 1 1/4" x 2 1/2" bh 1.00
- dia. 1 1/2" x 2 1/2" x 1 1/2" bh 1.00
- dia. 1 1/2" x 1 1/2" x 1 1/2" bh 1.00
- dia. 1 1/2" x 1" x 1 1/2" bh 4.00
- dia. 1 1/4" x 1" x 1 1/4" bh 5.00
- dia. 1" x 1" x 1" bh 5.00
d Elbow
- dia. 2 1/2" bh 2.00
- dia. 1 1/2" bh 8.00
- dia. 1" bh 6.00
e Reducer
- dia. 2 1/2" x 2" bh 1.00
- dia. 2" x 1 1/2" bh 1.00
- dia. 1 1/2" x 1 1/4" bh 4.00
- dia. 1 1/4" x 1" bh 5.00
f Red bulb pendant sprinkler head dia. 1/2" bh 23.00
Ex Viking atau setara
g Gate Valve
- dia. 2 1/2" (150 psi-flanged) bh 2.00
- dia. 1 1/2" (150 psi-flanged) bh 1.00
h Flow switch dia. 2 1/2", termasuk penarikan bh 1.00
kabel ke zona fire alarm terdekat
Ex Viking atau setara
i Material bantu ( hanger, flens, mur-baut dll.) ls 1.00
SUB TOTAL I

II TESTING & COMMISSIONING ls 1.00

SUB TOTAL II
TOTAL
RENCANA ANGGARAN BIAYA
PEKERJAAN PERSIAPAN, STRUKTUR DAN ARSITEKTURAL
PEMBANGUNAN GEDUNG PUSBINDIKLATREN
KANTOR KEMENTERIAN PPN/BAPPENAS JAKARTA
LOKASI : JL. PROKLAMASI NO.70 JAKARTA PUSAT

HARGA SATUAN JUMLAH HARGA


NO. URAIAN PEKERJAAN VOL. SAT.
Rp Rp

I. PEKERJAAN PERSIAPAN
1 Biaya Administrasi & Dokumentasi 1 ls
2 Pek. Mobilisasi dan Demobilisasi 1 ls
3 Pembuatan Gambar As-Built Drawing 1 ls
4 Pek. Kantor Direksi 2 Lantai 36 m2
5 Pek. Pagar Pengaman (seng gelombang tinggi 2 m) 20 m'
6 Pek. Papan Proyek 1 ls
7 Pek. Keamanan Proyek 4 bln
8 Pek. Pembersihan Site (buang puing, semak2 & Tebang Pohon) 745 m2
9 Pek. Penyediaan Lift barang 1 ls
10 Pekerjaan Pengukuran & Bouwplank 110 m'
11 Tower Crane (sewa) 4 bln
PEKERJAAN PERSIAPAN

II PEKERJAAN STRUKTUR
A PEKERJAAN PONDASI TIANG PANCANG
1 Mobilisasi de mobilisasi tiang pancang 1 ls
2 Pondasi Tiang Pancang Ø40 Type P-1 144 m1
3 Pondasi Tiang Pancang Ø40 Type P-3 720 m1
4 Pondasi Tiang Pancang Ø40 Type P-4 192 m1
5 Pondasi Tiang Pancang Ø40 Type P-9 216 m1
6 Sambungan Tiang Pancang 53 ttk
7 Bobokan Tiang Pancang 53 ttk
8 Loading Test 2 ttk
PEKERJAAN PONDASI

B PEKERJAAN PILE CAP PONDASI DAN DINDING PIT LIFT


1 Poer Beton Type P-1
- Galian tanah 3 m3
- Pasir Urug dipadatkan t=10 cm 1 m3
- Lantai kerja 1:3:5 t=5 cm 0 m3
- Cor Beton Ready Mix K-300 2 m3
- Besi D-16 606 kg
- Bekisting Pasangan Bata 12 m2
2 Poer Beton Type P-3
- Galian tanah 28 m3
- Pasir Urug dipadatkan t=10 cm 3 m3
- Lantai kerja 1:3:5 t=5 cm 1 m3
- Cor Beton Ready Mix K-300 19 m3
- Besi D-22 2989 kg
- Besi D-16 1580 kg
- Bekisting Pasangan Bata 19 m2
3 Poer Beton Type P-3A
- Galian tanah 12 m3
- Pasir Urug dipadatkan t=10 cm 1 m3
- Lantai kerja 1:3:5 t=5 cm 1 m3
- Cor Beton Ready Mix K-300 8 m3
- Water proofing interaged 8 m3
- Besi D-22 1281 kg
- Besi D-16 677 kg
- Bekisting Pasangan Bata 19 m2
4 Poer Beton Type P-4
- Galian tanah 6 m3
- Pasir Urug dipadatkan t=10 cm 1 m3
- Lantai kerja 1:3:5 t=5 cm 0 m3
- Cor Beton Ready Mix K-300 5 m3
- Besi D-22 847 kg
- Bekisting Pasangan Bata 18 m2
5 Poer Beton Type P-4A
- Galian tanah 6 m3
- Pasir Urug dipadatkan t=10 cm 1 m3
- Lantai kerja 1:3:5 t=5 cm 0 m3
- Cor Beton Ready Mix K-300 5 m3
- Water proofing interaged 5 m3
- Besi D-22 847 kg
- Bekisting Pasangan Bata 9 m2
6 Poer Beton Type P-9
- Galian tanah 14 m3
- Pasir Urug dipadatkan t=10 cm 1 m3
- Lantai kerja 1:3:5 t=5 cm 1 m3
- Cor Beton Ready Mix K-300 10 m3
- Water proofing interaged 10 m3
- Besi D-19 2474 kg
- Bekisting Pasangan Bata 21 m2
7 Dinding Pit Lift t=20 cm
- Galian tanah 11 m3
- Cor Beton Ready Mix K-300 3 m3
- Water proofing interaged 3 m3
- Besi D-13 229 kg
- Besi Ø10 ( Sengkang ) 136 kg
- Bekisting Pasangan Bata 15 m2
- Bekisting Multi t=9 mm 14 m2
- Stoot werk 14 m2
- Bongkar bekesting 14 m2
8 Pekerjaan Anti Rayap
- Anti rayap 909 m2

PEKERJAAN PILE
CAP PONDASI DAN
DINDING PIT LIFT

C PEKERJAAN STRUKTUR LANTAI GROUND


I. PEKERJAAN SLOOF, DINDING & LANTAI GROUND
1 Balok Beton Type SB-1 400/700
- Galian tanah 41 m3
- Pasir Urug dipadatkan t=10 cm 4 m3
- Lantai kerja 1:3:5 t=5 cm 2 m3
- Cor Beton Ready Mix K-300 20 m3
- Besi D-19 3179 kg
- Besi 4Ø12 281 kg
- Besi Ø10 ( Sengkang ) 615 kg
- Bekisting Pasangan Bata 101 m2
2 Balok Beton Type SB-1A 400/700
- Galian tanah 14 m3
- Pasir Urug dipadatkan t=10 cm 1 m3
- Lantai kerja 1:3:5 t=5 cm 1 m3
- Cor Beton Ready Mix K-300 7 m3
- Water proofing interaged 7 m3
- Besi D-19 1060 kg
- Besi D-12 94 kg
- Besi Ø10 ( Sengkang ) 205 kg
- Bekisting Pasangan Bata 34 m2
3 Balok Beton Type SB-1 300/600
- Galian tanah 26 m3
- Pasir Urug dipadatkan t=10 cm 4 m3
- Lantai kerja 1:3:5 t=5 cm 2 m3
- Cor Beton Ready Mix K-300 13 m3
- Besi D-19 2404 kg
- Besi D-12 137 kg
- Besi Ø10 ( Sengkang ) 553 kg
- Bekisting Pasangan Bata 84 m2
4 Balok Beton Type SB-1 300/600
- Galian tanah 3 m3
- Pasir Urug dipadatkan t=10 cm 0 m3
- Lantai kerja 1:3:5 t=5 cm 0 m3
- Cor Beton Ready Mix K-300 1 m3
- Water proofing interaged 1 m3
- Besi D-19 258 kg
- Besi D-12 15 kg
- Besi Ø10 ( Sengkang ) 59 kg
- Bekisting Pasangan Bata 9 m2
5 Lantai Beton t=12 cm
- Cor Beton Ready Mix K-300 31 m3
- Besi Ø10-150 (dua lapis) 5008 kg
- Pasir urug t=10 cm 26 m3
- Lantai kerja 1:3:5 t=5 cm 13 m3
- Pemeliharaan Plat lantai beton (rendam) 261 m2
Sub Jumlah
II. PEKERJAAN KOLOM
1 Kolom Beton Type K-1 Ø650
- Cor Beton Ready Mix K-300 1 m3
- Besi D22 468 kg
- Besi Ø10 ( Sengkang ) 36 kg
- Bekisting Multiplex 9 mm 4 m2
- Stoot werk 4 m2
- Bongkar bekesting 4 m2
2 Kolom Beton Type K-2 Ø650
- Cor Beton Ready Mix K-300 7 m3
- Besi D22 3277 kg
- Besi Ø10 ( Sengkang ) 251 kg
- Bekisting Multiplex 9 mm 30 m2
- Stoot werk 30 m2
- Bongkar bekesting 30 m2
3 Kolom Beton Type K-3 200/700/700
- Cor Beton Ready Mix K-300 3 m3
- Besi D-16 1099 kg
- Besi Ø10 ( Sengkang ) 229 kg
- Bekisting Multiplex 9 mm 32 m2
- Stoot werk 32 m2
- Bongkar bekesting 32 m2
4 Kolom Beton Type K-6 400/400
- Cor Beton Ready Mix K-300 1 m3
- Besi D-19 300 kg
- Besi Ø10 ( Sengkang ) 57 kg
- Bekisting Multiplex 9 mm 7 m2
- Stoot werk 7 m2
- Bongkar bekesting 7 m2
5 Kolom Beton Type K-7 Ø650
- Cor Beton Ready Mix K-300 8 m3
- Besi D22 2974 kg
- Besi Ø10 ( Sengkang ) 296 kg
- Bekisting Multiplex 9 mm 45 m2
- Stoot werk 45 m2
- Bongkar bekesting 45 m2
Sub Jumlah
III. PEKERJAAN TANGGA BETON
1 Pondasi Tangga
- Galian tanah 1 m3
- Buangan tanah 1 m3
- Cor Beton Ready Mix K-300 0 m3
- Besi Ø12-150 14 kg
- Besi Ø10-150 10 kg
- Bekisting pasangan bata 0 m2
2 Dinding Tangga
- Cor Beton Ready Mix K-300 0 m3
- Besi D13-150 19 kg
- Besi Ø10-150 11 kg
- Bekisting Multiplex 9 mm 2 m2
- Stoot samping 2 m2
- Bongkar bekesting 2 m2
3 Plat bordes dan Plat Tangga
- Cor Beton Ready Mix K-300 2 m3
- Besi D13-150 177 kg
- Besi Ø10-150 104 kg
- Bekisting Multiplex 9 mm 11 m2
- Stoot werk 11 m2
- Bongkar bekesting 11 m2
4 Anak Tangga
- Cor Beton Ready Mix K-300 1 m3
- Besi Ø8-200 34 kg
- Besi Ø8 10 kg
- Bekisting Multiplex 9 mm 3 m2
- Bongkar bekesting 3 m2
Sub Jumlah
IV. PEKERJAAN TANGGA BETON (ENTRANCE)
1 Pondasi Tangga
- Galian tanah 2 m3
- Buangan tanah 2 m3
- Cor Beton Ready Mix K-300 0 m3
- Besi Ø12-150 25 kg
- Besi Ø10-150 17 kg
- Bekisting pasangan bata 1 m2
2 Dinding Tangga
- Cor Beton Ready Mix K-300 0 m3
- Besi D13-150 34 kg
- Besi Ø10-150 20 kg
- Bekisting Multiplex 9 mm 3 m2
- Stoot samping 3 m2
- Bongkar bekesting 3 m2
3 Plat bordes dan Plat Tangga
- Cor Beton Ready Mix K-300 4 m3
- Besi D16-150 941 kg
- Besi D13-150 676 kg
- Besi Ø10-150 429 kg
- Bekisting Multiplex 9 mm 45 m2
- Stoot werk 45 m2
- Bongkar bekesting 45 m2
Sub Jumlah
V. PEKERJAAN GROUND RESERVOAR
1 Galian Tanah
- Galian 171 m3
- Buangan tanah 171 m3
2 Plat lantai
- Cor Beton Ready Mix K-300 15 m3
- Water proofing interaged 15 m3
- Besi D16-150 2436 kg
- Pasir urug dipadatkan t=10 cm 5 m3
- Lantai Kerja t=5 cm (1:3:5) 2 m3
3 Dinding pinggir t=25 cm
- Cor Beton Ready Mix K-300 17 m3
- Water proofing interaged 17 m3
- Besi D13-150 1127 kg
- Besi D10-150 669 kg
- Bekisting Pasangan Bata 69 m2
- Bekisting Multiplex 9 mm 69 m2
- Bongkar bekesting 69 m2
4 Dinding tengah t=20 cm
- Cor Beton Ready Mix K-300 3 m3
- Water proofing interaged 3 m3
- Besi D13-150 203 kg
- Besi D10-150 121 kg
- Bekisting Multiplex 9 mm 25 m2
- Bongkar bekesting 25 m2
5 Penutup lantai t=15 cm
- Cor Beton Ready Mix K-300 7 m3
- Besi Ø10-150 869 kg
- Bekisting Multiplex 9 mm 45 m2
- Stoot werk 45 m2
- Bongkar bekesting 45 m2
- Penutup plat baja man hole 1 bh
Sub Jumlah

PEKERJAAN
STRUKTUR
LANTAI GROUND

D PEKERJAAN STRUKTUR LANTAI SATU


I PEKERJAAN BALOK DAN PLAT
1 Balok Beton Type B1-1 (400/650)
- Cor Beton Ready Mix K-300 8 m3
- Besi D22 1751 kg
- Besi 2Ø12 ( Pinggang ) 60 kg
- Besi Ø10 ( Sengkang ) 429 kg
- Bekisting Multi 9 mm 45 m2
- Stoot werk (scafolding) 25 m2
- Bongkar bekesting 45 m2
2 Balok Beton Type B1-2 (400/650)
- Cor Beton Ready Mix K-300 6 m3
- Besi D-22 1062 kg
- Besi 2Ø12 ( Pinggang ) 45 kg
- Besi Ø10 ( Sengkang ) 256 kg
- Bekisting Multiplex 9 mm 33 m2
- Stoot werk (scafolding) 18 m2
- Bongkar bekesting 33 m2
3 Balok Beton Type B1-3 (400/600)
- Cor Beton Ready Mix K-300 13 m3
- Besi D-22 2297 kg
- Besi 2Ø12 ( Pinggang ) 107 kg
- Besi Ø10 ( Sengkang ) 583 kg
- Bekisting Multiplex 9 mm 71 m2
- Stoot werk (scafolding) 44 m2
- Bongkar bekesting 71 m2
4 Balok Beton Type B1-4 (400/600)
- Cor Beton Ready Mix K-300 1 m3
- Besi D-22 170 kg
- Besi 2Ø12 ( Pinggang ) 10 kg
- Besi Ø10 ( Sengkang ) 104 kg
- Bekisting Multiplex 9 mm 7 m2
- Stoot werk (scafolding) 4 m2
- Bongkar bekesting 7 m2
5 Balok Beton Type B1-5 (250/500)
- Cor Beton Ready Mix K-300 7 m3
- Besi D-16 1070 kg
- Besi 2Ø10 ( Pinggang ) 81 kg
- Besi Ø10 ( Sengkang ) 331 kg
- Bekisting Multiplex 9 mm 57 m2
- Stoot werk (scafolding) 36 m2
- Bongkar bekesting 57 m2
6 Balok Beton Type B1-6 (250/500)
- Cor Beton Ready Mix K-300 5 m3
- Besi D-16 731 kg
- Besi 2Ø10 ( Pinggang ) 48 kg
- Besi Ø10 ( Sengkang ) 204 kg
- Bekisting Multiplex 9 mm 40 m2
- Stoot werk (scafolding) 25 m2
- Bongkar bekesting 40 m2
7 Balok Beton Type B1-7 (200/730)
- Cor Beton Ready Mix K-300 0 m3
- Besi D-16 33 kg
- Besi 2Ø10 ( Pinggang ) 9 kg
- Besi Ø10 ( Sengkang ) 19 kg
- Bekisting Multiplex 9 mm 2 m2
- Stoot werk (scafolding) 1 m2
- Bongkar bekesting 2 m2
8 Balok Beton Type B1-7A (200/650)
- Cor Beton Ready Mix K-300 0 m3
- Besi D-16 86 kg
- Besi 2Ø12 ( Pinggang ) 24 kg
- Besi Ø10 ( Sengkang ) 29 kg
- Bekisting Multiplex 9 mm 5 m2
- Stoot werk (scafolding) 2 m2
- Bongkar bekesting 5 m2
9 Balok Beton Type B1-8 (250/400)
- Cor Beton Ready Mix K-300 1 m3
- Besi D-16 138 kg
- Besi 2Ø12 ( Pinggang ) 39 kg
- Besi Ø12 ( Sengkang ) 55 kg
- Bekisting Multiplex 9 mm 7 m2
- Stoot werk (scafolding) 6 m2
- Bongkar bekesting 7 m2
10 Balok Beton Type B1-9 200/400
- Cor Beton Ready Mix K-300 3 m3
- Besi D-16 495 kg
- Besi 2Ø10 ( Pinggang ) 68 kg
- Besi Ø12 ( Sengkang ) 150 kg
- Bekisting Multiplex 9 mm 24 m2
- Stoot werk (scafolding) 21 m2
- Bongkar bekesting 24 m2
11 Balok Beton Type B1-10 400/500
- Cor Beton Ready Mix K-300 1 m3
- Besi D-22 169 kg
- Besi 2Ø10 ( Pinggang ) 8 kg
- Besi Ø12 ( Sengkang ) 51 kg
- Bekisting Multiplex 9 mm 5 m2
- Stoot werk (scafolding) 3 m2
- Bongkar bekesting 5 m2
12 Balok Beton Type B1-11 250/400
- Cor Beton Ready Mix K-300 1 m3
- Besi D-16 112 kg
- Besi 2Ø10 ( Pinggang ) 13 kg
- Besi Ø12 ( Sengkang ) 36 kg
- Bekisting Multiplex 9 mm 7 m2
- Stoot werk (scafolding) 5 m2
- Bongkar bekesting 7 m2
13 Balok Beton Type B1-12 200/400/10
- Cor Beton Ready Mix K-300 1 m3
- Besi D-16 144 kg
- Besi 3Ø10 ( Pinggang ) 28 kg
- Besi Ø12 ( Sengkang ) 60 m2
- Bekisting Multiplex 9 mm 12 m2
- Stoot werk (scafolding) 7 m2
- Bongkar bekesting 12 m2
14 Lantai Beton t=12 cm
- Cor Beton Ready Mix K-300 27 m3
- Besi WM8-150 453 m2
- Bekisting Multi 9 mm 226 m2
- Stoot werk (scafolding) 226 m2
- Pemeliharaan Plat lantai beton (rendam) 226 m2
- Bongkar bekesting 226 m2
Sub Jumlah
II. PEKERJAAN TANGGA BETON
1 Plat bordes dan Plat Tangga
- Cor Beton Ready Mix K-300 2 m3
- Besi D13-150 219 kg
- Besi Ø10-150 130 kg
- Bekisting Multiplex 9 mm 14 m2
- Stoot werk (scafolding) 14 m2
- Bongkar bekesting 14 m2
2 Anak Tangga
- Cor Beton Ready Mix K-300 1 m3
- Besi Ø8-200 60 kg
- Besi Ø8 17 kg
- Bekisting Multiplex 9 mm 6 m2
- Bongkar bekesting 6 m2
Sub Jumlah
III. PEKERJAAN KOLOM
1 Kolom Beton Type K-1 Ø650
- Cor Beton Ready Mix K-300 1 m3
- Besi D22 468 kg
- Besi D-10 ( Sengkang ) 53 kg
- Bekisting Multiplex 9 mm 9 m2
- Stoot werk 9 m2
- Bongkar bekesting 9 m2
2 Kolom Beton Type K-2 Ø650
- Cor Beton Ready Mix K-300 10 m3
- Besi D22 2809 kg
- Besi D-10 ( Sengkang ) 371 kg
- Bekisting Multiplex 9 mm 61 m2
- Stoot werk 61 m2
- Bongkar bekesting 61 m2
3 Kolom Beton Type K-3 200/700/700
- Cor Beton Ready Mix K-300 4 m3
- Besi D-16 1056 kg
- Besi D-10 ( Sengkang ) 340 kg
- Bekisting Multiplex 9 mm 48 m2
- Stoot werk 48 m2
- Bongkar bekesting 48 m2
4 Kolom Beton Type K-6 400/400
- Cor Beton Ready Mix K-300 1 m3
- Besi D-19 300 kg
- Besi D-10 ( Sengkang ) 85 kg
- Bekisting Multiplex 9 mm 14 m2
- Stoot werk 14 m2
- Bongkar bekesting 14 m2
5 Kolom Beton Type K-7 Ø650
- Cor Beton Ready Mix K-300 9 m3
- Besi D22 2300 kg
- Besi D-10 ( Sengkang ) 191 kg
- Bekisting Multiplex 9 mm 49 m2
- Stoot werk 49 m2
- Bongkar bekesting 49 m2
Subjumlah
PEKERJAAN
STRUKTUR LANTAI
SATU
E PEKERJAAN STRUKTUR LANTAI DUA
I PEKERJAAN BALOK DAN PLAT
1 Balok Beton Type B2-1 (400/650)
- Cor Beton Ready Mix K-300 8 m3
- Besi D22 1728 kg
- Besi 2Ø12 ( Pinggang ) 59 kg
- Besi Ø10 ( Sengkang ) 423 kg
- Bekisting Multi 9 mm 44 m2
- Stoot werk (scafolding) 24 m2
- Bongkar bekesting 44 m2
2 Balok Beton Type B2-2 (400/650)
- Cor Beton Ready Mix K-300 6 m3
- Besi D-22 1062 kg
- Besi 2Ø12 ( Pinggang ) 45 kg
- Besi Ø10 ( Sengkang ) 256 kg
- Bekisting Multiplex 9 mm 33 m2
- Stoot werk (scafolding) 18 m2
- Bongkar bekesting 33 m2
3 Balok Beton Type B2-3 (400/600)
- Cor Beton Ready Mix K-300 10 m3
- Besi D-22 1661 kg
- Besi 2Ø12 ( Pinggang ) 78 kg
- Besi Ø10 ( Sengkang ) 422 kg
- Bekisting Multiplex 9 mm 52 m2
- Stoot werk (scafolding) 32 m2
- Bongkar bekesting 52 m2
4 Balok Beton Type B2-4 (400/600)
- Cor Beton Ready Mix K-300 1 m3
- Besi D-22 170 kg
- Besi 2Ø12 ( Pinggang ) 10 kg
- Besi Ø10 ( Sengkang ) 104 kg
- Bekisting Multiplex 9 mm 7 m2
- Stoot werk (scafolding) 4 m2
- Bongkar bekesting 7 m2
5 Balok Beton Type B2-5 (250/500)
- Cor Beton Ready Mix K-300 7 m3
- Besi D-16 1070 kg
- Besi 2Ø10 ( Pinggang ) 81 kg
- Besi Ø10 ( Sengkang ) 331 kg
- Bekisting Multiplex 9 mm 57 m2
- Stoot werk (scafolding) 36 m2
- Bongkar bekesting 57 m2
6 Balok Beton Type B2-6 (250/500)
- Cor Beton Ready Mix K-300 5 m3
- Besi D-16 731 kg
- Besi 2Ø10 ( Pinggang ) 48 kg
- Besi Ø10 ( Sengkang ) 204 kg
- Bekisting Multiplex 9 mm 40 m2
- Stoot werk (scafolding) 25 m2
- Bongkar bekesting 40 m2
7 Balok Beton Type B2-7 (200/730)
- Cor Beton Ready Mix K-300 0 m3
- Besi D-16 33 kg
- Besi 2Ø10 ( Pinggang ) 9 kg
- Besi Ø10 ( Sengkang ) 19 kg
- Bekisting Multiplex 9 mm 2 m2
- Stoot werk (scafolding) 1 m2
- Bongkar bekesting 2 m2
8 Balok Beton Type B2-7A (200/650)
- Cor Beton Ready Mix K-300 0 m3
- Besi D-16 86 kg
- Besi 2Ø12 ( Pinggang ) 24 kg
- Besi Ø10 ( Sengkang ) 29 kg
- Bekisting Multiplex 9 mm 5 m2
- Stoot werk (scafolding) 2 m2
- Bongkar bekesting 5 m2
8 Balok Beton Type B2-8 (250/400)
- Cor Beton Ready Mix K-300 1 m3
- Besi D-16 138 kg
- Besi 2Ø12 ( Pinggang ) 39 kg
- Besi Ø12 ( Sengkang ) 55 kg
- Bekisting Multiplex 9 mm 7 m2
- Stoot werk (scafolding) 6 m2
- Bongkar bekesting 7 m2
9 Balok Beton Type B2-9 200/400
- Cor Beton Ready Mix K-300 3 m3
- Besi D-16 483 kg
- Besi 2Ø10 ( Pinggang ) 68 kg
- Besi Ø12 ( Sengkang ) 261 kg
- Bekisting Multiplex 9 mm 24 m2
- Stoot werk (scafolding) 21 m2
- Bongkar bekesting 24 m2
10 Balok Beton Type B2-14 (400/600)
- Cor Beton Ready Mix K-300 4 m3
- Besi D22 939 kg
- Besi 15Ø12 ( Pinggang ) 36 kg
- Besi Ø10 ( Sengkang ) 586 kg
- Bekisting Multi 9 mm 35 m2
- Stoot werk (scafolding) 10 m2
- Bongkar bekesting 35 m2
11 Balok Beton Type BK-1 (400/600)
- Cor Beton Ready Mix K-300 3 m3
- Besi D22 755 kg
- Besi 2Ø12 ( Pinggang ) 25 kg
- Besi Ø10 ( Sengkang ) 507 kg
- Bekisting Multi 9 mm 11 m2
- Stoot werk (scafolding) 10 m2
- Bongkar bekesting 11 m2
12 Balok Beton Type BK-2 (250/400)
- Cor Beton Ready Mix K-300 2 m3
- Besi D16 250 kg
- Besi 4D16 ( Pinggang ) 125 kg
- Besi Ø10 ( Sengkang ) 298 kg
- Bekisting Multi 9 mm 35 m2
- Stoot werk (scafolding) 10 m2
- Bongkar bekesting 35 m2
14 Lantai Beton t=12 cm
- Cor Beton Ready Mix K-300 26 m3
- Besi WM8-150 430 m2
- Bekisting Multi 9 mm 226 m2
- Stoot werk 226 m2
- Pemeliharaan Plat lantai beton (rendam) 226 m2
- Bongkar bekesting 226 m2
15 Plat Kanopi Beton t=12
- Cor Beton Ready Mix K-300 3 m3
- Besi D13-150 413 kg
- Besi Ø10-150 245 kg
- Bekisting Multi 9 mm 16 m2
- Stoot werk (scafolding) 16 m2
- Pemeliharaan Plat beton (rendam) 16 m2
Sub Jumlah
II. PEKERJAAN TANGGA BETON
1 Plat bordes dan Plat Tangga
- Cor Beton Ready Mix K-300 2 m3
- Besi D13-150 170 kg
- Besi Ø10-150 101 kg
- Bekisting Multiplex 9 mm 11 m2
- Stoot werk (scafolding) 11 m2
- Bongkar bekesting 11 m2
2 Anak Tangga
- Cor Beton Ready Mix K-300 1 m3
- Besi Ø8-200 43 kg
- Besi Ø8 12 kg
- Bekisting Multiplex 9 mm 4 m2
- Bongkar bekesting 4 m2
Sub Jumlah
III. PEKERJAAN KOLOM
1 Kolom Beton Type K-1 Ø600
- Cor Beton Ready Mix K-300 1 m3
- Besi D19 216 kg
- Besi D-10 ( Sengkang ) 42 kg
- Bekisting Plat baja 7 m2
- Stoot werk 7 m2
- Bongkar bekesting 7 m2
2 Kolom Beton Type K-2 Ø600
- Cor Beton Ready Mix K-300 7 m3
- Besi D19 1511 kg
- Besi D-10 ( Sengkang ) 295 kg
- Bekisting Multiplex 9 mm 51 m2
- Stoot werk 51 m2
- Bongkar bekesting 51 m2
3 Kolom Beton Type K-7 200/700/700
- Cor Beton Ready Mix K-300 3 m3
- Besi D-16 905 kg
- Besi D-10 ( Sengkang ) 284 kg
- Bekisting Multiplex 9 mm 40 m2
- Stoot werk 40 m2
- Bongkar bekesting 40 m2
4 Kolom Beton Type K-7 Ø600
- Cor Beton Ready Mix K-300 4 m3
- Besi D19 863 kg
- Besi D-10 ( Sengkang ) 169 kg
- Bekisting Multiplex 9 mm 29 m2
- Stoot werk 29 m2
- Bongkar bekesting 29 m2
Sub Jumlah

PEKERJAAN
STRUKTUR LANTAI
DUA

F PEKERJAAN STRUKTUR LANTAI TIGA


I PEKERJAAN BALOK DAN PLAT
1 Balok Beton Type B3-1 (400/650)
- Cor Beton Ready Mix K-300 8 m3
- Besi D22 1522 kg
- Besi 2Ø12 ( Pinggang ) 59 kg
- Besi Ø10 ( Sengkang ) 286 kg
- Bekisting Multi 9 mm 44 m2
- Stoot werk (scafolding) 24 m2
- Bongkar bekesting 44 m2
2 Balok Beton Type B3-2 (400/650)
- Cor Beton Ready Mix K-300 6 m3
- Besi D-22 940 kg
- Besi 2Ø12 ( Pinggang ) 45 kg
- Besi Ø10 ( Sengkang ) 214 kg
- Bekisting Multiplex 9 mm 33 m2
- Stoot werk (scafolding) 18 m2
- Bongkar bekesting 33 m2
3 Balok Beton Type B3-3 (400/600)
- Cor Beton Ready Mix K-300 13 m3
- Besi D-22 2175 kg
- Besi 2Ø12 ( Pinggang ) 107 kg
- Besi Ø10 ( Sengkang ) 583 kg
- Bekisting Multiplex 9 mm 71 m2
- Stoot werk (scafolding) 44 m2
- Bongkar bekesting 71 m2
4 Balok Beton Type B3-4 (400/600)
- Cor Beton Ready Mix K-300 1 m3
- Besi D-22 170 kg
- Besi 2Ø12 ( Pinggang ) 10 kg
- Besi Ø10 ( Sengkang ) 104 kg
- Bekisting Multiplex 9 mm 7 m2
- Stoot werk (scafolding) 4 m2
- Bongkar bekesting 7 m2
5 Balok Beton Type B3-5 (250/500)
- Cor Beton Ready Mix K-300 7 m3
- Besi D-16 1070 kg
- Besi 2Ø10 ( Pinggang ) 81 kg
- Besi Ø10 ( Sengkang ) 331 kg
- Bekisting Multiplex 9 mm 57 m2
- Stoot werk (scafolding) 36 m2
- Bongkar bekesting 57 m2
6 Balok Beton Type B3-6 (250/500)
- Cor Beton Ready Mix K-300 5 m3
- Besi D-16 731 kg
- Besi 2Ø10 ( Pinggang ) 48 kg
- Besi Ø10 ( Sengkang ) 204 kg
- Bekisting Multiplex 9 mm 40 m2
- Stoot werk (scafolding) 25 m2
- Bongkar bekesting 40 m2
7 Balok Beton Type B3-7 (200/730)
- Cor Beton Ready Mix K-300 0 m3
- Besi D-16 33 kg
- Besi 2Ø10 ( Pinggang ) 9 kg
- Besi Ø10 ( Sengkang ) 19 kg
- Bekisting Multiplex 9 mm 2 m2
- Stoot werk (scafolding) 1 m2
- Bongkar bekesting 2 m2
8 Balok Beton Type B3-7A (200/650)
- Cor Beton Ready Mix K-300 0 m3
- Besi D-16 86 kg
- Besi 2Ø12 ( Pinggang ) 24 kg
- Besi Ø10 ( Sengkang ) 29 kg
- Bekisting Multiplex 9 mm 5 m2
- Stoot werk (scafolding) 2 m2
- Bongkar bekesting 5 m2
8 Balok Beton Type B3-8 (250/400)
- Cor Beton Ready Mix K-300 1 m3
- Besi D-16 138 kg
- Besi 2Ø12 ( Pinggang ) 39 kg
- Besi Ø12 ( Sengkang ) 55 kg
- Bekisting Multiplex 9 mm 7 m2
- Stoot werk (scafolding) 6 m2
- Bongkar bekesting 7 m2
9 Balok Beton Type B3-9 200/400
- Cor Beton Ready Mix K-300 3 m3
- Besi D-16 483 kg
- Besi 2Ø10 ( Pinggang ) 68 kg
- Besi Ø12 ( Sengkang ) 261 kg
- Bekisting Multiplex 9 mm 24 m2
- Stoot werk (scafolding) 21 m2
- Bongkar bekesting 24 m2
14 Lantai Beton t=12 cm
- Cor Beton Ready Mix K-300 26 m3
- Besi WM8-150 430 m2
- Bekisting Multi 9 mm 226 m2
- Stoot werk (scafolding) 226 m2
- Pemeliharaan Plat lantai beton (rendam) 226 m2
- Bongkar bekesting 226 m2
15 Plat Kanopi Beton t=12
- Cor Beton Ready Mix K-300 3 m3
- Besi D13-150 452 kg
- Besi Ø10-150 268 kg
- Bekisting Multi 9 mm 16 m2
- Stoot werk (scafolding) 16 m2
- Pemeliharaan Plat beton (rendam) 16 m2
- Bongkar bekesting 16 m2
Sub Jumlah
II. PEKERJAAN TANGGA BETON
1 Plat bordes dan Plat Tangga
- Cor Beton Ready Mix K-300 2 m3
- Besi D13-150 170 kg
- Besi Ø10-150 101 kg
- Bekisting Multiplex 9 mm 11 m2
- Stoot werk (scafolding) 11 m2
- Bongkar bekesting 11 m2
2 Anak Tangga
- Cor Beton Ready Mix K-300 1 m3
- Besi Ø8-200 43 kg
- Besi Ø8 12 kg
- Bekisting Multiplex 9 mm 4 m2
- Bongkar bekesting 4 m2
Sub Jumlah
III. PEKERJAAN KOLOM
1 Kolom Beton Type K-1 Ø600
- Cor Beton Ready Mix K-300 1 m3
- Besi D19 173 kg
- Besi D-10 ( Sengkang ) 42 kg
- Bekisting Plat baja 7 m2
- Stoot werk 7 m2
- Bongkar bekesting 7 m2
2 Kolom Beton Type K-2 Ø600
- Cor Beton Ready Mix K-300 7 m3
- Besi D19 1209 kg
- Besi D-10 ( Sengkang ) 295 kg
- Bekisting Multiplex 9 mm 51 m2
- Stoot werk 51 m2
- Bongkar bekesting 51 m2
3 Kolom Beton Type K-3 200/700/700
- Cor Beton Ready Mix K-300 3 m3
- Besi D-16 905 kg
- Besi D-10 ( Sengkang ) 284 kg
- Bekisting Multiplex 9 mm 40 m2
- Stoot werk 40 m2
- Bongkar bekesting 40 m2
4 Kolom Beton Type K-7 Ø600
- Cor Beton Ready Mix K-300 4 m3
- Besi D19 691 kg
- Besi D-10 ( Sengkang ) 169 kg
- Bekisting Multiplex 9 mm 29 m2
- Stoot werk 29 m2
- Bongkar bekesting 29 m2
Sub Jumlah

PEKERJAAN
STRUKTUR
LANTAI TIGA

G PEKERJAAN STRUKTUR LANTAI EMPAT


I PEKERJAAN BALOK DAN PLAT
1 Balok Beton Type B4-1 (400/650)
- Cor Beton Ready Mix K-300 8 m3
- Besi D22 1522 kg
- Besi 2Ø12 ( Pinggang ) 59 kg
- Besi Ø10 ( Sengkang ) 286 kg
- Bekisting Multi 9 mm 44 m2
- Stoot werk (scafolding) 24 m2
- Bongkar bekesting 44 m2
2 Balok Beton Type B4-2 (400/650)
- Cor Beton Ready Mix K-300 6 m3
- Besi D-22 940 kg
- Besi 2Ø12 ( Pinggang ) 45 kg
- Besi Ø10 ( Sengkang ) 214 kg
- Bekisting Multiplex 9 mm 33 m2
- Stoot werk (scafolding) 18 m2
- Bongkar bekesting 33 m2
3 Balok Beton Type B4-3 (400/600)
- Cor Beton Ready Mix K-300 13 m3
- Besi D-22 2175 kg
- Besi 2Ø12 ( Pinggang ) 107 kg
- Besi Ø10 ( Sengkang ) 583 kg
- Bekisting Multiplex 9 mm 71 m2
- Stoot werk (scafolding) 44 m2
- Bongkar bekesting 71 m2
4 Balok Beton Type B4-4 (400/600)
- Cor Beton Ready Mix K-300 1 m3
- Besi D-22 170 kg
- Besi 2Ø12 ( Pinggang ) 10 kg
- Besi Ø10 ( Sengkang ) 104 kg
- Bekisting Multiplex 9 mm 7 m2
- Stoot werk (scafolding) 4 m2
- Bongkar bekesting 7 m2
5 Balok Beton Type B4-5 (250/500)
- Cor Beton Ready Mix K-300 7 m3
- Besi D-16 1070 kg
- Besi 2Ø10 ( Pinggang ) 81 kg
- Besi Ø10 ( Sengkang ) 331 kg
- Bekisting Multiplex 9 mm 57 m2
- Stoot werk (scafolding) 36 m2
- Bongkar bekesting 57 m2
6 Balok Beton Type B4-6 (250/500)
- Cor Beton Ready Mix K-300 5 m3
- Besi D-16 731 kg
- Besi 2Ø10 ( Pinggang ) 48 kg
- Besi Ø10 ( Sengkang ) 204 kg
- Bekisting Multiplex 9 mm 40 m2
- Stoot werk (scafolding) 25 m2
- Bongkar bekesting 40 m2
7 Balok Beton Type B4-7 (200/730)
- Cor Beton Ready Mix K-300 0 m3
- Besi D-16 33 kg
- Besi 2Ø10 ( Pinggang ) 9 kg
- Besi Ø10 ( Sengkang ) 19 kg
- Bekisting Multiplex 9 mm 2 m2
- Stoot werk (scafolding) 1 m2
- Bongkar bekesting 2 m2
8 Balok Beton Type B4-7A (200/650)
- Cor Beton Ready Mix K-300 0 m3
- Besi D-16 86 kg
- Besi 2Ø12 ( Pinggang ) 24 kg
- Besi Ø10 ( Sengkang ) 29 kg
- Bekisting Multiplex 9 mm 5 m2
- Stoot werk (scafolding) 2 m2
- Bongkar bekesting 5 m2
8 Balok Beton Type B4-8 (250/400)
- Cor Beton Ready Mix K-300 1 m3
- Besi D-16 138 kg
- Besi 2Ø12 ( Pinggang ) 39 kg
- Besi Ø12 ( Sengkang ) 55 kg
- Bekisting Multiplex 9 mm 7 m2
- Stoot werk (scafolding) 6 m2
- Bongkar bekesting 7 m2
9 Balok Beton Type B4-9 200/400
- Cor Beton Ready Mix K-300 3 m3
- Besi D-16 483 kg
- Besi 2Ø10 ( Pinggang ) 68 kg
- Besi Ø12 ( Sengkang ) 261 kg
- Bekisting Multiplex 9 mm 24 m2
- Stoot werk (scafolding) 21 m2
- Bongkar bekesting 24 m2
14 Lantai Beton t=12 cm
- Cor Beton Ready Mix K-300 26 m3
- Besi WM8-150 430 m2
- Bekisting Multi 9 mm 226 m2
- Stoot werk 226 m2
- Pemeliharaan Plat lantai beton (rendam) 226 m2
- Bongkar bekesting 226 m2
15 Plat Kanopi Beton t=12
- Cor Beton Ready Mix K-300 3 m3
- Besi D13-150 452 kg
- Besi Ø10-150 268 kg
- Bekisting Multi 9 mm 16 m2
- Stoot werk (scafolding) 16 m2
- Pemeliharaan Plat beton (rendam) 16 m2
- Bongkar bekesting 16 m2
Sub Jumlah
II. PEKERJAAN TANGGA BETON
1 Plat bordes dan Plat Tangga
- Cor Beton Ready Mix K-300 2 m3
- Besi D13-150 170 kg
- Besi Ø10-150 101 kg
- Bekisting Multiplex 9 mm 11 m2
- Stoot werk (scafolding) 11 m2
- Bongkar bekesting 11 m2
2 Anak Tangga
- Cor Beton Ready Mix K-300 1 m3
- Besi Ø8-200 43 kg
- Besi Ø8 12 kg
- Bekisting Multiplex 9 mm 4 m2
- Bongkar bekesting 4 m2
Sub Jumlah
III. PEKERJAAN KOLOM
1 Kolom Beton Type K-2 Ø600
- Cor Beton Ready Mix K-300 11 m3
- Besi D19 1209 kg
- Besi D-10 ( Sengkang ) 464 kg
- Bekisting Multiplex 9 mm 36 m2
- Stoot werk 36 m2
- Bongkar bekesting 36 m2
2 Kolom Beton Type K-6 200/700/700
- Cor Beton Ready Mix K-300 3 m3
- Besi D-16 905 kg
- Besi D-10 ( Sengkang ) 284 kg
- Bekisting Multiplex 9 mm 40 m2
- Stoot werk 40 m2
- Bongkar bekesting 40 m2
3 Kolom Beton Type K-7 Ø600
- Cor Beton Ready Mix K-300 4 m3
- Besi D19 691 kg
- Besi D-10 ( Sengkang ) 169 kg
- Bekisting Multiplex 9 mm 29 m2
- Stoot werk 29 m2
- Bongkar bekesting 29 m2
Sub Jumlah

PEKERJAAN
STRUKTUR
LANTAI EMPAT

H PEKERJAAN STRUKTUR RING BALOK


I PEKERJAAN BALOK DAN PLAT
1 Balok Beton Type BA-1 (400/600)
- Cor Beton Ready Mix K-300 6 m3
- Besi D22 1093 kg
- Besi 2Ø12 ( Pinggang ) 51 kg
- Besi Ø10 ( Sengkang ) 232 kg
- Bekisting Multi 9 mm 47 m2
- Stoot werk (scafolding) 26 m2
- Bongkar bekesting 47 m2
2 Balok Beton Type BA-2 (400/600)
- Cor Beton Ready Mix K-300 4 m3
- Besi D19 455 kg
- Besi 2Ø12 ( Pinggang ) 34 kg
- Besi Ø10 ( Sengkang ) 154 kg
- Bekisting Multiplex 9 mm 23 m2
- Stoot werk (scafolding) 13 m2
- Bongkar bekesting 23 m2
3 Balok Beton Type BA-3 (400/500)
- Cor Beton Ready Mix K-300 14 m3
- Besi D19 2106 kg
- Besi 4D16 ( Pinggang ) 501 kg
- Besi Ø10 ( Sengkang ) 681 kg
- Bekisting Multiplex 9 mm 78 m2
- Stoot werk (scafolding) 48 m2
- Bongkar bekesting 78 m2
4 Balok Beton Type BA-4 (400/600)
- Cor Beton Ready Mix K-300 1 m3
- Besi D-22 97 kg
- Besi 2Ø12 ( Pinggang ) 6 kg
- Besi Ø10 ( Sengkang ) 59 kg
- Bekisting Multiplex 9 mm 4 m2
- Stoot werk (scafolding) 2 m2
- Bongkar bekesting 4 m2
5 Balok Beton Type BA-5 (250/500)
- Cor Beton Ready Mix K-300 2 m3
- Besi D16 251 kg
- Besi 2Ø10 ( Pinggang ) 19 kg
- Besi Ø10 ( Sengkang ) 78 kg
- Bekisting Multiplex 9 mm 13 m2
- Stoot werk (scafolding) 8 m2
- Bongkar bekesting 13 m2
6 Balok Beton Type BA-6 (250/500)
- Cor Beton Ready Mix K-300 1 m3
- Besi D-16 159 kg
- Besi 2Ø10 ( Pinggang ) 10 kg
- Besi Ø10 ( Sengkang ) 44 kg
- Bekisting Multiplex 9 mm 8 m2
- Stoot werk (scafolding) 5 m2
- Bongkar bekesting 8 m2
7 Balok Beton Type BA-7 (200/730)
- Cor Beton Ready Mix K-300 0 m3
- Besi D-16 33 kg
- Besi 2Ø10 ( Pinggang ) 9 kg
- Besi Ø10 ( Sengkang ) 19 kg
- Bekisting Multiplex 9 mm 2 m2
- Stoot werk (scafolding) 1 m2
- Bongkar bekesting 2 m2
8 Balok Beton Type BA-7A (200/650)
- Cor Beton Ready Mix K-300 0 m3
- Besi D-16 86 kg
- Besi 2Ø12 ( Pinggang ) 24 kg
- Besi Ø10 ( Sengkang ) 29 kg
- Bekisting Multiplex 9 mm 5 m2
- Stoot werk (scafolding) 2 m2
- Bongkar bekesting 5 m2
9 Balok Beton Type BA-8 (250/400)
- Cor Beton Ready Mix K-300 0 m3
- Besi D-16 51 kg
- Besi 2Ø12 ( Pinggang ) 14 kg
- Besi Ø12 ( Sengkang ) 20 kg
- Bekisting Multiplex 9 mm 3 m2
- Stoot werk 2 m2
- Bongkar bekesting 3 m2
10 Balok Beton Type BA-9 200/400
- Cor Beton Ready Mix K-300 0 m3
- Besi D-16 52 kg
- Besi 2Ø10 ( Pinggang ) 7 kg
- Besi Ø12 ( Sengkang ) 28 kg
- Bekisting Multiplex 9 mm 3 m2
- Stoot werk (scafolding) 2 m2
- Bongkar bekesting 3 m2
11 Balok Beton Type BA-10 400/500
- Cor Beton Ready Mix K-300 4 m3
- Besi D19 530 kg
- Besi 2Ø10 ( Pinggang ) 35 kg
- Besi Ø12 ( Sengkang ) 212 kg
- Bekisting Multiplex 9 mm 21 m2
- Stoot werk (scafolding) 14 m2
- Bongkar bekesting 21 m2
12 Balok Beton Type BA-11 250/400
- Cor Beton Ready Mix K-300 2 m3
- Besi D16 287 kg
- Besi 2Ø10 ( Pinggang ) 32 kg
- Besi Ø12 ( Sengkang ) 91 kg
- Bekisting Multiplex 9 mm 17 m2
- Stoot werk (scafolding) 13 m2
- Bongkar bekesting 17 m2
13 Balok Beton Type BA-12 200/400/10
- Cor Beton Ready Mix K-300 2 m3
- Besi D16 211 kg
- Besi 3Ø10 ( Pinggang ) 41 kg
- Besi Ø12 ( Sengkang ) 88 kg
- Bekisting Multiplex 9 mm 18 m2
- Stoot werk (scafolding) 11 m2
- Bongkar bekesting 18 m2
14 Balok Beton Type BA-13 (200/500)
- Cor Beton Ready Mix K-300 2 m3
- Besi D16 278 kg
- Besi 6D13 ( Pinggang ) 110 kg
- Besi Ø10 ( Sengkang ) 87 kg
- Bekisting Multi 9 mm 19 m2
- Stoot werk (scafolding) 10 m2
- Bongkar bekesting 19 m2
15 Lantai Beton t=15 cm
- Cor Beton Ready Mix K-300 18 m3
- Besi WM10-150 246 m2
- Bekisting Multi 9 mm 62 m2
- Stoot werk (scafolding) 62 m2
- Pemeliharaan Plat lantai beton (rendam) 62 m2
- Bongkar bekesting 62 m2
16 Lantai Beton t=10 cm
- Cor Beton Ready Mix K-300 3 m3
- Besi WM8-150 246 m2
- Bekisting Multi 9 mm 29 m2
- Stoot werk 29 m2
- Pemeliharaan Plat lantai beton (rendam) 29 m2
- Bongkar bekesting 29 m2
17 Plat Kanopi Beton t=12
- Cor Beton Ready Mix K-300 2 m3
- Besi D13-150 257 kg
- Besi Ø10-150 152 kg
- Bekisting Multi 9 mm 16 m2
- Stoot werk (scafolding) 16 m2
- Pemeliharaan Plat beton (rendam) 16 m2
- Bongkar bekesting 16 m2
Sub Jumlah
II. PEKERJAAN KOLOM
1 Kolom Beton Type K-4 Ø300
- Cor Beton Ready Mix K-300 1 m3
- Besi D13 117 kg
- Besi D-10 ( Sengkang ) 84 kg
- Bekisting Multi 9 mm 11 m2
- Stoot werk 11 m2
- Bongkar bekesting 11 m2
1 Kolom Beton Type K-5 120/300
- Cor Beton Ready Mix K-300 0 m3
- Besi D13 44 kg
- Besi D-10 ( Sengkang ) 26 kg
- Bekisting Multi 9 mm 5 m2
- Stoot werk 5 m2
- Bongkar bekesting 5 m2
Sub Jumlah

PEKERJAAN
STRUKTUR RING
BALOK

I PEKERJAAN STRUKTUR RANGKA ATAP


1 BAJA RINGAN
- Rangka atap dari baja ringan 281 m2
- Penutup atap dari zincalum 281 m2
PEKERJAAN
STRUKTUR
RANGKA ATAP
J. PEKERJAAN OVERSTEK GRC
- Kolom Grc 81 m2
- Knopi GRC 120 m2
- Rangka Pendukung 1 ls
PEKERJAAN
OVERSTEK GRC

III. PEKERJAAN ARSITEKTUR

I LANTAI GROUND
A Pekerjaan lantai
1 Floor hardener 326 m²
2 Pekerjaan granito tile 60 x 60 26 m²
3 Pekerjaan plin granito tile 10 x 60 17 m¹
4 Pekerjaan keramik tile 40 x 40 19 m²
5 Pekerjaan step nosing tangga keramik tile 10 x 40 19 m¹
6 Pekerjaan keramik tile anti slip 20 x 20 4 m²
7 Urugan pasir peninggian lantai bangunan 2 m³
8 Beton tumbuk 1 : 3 : 5 2 m³
9 Waterproofing bitutine sheet area taman 57 m²
10 Screeding 57 m²
Sub Total

B Pekerjaan dinding
1 Pekerjaan Pasangan bata 1:5, 1/2 batu 7 m²
2 Pekerjaan Pasangan bata Ringan/Hebel, T. 10 cm (Dinding Luar) 326 m²
3 Pekerjaan Pasangan bata Ringan/Hebel, T. 7,5 cm (Dinding Dalam) 79 m²
4 Pekerjaan Plesteran Prime Mortar & acian (dinding) 654 m²
5 Pekerjaan Plesteran Prime Mortar & acian (beton) 81 m²
6 Pekerjaan dinding keramik 20 x 25 Toilet 14 m2
7 Kolom praktis 111 m¹
8 Ring balok praktis 27 m¹
9 Pengecatan dinding interior 459 m²
10 Pengecatan dinding eksterior 305 m²
Sub Total

C Pekerjaan Kusen Pintu dan Jendela


1 Pekerjaan pintu Ps 1 2 Unit
2 Pekerjaan pintu P1 1 Unit
3 Pekerjaan pintu P3 2 Unit
4 Pekerjaan pintu P4 1 Unit
5 Pekerjaan BV 1 1 Unit
6 Pekerjaan BV 2 2 Unit
7 Pekerjaan BV 3 3 Unit
8 Pekerjaan pintu PB1 1 Unit
Sub Total

D Pekerjaan Plafond
1 Plafond ekspose beton 252 m²
2 Pengecatan plafond 377 m²
Sub Total

E Pekerjaan Sanitary
1 Kran air 2 Bh.
2 Floor drain 1 Bh.
3 Closed Jongkok 1 Bh.
Sub Total

F Pekerjaan Railing
1 Railling tangga hollow 2/2 & 5/5 finnish cat duco 14 m¹
2 Hand rail hollow 5/5 finnish cat duco 21 m¹
Sub Total

TOTAL LANTAI GROUND

II LANTAI 1
A Pekerjaan lantai
1 Pekerjaan granito tile 60 x 60 235 m²
2 Pekerjaan plin granito tile 10 x 60 116 m¹
3 Pekerjaan keramik tile anti slip 20 x 20 25 m²
4 Pekerjaan keramik tile 40 x 40 19 m²
5 Pekerjaan step nosing tangga keramik tile 10 x 40 18 m¹
6 Waterproofing coating area toilet 35 m²
7 Waterproofing bitutine sheet dak beton 127 m²
8 Screeding dak beton 127 m²
9 Pekerjaan dinding keramik 20 x 25 Tilet & Janitor 60 m2
Sub Total

B Pekerjaan dinding
1 Pekerjaan Pasangan bata 1:5, 1/2 batu 73 m²
2 Pekerjaan Pasangan bata Ringan/Hebel, T. 10 cm (Dinding Luar) 398 m²
3 Pekerjaan Pasangan bata Ringan/Hebel, T. 7,5 cm (Dinding Dalam) 47 m²
4 Pekerjaan Plesteran Prime Mortar & acian (dinding) 942 m²
5 Pekerjaan Plesteran Prime Mortar & acian (beton) 79 m²
6 Pekerjaan dinding keramik 20 x 25 60 m²
7 Kolom praktis 143 m¹
8 Ring balok praktis 30 m¹
9 Pengecatan dinding interior 647 m²
10 Pengecatan dinding eksterior +Beton kolom 307 m²
11 Pekerjaan Glass block 28 m2
12 Pekerjaan batu andesit abu-abu 26 m2
Sub Total

C Pekerjaan Kusen Pintu dan Jendela


1 Pekerjaan pintu P2 1 Unit
2 Pekerjaan pintu P5 1 Unit
3 Pekerjaan pintu P6 2 Unit
4 Pekerjaan pintu P7 1 Unit
5 Pekerjaan pintu Ps 2 1 Unit
6 Pekerjaan pintu Ps 3 1 Unit
7 Pekerjaan partisi PT1 3 Unit
8 Pekerjaan partisi PT2 2 Unit
9 Pekerjaan partisi PT3 3 Unit
10 Pekerjaan pintu PJ1 1 Unit
11 Pekerjaan jendela J3 1 Unit
12 Pekerjaan jendela J4 1 Unit
13 Pekerjaan jendela J6 1 Unit
14 Pekerjaan jendela BV4 2 Unit
15 Pekerjaan jendela BV5 1 Unit
Sub Total

D Pekerjaan Plafond
1 Plafond Gypsum t = 9 mm + rangka Metal Furing 279 m²
2 Plafond GRC t = 4 mm + rangka Metal Furing (Toilet) 23 m²
3 List Plafond 5 cm 142 m¹
4 Plafond ekspose beton 127 m²
5 Pengecatan Plafond 303 m²
Sub Total

E Pekerjaan Sanitary
1 Kloset duduk 5 Bh.
2 Jetwasher 5 Bh.
3 Wastafel 3 Bh.
4 Urinoir 3 Bh.
5 Sekat urinoir 2 Bh.
6 Kitchen zink 1 Bh.
7 Kran dinding 1 Bh.
8 Floor drain 4 Bh.
9 Meja beton + keramik 5 m²
10 Cermin 5 mm 4 m²
Sub Total

F Pekerjaan Railing
1 Railling tangga hollow 2/2 & 5/5 finnish cat duco 20 m¹
2 Hand rail hollow 5/5 finnish cat duco 28 m¹
Sub Total

LANTAI 1

III LANTAI 2
A Pekerjaan lantai
1 Pekerjaan granito tile 60 x 60 10 m²
2 Pekerjaan plin granito tile 10 x 60 13 m¹
3 Pekerjaan keramik tile 30 x 30 5 m²
4 Pekerjaan plin keramik tile 10 x 30 9 m¹
5 Pekerjaan keramik tile anti slip 20 x 20 28 m²
6 Pekerjaan keramik tile 40 x 40 21 m²
7 Pekerjaan step nosing tangga keramik tile 10 x 40 26 m¹
8 Waterproofing coating area toilet 40 m²
9 Screeding lantai 283 m²
10 Acian lantai 283 m²
11 Lantai vynil Tarket Sports T. 3.5 mm 233 m²
12 Waterproofing bitutine sheet dak beton 92 m²
13 Screeding dak beton 92 m²
14 Keramik Dinding KM / WC 20/25 72 m2
Sub Total

B Pekerjaan dinding
1 Pekerjaan Pasangan bata 1:5, 1/2 batu 73 m²
2 Pekerjaan Pasangan bata Ringan/Hebel, T. 10 cm (Dinding Luar) 284 m²
3 Pekerjaan Pasangan bata Ringan/Hebel, T. 7,5 cm (Dinding Dalam) 68 m²
4 Pekerjaan Plesteran Prime Mortar & acian (dinding) 713 m²
5 Pekerjaan Plesteran Prime Mortar & acian (beton) 84 m²
6 Pekerjaan dinding keramik 20 x 25 81 m²
7 Kolom praktis 143 m¹
7 Ring balok praktis 7 m¹
8 Pengecatan dinding interior 440 m²
9 Pengecatan dinding eksterior 250 m²
10 Pengecatan dinding partisi 225 m²
11 Pekerjaan Glass block 21 m2
Sub Total

C Pekerjaan Kusen Pintu dan Jendela


1 Pekerjaan partisi PT1 3 Unit
2 Pekerjaan partisi PT2 2 Unit
3 Pekerjaan partisi PT3 3 Unit
4 Pekerjaan pintu P2 1 Unit
5 Pekerjaan pintu P5 1 Unit
6 Pekerjaan pintu P6 2 Unit
7 Pekerjaan pintu P9 1 Unit
8 Pekerjaan pintu Ps3 1 Unit
9 Pekerjaan jendela BV4 1 Unit
10 Pekerjaan jendela BV5 1 Unit
11 Pekerjaan jendela BV6 1 Unit
12 Pekerjaan jendela J2 1 Unit
13 Pekerjaan jendela J4 1 Unit
14 Pekerjaan jendela J5 1 Unit
15 Pekerjaan jendela J7 1 Unit
Sub Total

D Pekerjaan Plafond
1 Plafond Gypsum t = 9 mm + rangka Metal Furing 247 m²
2 Plafond GRC t = 4 mm + rangka Metal Furing (Toilet) 23 m²
3 List Plafond 5 cm 150 m¹
4 Plafond ekspose beton 19 m²
5 Pengecatan Plafond 282 m²
6 Skylight kaca 6 + 6 mm 4 m²
Sub Total

E Pekerjaan Sanitary
1 Kloset duduk 6 Bh.
2 Jetwasher 6 Bh.
3 Wastafel 4 Bh.
4 Urinoir 2 Bh.
5 Sekat urinoir 1 Bh.
6 Kitchen zink 1 Bh.
7 Kran dinding 2 Bh.
8 Floor drain 4 Bh.
9 Meja beton + keramik 5 m²
10 Cermin 5 mm 4 m²
Sub Total

F Pekerjaan Railing
1 Railling tangga hollow 2/2 & 5/5 finnish cat duco 12 m¹
2 Hand rail hollow 5/5 finnish cat duco 24 m¹
3 Rambatan bunga besi beton Ø10 mm, Ø19 mm & plat besi 12 mm 20 m¹
Sub Total

LANTAI 2

IV LANTAI 3
A Pekerjaan lantai
1 Pekerjaan granito tile 60 x 60 9 m²
2 Pekerjaan plin granito tile 10 x 60 12 m¹
3 Pekerjaan keramik tile 30 x 30 7 m²
4 Pekerjaan plin keramik tile 10 x 30 9 m¹
5 Pekerjaan keramik tile anti slip 20 x 20 25 m²
6 Pekerjaan keramik tile 40 x 40 20 m²
7 Pekerjaan step nosing tangga keramik tile 10 x 40 24 m¹
8 Waterproofing coating area toilet 30 m²
9 Screeding lantai 251 m²
10 Acian lantai 251 m²
11 Lantai vynil Tarket Sports T. 3.5 mm 251 m²
12 Waterproofing bitutine sheet dak beton 19 m²
13 Screeding dak beton 19 m²
Sub Total

B Pekerjaan dinding
1 Pekerjaan Pasangan bata 1:5, 1/2 batu 73 m²
2 Pekerjaan Pasangan bata Ringan/Hebel, T. 10 cm (Dinding Luar) 293 m²
3 Pekerjaan Pasangan bata Ringan/Hebel, T. 7,5 cm (Dinding Dalam) 77 m²
4 Pekerjaan Plesteran Prime Mortar & acian (dinding) 731 m²
5 Pekerjaan Plesteran Prime Mortar & acian (beton) 84 m²
6 Pekerjaan dinding keramik 20 x 25 64 m²
7 Kolom praktis 143 m¹
7 Ring balok praktis 32 m¹
8 Pengecatan dinding interior 440 m²
9 Pengecatan dinding eksterior 250 m²
10 Pengecatan dinding partisi 280 m²
11 Pekerjaan Glass block 21 m2
Sub Total

C Pekerjaan Kusen Pintu dan Jendela


1 Pekerjaan partisi PT1 4 Unit
2 Pekerjaan partisi PT3 6 Unit
3 Pekerjaan pintu P2 1 Unit
4 Pekerjaan pintu P5 2 Unit
5 Pekerjaan pintu P6 2 Unit
6 Pekerjaan pintu P7 1 Unit
7 Pekerjaan pintu Ps 3 1 Unit
8 Pekerjaan pintu Ps 1 1 Unit
9 Pekerjaan jendela J1 1 Unit
10 Pekerjaan jendela J2 1 Unit
11 Pekerjaan jendela J5 1 Unit
12 Pekerjaan jendela J8 1 Unit
13 Pekerjaan jendela BV5 1 Unit
Sub Total 0

D Pekerjaan Plafond
1 Plafond Gypsum t = 9 mm + rangka Metal Furing 244 m²
2 Plafond GRC t = 4 mm + rangka Metal Furing (Toilet) 32 m²
3 List Plafond 5 cm 150 m¹
4 Plafond ekspose beton 18 m²
5 Pengecatan Plafond 294 m²
Sub Total

E Pekerjaan Sanitary
1 Kloset duduk 6 Bh.
2 Jetwasher 6 Bh.
3 Wastafel 3 Bh.
4 Urinoir 2 Bh.
5 Sekat urinoir 1 Bh.
6 Kitchen zink 1 Bh.
7 Kran dinding 2 Bh.
8 Floor drain 3 Bh.
9 Meja beton + keramik 1 m²
10 Cermin 5 mm 4 m²
Sub Total

F Pekerjaan Railing
1 Railling tangga hollow 2/2 & 5/5 finnish cat duco 12 m¹
2 Hand rail hollow 5/5 finnish cat duco 25 m¹
3 Rambatan bunga besi beton Ø10 mm, Ø19 mm & plat besi 12 mm 20 m¹
Sub Total

LANTAI 3

V LANTAI 4
A Pekerjaan lantai
1 Pekerjaan granito tile 60 x 60 12 m²
2 Pekerjaan plin granito tile 10 x 60 14 m¹
3 Pekerjaan keramik tile anti slip 20 x 20 31 m²
4 Pekerjaan keramik tile 40 x 40 20 m²
5 Pekerjaan step nosing tangga keramik tile 10 x 40 24 m¹
6 Waterproofing coating area toilet 37 m²
7 Screeding lantai 262 m²
8 Acian lantai 262 m²
9 Lantai vynil Tarket Sports T. 3.5 mm 262 m²
10 Waterproofing bitutine sheet dak beton 36 m²
11 Screeding dak beton 36 m²
Sub Total

B Pekerjaan dinding
1 Pekerjaan Pasangan bata 1:5, 1/2 batu 73 m²
2 Pekerjaan Pasangan bata Ringan/Hebel, T. 10 cm (Dinding Luar) 270 m²
3 Pekerjaan Pasangan bata Ringan/Hebel, T. 7,5 cm (Dinding Dalam) 32 m²
4 Pekerjaan Plesteran Prime Mortar & acian (dinding) 686 m²
5 Pekerjaan Plesteran Prime Mortar & acian (beton) 84 m²
6 Pekerjaan dinding keramik 20 x 25 73 m²
7 Kolom praktis 114 m¹
7 Ring balok praktis 25 m¹
8 Pengecatan dinding interior 630 m²
9 Pengecatan dinding eksterior 271 m²
10 Pengecatan dinding partisi 68 m²
11 Pekerjaan Glass block 21 m2
Sub Total

C Pekerjaan Kusen Pintu dan Jendela


1 Pekerjaan partisi PT1 4 Unit
2 Pekerjaan partisi PT3 6 Unit
3 Pekerjaan pintu P2 1 Unit
4 Pekerjaan pintu P6 2 Unit
5 Pekerjaan pintu P7 1 Unit
6 Pekerjaan pintu Ps 1 1 Unit
7 Pekerjaan pintu Ps 3 1 Unit
8 Pekerjaan jendela J2 1 Unit
9 Pekerjaan jendela J3 1 Unit
10 Pekerjaan jendela J5 1 Unit
11 Pekerjaan jendela J8 1 Unit
12 Pekerjaan jendela J7 1 Unit
13 Pekerjaan jendela BV3 1 Unit
14 Pekerjaan jendela BV5 1 Unit
Sub Total

D Pekerjaan Plafond
1 Plafond Gypsum t = 9 mm + rangka Metal Furing 256 m²
2 Plafond GRC t = 4 mm + rangka Metal Furing (Toilet) 30 m²
3 List Plafond 5 cm 150 m¹
4 Plafond ekspose beton 15 m²
5 Pengecatan Plafond 302 m²
Sub Total

E Pekerjaan Sanitary
1 Kloset duduk 6 Bh.
2 Jetwasher 6 Bh.
3 Wastafel 3 Bh.
4 Urinoir 3 Bh.
5 Sekat urinoir 2 Bh.
6 Kitchen zink 1 Bh.
7 Kran dinding 5 Bh.
8 Floor drain 4 Bh.
9 Meja beton + keramik 5 m²
10 Cermin 5 mm 4 m²
Sub Total

F Pekerjaan Railing
1 Railling tangga hollow 2/2 & 5/5 finnish cat duco 13 m¹
2 Hand rail hollow 5/5 finnish cat duco 25 m¹
3 Rambatan bunga besi beton Ø10 mm, Ø19 mm & plat besi 12 mm 20 m¹
Sub Total

LANTAI 4

VII LANTAI ATAP


A Pekerjaan lantai
1 Pekerjaan granito tile 60 x 60 5 m²
2 Pekerjaan plin granito tile 10 x 60 7 m¹
3 Waterproofing bitutine sheet dak beton 140 m²
4 Screeding dak beton 140 m²

B Pekerjaan dinding
1 Pekerjaan Pasangan bata Ringan, T. 10 cm (Dinding Luar) 76 m²
2 Pekerjaan Plesteran Prime Mortar & acian (dinding) 152 m²
3 Kolom praktis 15 m¹
4 Ring balok praktis 82 m¹
5 Pengecatan dinding interior 100 m²
6 Pengecatan dinding eksterior 100 m²

C Pekerjaan Kusen Pintu dan Jendela


1 Pekerjaan pintu P1 1 Unit

F Pekerjaan Railing
1 Railling tangga hollow 2/2 & 5/5 finnish cat duco 2 m¹

LANTAI ATAP

VII PEKERJAAN LANSEKAP

VII.1 LANTAI LUAR BANGUNAN


1 Lapisan tanah subur + rumput gajah mini 99 m²
2 Taman (tanaman rendah, ground cover dan tanaman rambat) 53 m²
3 Saluran air hujan 30 x 30
a. Galian tanah 34 m³
b. Urugan pasir 27 m³
c. Pasangan batu kali 6 m³
d. Peluran + acian dasar saluran 8 m²
e. Plesteran + acian dinding daluran 16 m²
f. Grill penutup saluran 20 m¹
g. Buang tanah bekas galian 34 m³
4 Saluran air hujan 5 x 15 (diluar bangunan) 12 m¹
5 Kansteen pasangan bata tinggi 15 cm 47 m¹
6 Lapisan aspal hotmix
a. Galian Tanah 55 m³
b. Pemadatan/Persiapan Subgrade 73 m²
c. Subbase Klas C tebal 35 cm 26 m³
d. Base Coarse Klas A tebal 25 cm 18 m³
e. Prime Coat RC 60, 1kg/m2 73 m²
f. Aspal hotmix 5 cm 73 m²
g. Buangan tanah keluar site 55 m³

LANTAI LUAR
BANGUNAN

VII.2 POS JAGA

1 Galian tanah 15 m3
2 Urugan kembali 7 m3
3 Pasir urug 2 m3
4 Lantai kerja 0 m3
5 Pondasi batu kosong 2 m3
6 Pondasi batu belah 4 m3
7 Beton tumbuk 1 : 3 : 5 1 m3
8 Sloof beton 0 m3
9 Pasangan dinding 7 m2
10 Plesteran dan acian 18 m2
11 Kolom beton 15 x 30 0 m3
12 Balok beton 0 m3
13 Plat dak beton 1 m3
14 Lantai keramik 9 m2
15 Kusen kaca depan ( kaca tempered) 1 bh
16 Kusen pintu (kaca tempered) 1 bh
17 Kusen jendela samping ( kaca tempered) 1 bh
18 meja kayu 2 bh
19 Cat dinding interior 13 m2
20 Cat dinding exterior 6 m2
POS JAGA

VII.3 PAGAR BANGUNAN DAN KELENGKAPANNYA


1 Pagar besi dan dinding masive 15 m2
2 Pintu gerbang 1 1
3 Standing letter 1 1
4 Tiang bendera dan alasnya 1 1
5 Bak sampah 1 1

PAGAR BANGUNAN

VII.4 SUMUR RESAPAN


1 Sumur resapan 8 titik

PEKERJAAN LANSEKAP
REKAPITULASI RENCANA ANGGARAN BIAYA
PEKERJAAN PEMBANGUNAN GEDUNG PUSBINDIKLATREN
KEMENTERIAN PERENCANAAN PEMBANGUNAN NASIONAL/BAPPENAS
JL. PROKLAMASI NO. 70
JAKARTA PUSAT

NILAI TOTAL
NO. URAIAN PEKERJAAN SUBJUMLAH JUMLAH
(Rp) (Rp)

I. PEKERJAAN PERSIAPAN

II PEKERJAAN STRUKTUR

A PEKERJAAN PONDASI TIANG PANCANG


B PEKERJAAN PILE CAP PONDASI DAN DINDING PIT LIFT
C PEKERJAAN STRUKTUR LANTAI GROUND
D PEKERJAAN STRUKTUR LANTAI SATU
E PEKERJAAN STRUKTUR LANTAI DUA
F PEKERJAAN STRUKTUR LANTAI TIGA
G PEKERJAAN STRUKTUR LANTAI EMPAT
H PEKERJAAN STRUKTUR RING BALOK
I PEKERJAAN STRUKTUR RANGKA ATAP
J. PEKERJAAN OVERSTEK GRC

III. PEKERJAAN ARSITEKTUR

I LANTAI GROUND
II LANTAI 1
III LANTAI 2
IV LANTAI 3
V LANTAI 4
VI LANTAI ATAP
VII PEKERJAAN LANSEKAP

IV. PEKERJAAN ELEKTRIKAL

I PEKERJAAN PANEL DAYA


II KABEL DAYA
III INSTALASI PENERANGAN DAYA
IV INSTALASI CABLE TRAY
V INSTALASI UNDERFLOOR DUCT
VI INSTALASI PENANGKAL PETIR
VII PENYAMBUNGAN DAYA PLN
VIII TESTING & COMMISSIONING
IX PEKERJAAN INSTALASI TELEPON
X PEKERJAAN FIRE ALARM
XI PEKERJAAN INSTALASI OUTLET DATA
XII PEKERJAAN INSTALASI SOUND SYSTEM
XIII PEKERJAAN INSTALASI GENSET
XIV PEKERJAAN MATV

V. PEKERJAAN MEKANIKAL DAN PLUMBING

I PEKERJAAN INSTALASI AIR BERSIH


II PEKERJAAN INSTALASI AIR KOTOR
III PEKERJAAN INSTALASI AC
IV FIRE HYDRANT SYSTEM
V INSTALASI SPRINKLER

JUMLAH BIAYA KONSTRUKSI


PAJAK PERTAMBAHAN NILAI ( PPN 10 % )
JUMLAH TOTAL
DIBULATKAN 11,519,000,000.00
Terbilang : Sebelas miliar lima ratus sembilan belas juta rupiah