BQ Gedung Pusbindiklat - Copy - 20121127132715 - 0
BQ Gedung Pusbindiklat - Copy - 20121127132715 - 0
BQ Gedung Pusbindiklat - Copy - 20121127132715 - 0
PEKERJAAN ELEKTRIKAL
PEMBANGUNAN GEDUNG PUSBINDIKLATREN
KEMENTERIAN PERENCANAAN PEMBANGUNAN NASIONAL/BAPPENAS
Jl. Proklamasi No 70, Jakarta
- 1 x MCCB 25 A, 3 P, 18 kA 1.00
- 3 x MCB 10 A, 3 P, 10 kA 3.00
- 3 x CT 40/5A 3.00
- 2 x Direct on Line Starter 1,5 kW 2.00
- 3 x fuse 2 A + fuse holder 3.00
- 3 x pilot lamp 3.00
- 2 x A/O/M selector switch 2.00
- 2 x push button ON 4.00
- 2 x push button OFF 4.00
- 4 x indikator lamp 4.00
- 1 x Phase Failure Relay 1.00
- 1 lot busbar 40 A full neutral, 5 bus 1.00
- 1 lot control wiring + aksesori 1.00
- 1 lot panel 50 (L) x 25 (D) x 60 (T) cm 1.00
- 1 lot pentanahan 1.00
- 1 x MCCB 25 A, 3 P, 10 kA 1.00
- 7 x MCB 6 A, 1 P, 6 kA 7.00
- 3 x fuse 2 A + fuse holder 3.00
- 3 x pilot lamp 3.00
- 1 lot busbar 40 A full neutral, 5 bus 1.00
- 1 lot internal wiring + aksesori 1.00
- 1 lot panel 50 (L) x 25 (D) x 60 (T) cm 1.00
- 1 lot instalasi kabel grounding 1.00
- 1 x MCCB 25 A, 3 P, 10 kA 1.00
-10 x MCB 6 A, 1 P, 6 kA 10.00
- 3 x fuse 2 A + fuse holder 3.00
- 3 x pilot lamp 3.00
- 1 lot busbar 40 A full neutral, 5 bus 1.00
- 1 lot internal wiring + aksesori 1.00
- 1 lot panel 50 (L) x 25 (D) x 60 (T) cm 1.00
- 1 lot pentanahan 1.00
- 1 x MCCB 25 A, 3 P, 10 kA 1.00
-7 x MCB 10 A, 1 P, 6 kA 7.00
-7 x MCB 6 A, 1 P, 6 kA 7.00
- 3 x fuse 2 A + fuse holder 3.00
- 3 x pilot lamp 3.00
- 1 lot busbar 40 A full neutral, 5 bus 1.00
- 1 lot internal wiring + aksesori 1.00
- 1 lot panel 50 (L) x 25 (D) x 60 (T) cm 1.00
- 1 lot instalasi kabel grounding 1.00
- 1 x MCCB 25 A, 3 P, 10 kA 1.00
- 20 x MCB 6 A, 1 P, 6 kA 20.00
- 3 x fuse 2 A + fuse holder 3.00
- 3 x pilot lamp 3.00
- 1 lot busbar 40 A full neutral, 5 bus 1.00
- 1 lot internal wiring + aksesori 1.00
- 1 lot panel 50 (L) x 25 (D) x 60 (T) cm 1.00
- 1 lot instalasi kabel grounding 1.00
HARGA JUMLAH HARGA
NO. URAIAN PEKERJAAN VOLUME SAT
SATUAN (Rp) (Rp)
- 1 x MCCB 25 A, 3 P, 10 kA 1.00
- 26 x MCB 6 A, 1 P, 6 kA 26.00
- 3 x fuse 2 A + fuse holder 3.00
- 3 x pilot lamp 3.00
- 1 lot busbar 40 A full neutral, 5 bus 1.00
- 1 lot internal wiring + aksesori 1.00
- 1 lot panel 50 (L) x 25 (D) x 60 (T) cm 1.00
- 1 lot instalasi kabel grounding 1.00
- 1 x MCCB 25 A, 3 P, 10 kA 1.00
- 16 x MCB 6 A, 1 P, 6 kA 16.00
- 3 x fuse 2 A + fuse holder 3.00
- 3 x pilot lamp 3.00
- 1 lot busbar 40 A full neutral, 5 bus 1.00
- 1 lot internal wiring + aksesori 1.00
- 1 lot panel 50 (L) x 25 (D) x 60 (T) cm 1.00
- 1 lot instalasi kabel grounding 1.00
- 1 x MCCB 16 A, 3 P, 10 kA 1.00
- 5 x MCB 6 A, 1 P, 6 kA 5.00
- 3 x fuse 2 A + fuse holder 3.00
- 3 x pilot lamp 3.00
- 1 lot busbar 40 A full neutral, 5 bus 1.00
- 1 lot control wiring + aksesori 1.00
- 1 lot panel 25 (L) x 20 (D) x 25 (T) cm 1.00
- 1 lot instalasi kabel grounding 1.00
- 20 x MCB 16 A, 1 P, 6 kA 20.00
- 3 x fuse 2 A + fuse holder 3.00
- 3 x pilot lamp 3.00
- 1 lot busbar 60 A full neutral, 5 bus 1.00
- 1 lot internal wiring + aksesori 1.00
- 1 lot panel 50 (L) x 25 (D) x 60 (T) cm 1.00
- 1 lot instalasi kabel grounding 1.00
- 1 x MCCB 25 A, 3 P, 10 kA 1.00
- 5 x MCB 6 A, 3 P, 10 kA 5.00
- 2 x MCB 6 A, 1 P, 6 kA 2.00
- 2 x Y-D starter 37 kW 2.00
- 9 x Direct on Line Starter 1,5 kW 3.00
- 9 x CT 40/5A 9.00
- 9 x A-meter 0 - 20 A 9.00
- 9 x fuse 2 A + fuse holder 9.00
- 3 x pilot lamp 3.00
- 1 x MCCB 25 A, 3 P, 10 kA 1.00
- 3 x MCB 6 A, 3 P, 10 kA 3.00
- 9 x Direct on Line Starter 1,5 kW 3.00
- 1 x Phase Failure Relay 1.00
- 3 x fuse 2 A + fuse holder 3.00
- 3 x pilot lamp 3.00
- 2 x A/O/M selector switch 2.00
- 2 x push button ON 2.00
- 2 x push button OFF 2.00
- 2 x indikator lamp 2.00
- 1 lot busbar 40 A full neutral, 5 bus 1.00
- 1 lot control wiring + aksesori 1.00
- 1 lot panel 50 (L) x 25 (D) x 60 (T) cm 1.00
- 1 lot instalasi kabel grounding 1.00
SUB TOTAL I
HARGA JUMLAH HARGA
NO. URAIAN PEKERJAAN VOLUME SAT
SATUAN (Rp) (Rp)
SUB TOTAL II
3.2 Lantai - 2
3.2 Lantai - 3
j Instalasi stop kontak 1 fasa, 200 VA, 220 V + out let stop 16.00 ttk
di bawahlantaimenggunakan konduit high impact
n Saklar tunggal 17.00 bh
Sakla ganda 6.00 bh
Saklar hotel tunggal 2.00 bh
HARGA JUMLAH HARGA
NO. URAIAN PEKERJAAN VOLUME SAT
SATUAN (Rp) (Rp)
3.3 Lantai - 4
4.1 Lantai 2
4.2 Lantai 3
4.1 Lantai 4
c Elbow 40 cm 3.00 bh
d Elbow 30 cm 2.00 bh
g Outside Riser 40 cm 2.00 bh
h Outside Riser 30 cm 1.00 bh
i Alat bantu (mur-baut, hanger rod, hinge fish 1.00 ls
plate dll.)
SUB TOTAL IV
5.1 Lantai 1
5.2 Lantai 2
5.2 Lantai 3
SUB TOTAL V
SUB TOTAL VI
VII PENYAMBUNGAN DAYA PLN
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN ( Rp) JUMLAH HARGA (Rp)
a.2 Lantai - 1
1 Instalasi titik outlet telepon lkp dgn telephone 5.00 ttk
receptacle outlet(dinding)
2 Analog DTMF hand set 5.00 unit
3 Terminal Box kap. 40 prs 1.00 unit
a.3 Lantai - 2
1 Instalasi titik outlet telepon lkp dgn telephone 8.00 ttk
receptacle outlet(dinding)
2 Analog DTMF hand set 8.00 unit
3 Terminal Box kap. 40 prs 1.00 unit
a.4 Lantai - 3
1 Instalasi titik outlet telepon lkp dgn telephone 12.00 ttk
receptacle outlet(dinding)
2 Analog DTMF hand set 12.00 unit
3 Terminal Box kap. 10 prs 1.00 unit
a.5. Lantai - 4
1 Instalasi titik outlet telepon lkp dgn telephone 1.00 ttk
receptacle outlet(dinding)
2 Analog DTMF hand set 1.00 unit
Sub Total
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN ( Rp) JUMLAH HARGA (Rp)
Sub Total
Sub Total
Jumlah Total
RENCANA ANGGARAN BIAYA
PEKERJAAN ELEKTRIKAL
PEMBANGUNAN GEDUNG PUSBINDIKLATREN
KEMENTERIAN PERENCANAAN PEMBANGUNAN NASIONAL/BAPPENAS
Jl. Proklamasi No 70, Jakarta
HARGA SATUAN
NO URAIAN PEKERJAAN VOLUME SAT JUMLAH HARGA (Rp)
(Rp)
2 Ground floor
- ROR & fixed temperature detector 8.00 bh
- Smoke temperature detector 1.00 bh
- Manual call point / MCP 1.00 bh
- Alarm bell dia. 4" 1.00 bh
- Alarm lamp 1.00 bh
- Terminal box 1.00 unit
- Instalasi detektor dan MCP 10.00 ttk
- Instalasi alarm dan bell 1.00 ttk
3 Lantai 1
- ROR & fixed temperature detector 6.00 bh
- Fixed temperature detector 1.00 bh
- Smoke temperature detector 1.00 bh
- Manual call point / MCP 1.00 bh
- Alarm bell dia. 4" 1.00 bh
- Alarm lamp 1.00 bh
- Terminal box 1.00 unit
- Instalasi detektor dan MCP 9.00 ttk
- Instalasi alarm dan bell 2.00 ttk
- ROR & fixed temperature detector 4.00 bh
- Manual call point / MCP 1.00 bh
- Alarm bell dia. 4" 1.00 bh
4 Lantai 2
- ROR & fixed temperature detector 9.00 bh
- Fixed temperature detector 1.00 bh
- Smoke temperature detector 1.00 bh
- Manual call point / MCP 1.00 bh
- Alarm bell dia. 4" 1.00 bh
- Alarm lamp 1.00 bh
- Terminal box 1.00 unit
- Instalasi detektor dan MCP 12.00 ttk
- Instalasi alarm dan bell 2.00 ttk
HARGA SATUAN
NO URAIAN PEKERJAAN VOLUME SAT JUMLAH HARGA (Rp)
(Rp)
5 Lantai 3
- ROR & fixed temperature detector 10.00 bh
- Fixed temperature detector 1.00 bh
- Smoke temperature detector 3.00 bh
- Manual call point / MCP 2.00 bh
- Alarm bell dia. 4" 1.00 bh
- Alarm lamp 1.00 bh
- Terminal box 1.00 unit
- Instalasi detektor dan MCP 16.00 ttk
- Instalasi alarm dan bell 2.00 ttk
6 Lantai 4
- ROR & fixed temperature detector 9.00 bh
- Fixed temperature detector 1.00 bh
- Manual call point / MCP 1.00 bh
- Alarm bell dia. 4" 1.00 bh
- Alarm lamp 1.00 bh
- Terminal box 1.00 unit
- Instalasi detektor dan MCP 11.00 ttk
- Instalasi alarm dan bell 2.00 ttk
Sub Total
Sub Total
Jumlah Total
RENCANA ANGGARAN BIAYA
PEKERJAAN ELEKTRIKAL
PEMBANGUNAN GEDUNG PUSBINDIKLATREN
KEMENTERIAN PERENCANAAN PEMBANGUNAN NASIONAL/BAPPENAS
Jl. Proklamasi No 70, Jakarta
a Lantai 1
c Lantai 2
d Lantai 3
e Kabel Penghubung
Sub Total
Sub Total
Jumlah Total
RENCANA ANGGARAN BIAYA
PEKERJAAN ELEKTRIKAL
PEMBANGUNAN GEDUNG PUSBINDIKLATREN
KEMENTERIAN PERENCANAAN PEMBANGUNAN NASIONAL/BAPPENAS
Jl. Proklamasi No 70, Jakarta
HARGA SATUAN
NO URAIAN PEKERJAAN VOLUME SAT JUMLAH HARGA (Rp)
(Rp)
a.2.1 Lantai 1
1 20 cm Ceiling Speaker 6W / 100 V 7.00 bh
Ex : TOA Seri PC 34 RW
2 30 W Attenuator Ex TOA Seri - 311 4.00 bh
3 Instalasi Ceiling Speaker 7.00 ttk
4 Instalasi Attenuator 4.00 ttk
5 Terminal Box ( TB-SS-1 ) 1.00 bh
Mezanin
1 20 cm Ceiling Speaker 6W / 100 V 4.00 bh
Ex : TOA Seri PC 34 RW
2 30 W Attenuator Ex TOA Seri - 311 3.00 bh
a.2.1 Lantai 2
1 20 cm Ceiling Speaker 6W / 100 V 11.00 bh
Ex : TOA Seri PC 34 RW
2 30 W Attenuator Ex TOA Seri - 311 7.00 bh
3 Instalasi Ceiling Speaker 11.00 ttk
4 Instalasi Attenuator 7.00 ttk
5 Terminal Box ( TB-SS-2 ) 1.00 bh
HARGA SATUAN
NO URAIAN PEKERJAAN VOLUME SAT JUMLAH HARGA (Rp)
(Rp)
a.2.2 Lantai 3
1 20 cm Ceiling Speaker 6W / 100 V 13.00 bh
Ex : TOA Seri PC 34 RW
2 30 W Attenuator Ex TOA Seri - 311 7.00 bh
3 Instalasi Ceiling Speaker 13.00 ttk
4 Instalasi Attenuator 7.00 ttk
5 Terminal Box ( TB-SS-3 ) 1.00 bh
a.2.3 Lantai 4
1 20 cm Ceiling Speaker 6W / 100 V 10.00 bh
Ex : TOA Seri PC 34 RW
2 30 W Attenuator Ex TOA Seri - 311 5.00 bh
3 Instalasi Ceiling Speaker 10.00 ttk
4 Instalasi Attenuator 5.00 ttk
5 Terminal Box ( TB-SS-3 ) 1.00 bh
Sub Total
Sub Total
Jumlah Total
RENCANA ANGGARAN BIAYA
PEKERJAAN ELEKTRIKAL
PEMBANGUNAN GEDUNG PUSBINDIKLATREN
KEMENTERIAN PERENCANAAN PEMBANGUNAN NASIONAL/BAPPENAS
Jl. Proklamasi No 70, Jakarta
b PEKERJAAN PEMIPAAN
1 Pemipaan Bahan Bakar 1 ls
Pemipaan bahan bakar antara fuel daily tank
dengan mesin dan antara weekly tank dgn
daily tank, pemipaan BSP sch. 30, penyam -
bungan dengan flange, termasuk klem pipa
dan pengecatan
2 Pemipaan Exhaust Gas
Pemipaan exhaust gas di dalam ruang DGS 1 ls
pemipaan dgn. BSP sch 30 dilapis tali asbes
dan alumunium jacketing.
Sub Total
Jumlah Total
RENCANA ANGGARAN BIAYA
PEKERJAAN ELEKTRIKAL
PEMBANGUNAN GEDUNG PUSBINDIKLATREN
KEMENTERIAN PERENCANAAN PEMBANGUNAN NASIONAL/BAPPENAS
Jl. Proklamasi No 70, Jakarta
HARGA JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT
SATUAN (Rp) HARGA (Rp)
1 Lantai 2 5 ttk
Kabel coaxial 5C-2V, 75 ohm ex YURI Japan,
di dlm konduit PVC high impact-heavy gauge
ex EGA/CLIPSAL termasuk F-connector dan
outlet TV.
2 Lantai 3 10 ttk
Kabel coaxial 5C-2V, 75 ohm ex YURI Japan,
di dlm konduit PVC high impact-heavy gauge
ex EGA/CLIPSAL termasuk F-connector dan
outlet TV.
Total
RENCANA ANGGARAN BIAYA
PEKERJAAN AIR BERSIH
PEMBANGUNAN GEDUNG PUSBINDIKLATREN
KEMENTERIAN PERENCANAAN PEMBANGUNAN NASIONAL/BAPPENAS
Jl. Proklamasi No 70, Jakarta
b INSTALASI PEMIPAAN
b.4 Lantai 1
1 Pipa tegak dia. 3" 8.00 m
Pipa dia. 1 1/2" 12.00 m
Pipa dia. 1" 26.00 m
Pipa dia. 3/4" 8.00 m
Pipa dia. 1/2" 76.00 m
2 Tee dia. 3" x 1 1/2" x 3" 1.00 bh
Tee dia. 1 1/2" x 1" x 1 1/2" 2.00 bh
Tee dia. 1" x 1" x 1" 1.00 bh
Tee dia. 1" x 3/4" x 1" 1.00 bh
Tee dia. 1" x 1/2" x 1" 8.00 bh
Tee dia. 3/4" x 3/4" x 3/4" 1.00 bh
Tee dia. 3/4" x 1/2" x 3/4" 2.00 bh
Tee dia. 1/2" x 1/2" x 1/2" 6.00 bh
3 Elbow dia. 1 1/2" 3.00 bh
Elbow dia. 1" 3.00 bh
Elbow dia. 3/4" 1.00 bh
Elbow dia. 1/2" 20.00 bh
4 Reducer dia. 1 1/2" x 3/4" 1.00 bh
Reducer dia. 1" x 1/2" 2.00 bh
Reducer dia. 3/4" x 1/2" 2.00 bh
5 Gate valve dia. 1 1/2" (125 psi-screwed) 1.00 bh
6 Material bantu (support,klem , socket dll) 1.00 ls
b.5 Lantai 2
1 Pipa tegak dia. 3" 8.00 m
Pipa dia. 1 1/2" 16.00 m
Pipa dia. 1" 12.00 m
Pipa dia. 3/4" 26.00 m
Pipa dia. 1/2" 48.00 m
2 Tee dia. 3" x 1 1/2" x 3" 1.00 bh
Tee dia. 1 1/2" x 1" x 1 1/2" 1.00 bh
Tee dia. 1 1/2" x 3/4" x 1 1/2" 2.00 bh
Tee dia. 1" x 1/2" x 1" 4.00 bh
Tee dia. 3/4" x 1/2" x 3/4" 6.00 bh
Tee dia. 1/2" x 1/2" x 1/2" 5.00 bh
3 Elbow dia. 1 1/2" 4.00 bh
Elbow dia. 1" 2.00 bh
Elbow dia. 3/4" 2.00 bh
Elbow dia. 1/2" 19.00 bh
4 Reducer dia. 1 1/2" x 3/4" 1.00 bh
Reducer dia. 1" x 1/2" 1.00 bh
Reducer dia. 3/4" x 1/2" 2.00 bh
5 Gate valve dia. 1 1/2" (125 psi-screwed) 1.00 bh
6 Material bantu (support,klem , socket dll) 1.00 ls
b.6 Lantai 3
1 Pipa tegak dia. 3" 8.00 m
Pipa tegak dia. 2" 2.00 m
Pipa dia. 1 1/2" 16.00 m
Pipa dia. 1" 12.00 m
Pipa dia. 3/4" 28.00 m
Pipa dia. 1/2" 36.00 m
2 Tee dia. 2" x 1 1/2" x 2" 1.00 bh
Tee dia. 1 1/2" x 1" x 1 1/2" 1.00 bh
Tee dia. 1 1/2" x 3/4" x 1 1/2" 3.00 bh
Tee dia. 1" x 1/2" x 1" 2.00 bh
Tee dia. 3/4" x 1/2" x 3/4" 5.00 bh
Tee dia. 1/2" x 1/2" x 1/2" 7.00 bh
3 Elbow dia. 1 1/2" 4.00 bh
Elbow dia. 1" 2.00 bh
Elbow dia. 3/4" 3.00 bh
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SAT
(Rp) (Rp)
b.7 Lantai 4
1 Pipa tegak dia. 3" 8.00 m
Pipa tegak dia. 2" 2.00 m
Pipa dia. 1 1/2" 6.00 m
Pipa dia. 1" 22.00 m
Pipa dia. 3/4" 18.00 m
Pipa dia. 1/2" 24.00 m
2 Tee dia. 2" x 1 1/2" x 2" 1.00 bh
Tee dia. 1 1/2" x 1" x 1 1/2" 2.00 bh
Tee dia. 1 1/2" x 3/4" x 1 1/2" 1.00 bh
Tee dia. 1" x 3/4" x 1" 1.00 bh
Tee dia. 1" x 1/2" x 1" 6.00 bh
Tee dia. 3/4" x 1/2" x 3/4" 6.00 bh
Tee dia. 1/2" x 1/2" x 1/2" 4.00 bh
3 Elbow dia. 1 1/2" 4.00 bh
Elbow dia. 1" 2.00 bh
Elbow dia. 3/4" 5.00 bh
Elbow dia. 1/2" 12.00 bh
4 Reducer dia. 1 1/2" x 1" 1.00 bh
Reducer dia. 1" x 1/2" 2.00 bh
5 Gate valve dia. 1 1/2" (125 psi-screwed) 1.00 bh
6 Material bantu (support,klem , socket dll) 1.00 ls
Tegangan : 380/660 V
Starter : DOL
Daya poros : 750 VA (min)
Kopling direct, base skid mounted
Kecepatan putar : 1450 rpm
Pengadaan pompa lengkap dgn panel kontrol
dan kabel power
3 Pressure Tank kap. 500 liter, 10 kg/cm2 1.00 bh
(1 unit)
b.8.3 INSTALASI PENYAMBUNGAN METER AIR PDAM / PALIJA 3" 1.00 unit
Sub Total
Sub Total
Jumlah Total
RENCANA ANGGARAN BIAYA
PEKERJAAN AIR KOTOR
PEMBANGUNAN GEDUNG PUSBINDIKLATREN
KEMENTERIAN PERENCANAAN PEMBANGUNAN NASIONAL/BAPPENAS
Jl. Proklamasi No 70, Jakarta
a Ground floor
1 Pipa
- dia. 6" 36.00 m
- dia. 4" 40.00 m
- dia. 2" 10.00 m
2 Pipa Tegak
- dia. 6" 4.00 m
- dia. 4" 4.00 m
3 Tee-Wye
- dia. 6" x 6" x 6" 1.00 bh
- dia. 6" x 2" x 6" 1.00 bh
- dia. 4" x 4" x 4" 1.00 bh
- dia. 4" x 2" x 4" 1.00 bh
- dia. 2" x 2" x 2" 1.00 bh
4 Elbow
- dia. 6" 4.00 bh
- dia. 4" 2.00 bh
- dia. 2" 3.00 bh
6 Septictank Biotech model RCX 10 (10m3) 1.00 unit
Pekerjaan sudah termasuk penggalian dan
pengurugan, pondasi struktur.
b Lantai - 1
1 Pipa
- dia. 4" 34.00 m
- dia. 3" 8.00 m
- dia. 2" 36.00 m
- dia.11/2" 64.00 m
2 Pipa Tegak
- dia. 6" 4.00 m
- dia. 4" 4.00 m
- dia. 3" 4.00 m
- dia. 2" 4.00 m
3 Tee-Wye
- dia. 6" x 4" x 6" 1.00 bh
- dia. 4" x 4" x 4" 6.00 bh
- dia. 4" x 3" x 4" 1.00 bh
- dia. 4" x 2" x 4" 1.00 bh
- dia. 3" x 2" x 3" 5.00 bh
- dia. 3" x 1 1/2" x 3" 1.00 bh
- dia. 2" x 2" x 2" 5.00 bh
- dia. 2" x 1 1/2" x 2" 3.00 bh
- dia. 1 1/2" x 1 1/2" x 1 1/2" 3.00 bh
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SAT
(Rp) (Rp)
4 Elbow
- dia. 4" 6.00 bh
- dia. 2" 12.00 bh
- dia. 1 1/2" 14.00 bh
5 Floor drain dia 2" 6.00 bh
6 Material bantu (socker, klem, lem dll.) 1.00 ls
c Lantai 2
1 Pipa
- dia. 4" 18.00 m
- dia. 3" 12.00 m
- dia. 2" 50.00 m
- dia.1 1/2" 46.00 m
2 Pipa Tegak
- dia. 6" 4.00 m
- dia. 4" 4.00 m
- dia. 3" 4.00 m
- dia. 2" 4.00 m
3 Tee-Wye
- dia. 6" x 4" x 6" 1.00 bh
- dia. 4" x 4" x 4" 5.00 bh
- dia. 4" x 3" x 4" 1.00 bh
- dia. 4" x 2" x 4" 1.00 bh
- dia. 4" x 1 1/2" x 4" 1.00 bh
- dia. 3" x 2" x 3" 7.00 bh
- dia. 3" x 1 1/2" x 3" 2.00 bh
- dia. 2" x 2" x 2" 4.00 bh
- dia. 2" x 1 1/2" x 2" 5.00 bh
- dia. 1 1/2" x 1 1/2" x 1 1/2" 4.00 bh
4 Elbow
- dia. 4" 5.00 bh
- dia. 2" 16.00 bh
- dia. 1 1/2" 20.00 bh
5 Floor drain dia 2" 5.00 bh
6 Material bantu (socker, klem, lem dll.) 1.00 ls
d Lantai 3
1 Pipa
- dia. 4" 18.00 m
- dia. 3" 12.00 m
- dia. 2" 42.00 m
- dia.1 1/2" 20.00 m
2 Pipa Tegak
- dia. 6" 4.00 m
- dia. 4" 4.00 m
- dia. 3" 4.00 m
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SAT
(Rp) (Rp)
3 Tee-Wye
- dia. 6" x 4" x 6" 1.00 bh
- dia. 4" x 4" x 4" 5.00 bh
- dia. 4" x 3" x 4" 1.00 bh
- dia. 4" x 2" x 4" 1.00 bh
- dia. 4" x 1 1/2" x 4" 1.00 bh
- dia. 3" x 2" x 3" 7.00 bh
- dia. 3" x 1 1/2" x 3" 2.00 bh
- dia. 2" x 2" x 2" 2.00 bh
- dia. 2" x 1 1/2" x 2" 3.00 bh
- dia. 1 1/2" x 1 1/2" x 1 1/2" 6.00 bh
4 Elbow
- dia. 4" 5.00 bh
- dia. 2" 16.00 bh
- dia. 1 1/2" 17.00 bh
5 Floor drain dia 2" 5.00 bh
6 Material bantu (socker, klem, lem dll.) 1.00 ls
e Lantai 4
1 Pipa
- dia. 4" 18.00 m
- dia. 3" 12.00 m
- dia. 2" 48.00 m
- dia.1 1/2" 46.00 m
2 Pipa Tegak
- dia. 6" 4.00 m
- dia. 4" 4.00 m
- dia. 3" 4.00 m
3 Tee-Wye
- dia. 6" x 4" x 6" 1.00 bh
- dia. 4" x 4" x 4" 5.00 bh
- dia. 4" x 3" x 4" 1.00 bh
- dia. 4" x 2" x 4" 1.00 bh
- dia. 4" x 1 1/2" x 4" 1.00 bh
- dia. 3" x 2" x 3" 5.00 bh
- dia. 3" x 1 1/2" x 3" 2.00 bh
- dia. 2" x 2" x 2" 3.00 bh
- dia. 2" x 1 1/2" x 2" 6.00 bh
- dia. 1 1/2" x 1 1/2" x 1 1/2" 6.00 bh
4 Elbow
- dia. 4" 5.00 bh
- dia. 2" 17.00 bh
- dia. 1 1/2" 18.00 bh
5 Floor drain dia 2" 5.00 bh
6 Material bantu (socker, klem, lem dll.) 1.00 ls
Sub Total
Sub Total
Jumlah Total
RENCANA ANGGARAN BIAYA
PEKERJAAN INSTALASI AC
PEMBANGUNAN GEDUNG PUSBINDIKLATREN
KEMENTERIAN PERENCANAAN PEMBANGUNAN NASIONAL/BAPPENAS
Jl. Proklamasi No 70, Jakarta
HARGA SATUAN
NO URAIAN PEKERJAAN VOLUME SAT JUMLAH HARGA (Rp)
(Rp)
a Lantai 1
b Lantai 2
c Lantai 3
d Lantai 4
Total
RENCANA ANGGARAN BIAYA
PEKERJAAN FRE HYDRANT
PEMBANGUNAN GEDUNG PUSBINDIKLATREN
KEMENTERIAN PERENCANAAN PEMBANGUNAN NASIONAL/BAPPENAS
Jl. Proklamasi No 70, Jakarta
SUB TOTAL I
HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN VOLUME SAT
(Rp) (Rp)
II INSTALASI PEMIPAAN
f Check Valve
- dia. 4" (150 psi - flanged) 2.00 bh
- dia. 2 1/2" (150 psi-flanged) 1.00 bh
g Double Sphere Flexible Joint
- dia. 5" (flanged) 2.00 bh
- dia. 4" (flanged) 2.00 bh
- dia. 2 1/2" (flanged) 1.00 bh
- dia. 2" (flanged) 1.00 bh
h Strainer
- dia. 5" (flanged) 2.00 bh
- dia. 2 1/2" (flanged) 1.00 bh
i Foot valve dia. 6" (flanged) 2.00 bh
j Pressure gauge 0 - 15 kg/cm2 4.00 bh
k Pressure switch 3.00 bh
l Savety valve 12 kg/cm2 dia. 2" (flanged) 1.00 bh
m Pressure tank 1000 lt, 15 kg/cm2 lengkap dgn. 1.00 unit
accessories
n Air Relase Valve (ARV) dia. 2" 1.00 bh
o Material bantu (mur-baut,flens,support,klem , 1.00 ls
fitting dll)
HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN VOLUME SAT
(Rp) (Rp)
a Pipa
- dia. 6" (Pipa Tegak) 4.00 m
- dia. 2 1/2" 24.00 m
b Elbow
- dia 2 1/2" 3.00 bh
c Tee
- dia 6" x 2 1/2" x 6" 1.00 bh
c Indoor hydrant box lengkap 1.00 bh
f Multipurpose dry chemical fire extinguisher 4.00 bh
kap. 6 kg lengkap dengan bracket dan nozzle
(portable type)
g Material bantu (mur-baut, flange, socket dll.) 1.00 ls
2.3 Lantai 1
Pemipaan dan fitting menggunakan BSP sch. 40
ASTM A-120, di dalam bangunan (dicat merah)
a Pipa
- dia. 6" (Pipa Tegak) 4.00 m
- dia. 2 1/2" 18.00 m
b Elbow
- dia 2 1/2" 3.00 bh
c Tee
- dia 6" x 2 1/2" x 6" 1.00 bh
e Indoor hydrant box lengkap 1.00 bh
f Multipurpose dry chemical fire extinguisher 4.00 bh
kap. 6 kg lengkap dengan bracket dan nozzle
(portable type)
g Material bantu (mur-baut, flange, socket dll.) 1.00 ls
2.4 Lantai 2
Pemipaan dan fitting menggunakan BSP sch. 40
ASTM A-120, di dalam bangunan (dicat merah)
a Pipa
- dia. 6" (Pipa Tegak) 4.00 m
- dia. 2 1/2" 24.00 m
b Elbow
- dia 2 1/2" 3.00 bh
c Tee
- dia 6" x 2 1/2" x 6" 1.00 bh
e Indoor hydrant box lengkap 1.00 bh
f Multipurpose dry chemical fire extinguisher 4.00 bh
kap. 6 kg lengkap dengan bracket dan nozzle
(portable type)
g Material bantu (mur-baut, flange, socket dll.) 1.00 ls
HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN VOLUME SAT
(Rp) (Rp)
2.5 Lantai 3
Pemipaan dan fitting menggunakan BSP sch. 40
ASTM A-120, di dalam bangunan (dicat merah)
a Pipa
- dia. 4" (Pipa Tegak) 4.00 m
- dia. 2 1/2" 22.00 m
b Elbow
- dia 2 1/2" 3.00 bh
c Tee
- dia 4" x 2 1/2" x 4" 1.00 bh
d Reducer dia 6" x 4" 1.00 bh
e Indoor hydrant box lengkap 1.00 bh
f Multipurpose dry chemical fire extinguisher 4.00 bh
kap. 6 kg lengkap dengan bracket dan nozzle
(portable type)
g Material bantu (mur-baut, flange, socket dll.) 1.00 ls
2.6 Lantai 4
Pemipaan dan fitting menggunakan BSP sch. 40
ASTM A-120, di dalam bangunan (dicat merah)
a Pipa
- dia. 2 1/2" 22.00 m
b Elbow
- dia. 4" 1.00 bh
- dia 2 1/2" 10.00 bh
c Tee
- dia 4" x 2 1/2" x 4" 1.00 bh
e Air release valve dia. 4" 1.00 bh
f Indoor hydrant box lengkap 1.00 bh
g Multipurpose dry chemical fire extinguisher 4.00 bh
kap. 6 kg lengkap dengan bracket dan nozzle
(portable type)
h Material bantu (mur-baut, flange, socket dll.) 1.00 ls
SUB TOTAL II
NO. URAIAN PEKERJAAN SAT VOLUME HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
a Pipa Distribusi
- dia. 2 1/2" m 8.00
- dia. 2" m 4.00
- dia. 1 1/2" m 40.00
- dia. 1 1/4" m 6.00
- dia. 1" m 38.00
b Pipa Tegak
- dia. 6" (flanged setiap 3 batang) m 4.00
- dia. 2" (flanged setiap 3 batang) m 4.00
c Tee
- dia. 6" x 2 1/2" x 6" (flanged) bh 1.00
- dia. 2 1/2" x 2 1/2" x 2 1/2" bh 2.00
- dia. 2 1/2" x 1 1/2" x 2 1/2" bh 1.00
- dia. 2 1/2" x 1 1/4" x 2 1/2" bh 1.00
- dia. 2" x 1 1/2" x 2" bh 1.00
- dia. 1 1/2" x 1 1/2" x 1 1/2" bh 1.00
- dia. 1 1/2" x 1" x 1 1/2" bh 6.00
- dia. 1 1/4" x 1" x 1 1/4" bh 1.00
- dia. 1" x 1" x 1" bh 4.00
d Elbow
- dia. 1 1/2" bh 2.00
- dia. 1" bh 6.00
e Reducer
- dia. 2 1/2" x 2" bh 1.00
- dia. 2" x 1 1/2" bh 1.00
- dia. 1 1/2" x 1" bh 3.00
- dia. 1 1/4" x 1" bh 1.00
f Red bulb pendant sprinkler head dia. 1/2" bh 15.00
Ex Viking atau setara
g Gate Valve
- dia. 2 1/2" (150 psi-screwed) bh 2.00
- dia. 1 1/2" (150 psi-screwed) bh 1.00
h Flow switch dia. 2 1/2", termasuk penarikan bh 1.00
kabel ke zona fire alarm terdekat
Ex Viking atau setara
i Material bantu ( hanger, flens, mur-baut dll.) ls 1.00
NO. URAIAN PEKERJAAN SAT VOLUME HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
1.2 Lantai 1
Pemipaan dan fitting menggunakan BSP Sch. 40
ASTM A-120, dicat warna merah
a Pipa Distribusi
- dia. 1 1/2" m 24.00
- dia. 1" m 16.00
b Pipa Tegak
- dia. 6" (flanged setiap 3 batang) m 4.00
- dia. 2" (flanged setiap 3 batang) m 4.00
c Tee
- dia. 6" x 2 1/2" x 6" (flanged) bh 1.00
- dia. 2 1/2" x 2 1/2" x 2 1/2" bh 2.00
- dia. 2 1/2" x 1 1/2" x 2 1/2" bh 1.00
- dia. 2 1/2" x 1 1/4" x 2 1/2" bh 1.00
- dia. 2" x 1 1/2" x 2" bh 1.00
- dia. 1 1/2" x 1 1/2" x 1 1/2" bh 1.00
- dia. 1 1/2" x 1" x 1 1/2" bh 6.00
- dia. 1 1/4" x 1" x 1 1/4" bh 1.00
- dia. 1" x 1" x 1" bh 4.00
d Elbow
- dia. 1 1/2" bh 2.00
- dia. 1" bh 3.00
e Reducer
- dia. 1 1/2" x 1" bh 1.00
f Red bulb pendant sprinkler head dia. 1/2" bh 5.00
Ex Viking atau setara
g Gate Valve
- dia. 1 1/2" (150 psi-screwed) bh 3.00
h Flow switch dia. 1 1/2", termasuk penarikan bh 1.00
kabel ke zona fire alarm terdekat
Ex Viking atau setara
i Material bantu ( hanger, flens, mur-baut dll.) ls 1.00
NO. URAIAN PEKERJAAN SAT VOLUME HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
1.3 Lantai 2
Pemipaan dan fitting menggunakan BSP Sch. 40
ASTM A-120, dicat warna merah
a Pipa Distribusi
- dia. 2 1/2" m 14.00
- dia. 2" m 4.00
- dia. 1 1/2" m 44.00
- dia. 1 1/4" m 6.00
- dia. 1" m 42.00
b Pipa Tegak
- dia. 6" (flanged setiap 3 batang) m 4.00
- dia. 2" (flanged setiap 3 batang) m 4.00
c Tee
- dia. 6" x 2 1/2" x 6" (flanged) bh 1.00
- dia. 2 1/2" x 2 1/2" x 2 1/2" bh 2.00
- dia. 2 1/2" x 1 1/2" x 2 1/2" bh 3.00
- dia. 2" x 1 1/2" x 2" bh 1.00
- dia. 1 1/2" x 2 1/2" x 1 1/2" bh 1.00
- dia. 1 1/2" x 1 1/2" x 1 1/2" bh 1.00
- dia. 1 1/2" x 1" x 1 1/2" bh 8.00
- dia. 1 1/4" x 1" x 1 1/4" bh 1.00
- dia. 1" x 1" x 1" bh 4.00
d Elbow
- dia. 2 1/2" bh 2.00
- dia. 1 1/2" bh 4.00
- dia. 1" bh 9.00
e Reducer
- dia. 2 1/2" x 2" bh 1.00
- dia. 2" x 1 1/2" bh 1.00
- dia. 1 1/2" x 1 1/4" bh 1.00
- dia. 1 1/2" x 1" bh 3.00
- dia. 1 1/4" x 1" bh 1.00
f Red bulb pendant sprinkler head dia. 1/2" bh 17.00
Ex Viking atau setara
g Gate Valve
- dia. 2 1/2" (150 psi-screwed) bh 2.00
- dia. 1 1/2" (150 psi-screwed) bh 1.00
h Flow switch dia. 2 1/2", termasuk penarikan bh 1.00
kabel ke zona fire alarm terdekat
Ex Viking atau setara
i Material bantu ( hanger, flens, mur-baut dll.) ls 1.00
NO. URAIAN PEKERJAAN SAT VOLUME HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
1.4 Lantai 3
Pemipaan dan fitting menggunakan BSP Sch. 40
ASTM A-120, dicat warna merah
a Pipa Distribusi
- dia. 2 1/2" m 14.00
- dia. 2" m 4.00
- dia. 1 1/2" m 46.00
- dia. 1 1/4" m 18.00
- dia. 1" m 32.00
b Pipa Tegak
- dia. 4" (flanged setiap 3 batang) m 8.00
c Tee
- dia. 4" x 2 1/2" x 4" (flanged) bh 1.00
- dia. 4" x 1 1/2" x 4" (flanged) bh 1.00
- dia. 2 1/2" x 2 1/2" x 2 1/2" bh 2.00
- dia. 2 1/2" x 1 1/2" x 2 1/2" bh 2.00
- dia. 2" x 1 1/2" x 2" bh 1.00
- dia. 2 1/2" x 1 1/4" x 2 1/2" bh 1.00
- dia. 1 1/2" x 2 1/2" x 1 1/2" bh 1.00
- dia. 1 1/2" x 1 1/2" x 1 1/2" bh 1.00
- dia. 1 1/2" x 1" x 1 1/2" bh 4.00
- dia. 1 1/4" x 1" x 1 1/4" bh 5.00
- dia. 1" x 1" x 1" bh 5.00
d Elbow
- dia. 2 1/2" bh 2.00
- dia. 1 1/2" bh 7.00
- dia. 1" bh 6.00
e Reducer
- dia. 2 1/2" x 2" bh 1.00
- dia. 2" x 1 1/2" bh 1.00
- dia. 1 1/2" x 1 1/4" bh 4.00
- dia. 1 1/4" x 1" bh 5.00
f Red bulb pendant sprinkler head dia. 1/2" bh 23.00
Ex Viking atau setara
g Gate Valve
- dia. 2 1/2" (150 psi-flanged) bh 2.00
- dia. 1 1/2" (150 psi-flanged) bh 1.00
h Flow switch dia. 2 1/2", termasuk penarikan bh 1.00
kabel ke zona fire alarm terdekat
Ex Viking atau setara
i Material bantu ( hanger, flens, mur-baut dll.) ls 1.00
NO. URAIAN PEKERJAAN SAT VOLUME HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
1.5 Lantai 4
Pemipaan dan fitting menggunakan BSP Sch. 40
ASTM A-120, dicat warna merah
a Pipa Distribusi
- dia. 2 1/2" m 10.00
- dia. 2" m 4.00
- dia. 1 1/2" m 36.00
- dia. 1 1/4" m 16.00
- dia. 1" m 30.00
b Pipa Tegak
- dia. 4" (flanged setiap 3 batang) m 8.00
c Tee
- dia. 4" x 2 1/2" x 4" (flanged) bh 1.00
- dia. 4" x 1 1/2" x 4" (flanged) bh 1.00
- dia. 2 1/2" x 2 1/2" x 2 1/2" bh 2.00
- dia. 2 1/2" x 1 1/2" x 2 1/2" bh 2.00
- dia. 2" x 1 1/2" x 2" bh 1.00
- dia. 2 1/2" x 1 1/4" x 2 1/2" bh 1.00
- dia. 1 1/2" x 2 1/2" x 1 1/2" bh 1.00
- dia. 1 1/2" x 1 1/2" x 1 1/2" bh 1.00
- dia. 1 1/2" x 1" x 1 1/2" bh 4.00
- dia. 1 1/4" x 1" x 1 1/4" bh 5.00
- dia. 1" x 1" x 1" bh 5.00
d Elbow
- dia. 2 1/2" bh 2.00
- dia. 1 1/2" bh 8.00
- dia. 1" bh 6.00
e Reducer
- dia. 2 1/2" x 2" bh 1.00
- dia. 2" x 1 1/2" bh 1.00
- dia. 1 1/2" x 1 1/4" bh 4.00
- dia. 1 1/4" x 1" bh 5.00
f Red bulb pendant sprinkler head dia. 1/2" bh 23.00
Ex Viking atau setara
g Gate Valve
- dia. 2 1/2" (150 psi-flanged) bh 2.00
- dia. 1 1/2" (150 psi-flanged) bh 1.00
h Flow switch dia. 2 1/2", termasuk penarikan bh 1.00
kabel ke zona fire alarm terdekat
Ex Viking atau setara
i Material bantu ( hanger, flens, mur-baut dll.) ls 1.00
SUB TOTAL I
SUB TOTAL II
TOTAL
RENCANA ANGGARAN BIAYA
PEKERJAAN PERSIAPAN, STRUKTUR DAN ARSITEKTURAL
PEMBANGUNAN GEDUNG PUSBINDIKLATREN
KANTOR KEMENTERIAN PPN/BAPPENAS JAKARTA
LOKASI : JL. PROKLAMASI NO.70 JAKARTA PUSAT
I. PEKERJAAN PERSIAPAN
1 Biaya Administrasi & Dokumentasi 1 ls
2 Pek. Mobilisasi dan Demobilisasi 1 ls
3 Pembuatan Gambar As-Built Drawing 1 ls
4 Pek. Kantor Direksi 2 Lantai 36 m2
5 Pek. Pagar Pengaman (seng gelombang tinggi 2 m) 20 m'
6 Pek. Papan Proyek 1 ls
7 Pek. Keamanan Proyek 4 bln
8 Pek. Pembersihan Site (buang puing, semak2 & Tebang Pohon) 745 m2
9 Pek. Penyediaan Lift barang 1 ls
10 Pekerjaan Pengukuran & Bouwplank 110 m'
11 Tower Crane (sewa) 4 bln
PEKERJAAN PERSIAPAN
II PEKERJAAN STRUKTUR
A PEKERJAAN PONDASI TIANG PANCANG
1 Mobilisasi de mobilisasi tiang pancang 1 ls
2 Pondasi Tiang Pancang Ø40 Type P-1 144 m1
3 Pondasi Tiang Pancang Ø40 Type P-3 720 m1
4 Pondasi Tiang Pancang Ø40 Type P-4 192 m1
5 Pondasi Tiang Pancang Ø40 Type P-9 216 m1
6 Sambungan Tiang Pancang 53 ttk
7 Bobokan Tiang Pancang 53 ttk
8 Loading Test 2 ttk
PEKERJAAN PONDASI
PEKERJAAN PILE
CAP PONDASI DAN
DINDING PIT LIFT
PEKERJAAN
STRUKTUR
LANTAI GROUND
PEKERJAAN
STRUKTUR LANTAI
DUA
PEKERJAAN
STRUKTUR
LANTAI TIGA
PEKERJAAN
STRUKTUR
LANTAI EMPAT
PEKERJAAN
STRUKTUR RING
BALOK
I LANTAI GROUND
A Pekerjaan lantai
1 Floor hardener 326 m²
2 Pekerjaan granito tile 60 x 60 26 m²
3 Pekerjaan plin granito tile 10 x 60 17 m¹
4 Pekerjaan keramik tile 40 x 40 19 m²
5 Pekerjaan step nosing tangga keramik tile 10 x 40 19 m¹
6 Pekerjaan keramik tile anti slip 20 x 20 4 m²
7 Urugan pasir peninggian lantai bangunan 2 m³
8 Beton tumbuk 1 : 3 : 5 2 m³
9 Waterproofing bitutine sheet area taman 57 m²
10 Screeding 57 m²
Sub Total
B Pekerjaan dinding
1 Pekerjaan Pasangan bata 1:5, 1/2 batu 7 m²
2 Pekerjaan Pasangan bata Ringan/Hebel, T. 10 cm (Dinding Luar) 326 m²
3 Pekerjaan Pasangan bata Ringan/Hebel, T. 7,5 cm (Dinding Dalam) 79 m²
4 Pekerjaan Plesteran Prime Mortar & acian (dinding) 654 m²
5 Pekerjaan Plesteran Prime Mortar & acian (beton) 81 m²
6 Pekerjaan dinding keramik 20 x 25 Toilet 14 m2
7 Kolom praktis 111 m¹
8 Ring balok praktis 27 m¹
9 Pengecatan dinding interior 459 m²
10 Pengecatan dinding eksterior 305 m²
Sub Total
D Pekerjaan Plafond
1 Plafond ekspose beton 252 m²
2 Pengecatan plafond 377 m²
Sub Total
E Pekerjaan Sanitary
1 Kran air 2 Bh.
2 Floor drain 1 Bh.
3 Closed Jongkok 1 Bh.
Sub Total
F Pekerjaan Railing
1 Railling tangga hollow 2/2 & 5/5 finnish cat duco 14 m¹
2 Hand rail hollow 5/5 finnish cat duco 21 m¹
Sub Total
II LANTAI 1
A Pekerjaan lantai
1 Pekerjaan granito tile 60 x 60 235 m²
2 Pekerjaan plin granito tile 10 x 60 116 m¹
3 Pekerjaan keramik tile anti slip 20 x 20 25 m²
4 Pekerjaan keramik tile 40 x 40 19 m²
5 Pekerjaan step nosing tangga keramik tile 10 x 40 18 m¹
6 Waterproofing coating area toilet 35 m²
7 Waterproofing bitutine sheet dak beton 127 m²
8 Screeding dak beton 127 m²
9 Pekerjaan dinding keramik 20 x 25 Tilet & Janitor 60 m2
Sub Total
B Pekerjaan dinding
1 Pekerjaan Pasangan bata 1:5, 1/2 batu 73 m²
2 Pekerjaan Pasangan bata Ringan/Hebel, T. 10 cm (Dinding Luar) 398 m²
3 Pekerjaan Pasangan bata Ringan/Hebel, T. 7,5 cm (Dinding Dalam) 47 m²
4 Pekerjaan Plesteran Prime Mortar & acian (dinding) 942 m²
5 Pekerjaan Plesteran Prime Mortar & acian (beton) 79 m²
6 Pekerjaan dinding keramik 20 x 25 60 m²
7 Kolom praktis 143 m¹
8 Ring balok praktis 30 m¹
9 Pengecatan dinding interior 647 m²
10 Pengecatan dinding eksterior +Beton kolom 307 m²
11 Pekerjaan Glass block 28 m2
12 Pekerjaan batu andesit abu-abu 26 m2
Sub Total
D Pekerjaan Plafond
1 Plafond Gypsum t = 9 mm + rangka Metal Furing 279 m²
2 Plafond GRC t = 4 mm + rangka Metal Furing (Toilet) 23 m²
3 List Plafond 5 cm 142 m¹
4 Plafond ekspose beton 127 m²
5 Pengecatan Plafond 303 m²
Sub Total
E Pekerjaan Sanitary
1 Kloset duduk 5 Bh.
2 Jetwasher 5 Bh.
3 Wastafel 3 Bh.
4 Urinoir 3 Bh.
5 Sekat urinoir 2 Bh.
6 Kitchen zink 1 Bh.
7 Kran dinding 1 Bh.
8 Floor drain 4 Bh.
9 Meja beton + keramik 5 m²
10 Cermin 5 mm 4 m²
Sub Total
F Pekerjaan Railing
1 Railling tangga hollow 2/2 & 5/5 finnish cat duco 20 m¹
2 Hand rail hollow 5/5 finnish cat duco 28 m¹
Sub Total
LANTAI 1
III LANTAI 2
A Pekerjaan lantai
1 Pekerjaan granito tile 60 x 60 10 m²
2 Pekerjaan plin granito tile 10 x 60 13 m¹
3 Pekerjaan keramik tile 30 x 30 5 m²
4 Pekerjaan plin keramik tile 10 x 30 9 m¹
5 Pekerjaan keramik tile anti slip 20 x 20 28 m²
6 Pekerjaan keramik tile 40 x 40 21 m²
7 Pekerjaan step nosing tangga keramik tile 10 x 40 26 m¹
8 Waterproofing coating area toilet 40 m²
9 Screeding lantai 283 m²
10 Acian lantai 283 m²
11 Lantai vynil Tarket Sports T. 3.5 mm 233 m²
12 Waterproofing bitutine sheet dak beton 92 m²
13 Screeding dak beton 92 m²
14 Keramik Dinding KM / WC 20/25 72 m2
Sub Total
B Pekerjaan dinding
1 Pekerjaan Pasangan bata 1:5, 1/2 batu 73 m²
2 Pekerjaan Pasangan bata Ringan/Hebel, T. 10 cm (Dinding Luar) 284 m²
3 Pekerjaan Pasangan bata Ringan/Hebel, T. 7,5 cm (Dinding Dalam) 68 m²
4 Pekerjaan Plesteran Prime Mortar & acian (dinding) 713 m²
5 Pekerjaan Plesteran Prime Mortar & acian (beton) 84 m²
6 Pekerjaan dinding keramik 20 x 25 81 m²
7 Kolom praktis 143 m¹
7 Ring balok praktis 7 m¹
8 Pengecatan dinding interior 440 m²
9 Pengecatan dinding eksterior 250 m²
10 Pengecatan dinding partisi 225 m²
11 Pekerjaan Glass block 21 m2
Sub Total
D Pekerjaan Plafond
1 Plafond Gypsum t = 9 mm + rangka Metal Furing 247 m²
2 Plafond GRC t = 4 mm + rangka Metal Furing (Toilet) 23 m²
3 List Plafond 5 cm 150 m¹
4 Plafond ekspose beton 19 m²
5 Pengecatan Plafond 282 m²
6 Skylight kaca 6 + 6 mm 4 m²
Sub Total
E Pekerjaan Sanitary
1 Kloset duduk 6 Bh.
2 Jetwasher 6 Bh.
3 Wastafel 4 Bh.
4 Urinoir 2 Bh.
5 Sekat urinoir 1 Bh.
6 Kitchen zink 1 Bh.
7 Kran dinding 2 Bh.
8 Floor drain 4 Bh.
9 Meja beton + keramik 5 m²
10 Cermin 5 mm 4 m²
Sub Total
F Pekerjaan Railing
1 Railling tangga hollow 2/2 & 5/5 finnish cat duco 12 m¹
2 Hand rail hollow 5/5 finnish cat duco 24 m¹
3 Rambatan bunga besi beton Ø10 mm, Ø19 mm & plat besi 12 mm 20 m¹
Sub Total
LANTAI 2
IV LANTAI 3
A Pekerjaan lantai
1 Pekerjaan granito tile 60 x 60 9 m²
2 Pekerjaan plin granito tile 10 x 60 12 m¹
3 Pekerjaan keramik tile 30 x 30 7 m²
4 Pekerjaan plin keramik tile 10 x 30 9 m¹
5 Pekerjaan keramik tile anti slip 20 x 20 25 m²
6 Pekerjaan keramik tile 40 x 40 20 m²
7 Pekerjaan step nosing tangga keramik tile 10 x 40 24 m¹
8 Waterproofing coating area toilet 30 m²
9 Screeding lantai 251 m²
10 Acian lantai 251 m²
11 Lantai vynil Tarket Sports T. 3.5 mm 251 m²
12 Waterproofing bitutine sheet dak beton 19 m²
13 Screeding dak beton 19 m²
Sub Total
B Pekerjaan dinding
1 Pekerjaan Pasangan bata 1:5, 1/2 batu 73 m²
2 Pekerjaan Pasangan bata Ringan/Hebel, T. 10 cm (Dinding Luar) 293 m²
3 Pekerjaan Pasangan bata Ringan/Hebel, T. 7,5 cm (Dinding Dalam) 77 m²
4 Pekerjaan Plesteran Prime Mortar & acian (dinding) 731 m²
5 Pekerjaan Plesteran Prime Mortar & acian (beton) 84 m²
6 Pekerjaan dinding keramik 20 x 25 64 m²
7 Kolom praktis 143 m¹
7 Ring balok praktis 32 m¹
8 Pengecatan dinding interior 440 m²
9 Pengecatan dinding eksterior 250 m²
10 Pengecatan dinding partisi 280 m²
11 Pekerjaan Glass block 21 m2
Sub Total
D Pekerjaan Plafond
1 Plafond Gypsum t = 9 mm + rangka Metal Furing 244 m²
2 Plafond GRC t = 4 mm + rangka Metal Furing (Toilet) 32 m²
3 List Plafond 5 cm 150 m¹
4 Plafond ekspose beton 18 m²
5 Pengecatan Plafond 294 m²
Sub Total
E Pekerjaan Sanitary
1 Kloset duduk 6 Bh.
2 Jetwasher 6 Bh.
3 Wastafel 3 Bh.
4 Urinoir 2 Bh.
5 Sekat urinoir 1 Bh.
6 Kitchen zink 1 Bh.
7 Kran dinding 2 Bh.
8 Floor drain 3 Bh.
9 Meja beton + keramik 1 m²
10 Cermin 5 mm 4 m²
Sub Total
F Pekerjaan Railing
1 Railling tangga hollow 2/2 & 5/5 finnish cat duco 12 m¹
2 Hand rail hollow 5/5 finnish cat duco 25 m¹
3 Rambatan bunga besi beton Ø10 mm, Ø19 mm & plat besi 12 mm 20 m¹
Sub Total
LANTAI 3
V LANTAI 4
A Pekerjaan lantai
1 Pekerjaan granito tile 60 x 60 12 m²
2 Pekerjaan plin granito tile 10 x 60 14 m¹
3 Pekerjaan keramik tile anti slip 20 x 20 31 m²
4 Pekerjaan keramik tile 40 x 40 20 m²
5 Pekerjaan step nosing tangga keramik tile 10 x 40 24 m¹
6 Waterproofing coating area toilet 37 m²
7 Screeding lantai 262 m²
8 Acian lantai 262 m²
9 Lantai vynil Tarket Sports T. 3.5 mm 262 m²
10 Waterproofing bitutine sheet dak beton 36 m²
11 Screeding dak beton 36 m²
Sub Total
B Pekerjaan dinding
1 Pekerjaan Pasangan bata 1:5, 1/2 batu 73 m²
2 Pekerjaan Pasangan bata Ringan/Hebel, T. 10 cm (Dinding Luar) 270 m²
3 Pekerjaan Pasangan bata Ringan/Hebel, T. 7,5 cm (Dinding Dalam) 32 m²
4 Pekerjaan Plesteran Prime Mortar & acian (dinding) 686 m²
5 Pekerjaan Plesteran Prime Mortar & acian (beton) 84 m²
6 Pekerjaan dinding keramik 20 x 25 73 m²
7 Kolom praktis 114 m¹
7 Ring balok praktis 25 m¹
8 Pengecatan dinding interior 630 m²
9 Pengecatan dinding eksterior 271 m²
10 Pengecatan dinding partisi 68 m²
11 Pekerjaan Glass block 21 m2
Sub Total
D Pekerjaan Plafond
1 Plafond Gypsum t = 9 mm + rangka Metal Furing 256 m²
2 Plafond GRC t = 4 mm + rangka Metal Furing (Toilet) 30 m²
3 List Plafond 5 cm 150 m¹
4 Plafond ekspose beton 15 m²
5 Pengecatan Plafond 302 m²
Sub Total
E Pekerjaan Sanitary
1 Kloset duduk 6 Bh.
2 Jetwasher 6 Bh.
3 Wastafel 3 Bh.
4 Urinoir 3 Bh.
5 Sekat urinoir 2 Bh.
6 Kitchen zink 1 Bh.
7 Kran dinding 5 Bh.
8 Floor drain 4 Bh.
9 Meja beton + keramik 5 m²
10 Cermin 5 mm 4 m²
Sub Total
F Pekerjaan Railing
1 Railling tangga hollow 2/2 & 5/5 finnish cat duco 13 m¹
2 Hand rail hollow 5/5 finnish cat duco 25 m¹
3 Rambatan bunga besi beton Ø10 mm, Ø19 mm & plat besi 12 mm 20 m¹
Sub Total
LANTAI 4
B Pekerjaan dinding
1 Pekerjaan Pasangan bata Ringan, T. 10 cm (Dinding Luar) 76 m²
2 Pekerjaan Plesteran Prime Mortar & acian (dinding) 152 m²
3 Kolom praktis 15 m¹
4 Ring balok praktis 82 m¹
5 Pengecatan dinding interior 100 m²
6 Pengecatan dinding eksterior 100 m²
F Pekerjaan Railing
1 Railling tangga hollow 2/2 & 5/5 finnish cat duco 2 m¹
LANTAI ATAP
LANTAI LUAR
BANGUNAN
1 Galian tanah 15 m3
2 Urugan kembali 7 m3
3 Pasir urug 2 m3
4 Lantai kerja 0 m3
5 Pondasi batu kosong 2 m3
6 Pondasi batu belah 4 m3
7 Beton tumbuk 1 : 3 : 5 1 m3
8 Sloof beton 0 m3
9 Pasangan dinding 7 m2
10 Plesteran dan acian 18 m2
11 Kolom beton 15 x 30 0 m3
12 Balok beton 0 m3
13 Plat dak beton 1 m3
14 Lantai keramik 9 m2
15 Kusen kaca depan ( kaca tempered) 1 bh
16 Kusen pintu (kaca tempered) 1 bh
17 Kusen jendela samping ( kaca tempered) 1 bh
18 meja kayu 2 bh
19 Cat dinding interior 13 m2
20 Cat dinding exterior 6 m2
POS JAGA
PAGAR BANGUNAN
PEKERJAAN LANSEKAP
REKAPITULASI RENCANA ANGGARAN BIAYA
PEKERJAAN PEMBANGUNAN GEDUNG PUSBINDIKLATREN
KEMENTERIAN PERENCANAAN PEMBANGUNAN NASIONAL/BAPPENAS
JL. PROKLAMASI NO. 70
JAKARTA PUSAT
NILAI TOTAL
NO. URAIAN PEKERJAAN SUBJUMLAH JUMLAH
(Rp) (Rp)
I. PEKERJAAN PERSIAPAN
II PEKERJAAN STRUKTUR
I LANTAI GROUND
II LANTAI 1
III LANTAI 2
IV LANTAI 3
V LANTAI 4
VI LANTAI ATAP
VII PEKERJAAN LANSEKAP