NO.

URAIAN PEKERJAAN SPESIFIKASI TEKNIS

I PEKERJAAN PERSIAPAN
1 Pembersihan lokasi Di dalam kavling
2 Bowplank & pengukuran

II PEKERJAAN TANAH
1 Galian tanah pondasi Uk. X X cm Batu kali (1:5)
2 Urugan pasir pondasi t= 5 cm Pasir pasang tebal = 5 cm
4 Pemerataan tanah
5 Pemadatan tanah
6 Urugan pasir lantai t = 5 cm Pasir pasang tebal = 5 cm

III PEKERJAAN PONDASI


1 Pasangan pondasi batu kali Uk. X X cm Batu kali (1:5)
2 Beton sloof 15/20 4O8 (1:2:3) Uk.15x20 cm Beton (1:2:3) Besi 4O8 ; O6-15 cm
3 Pasangan pondasi rollag bata
4 Pasangan tanggulan bata

IV PEKERJAAN PASANGAN DAN BETON


1 Pasangan dinding bata merah Pasangan (1:5)
2 Plesteran dinding aci Pasangan (1:5)
3 Pasangan dinding atas ringbalk Pasangan (1:5)
4 Plesteran dinding aci atas ringbalk Pasangan (1:5)
5 Kolom beton praktis Uk.13x13 cm Beton (1:2:3) Besi 4O8 ; O6-15 cm
6 Beton ring balk Uk.13x13 cm Beton (1:2:3) Besi 4O8 ; O6-15 cm

V PEKERJAAN TAMPAK DEPAN


1 Dak beton teras Tebal = 12 cm
2 Dak beton atas jendela kamar t=12 cm Tebal = 12 cm
3 Plester aci dak beton ex. Aquaproof
4 Pengecatan Dak teras
5 Waterproof dak teras ex. Aquaproof
6 Waterproof dak talang atap ex. Aquaproof
7 Pengecatan Dak atas jendela
8 Waterproof dak atas jendela
9 Kolom beton praktis sopi & t.depan ex. Batu garut
10 Beton ring balk 13/13 sopi & benteng Uk.13x13 cm Beton (1:2:3) Besi 4O8 ; O6-15 cm
NO. URAIAN PEKERJAAN SPESIFIKASI TEKNIS

VI PEKERJAAN LANTAI DAN KM/WC


1 Floor bawah lantai Tebal = 5 cm
2 Keramik lantai ruang dalam Uk. 30x30 cm ex.
3 Keramik teras depan Uk. 30x30 cm ex.
4 Keramik teras belakang Uk. 30x30 cm ex.
5 Keramik lantai KM/WC Uk. 20x20 cm ex.
6 Rabat beton carport Tebal = 10 cm
7 Rabat beton ruang cuci Tebal = 8 cm
8 List dinding KM/WC Uk. 8x20 cm ex.
9 Keramik dinding KM/WC 20/25 Uk. 20x25 cm ex.
10 Plint keramik lantai 10/30 KIA Impresso Uk. 10x30 cm putih ex.

VII PEKERJAAN KUSEN, PINTU,JENDELA &KUNCI


1 Kusen pintu & jendela dalam Kayu Bayur (6/15) atau Setara
2 Kusen pintu & jendela depan alumunium
3 Daun jendela Uk. Sesuai gambar
4 Daun pintu dalam Uk. Sesuai gambar, double tripleks + list
5 Daun pintu panel Uk. Sesuai gambar, panel kayu bayur
6 Kaca bening Tebal = 5 mm
7 Kunci pintu utama Sorento kode SRT P-DOBBIN NP
8 Kunci pintu dalam Belmondo kode BM-PL-T31-61
9 Engsel pintu dan jendela
10 Daun pintu PVC PVC DOOR warna putih ex.
11 Rambuncis
12 Hak angin

VIII PEKERJAAN PLAFOND


1 Rangka plafond Hollow 4x4 & 4x2
2 List plafond gypsum
NO. URAIAN PEKERJAAN

IX PEKERJAAN RANGKA ATAP & PENUTUP


1 Ring balk dan kolom sopi-sopi Uk.15x20 cm Beton (1:2:3) Besi 4O8 ; O6-15 cm
2 Rangka atap baja ringan galvanize ex. Karang pilang atau setara
3 Penutup atap genteng beton Exel Genteng beton flat ex. (Monier)
4 Penutup nok genteng beton Exel Nok genteng beton ex. (Monier)
5 Pembuatan talang beton
6 Pembuatan talang jurai
7 Riaman
8 Listplank

X PEKERJAAN SANITAIR & INSTALASI AIR


1 Bak mandi fiberglass Uk. 55x55 fiberglass
2 Kloset jongkok ex. INA Type C2
3 Floor drain
4 Septictank & rembesan
5 Inst. Air bersih PVC O 3/4" AW Wavin
6 Inst. Air kotor PVC O 4" D Wavin dr floordrain
7 Inst. Air kotor PVC O 4" D Wavin dr kloset
8 Inst. Air hujan PVC O 3" D Wavin
7 Kran dinding kamar mandi (ex. Onda), carpot, rabat cuci (ex.Versus)
8 Bak kontrol
9 Sumur pantek & pompa listrik Shimizu, PS-128 BIT

XI PEKERJAAN PENGECATAN
layer C1, ( Jotun navajowhite 1075 )
1 Cat tembok exterior
layer C2, ( Jotun claywood 10051 )
2 Cat tembok interior Paperlace 44555
3 Cat plafond & list plafond ex.Catylac ( Putih)
4 Cat kayu ex.Avian High gloss (Putih)

XII PEKERJAAN INSTALASI LISTRIK


1 Instalasi Titik lampu Kabel NYM Eterna 2x1,5 mm2
2 Stop kontak Kabel NYM Eterna 3x2,5 mm2
3 Box MCB 2 group
4 Arde pertanahan
5 Lampu taman

XIII PEKERJAAN LAIN-LAIN


1 Bak sampah
2 Tritisan koral
3 Pagar depan
4 Jembatan masuk 3mx1m Tebal = 10 cm Beton (1:2:3) Besi O 10 - 20 cm
NO. URAIAN PEKERJAAN

I PEKERJAAN PERSIAPAN
1 Pembersihan lokasi
2 Bowplank & pengukuran
3 Air kerja

II PEKERJAAN TANAH
1 Galian tanah pondasi
2 Urugan pasir pondasi t= 5 cm
3 Urug tanah kembali
4 Pemerataan tanah
5 Pemadatan tanah
6 Urugan pasir lantai t = 5 cm

III PEKERJAAN PONDASI


1 Pasangan pondasi batu kali
2 Beton sloof 15/20 4O8 (1:2:3)
3 Pasangan pondasi rollag bata
4 Pasangan tanggulan bata

IV PEKERJAAN PASANGAN DAN BETON


1 Pasangan dinding bata merah 1 : 5
2 Plesteran dinding aci 1 : 5
3 Pasangan dinding bata merah 1 : 5 atas ringbalk
4 Plesteran dinding aci 1 : 5 atas ringbalk
5 Kolom beton praktis rumah 13/13 ( 1:2:3 ) 4 O 8
6 Beton ring balk 13/13 rumah ( 1:2:3 ) 4 O 8

V PEKERJAAN TAMPAK DEPAN


1 Dak beton teras t=12 cm
2 Dak beton atas jendela kamar t=12 cm
3 Plester aci dak beton
4 Pengecatan Dak teras
5 Waterproof dak teras
6 Waterproof dak talang atap
7 Pengecatan Dak atas jendela
8 Waterproof dak atas jendela
9 Kolom beton praktis sopi & t.depan 13/13 ( 1:2:3 ) 4 O 8
10 Beton ring balk 13/13 sopi & benteng ( 1:2:3 ) 4 O 8
11 Pas. Keramik Fasad

VI PEKERJAAN LANTAI DAN KM/WC


1 Floor bawah lantai t = 5 cm
2 Keramik 30x30 putih KIA Impresso (KWP)
3 Keramik teras depan 30X30
4 Keramik teras belakang 30X30
5 Keramik lantai KM/WC 20x20
6 Rabat beton carport t = 10 cm
7 Rabat beton ruang cuci t = 8 cm
8 List dinding KM/WC
9 Keramik dinding KM/WC 20/25
10 Plint keramik lantai 10/30 KIA Impresso

VII PEKERJAAN KUSEN, PINTU,JENDELA &KUNCI


1 Kusen pintu & jendela setara kamper singkil 6/15
2 Kusen pintu & jendela aluminium
3 Rooster acian 20/20
4 Daun jendela aluminium
5 Daun jendela setara kamper singkil 6/15
6 Daun pintu double triplek + list
7 Daun pintu panel
8 Kaca bening 5 mm

NO. URAIAN PEKERJAAN

7 Kunci pintu utama


8 Kunci pintu dalam Royal 785
9 Kunci pintu KM/WC Alpha
10 Engsel pintu dan jendela
11 Daun pintu PVC
12 Rambuncis
13 Hak angin

VIII PEKERJAAN PLAFOND


1 Rangka hollow+gypsum
2 List plafond gypsum
3 Pas.Rangka kayu & tripleks
4 Listplafon kayu

IX PEKERJAAN RANGKA ATAP & PENUTUP


1 Ring balk dan kolom sopi-sopi 15/20 ,4O8
2 Rangka atap bj ringan galvanize
3 Penutup atap genteng beton Exel
4 Penutup nok genteng beton Exel
5 Pembuatan talang beton
6 Pembuatan talang jurai
7 Riaman
8 Listplank 2/20 & 2/10

X PEKERJAAN SANITAIR & INSTALASI AIR


1 Bak mandi fiberglass
2 Kloset jongkok INA Type C2
3 Floor drain
4 Septictank & rembesan
5 Inst. Air bersih PVC O 3/4" AW Wavin
6 Inst. Air kotor PVC O 4" D Wavin dr floordrain
7 Inst. Air kotor PVC O 4" D Wavin dr kloset
8 Inst. Air hujan PVC O 3" D Wavin
7 Kran dinding Asahi
8 Bak kontrol
9 Sumur pantek & pompa listrik

XI PEKERJAAN PENGECATAN
1 Cat tembok exterior Mowilex
2 Cat tembok interior Catylac
3 Cat plafond & list plafond Catylac
4 Cat kayu

XII PEKERJAAN INSTALASI LISTRIK


1 Titik lampu,saklar broco,kabel NYM
2 Stop kontak broco,kabel NYM
3 Box MCB 2 group
4 Arde pertanahan
5 Lampu taman

XIII PEKERJAAN LAIN-LAIN


1 Bak sampah
2 Tritisan koral
3 Pagar depan
4 Jembatan masuk 3mx1m
SPESIFIKASI TEKNIS

Di dalam kavling

Uk. X X cm Batu kali (1:5)


Pasir pasang tebal = 5 cm

Pasir pasang tebal = 5 cm

Uk. X X cm Batu kali (1:5)


Uk.15x20 cm Beton (1:2:3) Besi 4O8 ; O6-15 cm

Pasangan (1:5)
Pasangan (1:5)
Pasangan (1:5)
Pasangan (1:5)
Uk.13x13 cm Beton (1:2:3) Besi 4O8 ; O6-15 cm
Uk.13x13 cm Beton (1:2:3) Besi 4O8 ; O6-15 cm

Tebal = 12 cm
Tebal = 12 cm
ex. Aquaproof

ex. Aquaproof
ex. Aquaproof

ex. Batu garut


Uk.13x13 cm Beton (1:2:3) Besi 4O8 ; O6-15 cm
SPESIFIKASI TEKNIS

Tebal = 5 cm
Uk. 30x30 cm ex.
Uk. 30x30 cm ex.
Uk. 30x30 cm ex.
Uk. 20x20 cm ex.
Tebal = 10 cm
Tebal = 8 cm
Uk. 8x20 cm ex.
Uk. 20x25 cm ex.
Uk. 10x30 cm putih ex.

Kayu Bayur (6/15) atau Setara


alumunium
Uk. Sesuai gambar
Uk. Sesuai gambar, double tripleks + list
Uk. Sesuai gambar, panel kayu bayur
Tebal = 5 mm
Sorento kode SRT P-DOBBIN NP
Belmondo kode BM-PL-T31-61

PVC DOOR warna putih ex.

Hollow 4x4 & 4x2


gypsum
Uk.15x20 cm Beton (1:2:3) Besi 4O8 ; O6-15 cm
baja ringan galvanize ex. Karang pilang atau setara
Genteng beton flat ex. (Monier)
Nok genteng beton ex. (Monier)

Uk. 55x55 fiberglass


ex. INA Type C2

PVC O 3/4" AW Wavin


PVC O 4" D Wavin dr floordrain
PVC O 4" D Wavin dr kloset
PVC O 3" D Wavin
kamar mandi (ex. Onda), carpot, rabat cuci (ex.Versus)

Shimizu, PS-128 BIT

layer C1, ( Jotun navajowhite 1075 )


layer C2, ( Jotun claywood 10051 )
Paperlace 44555
ex.Catylac ( Putih)
ex.Avian High gloss (Putih)

Kabel NYM Eterna 2x1,5 mm2


Kabel NYM Eterna 3x2,5 mm2
Tebal = 10 cm Beton (1:2:3) Besi O 10 - 20 cm
NO. URAIAN PEKERJAAN
I PEKERJAAN PERSIAPAN
1 Pembersihan lokasi
2 Bowplank dan pengukuran
3 Air kerja
SUB TOTAL
II PEKERJAAN TANAH
1 Galian tanah pondasi
2 Urugan pasir pondasi
3 Urugan tanah kembali
4 Pemerataan tanah
5 Pemadatan tanah
6 Urugan pasir lantai
SUB TOTAL
III PEKERJAAN PONDASI
1 Foot Plat
2 Pasangan pondasi batu kali
3 Beton sloof Pagar
4 Beton sloof struktur
5 Pas. pondasi rollag bata
6 Pas. tanggulan bata
7 Rabat jalan dr teras ke carport
SUB TOTAL
IV PEKERJAAN PASANGAN & BETON Lt.1
1 Pasangan dinding bata merah
2 Plesteran dinding aci
3 Kolom beton praktis
4 Kolom beton kontruksi
5 Kolom beton kontruksi
6 Balok beton (1)
7 Balok beton (2)
8 Balok beton (3)
9 Balok beton (4)
10 Balok beton (5)
11 Balok beton (A)
12 Balok beton (B)
13 Balok beton (C)
14 Balok beton (D)
15 Balok beton
16 Balok beton
17 Beton ringbalk pagar
18 Pelat beton
19 Pelat tangga
SUB TOTAL
V PEKERJAAN PASANGAN & BETON Lt.2
1 Pasangan dinding bata merah
2 Plesteran dinding aci
3 Pas.dinding sopi lt.1
4 Plester aci sopi lt.1
5 Pas.dinding sopi lt.2 (kiri)
6 Plester aci sopi lt.2 (kiri)
7 Pas.dinding sopi lt.2 (kanan)
8 Kolom beton kontruksi
9 Kolom beton praktis
10 Beton ring balk sopi
11 Beton ring balk sopi lt.2 kiri & kanan
12 Beton ring balk 13/13
13 Balok beton bordes 15/20
SUB TOTAL

NO. URAIAN PEKERJAAN


VI PEKERJAAN TAMPAK DEPAN
1 Dek level atas kusen pintu lt.1
2 Plester + aci dak level atas kusen pintu lt.1
3 Kolom atas dak level 4O10, 13/13
4 Balok dak level, 15/15, 4 O 10
5 Pas.bata samping jend.lt.2
6 Plester aci dinding samping jend.lt.2
7 Dak level atas & bawah jend.lt.2
8 Plester aci dak level atas & bawah jend.lt.2
9 Pas.batu/keramik fasad
10 Pas.batu/tali air/Plester aci+cat
11 Variasi tali air
12 Dak level atas jend.lt.1 & 2
13 Plester aci dak level atas jend.lt.1 & 2
14 Plester aci tampak depan

VII PEKERJAAN TAMPAK BELAKANG


1 Dek level atas kusen pintu lt.1
2 Plester + aci dak level atas kusen pintu lt.1
3 Dak level atas kusen jend.lt.1
4 Plester aci dak level atas & bawah jend.lt.2
5 Variasi tali air
VIII PEKERJAAN LANTAI DAN KM/WC Lt.1
1 Floor bawah lantai t. 5 cm
2 Keramik 30x30 putih KIA Impresso (KWP)
3 Keramik teras depan 50/50
4 Keramik lantai km/wc 20x20
5 Rabat beton cartport
6 Keramik teras belakang 50/50
7 Rabat beton ruang cuci
8 Keramik dinding km/wc 20/25
9 Plint keramik lantai 10/30 KIA Impresso
10 List keramik dinding KM/WC
SUB TOTAL
IX PEKERJAAN LANTAI DAN KM/WC Lt.2
1 Keramik 30x30 putih KIA Impresso (KWP)
2 Keramik lantai km/wc 20x20
3 Keramik dinding km/wc 20/25
4 Plint keramik lantai 10/30 KIA Impresso
5 List keramik dinding KM/WC
6 Keramik anak tangga 30x30, KIA Impresso
SUB TOTAL
X PEKERJAAN KUSEN, PINTU, JDL & KUNCI
1 Kusen pintu & jendela 6/15 Bayur
2 Kusen pintu & jendela Aluminium
3 Daun jendela bayur
4 Daun jendela Aluminium
5 Daun pintu double tripleks + list.
6 Daun pintu panel
7 Daun pintu+kusen PVC
8 Kaca polos 5 mm
9 Kaca es u/ KM
10 Kunci pintu utama
11 Kunci pintu dalam
12 Engsel pintu dan jendela
13 Hak angin
14 Grendel
SUB TOTAL

NO. URAIAN PEKERJAAN


XI PEKERJAAN PLAFOND Lt.1
1 Rangka hollow+gypsum
2 List plafond
3 Rangka hollow+GRC board
SUB TOTAL
XII PEKERJAAN PLAFOND Lt.2
1 Rangka hollow+gypsum
2 List plafond
3 Rangka hollow+GRC board

SUB TOTAL
XIII PEK.RANGKA ATAP + PENUTUP ATAP
1 Rangka atap bj ringan galvanize
2 Penutup atap genteng beton Exel Monier
3 Penutup nok genteng beton Exel Monier
4 Talang BJLS
5 Talang tegak air hujan PVC dia. 2.5"
6 Listplank 2/20 & 2/10
7 Pas. Bata + plester tanggulan talang BJLS
8 Plester aci tanggulan talang BJLS
SUB TOTAL
XIV PEKERJAAN SANITAIR & INSTALASI AIR
1 Bak mandi fiber glass
2 Kloset jongkok ex INA type C2
3 Kran dinding ex ASAHI
4 Floor drain
5 Septiktank + rembesan
6 Instalasi air bersih PVC dia. 1/2"
7 Instalasi air kotor PVC dia. 4" septiktank
8 Instalasi air hujan
9 Instalasi air floordrain
10 Bak kontrol
11 Sumur pantek
12 Mono blok ex Amstard
SUB TOTAL
XV PEKERJAAN LAIN-LAIN
1 Decker rumah
2 Pagar Depan
3 Railing tangga
4 Tempat sampah
5 Tritisan Koral
SUB TOTAL
XVI PEKERJAAN PENGECATAN
1 Cat dinding interior standart catylac
2 Cat dinding exterior mowilex
3 Cat plafond + list plafond
4 Cat Kayu (kusen+d.pintu+d.jend.)
5 Cat listplank
6 Waterproofing talang + dak
SUB TOTAL
XVII PEKERJAAN INSTALASI LISTRIK
1 Panel box MCB 4 group
2 MCB
3 Instalasi penerangan
4 Instalasi lampu taman + tiang
5 Instalasi stop kontak
6 Instalasi arde
SUB TOTAL
SPESIFIKASI TEKNIS

Di dalam kavling

Pasir pasang tebal = 5 cm

Pasir pasang tebal = 5 cm

Uk. X ( 1 unit)
Uk. X X cm Batu kali (1:5)
Uk.15x20 cm Beton (1:2:3) Besi 4O8 ; O6-15 cm
Uk.15x25 cm Beton (1:2:3) Besi 5O12 ; O8-15 cm

Tebal = 10 cm

Pasangan (1:5)
Pasangan (1:5)
Uk.13x13 cm Beton (1:2:3) Besi 4O10 ; O6-15 cm
Uk.15x40 cm Beton (1:2:3) Besi 8O12 ; O8-15 cm
Uk.15x30 cm Beton (1:2:3) Besi 6O12 ; O8-15 cm
Uk.15x25 cm Beton (1:2:3) Besi 5O12 ; O8-15 cm
Uk.15x30 cm Beton (1:2:3) Besi 7O12 ; O8-15 cm
Uk.15x35 cm Beton (1:2:3) Besi 8O12 ; O8-15 cm
Uk.15x20 cm Beton (1:2:3) Besi 4O12 ; O8-15 cm
Uk.15x30 cm Beton (1:2:3) Besi 7O12 ; O8-15 cm
Uk.15x30 cm Beton (1:2:3) Besi 6O12 ; O8-15 cm
Uk.15x20 cm Beton (1:2:3) Besi 4O12 ; O8-15 cm
Uk.15x30 cm Beton (1:2:3) Besi 6O12 ; O8-15 cm
Uk.15x20 cm Beton (1:2:3) Besi 4O12 ; O8-15 cm
Uk.15x30 cm Beton (1:2:3) Besi 6O12 ; O8-15 cm
Uk.15x15 cm Beton (1:2:3) Besi 4O8 ; O6-15 cm
Uk.15x15 cm Beton (1:2:3) Besi 4O8 ; O6-15 cm
Tebal = 12 cm Beton (1:2:3) Besi O8-15 cm (rangkap)
Tebal = 10 cm Beton (1:2:3) Besi O12-15 cm

Pasangan (1:5)
Pasangan (1:5)
Uk.13x13 cm Beton (1:2:3) Besi 4O10 ; O6-15 cm
Uk.13x13 cm Beton (1:2:3) Besi 4O8 ; O6-15 cm
Uk.15x20 cm Beton (1:2:3) Besi 4O12 ; O8-15 cm
Uk.15x15 cm Beton (1:2:3) Besi 4O8 ; O6-15 cm
Pasangan (1:5)
Uk.13x13 cm Beton (1:2:3) Besi 4O8 ; O6-15 cm
Uk.13x13 cm Beton (1:2:3) Besi 4O8 ; O6-15 cm
Pasangan (1:5)
Uk.15x20 cm Beton (1:2:3) Besi 4O12 ; O8-15 cm
Uk.13x13 cm Beton (1:2:3) Besi 4O8 ; O6-15 cm
Uk.15x20 cm Beton (1:2:3) Besi 4O12 ; O6-15 cm

SPESIFIKASI TEKNIS
Tebal = 5 cm
Uk. 30x30 cm ex.
Uk. 50x50 cm putih ex.
Uk. 20x20 cm putih ex.
Tebal = 10 cm
Uk. 50x50 cm putih ex.
Tebal = 8 cm
Uk. 20x25 cm ex.
Uk. 10x30 cm putih
Uk. 8x20 cm ex.

Uk. 30x30 cm putih ex.


Uk. 20x20 cm ex.
Uk. 20x25 cm ex.
Uk. 10x30 cm ex.
Uk. 8x20 cm ex.
Uk. 30x30 cm putih ex.

Kayu bayur (6/15)


Uk. Sesuai gambar
Aluminium silver
Uk. Sesuai gambar, Panel Singkil
Uk. Sesuai gambar, double tripleks + list
Uk. Sesuai gambar, Panel Singkil
ex. Veronica (Muriko) PVC DOOR putih
Tebal = 5 mm
Tebal = 5 mm
Sorento kode SRT P-DOBBIN NP
Belmondo kode BM-PL-T31-61

Hollow 4x4 & 4x2


gypsum
GRC board
Hollow 4x4 & 4x2
gypsum
GRC board

baja ringan galvanize ex. Karang pilang atau setara


Genteng beton flat ex. (Monier)
Nok genteng beton ex. (Monier)

Uk. 55x55 fiberglass

ex. INA Type C2


ex. AMSTARD type Projecta

PVC dia 0,5" WAVIN type AW


PVC dia 4" WAVIN type D
PVC dia 2,5" WAVIN type D

Panasonic, GP 129 JXV, 125 watt

ex. Mowilex
ex.Catylac ( Cotton Rose)
ex.Catylac ( Putih)
ex.Avian High gloss (Putih)

Kabel NYM Eterna 2x1,5 mm2


Kabel NYM Eterna 3x2,5 mm2
ex. Broco
ex. Broco
ex. Morita
Tebal = 10 cm Beton (1:2:3) Besi O 10 - 20 cm

Pasangan batako plester aci + cat


Tidak ada
NO. URAIAN PEKERJAAN SPESIFIKASI TEKNIS

I PEKERJAAN PERSIAPAN
1 Pembersihan lokasi Di dalam kavling
2 Bowplank dan pengukuran
3 Air kerja
SUB TOTAL
II PEKERJAAN TANAH
1 Galian tanah pondasi
2 Urugan pasir pondasi t = 5 cm Pasir pasang tebal = 5 cm
3 Urugan tanah kembali
4 Pemerataan tanah
5 Pemadatan tanah
6 Urugan pasir lantai t = 5 cm Pasir pasang tebal = 5 cm

SUB TOTAL
III PEKERJAAN PONDASI
1 Foot Plat uk 0.8x0.8, 1unit Uk. X ( 1 unit)
2 Pasangan pondasi batu kali Uk. X X cm Batu kali (1:5)
3 Beton sloof Pagar, 15/20,4O8 Uk.15x20 cm Beton (1:2:3) Besi 4O8 ; O6-15 cm
4 Beton sloof Rumah 15/25, 5O12 Uk.15x25 cm Beton (1:2:3) Besi 5O12 ; O8-15 cm
5 Pasangan pondasi rollag bata
6 Pasangan tanggulan bata
7 Rabat jalan dr teras ke carport Tebal = 10 cm

SUB TOTAL
IV PEKERJAAN PASANGAN & BETON Lt.1
1 Pasangan dinding bata merah 1:5 Pasangan (1:5)
2 Pasangan Dinding Batako Pasangan (1:5)
3 Plesteran dinding aci 1:5 Uk.13x13 cm Beton (1:2:3) Besi 4O10 ; O6-15 cm
4 Kolom beton praktis 13/13(1:2:3) 4O8 KP Uk.15x40 cm Beton (1:2:3) Besi 8O12 ; O8-15 cm
5 Kolom beton kontruksi 15/40 (1:2:3) 10O12 K1 Uk.15x30 cm Beton (1:2:3) Besi 6O12 ; O8-15 cm
6 Kolom beton kontruksi 15/30 (1:2:3) 6O12 K3 Uk.15x25 cm Beton (1:2:3) Besi 5O12 ; O8-15 cm
7 Balok beton 15/30 (1:2:3) 7O12 Uk.15x30 cm Beton (1:2:3) Besi 7O12 ; O8-15 cm
8 Balok beton 15/30 (1:2:3) 6O12 Uk.15x35 cm Beton (1:2:3) Besi 8O12 ; O8-15 cm
9 Balok beton 15/30 (1:2:3) 5O12 Uk.15x20 cm Beton (1:2:3) Besi 4O12 ; O8-15 cm
10 Beton Ringbalk rumah 15/15, 4O10 Uk.15x30 cm Beton (1:2:3) Besi 7O12 ; O8-15 cm
11 Beton Ringbalk pagar 13/13, 4O8 Uk.15x30 cm Beton (1:2:3) Besi 6O12 ; O8-15 cm

SUB TOTAL Uk.15x20 cm Beton (1:2:3) Besi 4O12 ; O8-15 cm


V PEKERJAAN PASANGAN & BETON Lt.2 Uk.15x30 cm Beton (1:2:3) Besi 6O12 ; O8-15 cm
1 Pasangan dinding bata merah 1:5 Uk.15x20 cm Beton (1:2:3) Besi 4O12 ; O8-15 cm
2 Plesteran dinding aci 1:5 Uk.15x30 cm Beton (1:2:3) Besi 6O12 ; O8-15 cm
3 Kolom beton praktis 13/13(1:2:3) 4O8 KP Uk.15x15 cm Beton (1:2:3) Besi 4O8 ; O6-15 cm
4 Kolom beton konstruksi 15/25 (1:2:3) 4O12 K4 Uk.15x15 cm Beton (1:2:3) Besi 4O8 ; O6-15 cm
5 Beton ring balk 15/15 (1:2:3) 4O10 Tebal = 12 cm Beton (1:2:3) Besi O8-15 cm (rangkap)
6 Pelat beton t = 12cm Tebal = 10 cm Beton (1:2:3) Besi O12-15 cm
7 Pelat tangga t = 10cm
8 Pas.bata sopi-sopi
9 Kolom sopi-sopi 13/13, 4O8 Pasangan (1:5)
10 Ringbalk sopi-sopi 13/13, 4O8 Pasangan (1:5)
11 Plester + aci dinding atas genteng Uk.13x13 cm Beton (1:2:3) Besi 4O10 ; O6-15 cm
12 Balok Bordes 15/20, 4O12 Uk.13x13 cm Beton (1:2:3) Besi 4O8 ; O6-15 cm

SUB TOTAL Uk.15x20 cm Beton (1:2:3) Besi 4O12 ; O8-15 cm

VI PEKERJAAN PAS. & BETON TAMPAK DEPAN Uk.15x15 cm Beton (1:2:3) Besi 4O8 ; O6-15 cm
1 Pas.batu alam & sirip samping Pasangan (1:5)
2 Plester+aci (tampak depan+sirip tengah) Uk.13x13 cm Beton (1:2:3) Besi 4O8 ; O6-15 cm
3 Ringbalk variasi lt.2, 13/13 , 4O8 Uk.13x13 cm Beton (1:2:3) Besi 4O8 ; O6-15 cm
4 Kolom variasi lt.2, 13/13 , 4O8 Pasangan (1:5)
5 Pas. Batu alam Uk.15x20 cm Beton (1:2:3) Besi 4O12 ; O8-15 cm
6 Balok dak level, 10/13, 4O10 (tampak dpn+blkg) Uk.13x13 cm Beton (1:2:3) Besi 4O8 ; O6-15 cm
7 Dak level tampak depan t = 15 cm Uk.15x20 cm Beton (1:2:3) Besi 4O12 ; O6-15 cm
8 Dak level tampak belakang t = 15 cm
9 Dak level tampak depan t = 15 cm SPESIFIKASI TEKNIS

10 Tali air
11 Ban-banan t=10cm
SUB TOTAL
VII PEKERJAAN LANTAI DAN KM/WC Lt.1
1 Floor bawah lantai t. 5 cm
2 Keramik 30x30 putih KIA Impresso (KWP)
3 Keramik teras depan dan belakang 50/50
4 Keramik lantai km/wc 20x20
5 Keramik dinding km/wc 20/25
6 List keramik dinding KM/WC
7 Rabat beton cartport
8 Rabat beton ruang cuci
9 Plint keramik lantai 10/30 KIA Impresso
SUB TOTAL
VIII PEKERJAAN LANTAI DAN KM/WC Lt.2
1 Keramik 30x30 putih KIA Impresso (KWP)
2 Keramik lantai km/wc 20x20
3 Keramik dinding km/wc 20/25
4 List keramik dinding KM/WC
5 Plint keramik lantai 10/30 KIA Impresso
6 Keramik anak tangga 30x30, KIA Impresso
SUB TOTAL
IX PEKERJAAN KUSEN, PINTU, JDL & KUNCI
1 Kusen kayu bayur 6/15
2 Kusen + jend. Aluminium
3 Daun jendela bayur
4 Daun pintu double tripleks + list bayur Tebal = 5 cm
5 Daun pintu panel kamper Uk. 30x30 cm ex.
6 Daun pintu PVC Uk. 50x50 cm putih ex.
7 Kaca polos 5 mm Uk. 20x20 cm putih ex.
13 Kaca es 5 mm Tebal = 10 cm
8 Kunci pintu panel Uk. 50x50 cm putih ex.
9 Kunci pintu dalam ROYAL 785 G Tebal = 8 cm
10 Engsel pintu dan jendela Uk. 20x25 cm ex.
11 Hak angin Uk. 10x30 cm putih
12 Grendel Uk. 8x20 cm ex.

SUB TOTAL
X PEKERJAAN PLAFOND Lt.1
1 Rangka hollow+gypsum Uk. 30x30 cm putih ex.
2 List plafond Uk. 20x20 cm ex.

SUB TOTAL Uk. 20x25 cm ex.


XI PEKERJAAN PLAFOND Lt.2 Uk. 10x30 cm ex.
1 Rangka hollow+gypsum Uk. 8x20 cm ex.
2 List plafond Uk. 30x30 cm putih ex.

SUB TOTAL
XII PEK.RANGKA ATAP + PENUTUP ATAP
1 Kuda-kuda & Gording kayu borneo 8/12 Kayu bayur (6/15)
2 Rangka atap bj ringan galvanize Uk. Sesuai gambar
3 Penutup atap genteng beton Exel Monier Aluminium silver
4 Penutup nok genteng beton Exel Monier Uk. Sesuai gambar, Panel Singkil
5 Talang beton t = 12 cm Uk. Sesuai gambar, double tripleks + list
6 Talang tegak air hujan PVC dia. 2.5" Uk. Sesuai gambar, Panel Singkil
7 Papan talang bornneo 2/20 ex. Veronica (Muriko) PVC DOOR putih
8 Listplang borneo 2/20 Tebal = 5 mm
9 Pas. Bata + plester tanggulan talang beton Tebal = 5 mm

SUB TOTAL Sorento kode SRT P-DOBBIN NP


XIII PEKERJAAN SANITAIR & INSTALASI AIR Belmondo kode BM-PL-T31-61
1 Bak mandi fiber glass
2 Kloset jongkok ex INA type C2
3 Kran dinding ex ASAHI
4 Floor drain
5 Septiktank + rembesan
6 Instalasi air bersih PVC dia. 1/2"
7 Instalasi air kotor PVC dia. 4"
8 Bak kontrol
9 Sumur pantek + pompa air Hollow 4x4 & 4x2
10 Mono blok ex Amstard gypsum
SUB TOTAL GRC board
XIV PEKERJAAN PAGAR
1 Pagar depan t.74
2 Decker rumah
3 Railing tangga Hollow 4x4 & 4x2
4 Tempat sampah gypsum
SUB TOTAL GRC board
XV PEKERJAAN PENGECATAN
1 Cat dinding interior standart catylac
2 Cat dinding exterior mowilex
3 Cat plafond + list plafond baja ringan galvanize ex. Karang pilang atau setara
4 Cat Kusen Genteng beton flat ex. (Monier)
5 Daun Pintu Nok genteng beton ex. (Monier)
6 Cat Daun Jendela
7 Cat listplank
8 Cat talang
SUB TOTAL
XVI PEKERJAAN INSTALASI LISTRIK
1 Panel box MCB 4 group
2 Instalasi penerangan Uk. 55x55 fiberglass
3 Instalasi lampu taman + tiang
4 Instalasi stop kontak ex. INA Type C2
5 Instalasi arde ex. AMSTARD type Projecta

SUB TOTAL
PVC dia 0,5" WAVIN type AW
PVC dia 4" WAVIN type D
PVC dia 2,5" WAVIN type D

Panasonic, GP 129 JXV, 125 watt

ex. Mowilex
ex.Catylac ( Cotton Rose)
ex.Catylac ( Putih)
ex.Avian High gloss (Putih)

Kabel NYM Eterna 2x1,5 mm2


Kabel NYM Eterna 3x2,5 mm2
ex. Broco
ex. Broco
ex. Morita
Tebal = 10 cm Beton (1:2:3) Besi O 10 - 20 cm

Pasangan batako plester aci + cat


Tidak ada
atau setara