Download as pdf
Download as pdf
You are on page 1of 1
GENERAL NOTES FOR CIVIL CONSTRUCTION 4. COORDINATE WTH ARCHITECTURAL DRAWINGS FOR ALL DIMENSIONS, LEVELS, Ere. 22. STRUCTURE HAS BEEN DESIGNED FOR GROUND +TWO FLOOR ONLY. {3 BEARING CAPACITY OF SOIL HAS BEEN TAKEN AS 1:4_ TONS PER SOFT. (ASSUMED, TO BE VERIFIED BY THE CLIENT). ‘4. SULPHATE RESISTANT CEMENT SHOULD BE USED IN ALL .C.C, WORKS. UP TO PUNTH LEVEL. ‘8. CONORETE FOR ALL RC.C. WORKS SHALL DEVELOP A MINIMUM 6° WORKS, (GUBE STRENGTH OF 3,000 PS. AT 28 DAYS AS PER BS. 1681 EXCEPT FOR COLUMNS R.C.C.WALLS RAFT & COMBINED FOOTINGS WHERE IT SHALL BE (CUBE STRENGTH 4,00 PS. (1:1% 3) CONCRETE. (6. REINFORCEMENT WHERE ( #) HAS BEEN SPECIFIED IT SHALL BE OF M.S.COLD ‘TWISTED BARS CONFORMING TO B.S. 4481 HAVING A PROOF STRESS OF 60,000, SI AT OTHER LOCATIONS MS, PLAN BARS CONFORMING TO B.S 4449 SHALL BE sen. 7. FOLLOWING CLEAR CONCRETE COVER TO REINFORCEMENT SHALL BE PROVIDED RAFT e ‘COLUMNS ——1 472 BEANS —1" SAB ——— a {8 ALL SLABS HAVE BEEN DESIGNED FOR AN IMPOSED LOAD OF —49- LB PER SOFT (EXCLUSIVE OF PARTITIONS ETC). {2 TOP DISTRBUTION BARS HAVE NOT BEEN SHOWN IN PLAN. PROVIDE # 3@12" ole WHEREVER REQUIRD. 10. BOTTOM BARS IN PLAN SHOWN AS ———S0L1D ‘TOP BARS INPLAN SHOWN AS. ————- DOTTED ‘1. TIMBER SHUTTERING IS NOT ALLOWED PIPE SCAFFOLDING MUST BE USED IF THE HEIGHT IS MORE THAN 44.0, 412. PROPER DEWATERING WORK MUST BE CARRIED OUT UPTO THE POURING OF BASEMENT SLAB. 18, POTABLE WATER MUST BE USED IN ALL CONCRETING WORKS “VIN CASE OF ANY DISCREPANCY REFER TO THE CONSULTANTS. 18. TERMITE PROOFING SHOULD BE CARRIED OUT {AS PER STANDARD REQUIREMENTS, 18. COLUMNLAPS ARE 540 OF BAR. {7 BITUMEN COATING LAYER MUST BE APPLIED FOR. WATERPROOFING AND CORRISION RESISTANT. {18 REINFORCEMENT STEEL BARLAP'S WILL PROVIDE 54 @ WHICH WILL BE: “— oo sw ee so ‘18. CONCRETE MX SHALL BE 1:1%: 3 (4,000 P'8.) FOR ALL SHEAR WALLS & COLUMNS, 29, CLEAR CONCRETE COVER TO REINFORCEMENT ON. WATER FACE ————t 6° REMOTE FROM WATER FACE. 21, PROPER WATER PROOFING TREATMENT SHOULD BE CARRIED OUT. £2, WALL AND BASE (BOTTOM) SLAB SHOULD BE CAST AT ONE TIME. (MONOLTHICALLY)- 23. VERTICAL BARS OF COLUMNS SHOULD BE CARRIED UPTO THE TOP SUB. ‘SPECIAL NOTES FOR CONTRACTOR {THE STRENGTH AND STABILITY OF SHUTTERING AND THE QUALITY (OF WORKS AS WELL AS MATERIAL IS THE SOLE RESPONSIBILITY OF CONTRACTOR 2. THE SAFETY OF WORKERS TO BE PROPERLY ENSURED BY THE CONTRACTOR. 3. DRAWINGS MUST NOT BE SCALED.WRITTEN DIMENSIONS TO BE FOLLWED, 4. THE CONSULTANT DISCLAIM ALL AND ANY LIABILITY OF SITE. 6, FOREACH CONCRETE POURING 6 CUBE MUST BE MADE & TEST FROM 2 DIFFERENT LABORATORIES AT 7,14 & 28 DAYS. (6. CONCRETE HAND MING IS NOT ALLOWED. 124060. YD (@+2) BANGLOW SUKKUA | GENERAL NOT remaaar oa Pw-64)

You might also like