I.OBJECTIVES

 Conduct Instructional Supervision to teachers


 Monitor and check pupils attendance & academic performance
 Record and monitor reading progress by grade level
 Check DLL and Give technical assistance to all teachers in the delivery of their
lessons daily
 Conduct SLAC, staff meeting and SMEA

II. INTRODUCTION

To maximize the target for the month of February the above objective has been
accomplished through a consistent and proper use of time management in order to
attain all the necessary objectives within the month.

Out of 15 targets for my Instructional supervision it was indeed accomplished


based on the objective of my ORS. This is a big help for everyone especially to the
teachers who really need for technical assistance on the delivery of the lesson. Reading
status of the school is closely supervised specially that school year is near to end.
Based on the monthly tracking of reading assessment grade I has zero nonreader for
the last quarter of the year. 26 out of 26 are all reader pupils. Physical aspect has been
improved and developed through repainting, repair and put up new projects like table
tennis equipment for our athletes.

III. MONTHLY ACCOMPLISHMENT


DATE PLACE / PERSON VISITED ACCOMPLISHMENTS
Checked teachers DLL and other
2/3/20 San Isidro Elementary School
reports for the month
Monitored classes in all grade leve
2/4/20 San Isidro Elementary School

2/5/20 San Isidro Elementary School Monitored classes in all grade leve

Classroom observation Checking o


2/6/20 San Isidro Elementary School DLL grades 5-6
2/7/20 San Isidro Elementary School Conducted School Learning Actio
San Isidro Elementary School Conduct COT from Grades 1&2
2/10/20
Instructional Supervision from Kin
2/11/20 San Isidro Elementary School to Grade 6
Reading Assessment in grade 3&
2/12/20 San Isidro Elementary School Grade 1
2/13/20 San Isidro Elementary School Conducted General PTA Meeting
2/14/20 San Isidro Elementary School Conduct COT from Grades 3&4
Finalized SIP
2/17/20 San Isidro Elementary School
Conduct School Monitoring and
2/18/20 San Isidro ES Evaluation Adjustment
Process for renewal of Fidelity Bo
2/19/20 Catbalogan City
2/20/20
Office work and technical assistan
2/21/20 San Isidro Elementary School to teachers
Conduct Staff meeting for the
2/24/20 San Isidro Elementary School upcoming end year reports
2/25/20 HOLIDAY
Monitor the Project of MOOE for
2/26/20 San Isidro ES Quarter
Attend DisMEA and work for the
2/27-28/20 San Isidro ES MOOE liquidation

IV. Impact
All the activity and accomplishments within the month gives us direction on
the different programs and activities to be taken and to be accomplished for the next
month. What will be the priorities and the most needed targets to be done for the next
month.

V. Recommendations:

Some of the target for this was not able to accomplish that is why it is
important to have a plan of activities so that everything will be in place for
prioritization.

VI. Pictorial
PORTFOLIO DAY

GPTA MEETING

Republic of the Philippines


Department of Education
Region VIII
Division of Samar
District of Wright I
SOLUPAN ELEMENTARY SCHOOL
Paranas
MONTHLY
ACCOMPLISHMENT
REPORT
July 2020

Submitted by:
MA. CAROL C. FABRAO
School Head

Republic of the Philippines


Department of Education
Region VIII
Division of Samar
District of Wright I
SOLUPAN ELEMENTARY SCHOOL
Paranas

MONTHLY ACCOMPLISHMENT REPORT


JULY 2020

I.OBJECTIVES
 Conduct Monitoring on the reproduction of modules and learning materials of the
teachers
 Monitor and check teachers attendance, WAR and other reports
 Record and monitor printing of activity sheets by grade level
 Check activity sheets/worksheets and Give technical assistance to all teachers in the
delivery of their lessons daily
 Conduct virtual SLAC and staff meeting

II. INTRODUCTION

To maximize the target for the month of June the above objective has been
accomplished through a consistent and proper use of time management in order to attain all
the necessary objectives within the month with the new normal situation of learning process.

Focusing with the new setup of the department of education, all the necessary
objectives and goals that need to accomplish and perform despite of the amidst of COVID 19,
has been properly monitored and perform following the health protocol that the IATF has
been established.

III. MONTHLY ACCOMPLISHMENT

DATE PLACE / PERSON VISITED ACCOMPLISHMENTS


Checked teachers Printed BOL and MELC
7/1-3/20 Solupan Elementary School

7/4/20 Saturday/Services as required

7/5/20 Sunday

7/6/20 Work From Home Crafting of SLCP


Work From Home Update the WFP for some adjustment of projects and
7/7/20 programs aligned to the amidst of COVID 19 Pandemi
Work From Home Give technical assistance on the submission of IPCRF
7/8/20
7/9/20 Work From Home Input all the data especially the most essential PAP’s in
preparation for the opening of classes
Work From Home Update the school data enrollment for online submissio
7/10/20 Samar Division Facebook Page
7/11/20 Saturday/Services as required
7/12/20 Sunday
Work in School Join District Virtual Kick Off and SLCP presentation
7/13-15/20
Work in School Check and update teachers for their IPCRF submission
7/16/20
Work in School Visit and check school ground cleanliness and other up
in school
7/17/20
7/18/20 Saturday/Services as required
7/19/20 Sunday
7/20/20 Work in School Conduct Staff meeting for the upcoming end year repo
Work in School Work on the utilization of school MOOE and other pro
7/21/20
Work in School Monitor the Project of MOOE for the Quarter
7/22/20
7/23-24/20 Work from Home Attend DisMEA and work for the MOOE liquidation
7/25/20 Saturday/Services as required
7/26/20 Sunday
7/27/20 Work in School Preparing for the simulation of Modules
Work in School Continue monitoring on the printed learning materials
7/28/20 preparation of school based simulation
Work in School Conducted School Based Simulation of Modules and
7/29/30 Retrieval of worksheets
Attended Regional Monitoring and Evaluation of
7/30/20 Pequit Integrated School Accountability
7/31/20 Work From Home Submit AWA,WAR and DTR

IV. Impact

All the activity and accomplishments within the month gives us direction on the
different programs and activities to be taken and to be accomplished for the new normal
situation and this will be a bases and guide on what will be the priorities and the most needed
targets to be done for the next month.

V. Recommendations:
Due to its abnormal situation of work from home/school, adjustments and other issues
and concerns are need to prioritize and focus on the delivery of learning modalities in the new
normal setup.

Prepared by:
MA. CAROL C. FABRAO
School Head
Noted:

TEODORA B. ABAIGAR Ph. D.


District Supervisor

Republic of the Philippines


Department of Education
Region VIII
Division of Samar
District of Wright I
SOLUPAN ELEMENTARY SCHOOL
Paranas

MONTHLY ACCOMPLISHMENT REPORT


AUGUST 2020

I.OBJECTIVES

 Conduct Monitoring on the opening of modular classes


 Conduct Monitoring on the reproduction of modules and learning materials of the
teachers
 Monitor and check teachers attendance, WAR and other reports
 Record and monitor printing of activity sheets by grade level
 Check activity sheets/worksheets and Give technical assistance to all teachers in the
delivery of their lessons daily
 Conduct virtual SLAC and staff meeting
II. INTRODUCTION

In preparation of the opening of classes, checking and monitoring of Modules, BOL


and Worksheets of teachers are continue working in order to maximize the distribution for the
pupils in their modular home based schooling.

For the new normal set up of modular learning of pupils, the teachers must be ready
for the activity sheets that will cater the needs of the new learning environment of the pupils.
100% cooperation of parents as well as the teachers must be collaboratively work hand in
hand for the success of the new normal learning set up of the S.Y. 2020-2021.

III. MONTHLY ACCOMPLISHMENT

DATE PLACE / PERSON VISITED ACCOMPLISHMENTS


Work in School/Checked teachers Printed BOL and M
8/3-5/20 Solupan Elementary School
and Modules
8/6/20 Work from Home Work the IMSR for the week of August 3-7, 2020

Update in the group chat for some important informatio


8/7/20 Work from Home
disseminated by Samar Division and by our PSDS

8/10/20 Work in School Office work and other school reports


HOLIDAY SAMAR DAY
8/11/20
Work in School Work for my MAR, IMSP for the month of August
8/12/20
Work From Home Work the AWA for the week of August 10-14, 2020 an
attended Regional Webinar on the contextualization of
8/13-14/20 MELC for multi grade and other subjects
Work in School Update the school data enrollment for online submissio
8/17/20 Samar Division Facebook Page
8/18/20 Work in School Report to school and monitor teachers attendance
Check the printing of teachers for their modules by gra
8/19/20 Work in School level
Work from Home Update in group chat for some important school report
8/20-21/20
Work from Home Monitor the printing of their modules for the opening o
8/24/20 classes with the modular type of learning
Work from Home Assist teacher on their needs in preparing their worksh
8/25/20
Work from Home Attend Webinar for the BSP and GSP 2020
8/26/20
Work from Home Ask assistance to the barangay LGU for the distributio
8/27/20 modules for the pupils live in a distance home area
Work from Home check the activity of teachers via group chat and virtua
8/28/20 meeting
Work from Home Make IMSP, MAR and other school reports..
8/29-30/20

IV. Impact

Since the situation is not suitable in working at school due to the increase of the
infected of virus in the locality, work from home will be the perspective preference to
accomplish its goals and objective for the month of August 2020.

V. Recommendations:

Monitoring and supervision via group chat, virtual meeting with the teachers are must
since they are working from home.

Prepared by:
MA. CAROL C. FABRAO
School Head
Noted:

TEODORA B. ABAIGAR Ph. D.


District Supervisor
Republic of the Philippines
Department of Education
Region VIII
Division of Samar
District of Wright I
SOLUPAN ELEMENTARY SCHOOL
Paranas

MONTHLY ACCOMPLISHMENT REPORT


AS OF JANUARY 2021

I.OBJECTIVES

 Conduct Monitoring of teacher’s on the distribution and retrieval of modules


 Conduct Monitoring on the reproduction of modules and learning materials of the
teachers
 Monitor and check teachers attendance, WAR and other reports
 Record and monitor printing of activity sheets by grade level
 Check activity sheets/worksheets and Give technical assistance to all teachers in
making their LAS
 Conduct SLAC and staff meeting for some technical assistance.

II. INTRODUCTION

For the second quarter for this school year 2021 teachers have already prepared
learning materials like LAS and activity sheets. They have already the knowledge of
contextualizing some of the pupils LAS because of the different workshops conducted by
Deped through online training and other platforms.
To sustain the learning modality in the new normal the division office conducted and
implemented Project PAGDUAWA in order to attain the meaningful purpose of checking
teacher’s made materials as to how they have knowledge in preparing their activity sheets.

For instructional supervision, school activities has being established through


monitoring and other interventions so that there will be a continuous development on the
delivery of learning to the pupils despite of some circumstances.

III. MONTHLY ACCOMPLISHMENT

DATE PLACE / PERSON VISITED ACCOMPLISHMENTS


Work in School/Checked teachers Printed learning
1/4-5/2021 Solupan Elementary School
materials from kinder to grade 6
1/6-/2021 Solupan Elementary School Monitor on the distribution of modules

Attended District Conference with SGOD and Division


1/7/2021 Pabanog Elementary School
Personnel

1/8/2021 Solupan Elementary School Office work and other school reports
Solupan Elementary School Checked and monitored teacher’s LAS
1/9-10/2021
Solupan Elementary School Crafted AIP and WFP for S.Y. 2021
1/11-12/2021
Solupan Elementary School Prepared school reports in preparation for the District
1/13-15/2021 Pagduawa 2021
Solupan Elementary School Work the 4th quarter MOOE Liquidation
1/18/2021
1/19-2021 Solupan Elementary School Checked and monitor teachers attendance
Set up Kinder Booth and prepared all the learning mate
1/20/2021 Wright I Central Paranas to be displayed for District Pagduawa
Wright I Central Paranas Attended District Pagduawa
1/21/2021
Division Office Catbalogan City Submit documents for Ranking
1/22/2021
Solupan Elementary School Finalize the WFP to be submitted to the District
Bookkeeper
1-25/2021
Redaja Hall Catbalogan City Attend SBFP Orientation 2021
1/26/2021
Solupan Elementary School Worked monthly reports and submitted to the district o
1/27/2021
Solupan Elementary School Office work
1/28/2021
Solupan Elementary School Make IMSP, MAR, ORS and other school reports..
1/29/2021
IV. Impact

All the above mentioned activity, projects and school reports has been done and
accomplished for the month of January 2021. Through intensive monitoring and verifying of
the needed school accomplishment reports was already given priority. With this 95% has a
good impact for the attainment of the objectives for the month of January 2021.

V. Recommendations:

SLAC, Meetings and other FGD forum need to be consistent in order to solve
different problems that may arise and consistency of checking, monitoring and mentoring are
highly recommended.

Prepared by:

MA. CAROL C. FABRAO


School Head

Noted:

TEODORA B. ABAIGAR Ph. D.


District Supervisor
Republic of the Philippines
Department of Education
Region VIII
Division of Samar
District of Wright I
SOLUPAN ELEMENTARY SCHOOL
Paranas

MONTHLY ACCOMPLISHMENT REPORT


AS OF March 2021

I.OBJECTIVES

 Conduct Monitoring of teacher’s on the distribution and retrieval of modules


 Conduct Monitoring on the reproduction of modules and learning materials of the
teachers
 Monitor and check teachers attendance, IDLAR and other reports
 Record and monitor printing of activity sheets by grade level
 Check activity sheets/worksheets and Give technical assistance to all teachers in
making their LAS
 Conduct SLAC and staff meeting for some technical assistance.

II. INTRODUCTION

As of March 2021, Solupan Elementary School accomplished some of the target for
the said month. Online trainings/seminars, staff conference, online submission of reports,
PTA meeting, SLAC, Monitoring of teacher’s distribution of modules and physical
improvements.

Despite of the pandemic Solupan ES perform its best to cater the needs of the
learner’s in their modular distance learning.
III. MONTHLY ACCOMPLISHMENT

DATE PLACE / PERSON VISITED ACCOMPLISHMENTS


Work in School/Checked teachers Printed lear
3/1-2/2021 Solupan Elementary School
materials from kinder to grade 6
3/3/2021 Solupan Elementary School Monitor on the distribution of modules

Attended District Conference with SGOD and


3/4/2021 Solupan Elementary School
Division Personnel

3/5/2021 Solupan Elementary School Performed office work and other school report
Solupan Elementary School Checked and monitored grade 5-6 teacher’s L
3/8-9/2021
Solupan Elementary School Checked grade 2-3 LAS
3/10-11/2021
Solupan Elementary School Submitted online reports
3/12/2021
Solupan Elementary School Work the 4th quarter MOOE Liquidation
3/15-16/2021
3/17-19/2021 Solupan Elementary School Checked and monitor teachers attendance
Checked and monitored teacher’s accomplishm
3/22-23/2021 Solupan Elementary School reports for the month
Wright I Central Paranas Attended Liquidation Day
3/24/2021
Catbalogan City Attended Division CAUCUS
3/25/2021
Solupan Elementary School Office work /submitted SF4&SF7
3-26/2021
Solupan Elementary School Monitored school physical repair and mainten
3/29/2021
Solupan Elementary School Worked monthly reports and submitted to the
3/30/2021 district office
Solupan Elementary School Make IMSP, MAR, ORS and other school rep
3/31/2021
IV. Impact

All the above mentioned activity, projects and school reports has been done and
accomplished for the month of March 2021.All the school reports has been submitted through
intensive monitoring and supervision.

V. Recommendations:

SLAC, Meetings and other FGD forum need to be consistent in order to solve
different problems that may arise and consistency of checking, monitoring and mentoring are
highly recommended.

Prepared by:

MA. CAROL C. FABRAO


School Head

Noted:

TEODORA B. ABAIGAR Ph. D.


District Supervisor
\
Republic of the Philippines
Department of Education
Region VIII
Division of Samar
District of Wright I
SOLUPAN ELEMENTARY SCHOOL
Paranas

MONTHLY ACCOMPLISHMENT REPORT


AS OF April 2021

I.OBJECTIVES

 Conduct Monitoring of teacher’s on the distribution and retrieval of modules


 Conduct Monitoring on the reproduction of modules and learning materials of the
teachers
 Monitor and check teachers attendance, IDLAR and other reports
 Record and monitor printing of activity sheets by grade level
 Check activity sheets/worksheets and Give technical assistance to all teachers in
making their LAS/record of home visitation
 Conduct SLAC and staff meeting for some technical assistance.

II. INTRODUCTION

As of March 2021, Solupan Elementary School accomplished some of the target for
the said month. Online trainings/seminars, staff conference, online submission of reports,
PTA meeting, SLAC, Monitoring of teacher’s distribution of modules and physical
improvements.

Despite of the pandemic Solupan ES perform its best to cater the needs of the
learner’s in their modular distance learning.
III. MONTHLY ACCOMPLISHMENT

DATE PLACE / PERSON VISITED ACCOMPLISHMENTS


Conducted Instructional supervision on the sch
4/5-6/2021 Solupan Elementary School
entry of school forms
4/7/2021 Solupan Elementary School Checked the learner’s outputs by grade level

Updates the school online reports for the mont


4/8/2021 Solupan Elementary School
april

4/9/2021 Solupan Elementary School Performed office work and other school report
Solupan Elementary School Checked and monitored grade 5-6 teacher’s L
4/12-13/2021
Solupan Elementary School Checked grade 2-3 LAS
4/14/2021
Solupan Elementary School Submitted online reports
4/15/2021
Solupan Elementary School Monitor the projects implemented through mo
4/16/2021 fund
Conducted home visitation together with the
4/19/2021 Solupan Elementary School teachers
Checked and monitored teacher’s accomplishm
4/20-21/2021 Solupan Elementary School reports for the month
Solupan Elementary School Accomplishes school reports
4/23/2021
Solupan Elementary School Checked teachers monitoring tool and other sc
4/26-7/2021 forms
Solupan Elementary School Office work /submitted SF4&SF7
4/28/2021
Solupan Elementary School Monitored school physical repair and mainten
4/29/2021
Solupan Elementary School Make IMSP, MAR, ORS and other school rep
4/30/2021
IV. Impact

All the above mentioned activity, projects and school reports has been done and
accomplished for the month of March 2021.All the school reports has been submitted through
intensive monitoring and supervision.

V. Recommendations:

SLAC, Meetings and other FGD forum need to be consistent in order to solve
different problems that may arise and consistency of checking, monitoring and mentoring are
highly recommended.

Prepared by:

MA. CAROL C. FABRAO


School Head

Noted:

TEODORA B. ABAIGAR Ph. D.


District Supervisor
\

Republic of the Philippines


Department of Education
Region VIII
Division of Samar
District of Wright I
SOLUPAN ELEMENTARY SCHOOL
Paranas

MONTHLY ACCOMPLISHMENT REPORT


As of May 2021

I.OBJECTIVES

 Conduct Monitoring of teacher’s on the distribution and retrieval of modules


 Conduct Monitoring on the reproduction of modules and learning materials of the
teachers
 Monitor and check teachers attendance, IDLAR and other reports
 Record and monitor printing of activity sheets by grade level
 Check activity sheets/worksheets and Give technical assistance to all teachers in
making their LAS/record of home visitation
 Conduct SLAC and staff meeting for some technical assistance.

II. INTRODUCTION

Checking of modules, teacher’s accomplishments, SLAC and other important updates


has been accomplished. School funds and monitoring of projects is continuously monitored
with the help of teachers.

Updates of online reports and conferences has successfully submitted and attended.
With the new normal set up of educational system, Solupan Elementary School continued to
pursue the quality education that we could offer to our learners. Distribution of modules,
Home visitation & technical assistance was given to the teachers as well.

III. MONTHLY ACCOMPLISHMENT

DATE PLACE / PERSON VISITED ACCOMPLISHMENTS


Work in School/Checked teachers Printed lear
5/3-5/2021 Solupan Elementary School
materials from kinder to grade 6
5/6/2021 Solupan Elementary School Conduct instructional supervision from kinder

Checked teacher’s updates of learner’s progres


5/7/2021 Solupan Elementary School
other data regarding with their modules

5/10/2021 Solupan Elementary School Conduct SLAC on Classroom Management


Solupan Elementary School Checked and monitored grade 5-6 teacher’s L
5/11-12/2021
Solupan Elementary School Checked grade 2-3 LAS
5/13/2021
Solupan Elementary School Submitted online reports
5/14/2021
Solupan Elementary School Division/District Based Research Summit for S
5/17-21/2021 & master Teachers
5/24/2021 Solupan Elementary School Checked and monitor teachers attendance
Checked and monitored teacher’s accomplishm
5/25/2021 Solupan Elementary School reports for the month
WNHS Community Pantry & School Head Convergen
5/26-27/2021 meeting
Solupan ES Finalize the submission of SBFP ;liquidation
5/28/2021
Solupan Elementary School Office work /submitted SF4&SF7
5/29/21
Solupan Elementary School Conduct SL:AC on preparation of school form
5/30/2021
Solupan Elementary School Make IMSP, MAR, ORS and other school rep
5/30/2021

IV. Impact

All the above mentioned activity, projects and school reports has been done and
accomplished for the month of March 2021.All the school reports has been submitted through
intensive monitoring and supervision.

V. Recommendations:
SLAC, Meetings and other FGD forum need to be consistent in order to solve
different problems that may arise and consistency of checking, monitoring and mentoring are
highly recommended.

Prepared by:

MA. CAROL C. FABRAO


School Head

Noted:

TEODORA B. ABAIGAR Ph. D.


District Supervisor

Republic of the Philippines


Department of Education
Region VIII
Division of Samar
District of Wright I
SOLUPAN ELEMENTARY SCHOOL
Paranas
MONTHLY ACCOMPLISHMENT REPORT
As of JUNE 2022

I.OBJECTIVES

 Conduct Monitoring of teacher’s /Instructional supervision


 Monitor and check teachers attendance, WLP and other reports
 Conduct teachers professional meeting and other related tasks
 Conduct SLAC and staff meeting for some technical assistance.
 Monitor and supervise school programs and projects

II. INTRODUCTION

This month all the school forms needed for the year end rites are closely checked and
monitored in accomplishing and entering in the different forms to be submitted in the district.

Teachers and school head gathered, check and validate pupils documents as to the
entry in the LIS and NSO provided.

III. MONTHLY ACCOMPLISHMENT

DATE PLACE / PERSON VISITED ACCOMPLISHMENTS


Work in School/Checked teachers Printed lear
5/3-5/2021 Solupan Elementary School
materials from kinder to grade 6
5/6/2021 Solupan Elementary School Conduct instructional supervision from kinder

Checked teacher’s updates of learner’s progres


5/7/2021 Solupan Elementary School
other data regarding with their modules

5/10/2021 Solupan Elementary School Conduct SLAC on Classroom Management


Solupan Elementary School Checked and monitored grade 5-6 teacher’s L
5/11-12/2021
Solupan Elementary School Checked grade 2-3 LAS
5/13/2021
Solupan Elementary School Submitted online reports
5/14/2021
Solupan Elementary School Division/District Based Research Summit for S
5/17-21/2021 & master Teachers
5/24/2021 Solupan Elementary School Checked and monitor teachers attendance
Checked and monitored teacher’s accomplishm
5/25/2021 Solupan Elementary School reports for the month
WNHS Community Pantry & School Head Convergen
5/26-27/2021 meeting
Solupan ES Finalize the submission of SBFP ;liquidation
5/28/2021
Solupan Elementary School Office work /submitted SF4&SF7
5/29/21
Solupan Elementary School Conduct SL:AC on preparation of school form
5/30/2021
Solupan Elementary School Make IMSP, MAR, ORS and other school rep
5/30/2021

IV. Impact

All the above mentioned activity, projects and school reports has been done and
accomplished for the month of March 2021.All the school reports has been submitted through
intensive monitoring and supervision.

V. Recommendations:

SLAC, Meetings and other FGD forum need to be consistent in order to solve
different problems that may arise and consistency of checking, monitoring and mentoring are
highly recommended.

Prepared by:

MA. CAROL C. FABRAO


School Head

Noted:

TEODORA B. ABAIGAR Ph. D.


District Supervisor

You might also like