RKM POWERGEN PVT LTD PRE CHARGING CHECKLIST OF AVR

PROJECT :4X360 MW THERMAL POWER PLANT Date: Sheet No 1 of 2

Equipment name:

Location:

PRE-CHARGING CHECKS:

PRE CHARGING AVR CHECK LIST

S.No Checks Precautions TB Detail Status

Physical checks of
Entire AVR for any
wire loose
1
connections,
insulation failure,
water marks.
AC feedback wires EACF
board TB 1,2,3 to be
2 IR of AC bus duct removed,
12 no of filter fuses to be
removed
+ ve Bus before
3
FCB
DC feedbacks wires and
+ and - Bus after de-excitation wires to be
FCB removed. Rotor earth
4
( includes rotor fault cable to be isolated
winding also) in GRP side
1GA - TB 2- 22
Fuses of Field ACFF-FU1 &FU2
5
flashing circuit (15A)
FCB breaker circuit
6 PFU 1,2 (30A)
fuse
7 Filter circuit fuse FU1,2,3 (20A)

RKM RKM RKM


SIGNATURE
RKM POWERGEN PVT LTD PRE CHARGING CHECKLIST OF AVR

PROJECT :4X360 MW THERMAL POWER PLANT Date: Sheet No 2 of 2

Check DO status in
8
DCS
Check Closing of
EMCC
FCB in local and Field flashing supply
9 board-8FB/AVR
remote mode. Also should be in off condition
ACFF-FU1 & FU2
check status in DCS
EMCC 6RE &
Check fan supply-
10 13FF/AVR-FP FU1 &
main and standby
FP FU2
DCDB 10BV03,CAB-
Check DC-2 nos 3,Q 162/AVR EPDM
11 ( 1 control circuit TB1-5,6
and 1 no for FCB) DCDB 10BV02,CAB
5,Q231/AVR PFU 1,2
Check AC single EMCC- 8FC &
12 phase- 2 nos 6RD/AVR-EPDM TB1-
( main and standby) 13,17 & 21,22
Field flashing EMCC 8FB/AVR-
13
supply ACFF-FU1&FU2
Check air
conditioning are
14 working good and
entire house
keeping are good

NOTE: Field flashing supply should be ON only before startup of AVR