Lecture 2 - GCC and Utilities Placement
Lecture 2 - GCC and Utilities Placement
erniza.rozali@utp.edu.my
Heat Integration
Targeting so far :
• Composite Curves
• Problem Table Algorithm
This allows targeting for ONE hot and ONE cold utility.
BUT
What about when multiple utilities are available?
How to choose the best mix?
BFW
preheat Heating Heating Heating Heating
Heating
(Q+W)
Processes, building complexes
Heating Heat
pump
Cooling Cooling Power
Cooling (Q) (W)
Furnace Refrigeration
Air
Fuel Power
preheat Heating
The Heat Cascade
Interval Stream
∆Hinterval Tinterval
Temperature Population
°C kW
160 3 Qhmin = 65
30.0 30
150 95
-5.0 -5
145 90
CP = 4
-15.0
CP = 3
-15
140 4
75
-75.0 -75
90
CP = 2
2
0
100.0 100
CP = 1.5
50 100
-10.0 -10
30 1 90
15.0 15
20 QCmin = 105
Grand Composite Curve (GCC)
Tinterval
Qhmin = 65 160
30
95
-5
90
-15 140
75
-75 120
100
0 T* (˚C)
80
100
60
100
-10 40
90
15
20
QCmin = 105 H (kW)
Grand Composite Curve (GCC)
Hot streams
QH,min
Cold streams
‘Pockets’ of heat
recovery
QC,min
Grand Composite Curve (GCC)
QH,min
Heat
Sink
Heat
Source
QC,min
Utility placement
Why not?
Or?
LP
VLP
Utility placement
Available utilities:
- High Pressure Steam (HP) at 250oC
- Medium Pressure Steam (MP) at 180oC
- Low Pressure Steam (LP) at 150oC
90oC - Very Low Pressure Steam (VLP) at
130oC
- Cooling water (CW) at 30 – 40oC
- Chilled water (CH) at 5 – 10oC
20oC
CH, 105 kW
H
Utility placement
Various options
T*
160oC
LP, 65 kW
Available utilities:
- HP steam at 250oC
- MP steam at 180oC
- LP steam at 150oC
- VLP steam at 130oC
- CW at 30 – 40oC 90oC
- CH at 5 – 10oC
CW, 90 kW
20oC
CH, 15 kW
H H
Utility placement
Various options
T*
160oC
LP, 20 kW
Available utilities:
- HP steam at 250oC VLP, 45 kW
- MP steam at 180oC
- LP steam at 150oC
- VLP steam at 130oC
- CW at 30 – 40oC 90oC
- CH at 5 – 10oC
CW, 90 kW
20oC
CH, 15 kW
H
Hot oil circuits
Treturn
Tin Process
Tsupply Tout Duty
T
Tsup
Tret Tout
Tin
Q H
H
Hot oil circuits
T*
290°
The hot oil utility is T supply= 300°
NOT isothermal.
The return
temperature can ∆Tmin = 20°
be adjusted and
limited only by the
pinch
T return= 130°
Pinch
120°
H
Hot oil circuits
T* T*
290° 290°
T supply= 300°
∆Tmin = 20°
T return= 130°
Pinch Pinch
120° 120°
≈ H
≈
H
Flue gas
Place refrigeration
levels like steam
levels
CW
-5°C
-40°C
-70°C H
Generate Steam Below Pinch
T*
≈
Pinch
180°
140°
Steam
100°
60°
Cooling
Water
20°
≈ QC,min
H
0 20 40 60 80 100
GCC and Utilities Placement
Working Session 3
ΔTmin = 40 °C
Stream No. Supply Target Heat
and type temperature temperature capacity
Ts (°C) Tt (°C) flowrate CP
( kW/°C)
1 hot 450 60 60
2 hot 320 65 20
3 cold 100 500 40
4 cold 50 350 55
Utililites available:
TASKS
CP= 40
520 °C
1 90 -40 -3600 Deficit
430 °C
60 20 1200 Surplus
370 °C CP= 55
T* 600
500
400
300 Pocket
200
100
0 H
0 1000 2000 3000 4000 5000 6000 7000
GCC and Utilities Placement
Working Session 3
T*
750 Flue gas H=5,750 kW
CP=11.27 kW/ °C
600
450
T*=240 °C
150
CW H=3550 kW
0
0 2000 4000 6000 H