OKR Professional Doc in Dark Green Yellow Pink Friendly Corporate Style

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

Electrónica

Temario
IT Department, Weisenham Tech Solutions Period Covered: Q3 2030

Overview
This document defines our objectives, translates them into key results, and tracks the progress of both.
This will ensure company-wide alignment from leadership to teams.

Company Level
This section comes directly from our leaders' vision directives for this period.

DESCRIPTION OWNER DUE DATE STATUS

Objective A Add the first objective here 40% Complete

Key Result 1: Briefly expound on Add a point MM/DD/YYYY Not started


Translate the the key result person
objective above
into a
measurable
result here

Key Result 2: 20% Complete


Add another KR

Key Result 3: 100% Complete


Add here
Objective B Add the second objective here 17% Complete

Key Result 1 Describe the first Stuck


key result for the
second objective

Key Result 2 50% Complete

Key Result 3 Not started

Department Level
This section takes the key results from leadership, and turns them into objectives for the department.

DESCRIPTION OWNER DUE DATE STATUS

Objective A Take a key result from the company level as the 40% Complete
department's first objective

Key Result 1: Briefly expound Add a point MM/DD/YYYY Not started


Translate the on the key result person
objective above
into a
measurable
result here

Key Result 2: 20% Complete


Add another KR

Key Result 3: 100% Complete


Add here

Objective B Take another key result from above as the department's 17% Complete
second objective

Key Result 1 Describe the first Stuck


key result for the
second objective

Key Result 2 50% Complete


Key Result 3 Not started

Team Level
This section takes the key results from the department, and turns them into objectives for the team.

DESCRIPTION OWNER DUE DATE STATUS

Objective A Take a key result from the department level as the team's 40% Complete
first objective

Key Result 1: Briefly expound on Add a point MM/DD/YYYY Not started


Translate the the key result person
objective above
into a
measurable
result here

Key Result 2: 20% Complete


Add another KR

Key Result 3: 100% Complete


Add here

Objective B Take another key result from above as the team's second 17% Complete
objective

Key Result 1 Describe the first Stuck


key result for the
second objective

Key Result 2 50% Complete

Key Result 3 Not started

Version History
LAST UPDATED ON BY

MM/DD/YYYY Stela Ornelas

You might also like