: GS/AMBSD-SF-IC-14-0
GS Engineering & Contruction Corp. Rev No. : 00
8 Temporary Electricity
a. Electricity Shall be provided through ELCB (Electrical Leakage
Circuit Breaker) and it must be tested by regularly.
b. No elctrical cable shall be left on ground
c. Electrical cables shall be inspected to check if damaged or not
d. All electrical tools and distribution panel shall be covered
properly to prevent water from getting into the facility.
e. Earthing shall be installed to all electrical machines, tools and
distribution panels.
9 Storage of gas cylinders, Management of Warehouse
a. Gas cylinders and combustible materials shall be stored
separately in designated storage area.
b. Storage area to be locjed at all times. Only authoruzed person
can entry.
c. Empty and Occupied cylinders should be kept separately and
those cylinders shall be secured upright.
d. Warning signs and Material Safety Data Sheet (MSDS) should
be installed at storage area.
e. Smoking is prohibited nearby storage area.
f. Fire Fighting equipment shall be arrenged as per the relevant
regulations.
10 First Aid
a. First aid kitt and medicine shall be arranged and maintained
regularly.
b. First aid room / clinic should be arranged and aprroved nurse
should be deployed.
11 Emergency Responese & Preparedness
a. Assembly point shall be designated on site.
b. Emergency Contact Number should be displayed
12 Emergency Responese & Preparedness
a. Loose materials to be stacked in a tidy manner and cleared
away regular intervals.
b. Debris on working platform and access / egress way shall be
cleared.
c. Toilets onsite should be cleaned.