Labor Cess Calculation - P.W.D.

for Lucknow -2020 (construction rates )

Project Title :PROPOSED RESIDENTIAL BUILDING PLAN OF …………………………….


PROPOSED COVERED GROUND FLOOR FIRST FLOOR SECOND FLOOR MUMTY TOTAL
AREA ( IN SQ.M ) (COVERED AREA ) (COVERED AREA ) (COVERED AREA ) ( COVERED AREA) (COVERED AREA )

0.00 0.00 0.00 0.00 0.00


Plinth Region rate as per 15750.00 15750.00 15750.00 15750.00
attached rate list
Estimated Construction Cost 0 0 0.00 0.00 0
Proposed height in meter. GROUND FLOOR FIRST FLOOR SECONDFLOOR
(HEIGHT ) (HEIGHT ) (HEIGHT )

3.15 3.15 3.15 2.50

Additional provision 0.10 m


0.00 X 280.00 0.00 X 280.00 0.00 X 280.00 0.00 X 0.00
For extra height
0.00 0.00 0.00 0.00
0.00
TOTAL (A+B) 0.00
Internal water Suppy , 9Internal
Electrical electrification & ,Sanitary
installation , civil external service
connection ( 9 % + 12.50% +3.75 % 0.00
+1.25 %+1.25 % = 27.75 % charge .

TOTAL (A+B+C) 0.00


0.00
Labour cess @ 1.00% 0.00
Say Rs. 0.00