Kondai B&C
Kondai B&C
GST,
No. of Total Average Cost of
Type of Proposed Cost of Cost of CD Side Protecti Segnerage
Name of the Road CD Estimated Cost per Maintanance
Sl. No. Name of the Block proposal length Pavement works drains on work an and
works Cost KM for 5 years
others
From To *N/U KM Rs. Nos. Rs. Rs. Rs. Rs. Rs. Rs. Rs.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 Eturnagaram Chinaboinapalli Kondai U 16.000 2094.51 41 203.48 83.43 0.00 400.58 2782.00 173.88 361.15
2. Package No:-
4. Total Length (Km) - 16.00 In Built up area - 1.600 Km In Open Area - 14.400 Km
Yes NO
6. Estimated Cost Rs :
Item Total Cost in Rs. Average Cost per Km.
Lakhs
State Share
Chinaboinapally 1701
Shapelli 847
Kothuru 0
Dodla 419
Malyala 409
Kondai 822
Total 4198
c) Utility value = Total weight/ Length of road
d) Does the Proposed Road lead up to the growth centre /hub or the road is being
Yes
made partially?
f) Average PCI of the road to which proposed T or MRL will be connected Yes
h) If PCI of MDR / SH / NH is 3 or below , whether the State's undertaking for simultaneouly upgrading it
Yes
from State fund is avaible
8. a) Whether the Proposed Road has the desired carriage way width,Roadway
YES
width and Road Land Width (RLW )
b) Indicate the actual widths of the following for the proposed road In the Built Up Area (m) In the Open Area (m)
A. Pavement Components
C. Protection works
Chainage
Length( m)
Cost in Rs Average cost / m
From To
Retaining wall
Breast wall
Toe wall
Gabbion
Pitching for slopes 0
Total cost of protection works 0.00
D. Pucca Side Drains (if Provided) Chainage Cost in Rs Average cost / m
Length( m)
From To
1650.00 8343126
1650.00 8343126.00 4907721.00
Total cost of side drains works
E. Road Logo, other Road Furniture including Road safety signs
Number Cost in Rs Average cost / km
Number of Boards
14.Whether C.D.works / Protection works are provided as per RRM / Latest Circulars of NRRDA/ Respective Codes of IRC. Yes
Vetted at NRRDA
Year
15.Does the Estimation Conform to Standard Rate Analysis and SSR generated for the current Phase Yes No
Yes SOR 2018-9
16. Sources and the Lead distances of Materials are as under
Material Source Lead Distance (Km) Material Source Lead Distance
AEE/R&B/ Venkatapuram DEE/ R&B SD/ Mulugu EE/ R&B Div/ Mulugu SE/R&B Circle/Warangal
Counter Signatures of
Co-ordinator STA :
To be filled by State Technical Agency
Construction of BT road from Chinnaboinapally to Kondai road via shapally Dodla and Malyal from Km 0/0 to 16/0
Name of Road : in Eturnagaram Mandal in Jayashankar Bhupalpally District. Yes / NO to be filled by STA in own handwriting
21 In case, sub grade CBR is less than 5; has Soil Stabilisation etc. been proposed
( If not , specific Reasons given by PIU)
22 Is the design of the following elements as per Rural Roads Manul / Circulars of NRRDA:
Is the design of flexible Pavement as per IRC 37 2012 and design of Rigid Pavement as per IRC SP:58- 2015.
Certified that the Design and Estimation for the Proposed Road work are based on the data and SSR provided by PIU Engineers . The Proposal after final Correction is
entered on the OMMS.The Propasal may be considered for clearance.