Remaining Pekerjaan Contr

No Item Lokasi PIC


1 Development HMI System Platform Pump House Salman
Upload to existing PC Pump House Salman/Anas
Revisi Pump House Salman
Kirim update ke Wifgas agar ditambah window FGDS Pump House Salman
2 Development HMI Wonderware 10.5 Blending Anas
Upload to existing PC Blending Salman/Anas
Revisi Blending Anas
3 Persiapan PC Engineering Blending Salman/Anas
4 Troubleshooting address torque ALL Salman/Anas/Asep
5 Modifikasi panel Blending Gudang
Instalasi panel Blending Blending
Tarik kabel ethernet 2 line Blending
6 Perapihan kabel dan panel Pump House
Bikin lubang masuk kabel RS485 di dinding Pump House
Terminasi kabel di panel Pump House
Pasang extention power Pump House
Dressing kabel (Pakai tray, TC, atau lainnya) Pump House
Pasang alas spacer panel Pump House
7 Test integrasi (2 HMI & 1 PC engineering) ALL Salman/Anas
8 Test komunikasi third party masuk line RS485 ALL Salman/Anas
9 Seting & address semua MOV ALL Asep
10 Test mode local remote semua MOV ALL Salman/Anas/Asep
ng Pekerjaan Control System

Schedule
1 2 3 4 5 6 7 8 9 10 11
Note

File HMI lama tetap bisa dirunning apabila upload bermasalah

Paralel dengan revisi

Jangan lupa pasang extension plug


Jangan lupa alas (spacer) panel

Harus segera dikirim dari jakarta

Sebaiknya tidak dishare

Beberapa berjaga di lokasi agar tidak MOV tidak bergerak