Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Takeoff Sheet for Dike 2 (IPC 8) Takeoff Sheet for Dike 2 (IPC 8)

For the Contractor For the Consultant For the Contractor For the Consultant

___________ ___________

Elev=360.21

Elev=360.21
Elev=360.21

Elev=360.21
Elev=360.21

Elev=360.21
Offset =-1.5

Offset =1.5

Offset =-1.5

Offset =1.5
Offset =0.0

Offset =0.0
___________ ___________

Elev=356.29

Offset =9.3

Elev=356.13

Offset =9.7
Offset =-13.1
Elev=354.39

Offset =-13.4
Elev=354.24
STN = 4+060 , STN = 4+080 ,
Alignment Name = Dike 2 Alignment Name = Dike 2

FEDERAL DEMOCRATIC REPUBLIC ENSIRAD Civil Systems Engineering Plc. Afar Construction Corporation Tendaho PC-16 Irrigation Block
OF ETHIOPIA Tel: +251-116 -677684 Rehabilitation and Flood Protection Dike
Mobile: +251-930-000079 Maintenance Work
Gurd Shola Behinde Ethio Ceramics Bldg.

You might also like