2. Thermal Mapping of RM Store 3. DOP Test of HVAC 4. Heat penetration study/Thermal Mapping of Autoclaves and Dry Heat sterilizers 5. Autoclaves validation 6. Calibration of production and store equipment’s i.e. Balances, Pressure Gauges, Temperature Gauges 7. Calibration of QC and Micro lab Instruments 8. Installation of Pressure Differential Gauges in liquid Injections. 9. Liquid for filling in Manometers required. 10. If possible, Installation of HVAC connection in Main corridor 11. If possible, Installation of AC connection in executive entry 12. Proper arrangement of Packaging material in Packaging material store i.e everything must be arranged in proper manner, Labels and Unitcartons in Shippers, HDPE Bottles in proper PVC packing. No bags of Urea or any prohibited items for packing material allowed. 13. Liquid Material store also be arranged. 14. Empty Drums/discarded items must be sold. 15. Cleaning of all areas i.e Reception, Executive entry, Main corridor, all sections, QC Lab, Stores, packing hall, Changes rooms required before inspection 16. Process validation protocol and reports 17. Method validation protocol and reports 18. Stability protocols and stability data 19. Cleaning validation protocol and reports 20. HVAC Validation 21. DI and Distillation plant qualification