MAN HOLE 0.6 x 0.

SEPTIC TANK COVER SLAB DETAILS

100mmØ VENTILATING PIPE 3.0m HT.

CI MAN HOLE COVER 0.6 x 0.6 0.5m FREE BOARD


(HEAVY DUTY 250KG) BAFFLE WALL RCC 1:1.5:3.
RCC COVER SLAB 0.20 THK RCC COVER SLAB 0.15 THK

INSPECTION CHAMBER INSPECTION CHAMBER 0.6 X 0.45

GL GL

150Ø INLET
150Ø OUTLET TO SOAK PIT
150Ø HOLES 750C/C
BOTH VERTICALLY &
HORIZONTALLY
12mm THK. PLASTERING BRICK MASONARY IN CM 1:5
PLASTERING IN CM 1:5
SLOPE 1 : 10
SLOPE 1 : 10
CC 1:2:4, 0.2 THK

SECTION

INSPECTION CHAMBER 0.6 X 0.45 INSPECTION CHAMBER 0.6 X 0.45

BAFFLE WALL BAFFLE WALL

150Ø INLET IC MAN HOLE IC 150Ø OUTLET


0.6 X 0.6

SEPTIC TANK PLAN

BRICK CHAMBER WITH DRY JOINTS

RCC 1:1.5.3

INLET BRICK LINING WITH OPEN JOINTS

BRICK BAT AND BROKEN STONE

BRICK WORK OUTER CASTING


WITH COARSE SAND

SOAK PIT DETAILS

05 SEPTIC TANK & SOAK PIT DETAILS


BB30

D - CADD DESIGNER'S
AADI GROUPS MYSURU
Ph no. 98-86-471409

E-MAIL : dileepdcadd@gmail.com
CONSULTANTS :-

PROPOSED LAYOUT PLAN OF LFR & RETAIL OUTLET AT


ZALKI VILLAGE
PROJECT

INDIAN OIL CORPORATION LIMITED


SEPTIC TANK & SOAK PIT Belgaum Divisonal Office
DRAWING TITLE (FOR 50 USERS) OWNER

* REFER RELEVENT ARCHITECTURAL DRAWING NOTES:


* DO NOT COPY, RETRACE OR REPRODUCE THIS DRAWING
TENDER 28/09/2023 NTS

BB30
01. Bend, Hook, Covers & lap length should be taken as per 456-2000.
WITHOUT THE PERMISSION OF IOCL AUTHORITY. 02. Inspection chamber to be provide on both Inlet & Outlet. PURPOSE DATE SCALE
* ALL DIMENSIONS ARE IN METERS UNLESS SPECIFIED OTHER WISE.
03. The Invert of the outlet pipe shall be 50mm below the invert of the inlet pipe.
* DO NOT SCALE THIS DRAWING.
04. Provide 150Ø pipe at Inlet & Outlet.
AADI DILEEP
* ANY DISCREPANCY FOUND SHOULD BE BROUGHT TO THE
05. Top Level of cover slab shall be suit at site. DRAWN DESIGN BY DRAWING NO.
NOTICE OF THE ARCHITECT IMMEDIATELY. PROJECT DETAILS