Professional Documents
Culture Documents
CDP Worksheet
CDP Worksheet
CDP Worksheet
INWARD LOOKING:
PEOPLE AS SOCIETY
LOCAL ECONOMY
VISION REALITY
DESCRIPTOR SUCCESS INDICATOR CURRENT REALITY
GAP
OBSERVED CONDITION
VISION STATEMENT:
VISION REALITY
LOCAL DEVELOPMENT
VISION ELEMENT DESCRIPTOR SUCCESS INDICATORS
INDICATORS/RAPIDS
OUTWARD LOOKING:
INWARD LOOKING:
Access to safe potable water 100% of HH have access to safe potable
water through Level III water system.
Only 74% of HH have 26% of HH have no access to > Reaching the upland barangays to
access to safe potable safe potable water (Level cover with Level III is so expensive.
water (levell III) III) > Number of HH covered by the > HHs not
Level III water system has increased covered by Level III cannot afford
but 26% of the total HH is still expenses.
unserved. > Most of
the HH not served by Level III source
of water are located in the upland
barangays.
Only 85% of HH have 15% of HH have no sanitary > Most HHs without sanitary toilets are > Sanitary toilets were distributed in the
sanitary toilets toilets in the upland barangays > barangays but some HHs did not claim
Sanitary toilets are available but some because according to them they have no
HHs have complaining on the fund for the installation. Some have
installation because they said they have problems on access to water supply
no resources to install it. considering that water source is very far
from their houses.
14% Unemployment 14% Unemployment Rate
Rate for both Sexes for both Sexes
ION-FINDING MATRIX TRANSFORMING GOALS INTO ACTION
Occurrence of water borne > Provide subsidy to poor HHs To provide safe potable water To expand the coverage of Level III
diseases. to be covered by Level III. accessible to all. water system to uncovered
> Identify barangays.
sources of water in upland
area.
> Unsanitary environment and > conduct of IEC campaign > To promote healthy environment. To ensure every household have
possible cause of proliferation Pass and Ordinance penalizing sanitary toilets.
of diseases. HHs without sanitary toilets
> Provide subsidy
to poor HHs for the
installation of sanitary toilets
> Construction
of level I or level II water
system
INTO ACTION
STRATEGIES
PROGRAM/ PROJECTS/ ACTIVITIES/
LEGISLATIONS
IDENTIFYING PROJECT AND NON-PROJECT
PPAs
SECTOR PROJECT NAME COST PROJECT
ECT
NON-PROJECT LEGISLATION
SIFTING BY OWNERSHIP
P/P/As
SECTOR PROJECT NAME COST NATIONAL
LOCAL
PROV MUNICIPAL BRGY. PRIVATE SECTOR
RANKED LIST OF PROJECTS
LEVEL OF URGENCY
ESTIMATED COST
Sector Name of Project URGENT ESSENTIAL NECESSARY
LEVEL OF URGENCY
Enhancement of people's
right to balanced ecology
Promotion of Health and
Encouragement and
Preservation and
LIST OF PROJECTS
Safety
ASSIGNED
SECTOR WEIGHT (%) 10% 12% 11% 11%
(sector) (Name of Project) (cost)
0 0 3 0.36 1 0.11 2 0.22
1 0.1 1 0.12 1 0.11 1 0.11
1 0.1 1 0.12 1 0.11 1 0.11
1 0.1 1 0.12 1 0.11 1 0.11
1 0.1 1 0.12 1 0.11 1 0.11
1 0.1 1 0.12 1 0.11 1 0.11
1 0.1 1 0.12 1 0.11 1 0.11
1 0.1 1 0.12 1 0.11 1 0.11
1 0.1 1 0.12 1 0.11 1 0.11
1 0.1 1 0.12 1 0.11 1 0.11
1 0.1 1 0.12 1 0.11 1 0.11
1 0.1 1 0.12 1 0.11 1 0.11
1 0.1 1 0.12 1 0.11 1 0.11
1 0.1 1 0.12 1 0.11 1 0.11
1 0.1 1 0.12 1 0.11 1 0.11
1 0.1 1 0.12 1 0.11 1 0.11
1 0.1 1 0.12 1 0.11 1 0.11
1 0.1 1 0.12 1 0.11 1 0.11
1 0.1 1 0.12 1 0.11 1 0.11
1 0.1 1 0.12 1 0.11 1 0.11
1 0.1 1 0.12 1 0.11 1 0.11
1 0.1 1 0.12 1 0.11 1 0.11
1 0.1 1 0.12 1 0.11 1 0.11
1 0.1 1 0.12 1 0.11 1 0.11
1 0.1 1 0.12 1 0.11 1 0.11
1 0.1 1 0.12 1 0.11 1 0.11
1 0.1 1 0.12 1 0.11 1 0.11
1 0.1 1 0.12 1 0.11 1 0.11
1 0.1 1 0.12 1 0.11 1 0.11
1 0.1 1 0.12 1 0.11 1 0.11
1 0.1 1 0.12 1 0.11 1 0.11
1 0.1 1 0.12 1 0.11 1 0.11
1 0.1 1 0.12 1 0.11 1 0.11
1 0.1 1 0.12 1 0.11 1 0.11
1 0.1 1 0.12 1 0.11 1 0.11
1 0.1 1 0.12 1 0.11 1 0.11
1 0.1 1 0.12 1 0.11 1 0.11
1 0.1 1 0.12 1 0.11 1 0.11
1 0.1 1 0.12 1 0.11 1 0.11
1 0.1 1 0.12 1 0.11 1 0.11
1 0.1 1 0.12 1 0.11 1 0.11
1 0.1 1 0.12 1 0.11 1 0.11
1 0.1 1 0.12 1 0.11 1 0.11
1 0.1 1 0.12 1 0.11 1 0.11
1 0.1 1 0.12 1 0.11 1 0.11
1 0.1 1 0.12 1 0.11 1 0.11
1 0.1 1 0.12 1 0.11 1 0.11
1 0.1 1 0.12 1 0.11 1 0.11
1 0.1 1 0.12 1 0.11 1 0.11
1 0.1 1 0.12 1 0.11 1 0.11
1 0.1 1 0.12 1 0.11 1 0.11
1 0.1 1 0.12 1 0.11 1 0.11
1 0.1 1 0.12 1 0.11 1 0.11
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
Enahncement of economic
Preservation of Comfort
Improvement of public
and Convenmience
Promotion of full
employment
morals
justice
Order
11% 11% 11% 11% 12% TOTAL
PROJECTS
URGENCY LEVEL
GAM ESTIMATED COST
RANKING Sector Name of Project
1
1
CUMULATIVE COST
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
SUMMARY OF GAM RATINGS
No. Sector Name of Project Estimated Cost SOCIAL ECONOMIC ENVI INSTI
NG GRAND
TOTAL RANKING
SCORE
INFRA
LDIP FORM 1: IDENTIFYING PROJECT AND NON-PROJECT
PROJECT FILE
NO. RANDOM LIST OF PROJECTS INCLUDED IN INITIAL LIST
IST AND PRELIMINARY LIST
INCLUDED IN PRELIMINARY
LIST