A KOS BAHAN BAGI SEUNIT

BI BAHAN KUANTITI KOS JUMLAH


L SEUNIT
1 KAYU BLOK (1 CMX1CMX40CM) 30 RM3.00
2 MDF BOARD 30 RM2.00
3 PAKU HALUS 10 PAKET RM2.00
4 LAMPU LED 50 RM1.00
5. PRESPEK 50 RM2.50
6. GAM 20 RM1.00
7. KERTAS PASIR 20 RM1.00
8 SYELEK 10 TIN RM3.00
9 BATERI AA 1.5V 50 RM1.50
10 SUIS TEKAN TUTUP 50 RM0.50
11 PEMEGANG BATERI 50 RM0.80
12 WAYAR LEMBAR TUNGGAL 50 RM0.50
MERAH (0.5M)
13 WAYAR LEMBAR TUNGGAL 50 RM 0.50
HITAM (0.5M)
Jumlah
Kos upah: Bilangan pekerja xmasa x kadar upah sejam x bilangan hari
: 2orang x 5jam x rm5 x 5hari
: RM250

Kos OVERHEAD:
Perkara Kos sehari (RM) Bilangan hari Jumlah
Bil elektrik 2.00 5 10.00
Bil air 1.50 5 7.50
JUMLAH 17.50

JUMLAH MODAL: KOS BAHAN + KOS UPAH + KOS OVERHEAD


:RM605+ RM250+ 17.50
: RM872.50

KOS PENGELUARAN SEUNIT: JUMLAH MODAL/ BILANGAN (50 UNIT)


: RM872.50/50
: RM17.45

KOS JUALAN: KOS PENGELUARAN SEUNIT + (KEUNTUNGAN 50%)

:RM17.45 + (100/100 X 17.45)


: RM17.45 + RM17.45
:RM 34.90