From field analysis, we obtained information during
testing where the WWTP was filled full of water in a
condition where the WWTP has not been waterproofed and a leak occurs (cracks occur initial) where the inside of the WWTP should be given a waterproof layer before testing after that the new structure is loaded. The wall thickness design along with the reinforcement dimensions is very economical.
So what can we do:
o The B axis wall was dismantled and the new
wall thickness was 600 mm and carried out additional reinforcement and existing reinforcement will be maintained o The walls of axis A are strengthened using a 100mm thick jacketing method from the outside and inside in an elevation of 0.00 – 6.40 m including the other side that does not fail, a crack pattern occurs first reinforced with carbon fiber reinforced polymer plates. o For elevations of 6.40 -12.65 m, all walls are strengthened using the section jacketing method 100 mm thick. Analyze Calculation Structure of the WWTP with Computer Analysis We design load combination in full water condition & empty condition.
a. Load combination in Full water condition
b. Load combination in Empty condition
In this load combination, we trial and error up to 8
type combination of the water treatment simulation. And we get the need of the jacketing rebar. Exsisting rebar need for the structure waste water treatment.