Site Layout

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

AMENDMENT DATE DRAWN CHECKED DESIGN QP

BY BY ARCHT

B1 B5 B23 B37 F • UPDATED AND RELOCATED BICYCLE RACKS.


(CONT'N) • LANDSCAPE UPDATED.
DEC
2018
JEFF SAID JON/ PATRICK
MAK IT LEE
203345 • UPDATED PRIVACY SCREENS
• UPDATED MECH RISER LAYOUT.
25585 97250 80510 • ESS UPDATED.
CORRIGENDUM 8 DEC JEFF SAID JON/ PATRICK
G • NOTE ADDED. 2018 MAK IT LEE
• TRELLIS UPDATED.
SITE RESERVED FOR • SHIFTED EXISTING RWDP.
FUTURE PUBLIC HOUSING PICNIC LAWN
FL 104.50
NORTH


BICYCLE RACKS SHIFTED.
ADDED RWDP SERVING ROOF GARDEN.
PARK
BRIDGE
LL FL 102.80
N WA
GABIO RAMP U
P 1:25
SHELTER CK
CN 2750MM X 1100MM
DOGHOUSE
TO DETAIL
2750MM X 1100MM
ADULT
FITNESS
STATION 3
FL 104.55
JOG
GING
TRA
CN
PROPOSED SLAB PROPOSED SLAB FL 104.55
OPENING OPENING
SHELTER BIKE PARK
PLAYGROUND 6
FL 106.00 FL 106.05
:25 MID-WAY PLAZA 2
RAMP UP 450 ELDERLY P UP 1 FL 104.55
GRADIENT 1:25
FITNESS STATION 2 RAM
FL 106.00 SOAKAWAY
DRAIN
2750MM X 1100MM VOID

750
447 PROPOSED SLAB
OPENING

R8
446-3 Edeck slab and beam-
Basement slab-
Scaffold erection 446-3 Edeck slab and beam- 5
20/10 TURF & LANDSCAPING 1:2
DROP-OFF
PORCH 2
PRECINCT PAVILION 2
SFL 106.300
106.150 446 (FOR DETAILS REFER TO
LANDSCAPING DRAWINGS)
HARD COURT
Planks 6/10 comes AMP
UP FLAT COMMUNITY
GREEN LAWN SHINSHI
2750MM X 1100MM FL 106.00 PLAZA 3 R
PROPOSED SLAB
OPENING
PLAZA 1 SFL 105.700 Cast by 20/10 FL 106.00
FG 104.50
SFL 105.550 LAWN
FG 105.55

FUTURE GREEN RESERVE


Clear the place and arrange lorry FG 104.50 TURF & LANDSCAPING

RAM ADIEN
GR
00
P 4 1:12
P Ucrane
T
RAMP UP 450
for SKer to hoist rebar and
GRADIENT 1:25
ARRIVAL
(FOR DETAILS REFER TO
LANDSCAPING DRAWINGS)
SHELTER
FL 105.55 PRECISE
106 formwork erection. PLAYGROUND 5 2750MM X 1100MM
PLAZA
.100 PROPOSED SLAB
FL 106.00 FL 105.55
1:25
OPENING
LINKWAY 6 P UP
106.000 106.000 PWCS ADULT FITNESS RAM
105.000
104.850
manhole STATION 2
RA
IN G
ARD
cover-17/10 SHELTER
FL 106.05
FL 106.00
AUB
BU SFL EN PL. 106.000
SU LK 106
ME MP .150
TER NS
APPROXIMATE VOID PLAYGROUND 7
NS
RAIN GARDEN TERMINATION OF FIRE RA PLAYGROUND 8
105.500 ENGINE ACCESS ROAD MP FL 104.55
U FL 104.55
105.000 P1
DT top slab- :25
CONSUMER CONSUMER
21/9+7 (pull out). 1st storey part E & F SWITCH ROOM SWITCH ROOM JOGG SKer
90710

FSCF I SFL 106.150 SFL 106.150 ING T


105.000
104.85028/9 cast. DETENTION 6th storey-20/10 R ACK
105.000
VOID SFL 106.150
SFL 106.150 10th storey-
105.500 TANK 1 SFL 106.150 MID-WAY PLAZA 1
Falsework remain 5th storey- 30/9

96280
BELOW NS NS
22/10 BUL FL 104.55
NS NS K RAMP
RAMPCastedDOW on 10/10 VOID
9th storey- 26/9 NS NS SUM
MET P U P 1:25
N 350 PLAZA 4 ER
FL 106.00
S1
SFL 106.150
A B C
2nd sty-
SFL
106.1
1st sty- 1/10 50
SHELTER
FL 104.55
ELDERLY
JOG
GIN
GA
ZHONG KAI
105.350
RAIN GARDEN S3 RE
105.500 106.000 NS BE FITNESS A
NS RO D-
105.500
NS NS 447A VOID LIFT
LOBBY
OM
LIV
STATION 4
FL 104.55
SFL 106.150 DIN ING/

PROPOSED SLAB
OPENING
Edeck slab-
2750MM X 1100MM

21/10
URBAN WATER
HARVESTING ROOM

SFL 106.150
INFANT CARE
SFL 106.250
E
VOID
2750MM X 1100MM
PROPOSED SLAB
OPENING S2
RAM
GRA P UP
DIEN
T 1:1
KIT
CH -
EN
ING

1st sty- 15/10ROBOEDM-


LIV
DIN ING/
ING
SOUTH
PLAZA
Y5G
SHO D SEATING 2 HS FL 102.80
W ER RAIN HS
MA
RAMP UP
ACTIVITY AREA S2 CORNER GAR BE IN 1:25
FL 106.00 DEN RO D- BE
7th - 21/10* KIT OM
R O A D)

CHIL CH - RO D-
DRE EN OM
N APPROXIMATE LOCATION BE
(BOY 'S TOILE
6th storey-20/9 RO D-
S) T STO SHO OF FIRE ENGINE ACCESS OM
SHELTERED
LAY-BY RECEPTION/
STAFF OFFICE SUPERVISOR'S
RE
5th storey- 23/8
W ER ROAD FOR TURNING

SFL RAIN
LIV
DIN ING/
ING
SOON LEE
ROOM/ SICK BAY 106. GARD
EN SF 1st sty- 22/10DINLIVINING/
Backfill, CHIL
DRE 150 L 106 CH -
KIT BE
RO D-
SEA
N G
105.500 (GIR 'S TOILE EN OM
105.350
top slab L S) T S4 .85 HS
BE
105.650
PLAZA 2 0 HS RO D-
105.500
PL. 106.000 OM
ORY 4

UP 350 MA
BE IN BED- Compaction
BED- BED- BED-
GRADIENT 1:25 CHILDCARE CENTRE NS S3 RO D- MAIN
ROOM ROOM
MAIN MAIN
ROOM ROOM
OM BED- BED- BED-

/CE drain base-


SFL 106.250
AC
SPA U
CE STOR
E
NS
9th storey- 28/10
8th storey- 14/10 S1
RA
IN G
KIT
CH -
EN
ROOM
LIVING/
Anti-termite:
DINING ROOM 17/10 ROOM
GUO XIN
17/10, backfill, RAIN G
AR
DE
NS
NS ARDE N
HIGH LINKWAY PWCS COMM
LIVING UNITY
N APPROXIMATE LOCATION
VOID VOID KIT- HS
LIVING/
DINING
4 VOID OF FIRE ENGINE ACCESS CHEN
SFL 10 AREA
(C A T E G

connection

PROMENADE
ROAD FOR TURNING
LINKWAY 7 6.150 SFL 1
0 6.150 SFL 106.950
HIGH
LINKWAY 3
COMM
UNITY
LI
NS

SFL 10 VING AREA


RAMP UP
GRADIE
NT 1:1 SFL
VOID LIFT LOBBY
SFL 106.950

S4
HS
MAIN
BED-
CHENGYI
6.150 II
NS
2 106.450 1st column- 19/9 (inspection)
RAMP UP
GRADIENT 1:12
C B A
VOID ROOM
105.500
105.350
105.500
106.000 SFL
106
COMMUN
ITY LIVIN
SFL 106.1 G AREA II
2nd slab ; 1stwk oct 19/10 448A
.150 50
RA
CA RAMP DOWN
350 IN GA NS NS
SF
1

RD DOGHOUSE
LE
BUS SHELTER

EN SHELTER TO DETAIL L 106 FL 105.00 FL 104.50


2750MM X 1100MM SFL 106.950 CONSUMER
.95
5570

105.700 PL. 106.000 FL 106.05 PROPOSED SLAB SWITCH ROOM


0
PLAYGROUND 3
189860

189860
105.850 106.000 RE OPENING SFL. 106.950
105.850 STO SID
RE EN FL 106.00

BZ 1st column
BZ
STO T'S NS
C
SFL OMMIT

N
RE NS
RAIN GARDEN PLAZA 5

ARDE
106 TE SFL
.250 E C
EN
TR FL 106.00 2750MM X 1100MM 2nd slab-
1 06.9
5
19/10
E PROPOSED SLAB 0
DT top slab-

G
DETENTION PLAYGROUND 2 RAIN GARDEN OPENING

RAIN
S5
TANK 2
BELOW
105.850
106.000 OF
FIC
E
LINKB
R
AT 10 IDGE
TH ST
FL 106.00
NS WELL LINK

L
VOID SFL 106.150
COMMUN Y

PUNGGO
ITY LIVING
SFL 106.1 AREA TRELLIS TO
105.850
105.700
NS NS
50 LINKWAY 5 DETAIL
VOID
8th storey- holdCOMM 2750MM X 1100MM ADULT FITNESS
ARK DRIVEWAY

3th S1storey- 31/10 NS NS UNIT PROPOSED SLAB


STATION 1
7th storey- 7/7 SFL 10Y 6.LI15VIN0 G AREA RAIN
OPENING SHELTER FL 106.00
SFL
1 06.9
2th storey- 13/10 SFL 106.150 HIGH G ARDE FL 106.05
50

SFL 106.150 NS NS
LINKWAY 2 N
A B C

6th storey- 21/10 COMM


UNITY
NS NS VOID
446B 5th storey-LOBBY
7/10
LIFT RAIN G
AREA LIVING
SFL 10 I
6.150
6M WIDE CARP

ARDEN RAIN
CONSUMER CONSUMER GAR
SWITCH ROOM SWITCH ROOM
SFL 106.150 VOID 3rd sty - 19/10 DEN VOID
BULK S3 NS
SFL 106.150 SFL 106.150 COM
2nd storey- 19/9
TENDER DRAWING
SUMP M UNIT
E
METER AR Y LIVING
SFL EA I
ROAD

D 1st storey- 12/7 106.1


50
ELDERLY FITNESS PLAYGROUND 1
S2 2750MM X 1100MM
STATION 1 FL 106.00
PROPOSED SLAB NS
OPENING S2 FL 106.00
106.150 NS
NS
RAIN G PLATFORM
ARDE
N FL 105.00
Basement
RAMP UP 300 slab-RAMP TO BASEMENT
SFL
106
.150
SFL
1 06.1 FL 105.00 +286,1*
GRADIENT 1:10 FOR FOOTPATH, PLANTERS, LANDSCAPING 50 ED
22/10 CARPARK APPROXIMATE LOCATION
OF FIRE ENGINE ACCESS FEATURES REFER TO LANDSCAPE DRAWINGS
U
CE CA T
SFL NTRE ION
'(9(/230(17
ROAD FOR TURNING 106 I
GRADIENT 1:11.39 TRELLIS TO RA
DETAIL IN GA APPROXIMATE LOCATION RAIN
STO
RE
1st column
.250
%2$5'
RD OF FIRE ENGINE ACCESS CH
EN GAR RE ILD-
ROAD FOR TURNING DEN 2nd slab- 19/10
PUNGGOL

PL. 106.000 TO N'S RAIN GARDEN


ILE
T SH
WE O- after 2
HDB Hub 480 Lorong 6 Toa Payoh
S4
S3
Slab mesh R
NS
Singapore 310480
75055

E
ACK
2750MM X 1100MM NS
105.850 105.850 RE

ARY LIN
SFL
PROPOSED SLAB
days cast STA CEPT

R
105.700 106.000
OPENING
106
.150 4th storey- 22/10 FF ION/ DINING AREA DINING AREA DINING AREA

BUFFE
ARE
A

G SETB
PLAYGROUND 4 3th storey- 30/9 2750MM X 1100MM 1st column TRELLIS TO
DETAIL
SH

PROPOSED SLAB
FL 106.00 FL
2nd slab- 7/10 OWNER SIGNATURE:
EL

10 OPENING
6.0 RAI S1 CHILDREN'S
TE

SICK STORE STORE KITCHEN


N

BOUND
5 TOILET SFL 106.150
GA
R

VOID BAY
Slab mesh after 2

GREEN
RD NS RAIN GA VOID LIFT LOBBY
EN NS RDEN RAIN GARDEN SFL 106.150 KITCHEN

BUILDIN
S FL
106.1
50
PLAZA 6
days cast DRAWING NO. HB-D1809-AR-081 REVISION: G

93580
RA ELDERLY FITNESS SFL 106.150
IN G FL 106.00 SFL 106.150
C B A
AR STATION 3
CO DE NS 3rd storey- 12/10
UN
6 th - S22/10
IT
MM
N FL 106.00 LINKWAY 4
NS
NS PRECINCT NAME: PUNGGOL POINT COVE BTO
FL Y LIVIN
106 SFL 106.1
2nd storey- 12/9 NS PER
VOID
.150 G AR 50 S4
5th storey-
NS 30/9
EA
2nd storey-PANTRY17/10 VOID
NS PWCS base 1/10 DETENTION PROJECT TITLE
4th storey- 8/9
APRON DRAIN
cast (joining area) CONSUMER CONSUMER TEACHER'S
EDUCATION CENTRE II
1st storey- SFL8/8
106.250 448B 448A IC- 5/10
TANK 3
BELOW
TO DETAIL
1250MM HIGH GS TURFED FIRE
SWITCH ROOM
SFL 106.150
SWITCH ROOM
SFL 106.150
ROOM/ AREA ACTIVITY
ROOM
PUNGGOL NORTH CONTRACT 14 & COMMON
2nd storey- NS 27/10
RAILING A ENGINE ACCESS
1st storey-
SFL
106
NS
27/9
SF
L1
06. FL 105.00 FL 104.50
GREEN - PROPOSED PUBLIC HOUSING
150
Backfill, lean DEVELOPMENT COMPRISING 5 BLOCKS OF
105.850
105.700
105.850
106.000
VOID LIFT
LOBBY B
3th storey- 18/10
COMMUNITY LIVING AREA
SFL 106.150 106.000
.1 50
S2
SFL
2th storey- 9/9. concrete Basement slab- 2750MM X 1100MM 106.150

VOID
106.150

C
NS
Handover to do 3 days after soil
PROPOSED SLAB
OPENING Materials clear - 8/ 14 / 20 / 21 / 22 / 23 - STOREY RESIDENTIAL
6000 106.000
zhongkai RAMP UP 300 RAMP TO BASEMENT
S1
SFL 106.150
slab cleard. GRADIENT 1:25
CAR PARK BUILDINGS (TOTAL 1178 UNITS) WITH 1 LEVEL
CE DRAIN

RW wall -15/10 GRADIENT 1:8.24 S5 OF BASEMENT CAR PARK, ESS, PRECINCT


10th- Hold VOID basement DEVELOPMENT
105.850
105.700
105.850
106.000
TO CE DRAIN
NS NS
9th- 7/10 446A
VOID
slab -18/10
BOUNDARY TRELLIS TO
DETAIL 2nd storey PAVILION, COMMUNITY FACILITIES &
first portion ramp-
RAMP UP 150 VOID DECK/ PLAY AREA
SFL 106.150 CONSUMER
SWITCH ROOM EPS
448C 105.850
105.200
BU
SU LK
1st storey-
C
14/10
O
NS COMMON GREEN AT PUNGGOL WAY
SFL 106.150 BULK 105.700 ME MP SW NSUM SFL
SUMP
106.000
DROP-OFF TER SFL ITCH ER 1 06.1
106 ROO 50
METER .15 M
LINKWAY 3
BE PORCH 1
106.000 105.850 0
NS 105.700
VO
IDDE
C
SFL K/ PL
NS 105.850
448 SFL 105.400
UR
HA BAN W
2750MM X 1100MM 106 A Y A Edeck- casted on 11/10 SFL RVES ATE
SITE RESERVED FOR
GRADIENT 1:25

.15 RE 106 TING R


0 PLAZA 7
PL. 106.000 A
RAMP UP 800

PROPOSED SLAB .15


0 ROOM
106.000 COLOURED PREMIX OPENING
PRECINCT PAVILION 1 SFL 105.250 Sprinkler tank
105.850 FINISHES AT EPS AREA DOGHOUSE PLACE OF WORSHIP
TO DETAIL 22KV/LV (W/ ACCESS TO base casted

25
106.000 (CHINESE TEMPLE) BASEMENT)
LOT NO.: MUKIM NO.:

31
105.850 ESS 104.950 105.100 27/9

R
105.700 SFL 105.650
18525

105.250
105.850
105.050
Wall- 01142L PT, 01143C PT, 01294C PT, 02681X PT, 02900X PT, 21
106.000
RAMP UP 150 105.500 105.500
105.200
RAMP UP 150 GRADIENT 1:16 105.100
105.050 105.050
105.500
99571W PT, 99572V PT, 99576K, 99577N PT, 99578 X, 99579L PT,
RAMP UP 650 GRADIENT 1:16
GRADIENT 1:15
105.050 105.200
LINKWAY 2 2750MM X 1100MM 104.550
99589A, PT, 99590P PT, 99591T PT, 99603K, 99604N PT, 99613V,
6000

PROPOSED SLAB OPENING


99614P & 99615T
RA ADIE

SIGNAGE TO
GR
MP N

DETAIL 105.700
6M WIDE CARPARK
UP T 1:2

FL 103.700
20 5

105.850 105.050
HIGH LINKWAY 1 10000
0

CONCRETE PLUNTHS 105.200


105.050
105.850 RAMP UP 400
GRADIENT 1:25
DRIVEWAY 104.400 JOB TITLE

RA ADIE
BA 8000 (L) X 500 (W) X 150 (H)

BA

GR
104.900 106.000

MP N T
105.200 104.950 104.550
105.050 104.900 104.900

UP 1:1
105.100
RAMP UP 200

130 5
105.050 105.050

PUNGGOL NORTH CONTRACT 14

0
105.650
GRADIENT 1:15 105.800
COLOURED PREMIX CONCRETE PLUNTHS
REMOVABLE-TYPE BOLLARDS
00 FINISHES AT EPS AREA 8000 (L) X 500 (W) X 150 (H)
00

1
90
R RAMP UP 550 R
90 103.750
& COMMON GREEN
GRADIENT 1:12

LINKWAY 1 DRAWING TITLE (EST. BLK. 446)


BUS SHELTER 2

E-DECK LEVEL FLOOR PLAN


E-DECK LEVEL FLOOR PLAN 59680 80305
3500
63360

SCALE: 1 : 500 203345

(FOR ACTUAL LANDSCAPE LAYOUT AND


DIMENSION TO REFER TO LANDSCAPE
DRAWINGS) B1 B14 V1 V2 B24 B37 SCALE : 1:500 DATE : JUN 2018

DRAWN BY: JEFF CHECKED BY: SAID


GENERAL NOTES: (FOR MSCP) 10. PROVIDE FIRE EXTINGUISHERS IN ACCORDANCE WITH PREVAILING CODES & 18. EMERGENCY LIGHTING/ DIRECTIONAL EXIT SIGN/ EXIT SIGN TO BE PROVIDED ALONG AMENDMENT DATE DRAWN CHECKED DESIGN QP AMENDMENT DATE DRAWN CHECKED DESIGN QP AMENDMENT DATE DRAWN CHECKED DESIGN QP
NOTES : REGULATIONS. THE PATH LEADING TO ALL EXIT STAIRCASES/ ESCAPE ROUTE & ALL SERVICES BY BY ARCHT BY BY ARCHT BY BY ARCHT
1. OPENINGS TO BE PROVIDED FOR FLOOR WASTE, FLOOR TRAP, GULLEY & INSPECTION
1. THE CONTRACTOR MUST CHECK ALL DIMENSIONS ON SITE. ANY DISCREPANCIES IN CHAMBER AS INDICATED ON SANITARY DRAWING. 11. WALL ABUTTING CAR WASH BAY TO BE PROVIDED WITH FULL HEIGHT 200mm X 200mm ROOMS WITH MORE THAN 1 EXIT. ALL DIRECTIONAL EXIT SIGN/ EXIT SIGNS TO BE OF E • CHANGED DIRECTION OF DUCT. DEC JEFF SAID JON/ PATRICK CORRIGENDUM 3 NOV JEFF SAID JON/ PATRICK CORRIGENDUM 1 OCT JEFF SAID JON/ PATRICK
C A
THE FIGURED DIMENSIONS ARE TO BE REPORTED IMMEDIATELY TO THE ARCHITECT 2. FOR FINISHES TO MULTI-STOREY CARPARK TO REFER TO SPECIFICATION. PATTERN GLAZED WALL TILES FINISH AND PROVIDE A WATER TAP. “RUNNING-MAN” TYPE. (CONT'N) • SHIFT RAILING IN. 2018 MAK IT LEE • NON SHELTERS UPDATED TO TALLY WITH C&S. 2018 MAK IT LEE • HIGH LINKWAY TYPE 4 & 5 OMITTED. 2018 MAK IT LEE
OR ENGINEER. DO NOT SCALE-OFF MEASUREMENT FROM DRAWINGS. 19. EMERGENCY LIGHTING TO BE PROVIDED AT ALL EXIT STAIRCASES, LOBBIES, TELECOM • DOOR AT STORE UPDATED. • ME DUCTS UPDATED. • ANNOTATIONS ADDED.
3. ALL FIRE RATED-DOOR SHALL BEAR APPROVED LABEL AND FITTED WITH SELF-CLOSING 12. ALL DRY RISERS SHALL BE 100mmØ WITH 2-WAYS BREECHING INLET AT 1ST STOREY & • BICYCLE RACKS SHIFTED. • DETENTION TANK LOCATION ADDED. • LANDSCAPE UPDATED.
6XUEDQD-XURQJ&RQVXOWDQWV3WH/WG
2. WHILE EVERY CARE HAS BEEN EXERCISED IN HIGHLIGHTING THE AMENDMENTS EQUIPMENT ROOM, PUMP ROOM & OTHER SERVICES ROOMS. • WALLS ADJUSTED. • URBAN WATER HARVESTING ROOM REMOVED. • APRON DRAIN UPDATED AND CE DRAIN ADDED.
DEVICE AND SHALL BE CONSTRUCTED AND INSTALLED TO COMPLY WITH LANDING VALVES AT 1ST / TYPICAL STOREY WITH DIRECTIONAL SIGNAGES AS
VIA "CLOUDING", CONSULTANT DOES NOT WARRANT THE ACCURACY AND SPECIFICATIONS STIPULATED UNDER SS332 SPECIFICATION FOR FIRE DOORS. REQUESTED BY REGISTERED INSPECTOR WITHOUT ADDITIONAL COST. 20. FOR EXIT SIGNAGES/ EMERGENCY LIGHTINGS TO ALL DECK OF MSCP, TO REFER • METAL GATE ADDED. • LETTER BOXES RELOCATED. • GENERAL NOTES ADDED. 168 Jalan Bukit Merah #01-01 Connection One, Singapore 150168
• LINKWAY & HIGH LINKWAY TO BUS SHELTER 1 • STAIRCASE UPDATED.
COMPLETENESS OF SUCH HIGHLIGHTING. ELECTRICAL DRWG. CORRIGENDUM 2 Tel : + 65 62481288
4. ALL OPENINGS OF SERVICE PIPES TO BE EFFECTIVELY INSTALLED WITH APPROPRITE 13. PROVIDE GS GRATING WITH GAP NOT GREATER THAN 12mm OVER ALL CUT-OFF ADDED.
CORRIGENDUM 4 NOV JEFF SAID JON/ PATRICK B • RWDP AND T-DUCT SIZE ADJUSTED. NOV JEFF SAID JON/ PATRICK
FIRE STOPPED MATERIALS AFTER INSTALLATION OF PIPES/ CABLES. DRAINS AT ACCESSIBLE ROUTES AND LINKBRIDGES. 21. LIFT SHALL BE PROVIDED WITH EMERGENCY POWER SUPPLY FROM STANDBY • LINKWAY TO BUS SHELTER 2 UPDATED. D • BULK METER SUMP RELOCATED. 2018 MAK IT LEE
www.surbanajurong.com
3. THE CONTRACTOR SHALL VERIFY AND SATISFY HIMSELF THAT THE LATEST GENERATING PLANT FOR HOMING TO THE DESIGNATED FLOOR WHEN THERE IS A POWER • PRECINCT PAVILION 2 UPDATED. • STACK PIPE DUCTS OMITTED DOOR & WALL. 2018 MAK IT LEE
Company Regn No : 200304951Z
• REMOVED DCS DUCT NAMING. • BI RELOCATED.
AMENDMENTS ARE USED FOR CONSTRUCTION IN ACCORDANCE TO THE LATEST 5. GAS PIPE IS NOT ALLOWED WITHIN ANY SERVICES ROOM/ STAIRCASE 14. HANDRAIL MUST BE CONTINUOUS THROUGHOUT, MINIMUM 1 NO. TO STAIRCASE WITH FAILURE IN THE BUILDING. • LANDSCAPE UPDATED. • COMMUNITY LIVING ROOM UPDATED.
• MV DOGHOUSE RELOCATED. • LENGHTENED COLUMN TO TALLY WITH C&S.
DRAWINGS. 6. NO OPENING OR VOID IN ANY SAFETY RAILING & PARAPET WALL TO ALLOW THE R = 2 OR R > 2 & INTERMEDIATE HANDRAIL REQIRED FOR EXIT STAIRCASE WIDTH >2M 22. MINIMUM HEIGHT CLEARANCE FOR CAR PARK DECK: • MV DOGHOUSE ADDED. • FIRELIFT D UPDATED. DRAWING NO. SB-DP-HAPG-D1805-AR-081 REVISION: G
• EPS ADDED.
PASSAGE OF A 100mmØ SPHERE. AND SPACED AT NOT LESS THAN 1000mm OF CLEAR-WIDTH. • CAR PARK DECK CEILING HEIGHT = MIN. 2.5m CLEAR • TRELLIS ADDED. • MECH RISER ADDED.
4. THIS DRAWING SHALL NOT BE USED OTHER THAN FOR ITS INTENDED PURPOSE AS CORRIGENDUM 7 • STAIRCASE UPDATED. • E-DUCT OMITTED.
7. PROVIDE CONVEX MIRRORS AT DRIVEWAYS & EVERY JUNCTIONS OF RAMP FOR SO 15. ALL RAINWATER DOWN PIPE (RWDP) & DOWN PIPE (DP) SHALL DISCHARGE TO THE • CAR PARK DECK HEADROOM (BEAM) = MIN. 2.2m CLEAR LIM YU FENG JONATHAN /
STATED HEREIN. F • FHR/DR ADDED. DEC JEFF SAID JON/ PATRICK • ANNOTATIONS ADDED. • T DUCT RELOCATED. LEE CHAY PEW PATRICK
REP APPROVAL ON SITE. NEAREST HOUSE DRAIN. GRATING TO BE INSTALLED FOR ALL HOUSE DRAINS & ALL • CAR PARK RAMP HEADROOM (BEAM) = MIN. 2.2m CLEAR • BI ADDED. 2018 MAK IT LEE • E-DUCT AND DCS SWAPPED. MAK IE TING AMANDA
FOOTPATHS. • STAIRCASE HEADROOM = MIN. 2.1m CLEAR CORRIGENDUM 5 DEC JEFF SAID JON/ PATRICK • R DUCT CHANGED TO E-DUCT. DESIGN ARCHITECT QUALIFIED PERSON (ARCH)
8. EXACT GANTRY LOCATION SHALL BE DETERMINED BY SO REP ON SITE. • RELOCATED STACK DUCT OPENING. E • ADDED COLUMN TO TALLY WITH C&S. 2018 MAK IT LEE
16. TO PROVIDE AND LOCATE AT THE LIFT LOBBY THE LIFT NOTICE PLATE & SIGNAGE • SERVICES ROOM CEILING HEIGHT = MIN. 2.5m CLEAR • ADJUSTED PARAPET WALL.
9. CONTRACTOR TO SUBMIT WORKSHOP DRAWINGS WITH PE CERTIFICATION TO THE • ADDED FALSE COLUMN. • UPDATED LIFT BEAM. THE OWNERSHIP OF THE COPYRIGHT IN THIS DRAWING IS RETAINED BY SURBANA JURONG
INDICATING THE LOCATION OF DRY RISING MAINS. 23. MAINTENANCE PATHS TO LANDSCAPE AREAS TO BE DECIDED BY SO REP. • ADDED MV SHAFTS.
DESIGN STRUCTURAL ENGR’S APPROVAL FOR CLADDING, RAILINGS, GRILLES, SUN • BOX UP AS PER UPPER LEVEL. CONSULTANTS PTE LTD WHOSE CONSENT MUST BE SOUGHT BEFORE ANY USE OR
SCREENS & OTHER SIMILAR DETAILS NOT INCLUDED IN THE DETAIL DRAWINGS. 17. MINIMUM 2 NOS. OF ILLUMINATED ESTATE BLOCK SIGNAGES TO BE PROVIDED TO EACH • STAIRCASE GRADED. • OMIT R-DUCT ANNOTATIONS AND DOORS.
BLOCK. • UPDATED OPENING TO 3M & 1.5M. REFERENCE : REPRODUCTION OF THE DRAWING OR ANY PART THEREOF CAN BE MADE.
• ADDED RAILINGS.

DwgFileName: D1805_A-081-S01_LA--PG-G

You might also like