MEASUREMENT SHEET FOR LOUVER PAINTING WORK AT SIDDHA ESPLANADE PROJECT

SL.NO. DESCRIPTION OF ITEM UNIT NO LENGTH BREADTH TOTAL QTY


SQM 1 0.915 0.454 0.415
SQM 1 1.080 0.454 0.490
SQM 1 1.225 0.454 0.556
SQM 1 1.360 0.454 0.617
SQM 1 1.475 0.454 0.670
SQM 1 1.570 0.454 0.713
SQM 1 1.638 0.454 0.744
SQM 1 1.675 0.454 0.760
SQM 1 1.710 0.454 0.776
SQM 1 1.705 0.454 0.774
SQM 1 1.690 0.454 0.767
SQM 1 1.650 0.454 0.749
SQM 1 1.593 0.454 0.723
SQM 1 1.550 0.454 0.704
SQM 1 1.506 0.454 0.684
SQM 1 1.462 0.454 0.664
SQM 1 1.425 0.454 0.647
SQM 1 1.405 0.454 0.638
SQM 1 1.417 0.454 0.643
SQM 1 1.445 0.454 0.656
SQM 1 1.500 0.454 0.681
SQM 1 1.585 0.454 0.720
1 MS LOUVER PAINTING AT FEATURE WALL
SQM 1 1.695 0.454 0.770
SQM 1 1.850 0.454 0.840
SQM 1 2.060 0.454 0.935
SQM 1 2.310 0.454 1.049
SQM 1 2.545 0.454 1.155
SQM 1 2.750 0.454 1.249
SQM 1 2.935 0.454 1.332
SQM 1 3.090 0.454 1.403
SQM 1 3.230 0.454 1.466
SQM 1 3.352 0.454 1.522
SQM 1 3.455 0.454 1.569
SQM 1 3.530 0.454 1.603
SQM 1 3.600 0.454 1.634
SQM 1 3.665 0.454 1.664
SQM 1 3.705 0.454 1.682
SQM 1 3.742 0.454 1.699
SQM 1 3.775 0.454 1.714
SQM 1 3.790 0.454 1.721
SQM 1 3.822 0.454 1.735
SQM 1 3.825 0.454 1.737
SQM 1 3.837 0.454 1.742
TOTAL QTY IN SQM= 45.011
TOTAL QTY IN SFT= 484.502
COST COMPARATIVE STATEMENT OF LOUVER PAINTING WORK AT SIDDHA ESPLANADE PROJECT

PROPOSED RATE OF
TOTAL INTREX
SL.NO. DESCRIPTION OF WORK UNIT SIDDHA
QTY
RATE AMOUNT RATE AMOUNT

Towards the cost of supply and


applying of 1coat primer 2coat N C
metal putty then proper sanding,
applying 1coat duco primer by
1 SQ. FT. 484.502 101.56 49204.853 180.00 87210.36
spray with check putty and
applying 2 or more coat duco
paint by spray finish on feature
iron stracture wall

TAL COST (EXCLUDING GST)= 49204.853 87210.36

FURTHER NEGOTIATED AND AGRRED BY VENDOR 140.78 68,207.61

ITEM DUCCO PUTTY ON STRUCTURAL ELEMENT EXPOSED SURFACE


RATE
DETAILS OF ANALYSIS 45.4 SQM

SL.NO DESCRIPTION UNIT QTY RATE COST


1 MATERIAL - -
MRF Duco Primer Ltr 12 349.25 4,191.00
MRF auto coat putty Ltr 47 265.00 12,455.00
Duco zet Black
Duco Red
Thinner Ltr 30 110.00 3,300.00
M-seal gm 500 1.00 145.00
NC Putty KG 12 120.00 1,440.00
MRF paint Ltr 12 309.00 3,708.00

2 LABOUR
For Putty - 4 SQM 136.2 107.64 14,660.57
FOR PAINTING+ PRIMER-3 SQM 544.8 107.64 58,642.27

39899.75

39899.75

4 SUNDRY & CONTINGENCIES % 1% 7,891.71 78.92

5 SAFETY & PPE % 1% 7,891.71 78.92


5 WATER & ELECTRICITY CHARGE % 1% 7,891.71 78.92
6 TOOLS & PLANT % 1% 7,891.71 78.92

7 MACHINARY HIRE CHARGE % 1% 7,891.71 78.92

40,294.15

6 OVER HEAD & PROFIT % 15% 40,294.15 6,044.12

SUB TOTAL 46,338.28

ESI &PF (50%) 16.50% 19949.88 3291.7294


49,629.73

RATE/ SFT 101.56