CHINA COMMUNICATION CONSTRUCTION (ECRL) SDN. BHD.

EAST COAST RAIL LINK (ECRL) PROJECT

GENERAL PERMIT TO WORK

GENERAL PERMIT TO WORK Permit No.:


许可证编号
GW/T3/23/
一般作业许可证

This permit is valid for one shift from the time of approval. Application must be submitted at least one day in advance.
许可证的有效期为一个班次,提前一天申请

Part 1: Application – to be completed by Sub-Contractor 第一部分申请—承包商填写

Work Performed by: CCC(ECRL)


承包商名称: (Name of Sub-Contractor 承包商名称)
Name of Supervisor in Charge:
作业负责人:
Location: TUNNEL 3
位置: (Sketch Attach 附带图)
Date & Time of Work: From: To: No. of Workers:
作业的时间和日期: 自: 至: 工人人数:
Safety Requirements to be complied with Prior Application of permit 以下安全要求必须在申请许可证前完成:
 New workers been through Induction (Induction)
新进场人员完成进场培训
 Approved Method Statement (MS) 施工方案审批通过  Temporary working platform ( scaffold, ladder, MEWP)
 HIRARC communicated with work contractor. 临时作业平台(脚手架、梯子、登高设备)
HIRARC(安全风险评估)与负责承包商交底  Electrical Safety (Industrial Plug, Cable Condition,Cable
 Good weather 良好天气 Hanger).
安全用电(工业插头、电缆情况、电缆吊架)
 Provide warning signs.警告标志
 Drinking water and food available 饮用水和食品具备
 Improve adequate lighting.改善照明
 Access to work site condition  Qualified tool and equipment 合格的工具设备
 Supervisor on duty 监护人在唱  Appropriate PPE with SIRIM Certified or Equivalent.
 Transportation for worker 交通车辆 恰当的劳保用品
 Communication is available 沟通方式( Walkie  ERP (ERT, Emergency Vehicle, First Aid Box,
Talkie, Wisel, loudhailer etc.) Fire extinguisher, Fire Blanket etc.) 应急反应计
 Traffic Controller ( Banksman , flagman) 划
交通管理员(交通信号工)  Other 其他

Description and Nature of Work: Requested by: 申请人


作业的性质与描述:
Name:
1. EXCAVATION (MUCKING OUT) 姓名
2. SHOTCRETE
3. SECOND LINING WORK Signature:
4. REBAR WORK/STEEL WORK 签名
5. INVERTED ARC WORK Date / Time:
6. GROUTING WORK 日期/时间

Part 2: Checking by SECTION Safety & Health Officer / Site Engineer 第二部分:由分部的安全官/主管工程师检查

Others 其它注意事项:

Name: Signature: Date / Time:


姓名: 签名: 日期/时间:

Standard Operating Procedure – Permit to Work Rev 04


02/08/2021
Part 4: Approval By SECTION Project
Part 3: Reviewed By Section Worksite Manager Manager/Construction Manager/Authorized Person by
第三部分:分部现场工点经理审核 Section General Manager
第四部分:分部项目经理/分管副经理/项目经理授权人审批
 Acknowledge work to be done 确认安全要求具备 The above mentioned work is 上述工作
 Comments 意见: APPROVED 批准 / NOT APPROVED 不批准

Name / Signature Date / Time Name / Signature Date / Time


姓名/签名 日期/时间 姓名/签名 日期/时间

Part 5: Notification of Completion of Work by Sub-Contractor 第五部分:由承包商通知工作已经完成

Hereby, I have confirmed The above work was completed and work area has been clean Date / Time:
and clear without any risk 本人确定上述工作已经完成,现场已整洁完毕无隐患: 日期/时间:
Name: Signature: Date / Time:
姓名: 签名: 日期/时间:
ORIGINAL – to be displayed prominently at the working location and return to CCC-ECRL HSE Department after
work. 2nd Copy – CCC-ECRL HSE Dept.
原件---必须展示在工作现场,作业完成后提交分部 HSE
Note 办公室第一份复印件---存放在 HSE 办公室
HSE Department reserve the right to REVOKE this PTW if there is any noncompliance's to the HSE Requirements
during sub-contractor performing their work. 当分包商在作业中出现任何不符合 HSE 要求的情况,HSE 部门保留
撤销此
PTW 的权利。
Applicant must copy and distribute this permit after part 4 is completed.
All the appropriate signatures must be obtained before work starts.
申请人必须在第四部分完成后复印并分发本作业许可证。
工作开始前必须签字完毕。

Standard Operating Procedure – Permit to Work Rev 04


02/08/2021