The three sentence summary is:
The document outlines a plan to lift and hoist pump C-4 which includes erecting a temporary scaffolding near the pump's location, attaching lifting belts rated for 2 tons to the scaffolding and pump rated at 590 kg, and using a chain block rated for 3 tons to lift the pump into place and then lower it onto its foundation for alignment and anchoring. Safety precautions such as using proper PPE, inspecting lifting equipment, barricading the work area, and having fire safety equipment on site will also be implemented.
The three sentence summary is:
The document outlines a plan to lift and hoist pump C-4 which includes erecting a temporary scaffolding near the pump's location, attaching lifting belts rated for 2 tons to the scaffolding and pump rated at 590 kg, and using a chain block rated for 3 tons to lift the pump into place and then lower it onto its foundation for alignment and anchoring. Safety precautions such as using proper PPE, inspecting lifting equipment, barricading the work area, and having fire safety equipment on site will also be implemented.
The three sentence summary is:
The document outlines a plan to lift and hoist pump C-4 which includes erecting a temporary scaffolding near the pump's location, attaching lifting belts rated for 2 tons to the scaffolding and pump rated at 590 kg, and using a chain block rated for 3 tons to lift the pump into place and then lower it onto its foundation for alignment and anchoring. Safety precautions such as using proper PPE, inspecting lifting equipment, barricading the work area, and having fire safety equipment on site will also be implemented.
Necessary permit to work shall be issued before commencing work at the site. Mobilization of material along with tools, equipment, and manpower from workshop to working area. Use Fork Lift/Hand pallet jack to Shift Pumps closest to the desired location. Make Temporary scaffolding platform to align with CFP room stairs steps. After shifting the pump C4, near the foundation scaffolding shall be install with the provision of chain block arrangement. According OSHA 29 CFR 1926.454 scaffolding capacity 450kg/m2 Total area of scaffolding = 4.39m2 with capacity of 1975kg After completing the erection of scaffolding for lifting of pump then Lifting belt capacity 2 ton shall be wrapped around the scaffolding loading member. Second lifting belt attached with pump weight 590 kg then attached the one end of chain block capacity 3 ton to first lifting belt and other end to second lifting belt. After ensuring all lifting equipment properly attached the lift the pump to desired location. Then lowering the pump on foundation for leveling ,alignment & anchor grouting for Pump C4 After completing the job scaffolding shall be dismantled. HSSE All PPE equipment requirements will be implemented as per HSSE guidelines. Only inspected and approved erected lifting and hoisting scaffolding arrangement will be allowed to be used. Before erection of scaffolding for lifting and hoisting ground level should be checked. Before the start of the activity working area will be barricaded. Fire extinguisher & firewatcher shall be placed at the working area.