South Gas Compression pipeline Project (Harad) JOB No:

PROJECT / UNIT QC Record No


CIV-0
South Gas Compression pipeline Project (Harad)
Sheet: 1/1
SURVEYING REPORT
TOTAL STATION: TOPCON DS-101 SN= CM2342 AUTO LEVEL:Auto level TOPCON MODEL AT-B2 SER:QQ4273

CALIBRATION DUE DATE: 02/12/2023 CALIBRATION DUE DATE: 02/12/2023

AREA : K7 base course FOR PATROL ROAD pipel


DESIGN CO-ORDINATES ACTUAL CO-ORDINATES DIFFERENCE ELEVATION ACTUAL DIFFERENCE
AXIS NO. Remarks
Easting Northing Easting Northing Easting Northing ELEVATION ELEVATION ELEVATION

1 306730.512 2661465.244 306730.510 2661465.243 0.002 0.001 291.939 291.929 0.010

2 306444.321 2661367.791 306444.319 2661367.790 0.002 0.001 291.939 291.918 0.021

3 306329.424 2661581.241 306329.422 2661581.240 0.002 0.001 291.939 291.938 0.001

M
L=446

SURVEY(PETROJET) CONTRACTOR (PETROJET) QUALITY (PETROJET) QUALITY (SAIPEM)

NAME: NAME: NAME: NAME:

SIGNATURE: SIGNATURE: SIGNATURE: SIGNATURE:

DATE: DATE: DATE: DATE:

1/1