UPPERSTRUCTURE / Swing Device

IMPORTANT: Pay attention to the mounting direc- IMPORTANT: Pay attention to the mounting direc-
tion of the 2nd stage carrier. tion of the sun gear.

24. Install the 2nd stage carrier (18) assembly onto 29. Install 1st stage sun gear (2) into the 1st stage
the spline of shaft (30), while the concave part of carrier (21) assembly with the stepped side of the
the boss in bottom side of the carrier comes in sun gear facing down.
contact with lock plate (16).
Concave Part 30. Install pipe (32) into housing (25) with seal tape
18
wound on the threaded part of the pipe.
16 : 18 mm
30
31. Wind seal tape on drain plug (31), then install it
into pipe (32).
: 8 mm
: 50 N⋅m (5 kgf⋅m, 36 Ibf⋅ft)

32. Fill gear oil into ring gear (24) until the middle part
W178-02-06-014 of the 1st stage sun gear (2) is submerged.
(Approx. 6.7 L, 1.77 Us gal)
25. Install 2nd stage sun gear (20) into the 2nd stage
carrier (18) assembly with the small diameter part 33. Clean off the old THREEBOND, then apply new
of the 2nd stage sun gear facing up. THREEBOND #1212 onto the motor (1) mounting
surface of ring gear (24).
26. Clean off old THREEBOND and apply new
THREEBOND #1215 onto the mounting surface CAUTION: Motor weight: 47 kg (100 lb)
of ring gear (24) inside of housing (25).
34. Install eyebolt (M10) to motor (1), and lift it up by
27. Install eyebolt (M12) to the motor mounting crane. Align the mating marks, then fasten the
threaded hole on ring gear (24). Lift the ring gear swing motor and ring gear (24) with bolts (22) (8
up by crane, to install it on housing (25) with used).
socket bolts (23) (12 used) while aligning the : 10 mm
matching marks made when disassembling. : 88 N⋅m (9 kgf⋅m, 65 Ibf⋅ft)
: 10 mm

Eyebolt Mounting
28. Install the 1st stage carrier (21) assembly onto the Position
spline of 2nd stage sun gear (20).

W178-02-06-005

W2-6-17