KENMARE

Paddock Designation: Paddock 61 Date Logged: 21/Apr/2022


Berm Designation: Berm 61 Logged by: D. Amurane

3. Berm Design Specifications


Berm Crest Elevation (mRL) 58 Planned Phreatic Gradient N/A
Berm Crest Width (m) 7.0 Gradient of Flanks 1:2
Planned Water Level on Inside (mRL) N/A Material Type Sand
Berm Length (m) 561 Reinforcement required? No
Berm Area at Crest (m2) 4,025 Method of Construction Mechanical
Volume of Material (m3) 17,534 Construction time (days) 2
Required by 7-May-2022

BERM CLASSIFICATION
Failure
Element at Risk Magnitude of Consequence
Classification

Population at Risk 0 -1 Low

Potential Loss of Life None expected Low

Minimal short-term loss or deterioration of habitat or rare and endangered species


Environment Low

Minimal effects and disruption of business and livelihoods. No measurable effect on


Health, Social and Cultural human health. No disruption of heritage, recreation, community or cultural assets Low

Low economic losses: area contains limited infrastructure or services. <US$1M.


Infrastructure and Economics Low

Overall Classificaion Low

Colour Code Layout and Section

Extreme Extreme
Very High Very High
High High
Significant Significant
Low Low

SIGN-OFF

NAME POSITION SIGNATURE DATE

General Manager
Operations Manager
Mining Technical Manager
Shore Services Manager
Mining Manager
Geotechnical Consultant (Davies Lyyn & Partners (Pty) Ltd)
Geotechnical Consultant (SLR Consulting (Africa) (Pty) Ltd)
Mario Mafuca Production Superintendent 23/04/2022

Mine Planning Superintendent 23-04-22


Shore Services Superintendent 23/04/2022
Concentrator plant Superintendent
Dionisio Amurane Hydro-Geotechnical Specialist 22/04/2022