4.0 Material Traceability Flow Chart

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 1

Doc. No.

: FC/QA/01
Material Traceability Flow chart
Rev. No. & Date: 00 & 05.04.2018

Prepared: Approved:

Raw Material
Incoming
identification Tag

(RM Accepted ) (RM rejeted)

Raw Material Raw Material


Accepted Tag Rejected Tag

FIFO Tag for FIFO Tag for Raw FIFO Tag for
Raw Material - Material -SECOND Raw Material -
FIRST ISSUE ISSUE THIRD ISSUE

(Accepted) (Rework)
Route card Tag followed
for Forging,CNC,
Outsourcing(route card
will return from supplier
(Rejected) with operation details
filled)
(Hold)

(Rework Possible) Rework Tag used


Rejection Tag for (Rejected) Hold Tag to hold
in Rework part
identification of suspected material
with Reason for
Rejected product to take decision
Rework

(Rework Accepted)

Accepted Tag used


in packed products
for Dispatch
(Batch coding
system)

Note: Heat No. is followed in all Tag for Lot Traceability

You might also like