TO GENERAL MANAGER Quotation No :

Attn.
Date : 25.09.2023 R0

PROPOSED BOQ FOR THE CONSTRUCTION OF ADDITIONAL SUPPORTS TO EXISTING RETAINING WALLS AT
STREAMWOOD GARDENS ESTATE, LUGBE, ABUJA

S/NO DESCRIPTION QTY UNIT RATE AMOUNT

CIVIL WORKS

SITE PREPARATION

Digging up and removing rubbles, rubbish,


debris, grub up and clear away all vegetable
A matter, hedges, shrubs and trees , bush, etc
and roughly level and prepare surface for
works, not exceeding 150mtrs length
(provisional) 1200 m2 0.00 -

To Colletion 0.00

EXCAVATION, LEVELLING AND COMPACTION,


FILLING ETC

D20: EXCAVATING AND FILLING (INCLUSIVE


OF WORKING SPACE)

Excavate for Column Plinth, Depth not


A exceeding 2mtrs 336 m3 0.00 -

Excavate for Inclined Beam, Width not


B exceeding 1mtrs 101 m3 0.00 -

Deposition of temporary Soil heaps on site as


C designated by estate management 437 m3 0.00 -

Backfilling of Concreted Trenches with


Excavated materials heaped on site, Placed
in Layers not exceeding 200mm thickness,
D compacted Adequately 387 m3 0.00 -
LEVELLING AND COMPACTION

Level and Compact bottom of excavation


with Sharp sand
E Column Plinth Excavation 168 m2 0.00 -

F Inclined Beam Excavation 181 m2 0.00 -

To Colletion 0.00

CONCRETE WORKS

IN - SITU CONCRETE

E10: MIXING/CASTING/CURING/IN-SITU
CONCRETE

Reinforced in-situ concrete; B.S.5328,


designed mix C30, 20 aggregate, minimum
cement content 330 kg/m3; vibrated

A Column footing, not exceeding 200 thick 24 m3 0.00 -

Upstand supprot column, (0.3X0.45), Height


B not exceeding 1000mm 6 m3 0.00 -

C Inclined Beam, Not exceeding 230mm depth 10 m3 0.00 -

Retainingwall makeup level, Not Exceeding


D 120m considered 11 m3 0.00 -

BLINDING

Plain In-Situ concrete, C10, 20mm Aggregate,


Poured against excavated earth surface

E Compacted Base Portion 6 m3 0.00 -

F Compacted Inclined Beam portion 4 m3 0.00 -

To Colletion 0.00

FORMWORKS

E20: FORMWORK FOR IN-SITU CONCRETE


Sawn treated and fairfaced smooth finish

A To sides of Blinding 687 L.M 0.00 -

B To sides of Column Plinth 63 m2 0.00 -

C To sides of Upstand Column 63 m2 0.00 -

D To Sides of Inclined Beams 83 m2 0.00 -

E To sides of Retaining wall makeup Beam 60 m2 0.00 -

To Colletion 0.00

REINFORCEMENT WORKS

E30: REINFORCEMENT FOR IN-SITU


CONCRETE

Reinforcement bars to B.S.4449 (2005), hot


rolled deformed high yield steel bars grade
460/500 yield strength not less than
460/500 N/mm2

Straight / bent bars in Plinth, Columns, and


Beams

A 12mm diameter Main bars 7 Ton 0.00 -

B 10mm Diameter links 2 Ton 0.00 -

To Colletion 0.00

SUMMARY

1 Site Preparation 0.00

2 Excavation, Levelling and Compaction 0.00

3 Concrete Works 0.00

4 Formworks 0.00

5 Reinforcement Works 0.00


COLLECTIONS CARRIED TO SUMMARY 0