DAILY PROGRESS REPORT ‐ E & I ‐ INSTRUMENT CALIBRATION

GS/
PROJECT# COKER (CB/CPC/2058)
SUBCON
GULF SPIC / Vendor DATE 9‐Oct‐23

S.N UNIT/AREA TAG NO. EQUIPMENT DESCRIPTION

1 UNIT-20, TRAIN-1 20-FT-104 Flow Transmitter

2 UNIT-20, TRAIN-1 20-FT-105 Flow Transmitter

3 UNIT-20, TRAIN-1 20-FT-109 Flow Transmitter

4 UNIT-20, TRAIN-1 20-FT-113 Flow Transmitter

5 UNIT-20, TRAIN-1 20-FT-115 Flow Transmitter

6 UNIT-20, TRAIN-1 20-FT-150 Flow Transmitter

7 UNIT-20, TRAIN-1 20-FT-161 Flow Transmitter

8 UNIT-20, TRAIN-1 20-FT-167 Flow Transmitter

9 UNIT-20, TRAIN-1 20-FT-168 Flow Transmitter

10 UNIT-20, TRAIN-1 20-FT-169 Flow Transmitter

11 UNIT-20, TRAIN-1 20-FT-170 Flow Transmitter

12 UNIT-20, TRAIN-1 20-FT-172 Flow Transmitter

13 UNIT-20, TRAIN-1 20-FT-185 Flow Transmitter

14 UNIT-20, TRAIN-1 20-FT-189 Flow Transmitter

15 UNIT-20, TRAIN-1 20-FT-302 Flow Transmitter

PREPARED BY CHECKED BY

SIGN SIGN

DATE 9‐Oct‐23 DATE 9‐Oct‐23

NAME Sivasankaran K NAME Biju Koshy

Original- Site E
Copy-TS/QC by mail GS Technical Services GS-LF-EI-03 Rev-0