PUNCH LISTas Per Adiitional Works
PUNCH LISTas Per Adiitional Works
PUNCH LIST
NO. BEFORE AFTER
4.0 Paint Panel board same color as wall ADDITIONAL WORKS(after Occupancy Inspection)
5.0 Install additional stand pipe for washer drain ADDITIONAL WORKS(after Occupancy Inspection)
6.0 Install weather proof 2-units outlet ADDITIONAL WORKS(after Occupancy Inspection)
7.0 Solution to prevent rainwater from puddling on stairways landing ADDITIONAL WORKS(after Occupancy Inspection)
8.0 Add exterior man gate handle & stopper ADDITIONAL WORKS(after Occupancy Inspection)